START COMPLETEDPROJECT PROJECT
6600023950 Khafji NGL Pipelines Khafji/Safaniyah 2/3/2010 2/1/2013Construction & Installation of facilities including 4” Ø Khafji,
Safaniyah NGL-1 (KFSNGL-1)
HPT PROJECT
NO. FX11-1431Hitachi Water Injection Pump Project Harradh
Apr. 16,
2012Nov. 14, 2012
Installation of Hitachi Water Injection Pump in Saudi Aramco-GOSP-
2
6600021297 Pipeline Rehabilitation Phase VI
Abqaiq/Dhahran/Ras
Tanura/Jubail/
Khursaniyah
20 Oct. 2008 19-Jul-12Rehabilitation of existing pipeline QA-4, QRT-6, SK-4, KRT-4 Pipeline
size 40", 42" 46" & 48"
6600026645Onshore Maintain Potential Project,
Tie-In of PWI Wells 514, 649, 662 & 664Juaymah/ Qatif Jul. 27, 2011 Mar. 1, 2012
Process Mechanical/Piping, Electrical, Instrumentation &
Civil/Structural Works for Qatif 514, 649, 662 & 664
BI/JO: 10-
03008-
9147/8184
Onshore Maintain Potential Project,
Lakos De-SanderQatif
06 Dec.
201026-May-11 Tie-In Qatif 656 @ W-09 & Installation of Lakos Desander @ W-50
W10/Bin
QurayaPower Plant 10 Riyadh 24-Jul-10 27 Dec. 2010 Construction of Fuel Oil Pipelines
6600012729 Khuff Gas ProjectUthmaniyah/Hawiyah/S
hedgum/Abqaiq26 Mar. 2005 25 Mar. 2010 Construction of Well Heads, Flowlines & Trunklines for Khuff Gas
6600019231 Ras As Zawr Sales Gas PipelineAbu Hadriyah /
Khursaniyah
03 Nov.
200730 Sept. 2010
Lump Sum Turnkey Project for the Construction of Gas Pipeline for
Ma'aden
08-1185-PA-
211
EPC Contract for Gas Pipeline OGI
at Raz As ZawrAbu Hadriyah 04 Jan. 2009 07 Nov. 2009
Construction of 24" dia Gas Pipeline for MPL Phosphate Co.
(Ma'aden)
706/2007Natural Gas Distribution System for
Dammam 2nd
Industrial City (DIC-2)Dammam 9-Jan-07 28-Feb-09
Installation OF Natural Gas Distribution System Pipeline, 36 Units of
Metering Skids for Dammam 2nd
Industrial City.
41.01/032-2005 Yamama Crude Oil Storage Tank Riyadh 7-Jul-06 30-Jun-07Provide a detail design package to upgrade the existing YSCC
Crude Oil Storage System.
CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK
Bin Qurayah Construction Work Experience
Page 1 of 5
![Page 2: BQ Work Experience](https://reader035.fdocuments.us/reader035/viewer/2022081211/568c33921a28ab02358d379f/html5/thumbnails/2.jpg)
START COMPLETEDPROJECT PROJECT
CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK
Bin Qurayah Construction Work Experience
BI-21-00014 Al Tuwarqi Fuel Gas Line Dammam 1-Feb-06 30-Jun-07Construction of 16" dia X 18 km Fuel Gas Line, Metering Station of
SCADA System for Al Tuwarqi.
6600015067 Pipeline Rehabilitation Phase - IV
( QRT-6/QRT-8 Offshore Pipeline )QATIF 13 Dec. 05 28 April. 07
Rehabilitation/Replacement of 3 km. 40" dia. Pipeline offshore at
QRT-6 / QRT-8 Offshore pipeline.
6600012201 SHIP SLOP OIL RECEPTION OIL
FACILITY AT YANBU COTYANBU 05-Jan.-05 28 Aug. 06
Installation of 10" internally cement lined coated pipe along the
trestle area at loading berths in Yanbu COT ( OFFSHORE PROJECT)
66000008420TIE-IN BERRI 336/337 TO BERRI GOSP-4
AND BERRI 259 TO BERRI-815ABU ALI 12-Jan-00 31-Mar-04
Installation of Wellhead Piping and Flowline, const. 10" Trunkline
header positive seal coupling, including 4" (cement lined) disposal
line and 8" (cement lined) Water Injection Line, cathodic
protection and varoius electrical and instrumentation works
66000006552
TIE-IN UTMN-1520 & 1537 F/L's TO
UTMN GOSP-12 AND UTMN 1328
LATERAL (PWI) TO WIP-4
UTHMANIYAH 18-Mar-03 17-Jul-03Installation of Wellhead Piping and Flowline, const. drain pit appr. 8
KM including Water Injection Line and cathodic protection.
