BQ Work Experience

6
START COMPLETED PROJECT PROJECT 6600023950 Khafji NGL Pipelines Khafji/Safaniyah 2/3/2010 2/1/2013 Construction & Installation of facilities including 4” Ø Khafji, Safaniyah NGL-1 (KFSNGL-1) HPT PROJECT NO. FX11-1431 Hitachi Water Injection Pump Project Harradh Apr. 16, 2012 Nov. 14, 2012 Installation of Hitachi Water Injection Pump in Saudi Aramco-GOSP- 2 6600021297 Pipeline Rehabilitation Phase VI Abqaiq/Dhahran/Ras Tanura/Jubail/ Khursaniyah 20 Oct. 2008 19-Jul-12 Rehabilitation of existing pipeline QA-4, QRT-6, SK-4, KRT-4 Pipeline size 40", 42" 46" & 48" 6600026645 Onshore Maintain Potential Project, Tie-In of PWI Wells 514, 649, 662 & 664 Juaymah/ Qatif Jul. 27, 2011 Mar. 1, 2012 Process Mechanical/Piping, Electrical, Instrumentation & Civil/Structural Works for Qatif 514, 649, 662 & 664 BI/JO: 10- 03008- 9147/8184 Onshore Maintain Potential Project, Lakos De-Sander Qatif 06 Dec. 2010 26-May-11 Tie-In Qatif 656 @ W-09 & Installation of Lakos Desander @ W-50 W10/Bin Quraya Power Plant 10 Riyadh 24-Jul-10 27 Dec. 2010 Construction of Fuel Oil Pipelines 6600012729 Khuff Gas Project Uthmaniyah/Hawiyah/S hedgum/Abqaiq 26 Mar. 2005 25 Mar. 2010 Construction of Well Heads, Flowlines & Trunklines for Khuff Gas 6600019231 Ras As Zawr Sales Gas Pipeline Abu Hadriyah / Khursaniyah 03 Nov. 2007 30 Sept. 2010 Lump Sum Turnkey Project for the Construction of Gas Pipeline for Ma'aden 08-1185-PA- 211 EPC Contract for Gas Pipeline OGI at Raz As Zawr Abu Hadriyah 04 Jan. 2009 07 Nov. 2009 Construction of 24" dia Gas Pipeline for MPL Phosphate Co. (Ma'aden) 706/2007 Natural Gas Distribution System for Dammam 2 nd Industrial City (DIC-2) Dammam 9-Jan-07 28-Feb-09 Installation OF Natural Gas Distribution System Pipeline, 36 Units of Metering Skids for Dammam 2 nd Industrial City. 41.01/032-2005 Yamama Crude Oil Storage Tank Riyadh 7-Jul-06 30-Jun-07 Provide a detail design package to upgrade the existing YSCC Crude Oil Storage System. CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK Bin Qurayah Construction Work Experience Page 1 of 5

description

 

Transcript of BQ Work Experience

Page 1: BQ Work Experience

START COMPLETEDPROJECT PROJECT

6600023950 Khafji NGL Pipelines Khafji/Safaniyah 2/3/2010 2/1/2013Construction & Installation of facilities including 4” Ø Khafji,

Safaniyah NGL-1 (KFSNGL-1)

HPT PROJECT

NO. FX11-1431Hitachi Water Injection Pump Project Harradh

Apr. 16,

2012Nov. 14, 2012

Installation of Hitachi Water Injection Pump in Saudi Aramco-GOSP-

2

6600021297 Pipeline Rehabilitation Phase VI

Abqaiq/Dhahran/Ras

Tanura/Jubail/

Khursaniyah

20 Oct. 2008 19-Jul-12Rehabilitation of existing pipeline QA-4, QRT-6, SK-4, KRT-4 Pipeline

size 40", 42" 46" & 48"

6600026645Onshore Maintain Potential Project,

Tie-In of PWI Wells 514, 649, 662 & 664Juaymah/ Qatif Jul. 27, 2011 Mar. 1, 2012

Process Mechanical/Piping, Electrical, Instrumentation &

Civil/Structural Works for Qatif 514, 649, 662 & 664

BI/JO: 10-

03008-

9147/8184

Onshore Maintain Potential Project,

Lakos De-SanderQatif

06 Dec.

201026-May-11 Tie-In Qatif 656 @ W-09 & Installation of Lakos Desander @ W-50

W10/Bin

QurayaPower Plant 10 Riyadh 24-Jul-10 27 Dec. 2010 Construction of Fuel Oil Pipelines

