2020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd Page 1 of 10Cover
2020 Census 18. Nonresponse Followup Operation (NRFU) Version: 7.1
Revision Date: July 10, 2019
Facilitation & Analysis: Susan Alexander
Model Preparation: Rosalyn Thomas, Susan Alexander, Monique Edmonds
Subject Matter Experts: Dominic Beamer, Sarah Gibb, Ward Kay
Major Revision Change History
Date Page #’sDescription Author Version #
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
Table of Contents
Reading and Understanding the ModelLegend. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Business Process ModelContext Model . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
50 Perform NRFU Data Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 50.30 Perform Manager Visit . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 5 50.40 Enumerate Housing Unit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 50.50 Enumerate Housing Unit via Proxy Interview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 50.60 Perform NRFU Reinterview (RI) Data Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
50.70 Closeout Contact Attempt. . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 60 Adjudicate Reinterview Results. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
12/31/2014 Baseline 1.0 Marie Jones 1.0 All
04/24/2015 Baseline 2.0 Rosalyn Thomas 2.0 All
08/14/2015 Baseline 2.0 (Added QC) Rosalyn Thomas 3.0 3 & 7
12/17/2015 Removed Cov Reinterview and ref. to 2017 test Susan Alexander 4.0 All
06/20/2016 Updates per review of DOP Susan Alexander 4.1-4.3 All
06/29/2016 Updates per review of DOP Linda Song 4.4 All
09/21/2017 Updates [summary of multiple revisions] Susan Alexander 4.5-4.14 All
12/12/2018 Updates per IPT Monique Edmonds 5.0 All
01/29/2019 Updated to include “NFRU Adds” Monique Edmonds 5.1 3
02/13/2019 CR 7241 Monique Edmonds 5.1 3
03/01/2019 Context Model update per MITRE Review Monique Edmonds 6.1 4
04/26/2019 Updated to include SEI-QA Review updates Natia Samuels 6.2 4
05/30/2019 CR 13981 Natia Samuels 7.0 All
07/10/19 Summarized versions on cover, corrected 50.20 on Keith Harmon 7.1 1, 4-10 BPM 50 include "and Quality Control", Updated Annotation layer (used in DOP; not visible in baseline), Cosmetic: Updated several steps to fix Title Case
1010
Determine
Universe for
Mailing
10
Determine
Universe for
Mailing
2020
Identify
Respondents
20
Identify
Respondents
3030
Write Specs
for Mailout
30
Write Specs
for Mailout
Electronic?30.05
4040
Process
Postcards
40
Process
Postcards
5050
Prepare Paper
Surveys and
Envelopes for
50
Prepare Paper
Surveys and
Envelopes for
6060
Go Live with
Online Survey
60
Go Live with
Online Survey
7070
Label & Mail
all Survey-
Related
Information
70
Label & Mail
all Survey-
Related
Information
Follow-UpRequired?
70.05
8080
Update Status
Nightly
80
Update Status
Nightly
Yes
No
Yes
No
Final Universe
Mailout File
MailoutSpecs
9090
Conduct
Follow-Up
90
Conduct
Follow-Up
2020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd Page 2 of 10Legend
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
Reading and Understanding the ModelExample Activity Model
BPM Purpose
▪ Describe Census Operations business processes – activities, resources and key milestones
▪ Provide the details necessary for non-subject matter experts to understand the business process
▪ Contribute to the requirements development process
▪ Facilitate the linkage of business processes to IT capabilities
▪ Capture Operations inputs and outputs
Reading and Understanding the ModelExample Activity Model
BPM Purpose
▪ Describe Census Operations business processes – activities, resources and key milestones
▪ Provide the details necessary for non-subject matter experts to understand the business process
▪ Contribute to the requirements development process
▪ Facilitate the linkage of business processes to IT capabilities
▪ Capture Operations inputs and outputs
Start
Oct 31
End
Data Object – Output This
represents any out-going data
(e.g., files, data, etc.) from the
activity.
Activity – This represents
the atomic level of an
activity in the process
model.
Sequence Flow – This
represents the direction
of the process’ flow.
Data Object – Input This
represents any in-coming
data (e.g., files, data,
etc.) to the activity.
Gateway – Exclusive decision
gateway This represents that the
process must go one way or the
other but not both at once.
Intermediate Timed Event – This
represents an event that waits for the
specified timeframe to occur before
proceeding to the next activity.
Gateway – Parallel split gateway
This represents the start of
activities that happen in parallel.
Gateway – Parallel merge
gateway This represents the end of
activities that happen in parallel. All
incoming flows must complete
before triggering the outgoing flow.
Sub Process – This
represents a further
detailing process model.
The details about this
activity appear on
another page.