66000006481TIE-IN OF UTMN-1516 F/L, TR/L, TST/L
TO UTMN GOSP-11UTHMANIYAH 4-Mar-03 31-Oct-03
Installation of Wellhead Piping and Flowline, const. Of drain pit
appr. 18 KM including Manifol and production Header Jumpover,
Test Line and Trunkline and cathodic protection
BI. 2031
FUEL GAS PIPELINE AND GAS
METERING STATION FOR YAMAMA
CEMENT FACTORY
RIYADH 22-Aug-01 3-Sep-02
Installation of 18.5 KM of 20" dia. Fuel Gas Line and Gas metering
station, control room and associated piping, instrumentation,
electrical and civil works.
3000005198Construction of additional Fuel Gas
Line Abqaiq PlantABQAIQ 22-Apr-02 30-Jun-03
Installation of 12" dia RTR pipe & 10" dia off-plot and in-plant piping
for Abqaiq Plant and associated electrical,civil, instrumentation &
mechanical works.
600044719Pipeline Laterals & Crossover
Daylighting - UTMNUTHMANIYAH 25-Mar-02 30-Jun-03
Installation of 20",24",28",30" & 40" above ground piping that
includes hot tapping & stopple.
Page 2 of 5
![Page 3: BQ Work Experience](https://reader035.fdocuments.us/reader035/viewer/2022081211/568c33921a28ab02358d379f/html5/thumbnails/3.jpg)
START COMPLETEDPROJECT PROJECT
CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK
Bin Qurayah Construction Work Experience
44617/00SALES GAS, RIYADH REFINERY YIELD
IMPROVEWMENT PROGRAMRIYADH 21-Aug-01 30-Jun-03
Installation of 9 KM 16" Gas Line to Riyadh Refinery (On-Plot & Off-
Plot) and associated RTR piping, electrical, instrumentation, and
civil works.
44620/00TIE-IN 1454, 1455, 1492 & 1493 F/L's TO
UTMN GOSPS # 10 & 11UTHMANIYAH 6-Jun-01 10-Nov-01 Installation 16" dia. TR/L, 8" dia. TST/L & 8" dia. F/L
44619/00
TIE-IN HWYH 396,399 F/L's TO HWYH
GOSP #3 & HARDH 250 F/L TO HWYH
GOSP # 4
HAWIYAH 22-Apr-01 21-Sep-01 Installation of 16" dia. TR/L, 10" dia. TST/L & 8" dia.F/L.
44468/00TIE-IN UTMN-1300,1304, 1306, 1307
F/L's TO UTMN GOSP-13UTHMANIYAH 18-Apr-00 10-Dec-00 Installation of 8" dia. F/L's & Well Head.
44469/00
TIE-IN UTMN-1462 F/L TO UTMN GOSP-
12 AND UTMN - 1468 F/L TO UTMN
GOSP-11
UTHMANIYAH 18-Apr-00 25-Aug-00 Installation of 8" dia. F/L's & Well Head.
44470/00
TIE-IN HWYH-343,344, 345, 346, 347,
348 & 12" DIA. TR/L HWYH-3, 346, 347
TO HWYH GOSP-2
HAWIYAH 19-Apr-00 30-Oct-00 Installation of 8" dia. F/L's & 12" dia. TR/L, Manifold and Well Head.
47252/00
TIE-IN EIGHT (8") OIL F/LS &
INSTALLATION OF TWO TEST SKIT
FACILITIES AT SHAYBAH FIELDS.
SHAYBAH 15-Aug-99 31-Jul-00Installation of F/L's, Trunk Line & Test Skids at Shaybah Filed, Sabkah-
17, 38 & 92.
44425/00TIE-IN UTMN-1281, 1282, 1285, 1288 &
1291 F/Ls TO UTMN GOSP-4UTHMANIYAH 2-Jan-00 31-Aug-00
Installation of 8" dia. F/L's & 16" dia TR/L's & J/O & Well Head to
UTMN Gosp-4.
44443/00TIE-IN UTMN-1284, 1286, 1287 & 1289
F/LS AND T/L TO UTMN GOSP-4UTHMANIYAH 25-Jan-00 24-May-00
Installation of 8" dia. F/L's & 16" dia. TR/L's & J/O, Well Head to
UTMN Gosp-4.
44416/00Tie-in UTMN-1447 & 1448 F/L's to U-
Gosp # 12Uthmaniyah 29-Dec-99 8-Jun-00
Installation of 5 KM of 16" dia. Trunkline and 3 KM of 8" dia. U/G
Pipelines.