6600012729 Khuff Gas ProjectUthmaniyah/Hawiyah/S

hedgum/Abqaiq26 Mar. 2005 25 Mar. 2010 Construction of Well Heads, Flowlines & Trunklines for Khuff Gas

6600019231 Ras As Zawr Sales Gas PipelineAbu Hadriyah /

Khursaniyah

03 Nov.

200730 Sept. 2010

Lump Sum Turnkey Project for the Construction of Gas Pipeline for

Ma'aden

08-1185-PA-

211

EPC Contract for Gas Pipeline OGI

at Raz As ZawrAbu Hadriyah 04 Jan. 2009 07 Nov. 2009

Construction of 24" dia Gas Pipeline for MPL Phosphate Co.

(Ma'aden)

706/2007Natural Gas Distribution System for

Dammam 2nd

Industrial City (DIC-2)Dammam 9-Jan-07 28-Feb-09

Installation OF Natural Gas Distribution System Pipeline, 36 Units of

Metering Skids for Dammam 2nd

Industrial City.

41.01/032-2005 Yamama Crude Oil Storage Tank Riyadh 7-Jul-06 30-Jun-07Provide a detail design package to upgrade the existing YSCC

Crude Oil Storage System.

CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK

Bin Qurayah Construction Work Experience

Page 1 of 5

Page 2: BQ Work Experience

START COMPLETEDPROJECT PROJECT

CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK

Bin Qurayah Construction Work Experience

BI-21-00014 Al Tuwarqi Fuel Gas Line Dammam 1-Feb-06 30-Jun-07Construction of 16" dia X 18 km Fuel Gas Line, Metering Station of

SCADA System for Al Tuwarqi.

6600015067 Pipeline Rehabilitation Phase - IV

( QRT-6/QRT-8 Offshore Pipeline )QATIF 13 Dec. 05 28 April. 07

Rehabilitation/Replacement of 3 km. 40" dia. Pipeline offshore at

QRT-6 / QRT-8 Offshore pipeline.

6600012201 SHIP SLOP OIL RECEPTION OIL

FACILITY AT YANBU COTYANBU 05-Jan.-05 28 Aug. 06

Installation of 10" internally cement lined coated pipe along the

trestle area at loading berths in Yanbu COT ( OFFSHORE PROJECT)

66000008420TIE-IN BERRI 336/337 TO BERRI GOSP-4

AND BERRI 259 TO BERRI-815ABU ALI 12-Jan-00 31-Mar-04

Installation of Wellhead Piping and Flowline, const. 10" Trunkline

header positive seal coupling, including 4" (cement lined) disposal

line and 8" (cement lined) Water Injection Line, cathodic

protection and varoius electrical and instrumentation works

66000006552

TIE-IN UTMN-1520 & 1537 F/L's TO

UTMN GOSP-12 AND UTMN 1328

LATERAL (PWI) TO WIP-4

UTHMANIYAH 18-Mar-03 17-Jul-03Installation of Wellhead Piping and Flowline, const. drain pit appr. 8

KM including Water Injection Line and cathodic protection.

66000006481TIE-IN OF UTMN-1516 F/L, TR/L, TST/L

TO UTMN GOSP-11UTHMANIYAH 4-Mar-03 31-Oct-03

Installation of Wellhead Piping and Flowline, const. Of drain pit

appr. 18 KM including Manifol and production Header Jumpover,

Test Line and Trunkline and cathodic protection

BI. 2031

FUEL GAS PIPELINE AND GAS

METERING STATION FOR YAMAMA

CEMENT FACTORY

RIYADH 22-Aug-01 3-Sep-02

Installation of 18.5 KM of 20" dia. Fuel Gas Line and Gas metering

station, control room and associated piping, instrumentation,

electrical and civil works.

3000005198Construction of additional Fuel Gas

Line Abqaiq PlantABQAIQ 22-Apr-02 30-Jun-03

Installation of 12" dia RTR pipe & 10" dia off-plot and in-plant piping

for Abqaiq Plant and associated electrical,civil, instrumentation &

mechanical works.

600044719Pipeline Laterals & Crossover

Daylighting - UTMNUTHMANIYAH 25-Mar-02 30-Jun-03

Installation of 20",24",28",30" & 40" above ground piping that

includes hot tapping & stopple.

Page 2 of 5

Page 3: BQ Work Experience

START COMPLETEDPROJECT PROJECT

CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK

Bin Qurayah Construction Work Experience

44617/00SALES GAS, RIYADH REFINERY YIELD

IMPROVEWMENT PROGRAMRIYADH 21-Aug-01 30-Jun-03

Installation of 9 KM 16" Gas Line to Riyadh Refinery (On-Plot & Off-

Plot) and associated RTR piping, electrical, instrumentation, and

civil works.

44620/00TIE-IN 1454, 1455, 1492 & 1493 F/L's TO

UTMN GOSPS # 10 & 11UTHMANIYAH 6-Jun-01 10-Nov-01 Installation 16" dia. TR/L, 8" dia. TST/L & 8" dia. F/L

44619/00

TIE-IN HWYH 396,399 F/L's TO HWYH

GOSP #3 & HARDH 250 F/L TO HWYH

GOSP # 4

HAWIYAH 22-Apr-01 21-Sep-01 Installation of 16" dia. TR/L, 10" dia. TST/L & 8" dia.F/L.

44468/00TIE-IN UTMN-1300,1304, 1306, 1307

F/L's TO UTMN GOSP-13UTHMANIYAH 18-Apr-00 10-Dec-00 Installation of 8" dia. F/L's & Well Head.

44469/00

TIE-IN UTMN-1462 F/L TO UTMN GOSP-

12 AND UTMN - 1468 F/L TO UTMN

GOSP-11

UTHMANIYAH 18-Apr-00 25-Aug-00 Installation of 8" dia. F/L's & Well Head.

44470/00

TIE-IN HWYH-343,344, 345, 346, 347,

348 & 12" DIA. TR/L HWYH-3, 346, 347

TO HWYH GOSP-2

HAWIYAH 19-Apr-00 30-Oct-00 Installation of 8" dia. F/L's & 12" dia. TR/L, Manifold and Well Head.

47252/00

TIE-IN EIGHT (8") OIL F/LS &

INSTALLATION OF TWO TEST SKIT

FACILITIES AT SHAYBAH FIELDS.

SHAYBAH 15-Aug-99 31-Jul-00Installation of F/L's, Trunk Line & Test Skids at Shaybah Filed, Sabkah-

17, 38 & 92.

44425/00TIE-IN UTMN-1281, 1282, 1285, 1288 &

1291 F/Ls TO UTMN GOSP-4UTHMANIYAH 2-Jan-00 31-Aug-00

Installation of 8" dia. F/L's & 16" dia TR/L's & J/O & Well Head to

UTMN Gosp-4.

44443/00TIE-IN UTMN-1284, 1286, 1287 & 1289

F/LS AND T/L TO UTMN GOSP-4UTHMANIYAH 25-Jan-00 24-May-00

Installation of 8" dia. F/L's & 16" dia. TR/L's & J/O, Well Head to

UTMN Gosp-4.

44416/00Tie-in UTMN-1447 & 1448 F/L's to U-

Gosp # 12Uthmaniyah 29-Dec-99 8-Jun-00

Installation of 5 KM of 16" dia. Trunkline and 3 KM of 8" dia. U/G

Pipelines.

47250/00Tie-in HWYH-276,277,278 & 279 F/L'S

to HWYH Gosp-3ABQ. 17-Aug-99 20-Nov-99 Installation of 8" dia F/L's & Well Head Piping

Page 3 of 5

Page 4: BQ Work Experience

START COMPLETEDPROJECT PROJECT

CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK

Bin Qurayah Construction Work Experience

47232/00

Tie-in UTMN F/LS 1241, 1269 & 1270

and J/O 1255 & J.O. 310/324 to

UTMN

ABQ. 19-Jun-99 11-Oct-99 Installation of 3.5 KM of 8" underground pipelines.