47250/00Tie-in HWYH-276,277,278 & 279 F/L'S
to HWYH Gosp-3ABQ. 17-Aug-99 20-Nov-99 Installation of 8" dia F/L's & Well Head Piping
Page 3 of 5
![Page 4: BQ Work Experience](https://reader035.fdocuments.us/reader035/viewer/2022081211/568c33921a28ab02358d379f/html5/thumbnails/4.jpg)
START COMPLETEDPROJECT PROJECT
CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK
Bin Qurayah Construction Work Experience
47232/00
Tie-in UTMN F/LS 1241, 1269 & 1270
and J/O 1255 & J.O. 310/324 to
UTMN
ABQ. 19-Jun-99 11-Oct-99 Installation of 3.5 KM of 8" underground pipelines.
47223/00Tie-in ABQ F/LS 411, 419, 421 & 422 to
ABQ GOSP-3ABQ. 17-May-99 14-Aug-99 Installation of 1.5 KM of 8" underground pipelines.
47169/00Tie-in HRDH 328 & 332 (DW) to HRDH
East HeaderUdhaliyah 16-Feb-99 2-May-99 Installation of 10" dia Well Head & Flow line
47176/00Tie-in HRDH-162 & 163 to HRDH Gosp-
1Haradh 9-Jan-99 9-Apr-99 Installation of 8" dia F/L's & Well Head piping
47175/00 Tie-in ANDR-458 to ANDR Gosp-6 Aindar 15-Dec-98 14-Apr-99Installation of 10" dia F/L Well Head & Test line & 16" dia Trunk line &
J.O.
47122/00Tie-in HRDH-158,159 & 160 F/L's, 10"
TST/L & 16" T/L to HRDH Gosp-1HARADH 13-Jul-98 8-Feb-99 Installation of 10" T/L, 10" TST/L & 8" F/L's 186 KL.
47127/00Tie-in UTMN-1248 & 1251 F/L's to
UTMN Gosp-4Udhaliyah 12-Jul-98 16-Feb-99 Install 605KL of 10" flowline
47098/00Tie-in HWYH-268,269,270 & 271 P/L'S
to HWYH Gosp-3Hawiyah 12-May-98 20-Oct-98 Installation of 8" dia wellhead and underground flow line 3.0kl.
29547/00U-WIPS-5, South Header and Lateral
ReplacementU-Wips-5 Uthmaniyah 12-Apr-88 15-Apr-89
Replace existing 24",20",18",16' and 12" dia header to a new
internally and externally FBE coated pipe. Replace 10",8" and 6"
diameter lateral using positive seal coupling. The work also include
site preparation,construction of foundation and anchors and
47082/00Tie-in ANDR-444 &SDGM-383 TO
SDGM WIP-3WShedgum 23-Apr-98 12-Jul-98 Construction of 8" dia wellhead flowline & 10" dia test line 4.5kl.
40552/014Replacement of 36" dia Pipeline at
Abqaiq PlantsAbqaiq Plant 17-Mar-98 17-Oct-98 Replace 36" & 24" dia piping at Abqaiq Tank Farm.
47081/00Tie-in ANDR-447 & 448 to ANDR Gosp-
6 and ANDR-455 to ANDR Gosp-4Aindar 17-Mar-98 26-Jul-98 Construct 8"dia wellhead and flowline,6.0KL
Page 4 of 5
![Page 5: BQ Work Experience](https://reader035.fdocuments.us/reader035/viewer/2022081211/568c33921a28ab02358d379f/html5/thumbnails/5.jpg)
START COMPLETEDPROJECT PROJECT
CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK
Bin Qurayah Construction Work Experience
47059/00Tie-in HWYH-266 & 267 to HWYH Gosp-
3 & HWYH-249 to HWYH Gosp-2Hawiyah 17-Jan-98 17-Apr-98 Construct 8"dia Wellhead and Underground Flowline 3.2 KL.
47024/00Tie-in 33kv Laterals at Wellsites
Transformer HWTH-139,141,143 & 144Hawtah 17-Sep-97 31-May-98
Installation of 33kv overhead transmission line and other associated
electrical and instrumentation works.
47093/00
Tie-in HWYH-245,246,248 Flowlines
HWYH-246 10"dia Test Line and HWYH-
111 Jumpover to HWYH-Gosp-2
Hawiyah 31-Mar-98 1-Nov-98Miscelleneous civil,electrical, mech., piping & instrumentation
works.
47010/00
Tie-in HWYH-264 & 265 to HWYH Gosp-
3 and HWYH-298 & 299 to HWYH
Gosp-4
Hawiyah 20-Aug-97 9-Jan-98Construct 8"dia Wellhead and Aboveground Underground Flowline
5.7KL.