47223/00Tie-in ABQ F/LS 411, 419, 421 & 422 to

ABQ GOSP-3ABQ. 17-May-99 14-Aug-99 Installation of 1.5 KM of 8" underground pipelines.

47169/00Tie-in HRDH 328 & 332 (DW) to HRDH

East HeaderUdhaliyah 16-Feb-99 2-May-99 Installation of 10" dia Well Head & Flow line

47176/00Tie-in HRDH-162 & 163 to HRDH Gosp-

1Haradh 9-Jan-99 9-Apr-99 Installation of 8" dia F/L's & Well Head piping

47175/00 Tie-in ANDR-458 to ANDR Gosp-6 Aindar 15-Dec-98 14-Apr-99Installation of 10" dia F/L Well Head & Test line & 16" dia Trunk line &

J.O.

47122/00Tie-in HRDH-158,159 & 160 F/L's, 10"

TST/L & 16" T/L to HRDH Gosp-1HARADH 13-Jul-98 8-Feb-99 Installation of 10" T/L, 10" TST/L & 8" F/L's 186 KL.

47127/00Tie-in UTMN-1248 & 1251 F/L's to

UTMN Gosp-4Udhaliyah 12-Jul-98 16-Feb-99 Install 605KL of 10" flowline

47098/00Tie-in HWYH-268,269,270 & 271 P/L'S

to HWYH Gosp-3Hawiyah 12-May-98 20-Oct-98 Installation of 8" dia wellhead and underground flow line 3.0kl.

29547/00U-WIPS-5, South Header and Lateral

ReplacementU-Wips-5 Uthmaniyah 12-Apr-88 15-Apr-89

Replace existing 24",20",18",16' and 12" dia header to a new

internally and externally FBE coated pipe. Replace 10",8" and 6"

diameter lateral using positive seal coupling. The work also include

site preparation,construction of foundation and anchors and

47082/00Tie-in ANDR-444 &SDGM-383 TO

SDGM WIP-3WShedgum 23-Apr-98 12-Jul-98 Construction of 8" dia wellhead flowline & 10" dia test line 4.5kl.

40552/014Replacement of 36" dia Pipeline at

Abqaiq PlantsAbqaiq Plant 17-Mar-98 17-Oct-98 Replace 36" & 24" dia piping at Abqaiq Tank Farm.

47081/00Tie-in ANDR-447 & 448 to ANDR Gosp-

6 and ANDR-455 to ANDR Gosp-4Aindar 17-Mar-98 26-Jul-98 Construct 8"dia wellhead and flowline,6.0KL

Page 4 of 5

Page 5: BQ Work Experience

START COMPLETEDPROJECT PROJECT

CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK

Bin Qurayah Construction Work Experience

47059/00Tie-in HWYH-266 & 267 to HWYH Gosp-

3 & HWYH-249 to HWYH Gosp-2Hawiyah 17-Jan-98 17-Apr-98 Construct 8"dia Wellhead and Underground Flowline 3.2 KL.

47024/00Tie-in 33kv Laterals at Wellsites

Transformer HWTH-139,141,143 & 144Hawtah 17-Sep-97 31-May-98

Installation of 33kv overhead transmission line and other associated

electrical and instrumentation works.

47093/00

Tie-in HWYH-245,246,248 Flowlines

HWYH-246 10"dia Test Line and HWYH-

111 Jumpover to HWYH-Gosp-2

Hawiyah 31-Mar-98 1-Nov-98Miscelleneous civil,electrical, mech., piping & instrumentation

works.

47010/00

Tie-in HWYH-264 & 265 to HWYH Gosp-

3 and HWYH-298 & 299 to HWYH

Gosp-4

Hawiyah 20-Aug-97 9-Jan-98Construct 8"dia Wellhead and Aboveground Underground Flowline

5.7KL.

47002/00

Tie-in UTMN-993,1238 and 1239 to

UTMN Gosp-13 and UTMN-1184 &

1188 to UTMN Gosp-9

Uthmaniyah 15-Jul-97 12-Nov-97 Construction of 8" x 10"dia Wellhead and Flowlines 5.0 KL.

44146/00

Tie-in UTMN-1218 & 1219 to U-Gosp-

13 and UTMN-1029 & 1226 to U-Gosp-

4

Uthmaniyah 18-Mar-97 10-Jul-97 Installation of 8" & 10" dia Wellhead and Flowlines 3.2 KL.

45999/00Refinery Water Disposal to Wells RSTR-

602 and 603 Ras TanuraRas Tanura 8-Mar-97 13-Dec-97

Installation of 10" Cement lined Wellhead & lateral and 12"dia

Header to Ras Tanura Refinery 2.0KL.

44078/00Tie-in HRDH-128,149 & 150 F/L'S to

Haradh Gosp-1Haradh 11-Jan-97 11-Apr-97

Installation of 8" dia Wellhead & Flowline and 10" dia Trunkline to

Haradh Gosp-1 6.5KL

44019/00Tie-in ANDR-422,423 & 424 Wells to

ANDR WIP-1Aindar 27-Nov-96 15-Apr-97

Installation of 10" internally coated wellhead and lateral for water

injection line.

45715/00Khuff Condensate to RT-Refinery Off-

Plot Work Pipeline and Dead Legs.

Ras Tanura, Qatif, ABQ.,

Aidar & Shedgum13-Apr-96 30-Oct-96

Relocation of scrape trap, Installation of drop- out spools, dead

legs removal on jumpover spools of 30 & 24 16" & 12"dia pipe and

associated civil & instrumentation work.

45743/00Tie-in UTMN-28 and 1157 to UTMN WIP-

4SUthmaniyah 12-Mar-96 3-Nov-96

Installation of 8" & 10"dia wellhead and lateral for water injection

4.0kl.Page 5 of 5

Page 6: BQ Work Experience

START COMPLETEDPROJECT PROJECT

CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK

Bin Qurayah Construction Work Experience

45564/00

Constructions of Flowline

1137,1138,1139 & 1140 and 20"

Trunkline & 10" Test Line to U-Gosp-12

Uthmaniyah 27-Aug-95 25-Feb-96Construction and installation of 6.5km of 20" trunkline,4.5km of

10"dia test line and 4.0kl 8"dia well head and flowlines.

45181/00

Re-route and Construct New

Flowline to the South Corridor of the

New Header Gosp-1

Haradh 22-Mar-95 4-May-96Installation of 23km of 16" dia, 5km of 20" underground trunkline and

instillation of 20kl 8" & 10" flowlines.

37984/00 UTMN-202 to SWD of U-Gosp-11 Uthmaniyah 28-Sep-94 10-Feb-95Installation of 12" dia underground water disposal internally coated

pipe(3.0kl) and 10" dia water disposal flowline.

37862/00Install Shipping,Pumps, Valves and

Lines for Aindar Gosp-1,4 & 6Aindar 26-Jun-94 6-Jun-95

Installation of Three 150 H.P. horizontal shipping pumps, PLC, UPS,

Modification of In-plant piping, 12" RTR oil/water pipelines and

associated electrical and instrumentation works.

38511/00Maitenance of Under Ground Utilities-

DhahranDhahran 1-Jun-94 31-May-99

Maintenance of drinking water, raw water, miscellaneous RTR

pipelines 4"-12" dia), AC, sewer,telephone and electrical line.

47025/00Miscellaneous Works for Nuayyim to

Hawtah ProjectsHawtah 13-Sep-97 31-Jan-98

Installation of 20" inlet line to HWTH FCC, upgrade RTR fire water

pipelines & test skids at Nuayyim fields.

- Hofuf Cement,4th Extension Project Hofuf 1-Mar-94 10-Sep-96

The work includes installation of piping structural and electrical

works for mixed beds,silos, cement mill, ball mill, conveyors, kiln,

covered reclaimer etc.

60006/00 Sub-

Con.#

6950001-M

In-Plant Piping at Plant 423

Uthmaniyah Water Supply System.

Uthmaniyah, Qurrayah

& Hufuf11-Oct-92 23-Oct-93

Installation of internally coated heavy wall pipe at Qurraya

seawater plant,UTH. Water supply system & UTMN WIP-4

60"dia,56"dia 38"dia,36"dia,42"dia,24"dia & 18" dia total piping of 3kl.

(Note: More Projects with Saudi Aramco were Completed Since 1975 to 1985)

Page 6 of 5