47002/00
Tie-in UTMN-993,1238 and 1239 to
UTMN Gosp-13 and UTMN-1184 &
1188 to UTMN Gosp-9
Uthmaniyah 15-Jul-97 12-Nov-97 Construction of 8" x 10"dia Wellhead and Flowlines 5.0 KL.
44146/00
Tie-in UTMN-1218 & 1219 to U-Gosp-
13 and UTMN-1029 & 1226 to U-Gosp-
4
Uthmaniyah 18-Mar-97 10-Jul-97 Installation of 8" & 10" dia Wellhead and Flowlines 3.2 KL.
45999/00Refinery Water Disposal to Wells RSTR-
602 and 603 Ras TanuraRas Tanura 8-Mar-97 13-Dec-97
Installation of 10" Cement lined Wellhead & lateral and 12"dia
Header to Ras Tanura Refinery 2.0KL.
44078/00Tie-in HRDH-128,149 & 150 F/L'S to
Haradh Gosp-1Haradh 11-Jan-97 11-Apr-97
Installation of 8" dia Wellhead & Flowline and 10" dia Trunkline to
Haradh Gosp-1 6.5KL
44019/00Tie-in ANDR-422,423 & 424 Wells to
ANDR WIP-1Aindar 27-Nov-96 15-Apr-97
Installation of 10" internally coated wellhead and lateral for water
injection line.
45715/00Khuff Condensate to RT-Refinery Off-
Plot Work Pipeline and Dead Legs.
Ras Tanura, Qatif, ABQ.,
Aidar & Shedgum13-Apr-96 30-Oct-96
Relocation of scrape trap, Installation of drop- out spools, dead
legs removal on jumpover spools of 30 & 24 16" & 12"dia pipe and
associated civil & instrumentation work.
45743/00Tie-in UTMN-28 and 1157 to UTMN WIP-
4SUthmaniyah 12-Mar-96 3-Nov-96
Installation of 8" & 10"dia wellhead and lateral for water injection
4.0kl.Page 5 of 5
![Page 6: BQ Work Experience](https://reader035.fdocuments.us/reader035/viewer/2022081211/568c33921a28ab02358d379f/html5/thumbnails/6.jpg)
START COMPLETEDPROJECT PROJECT
CONTRACT # NAME OF PROJECT LOCATION SCOPE OF WORK
Bin Qurayah Construction Work Experience
45564/00
Constructions of Flowline
1137,1138,1139 & 1140 and 20"
Trunkline & 10" Test Line to U-Gosp-12
Uthmaniyah 27-Aug-95 25-Feb-96Construction and installation of 6.5km of 20" trunkline,4.5km of
10"dia test line and 4.0kl 8"dia well head and flowlines.
45181/00
Re-route and Construct New
Flowline to the South Corridor of the
New Header Gosp-1
Haradh 22-Mar-95 4-May-96Installation of 23km of 16" dia, 5km of 20" underground trunkline and
instillation of 20kl 8" & 10" flowlines.
37984/00 UTMN-202 to SWD of U-Gosp-11 Uthmaniyah 28-Sep-94 10-Feb-95Installation of 12" dia underground water disposal internally coated
pipe(3.0kl) and 10" dia water disposal flowline.
37862/00Install Shipping,Pumps, Valves and
Lines for Aindar Gosp-1,4 & 6Aindar 26-Jun-94 6-Jun-95
Installation of Three 150 H.P. horizontal shipping pumps, PLC, UPS,
Modification of In-plant piping, 12" RTR oil/water pipelines and
associated electrical and instrumentation works.
38511/00Maitenance of Under Ground Utilities-
DhahranDhahran 1-Jun-94 31-May-99
Maintenance of drinking water, raw water, miscellaneous RTR
pipelines 4"-12" dia), AC, sewer,telephone and electrical line.
47025/00Miscellaneous Works for Nuayyim to
Hawtah ProjectsHawtah 13-Sep-97 31-Jan-98
Installation of 20" inlet line to HWTH FCC, upgrade RTR fire water
pipelines & test skids at Nuayyim fields.
- Hofuf Cement,4th Extension Project Hofuf 1-Mar-94 10-Sep-96
The work includes installation of piping structural and electrical
works for mixed beds,silos, cement mill, ball mill, conveyors, kiln,
covered reclaimer etc.
60006/00 Sub-
Con.#
6950001-M
In-Plant Piping at Plant 423
Uthmaniyah Water Supply System.
Uthmaniyah, Qurrayah
& Hufuf11-Oct-92 23-Oct-93
Installation of internally coated heavy wall pipe at Qurraya
seawater plant,UTH. Water supply system & UTMN WIP-4
60"dia,56"dia 38"dia,36"dia,42"dia,24"dia & 18" dia total piping of 3kl.
(Note: More Projects with Saudi Aramco were Completed Since 1975 to 1985)