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
NRFU Operational Management and Data Collection
NRFU Operation Closeout
NRFU Planning and Preparation
1010Develop
NRFU AdRec
Processing
Requirements,
Contact
Strategies, and
Business Rules
10Develop
NRFU AdRec
Processing
Requirements,
Contact
Strategies, and
Business Rules
1212
Identify Areas for
Early NRFU
12
Identify Areas for
Early NRFU
1818
Prepare for and
Deliver NRFU-
Specific Training
18
Prepare for and
Deliver NRFU-
Specific Training
1414Develop
Requirements for
and Approve
Systems
Supporting NRFU
14Develop
Requirements for
and Approve
Systems
Supporting NRFU
1616Determine Staff
Needs and
Performance
Metrics
16Determine Staff
Needs and
Performance
Metrics
Business Rules & Contact
Strategies
Early NRFU Areas
8080
Closeout NRFU
Operation
80
Closeout NRFU
Operation
3030
Monitor
Progress and
Resolve Issues
30
Monitor
Progress and
Resolve Issues
Operation Closeout
Criteria Met?
Yes
4545
Create Work
Assignments (incl.
Grouped
Manager Visit Cases)
45
Create Work
Assignments (incl.
Grouped
Manager Visit Cases)3535
Receive
NRFU Universe and
Updates from RPO
35 Receive
NRFU Universe and
Updates from RPO
NRFU Universe/Workload Updates
No (Repeat Daily)
5050
Perform NRFU
Data Collection
50
Perform NRFU
Data Collection
Paradata to PM
Case Status/Response/
Address Data to RPO
6060
Adjudicate
Reinterview Results
60
Adjudicate
Reinterview Results
5555Receive Automated
Quality Control
Comparison Results
from RPO
55Receive Automated
Quality Control
Comparison Results
from RPO
QC Computer Match Anomaly?
Yes
RI Decision Outcome to
RPO
No
Case Status Data to RPO (e.g. Rework
Needed)
7070
Submit Time and
Expense Data
70
Submit Time and
Expense Data
1111Develop and
Approve Field
Printed Materials
and Kit Specs
11Develop and
Approve Field
Printed Materials
and Kit Specs
3838
Perform In-Office
Adds
38
Perform In-Office
Adds
Start
EndNRFUBegins
RI QC Has Begun
Includes:Early NRFUNRFU ProductionField VerificationRe-collectManager VisitsIn-field Adds
2020 Census 18. Nonresponse Followup Operation (NRFU) Purpose: To determine housing unit status for nonresponding addresses and to enumerate housing units for which a 2020 Census response was not received.
18-1
18-5
18-2 NRFU Operational Workload Management
18-2.1
18-4 NRFU Quality Control
Adjudication
18-3 NRFU Data Collection
18-3.7
18-4.1 18-4.2
18-2.2 Receive and Process NRFU Universe and Updates
Page 3 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsdContext Model
18-1.3
18-1.4
18-1.5
18-1.6
18-1.1
18-1.2
18-3.1 Receive Work Assignment 18-3.2 Perform Field Verification Data Collection 18-3.3 Perform NRFU Manager Visit 18-3.4 Perform NRFU Case Enumeration18-3.5 Perform NRFU Reinterview Data Collection18-3.6 Closeout Contact Attempt
18-2.2.318-2.2.2
18-2.2.1
18-5.1
50 Perform NRFU Data Collection Purpose: To collect responses from respondents. Case notes may be updated at any point.
50.1050.10
Receive Work
Assignment
50.10
Receive Work
Assignment
Is Individual Unit Eligible for
Enumeration?
No
Yes
Case Complete?
Proxy Available?
No
No
Yes
Paradata
Case Status/ Response/
AddressData
Determine Case Type
Early NRFUNRFU Prod
NRFU Rework
50.3050.30
Perform
NRFU Manager Visit
50.30
Perform
NRFU Manager Visit
FV Grouped Multiunit
50.4050.40
Enumerate Housing
Unit
50.40
Enumerate Housing
Unit
50.7050.70
Closeout
Contact Attempt
50.70
Closeout
Contact Attempt
Yes
No
Yes
50.2050.20Perform Field
Verification
Data Collection
and Quality
Control
50.20Perform Field
Verification
Data Collection
and Quality
Control
18-3.1 Receive Work Assignment
18-3.2 Perform Field Verification
Data Collection and Quality Control
18-3.3 Perform NRFU Manager Visit
18-3.4 Perform NRFU Case Enumeration
18-3.6 Closeout Contact Attempt
18-3 NRFU Data Collection (In Part)
Proxy Eligible?
50.6050.60Perform
NRFU Reinterview
Data Collection
50.60Perform
NRFU Reinterview
Data Collection
18-3.5 Perform NRFU Reinterview Data Collection
NRFU RI
50.5050.50Enumerate Housing
Unit via
Proxy Interview
50.50Enumerate Housing
Unit via
Proxy Interview
18-3.4.2
18-3.4.1
50.8050.80
Perform
Manager
Review Process
50.80
Perform
Manager
Review Process
Is Manager Review
Required?
No
Yes
Page 4 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd50 Perform NRFU Data Collection
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
Start Sub-process
End Sub-process
Verification Case
Status:
• Verified
• Delete
• Other
This
includes
any field-
adds
Unit should never be
grouped into one of the
combined multiunit cases
in the future
Unit is candidate for
continued grouping into
multiunit case for future
days’ assignments
50.30 Perform NRFU Manager VisitPurpose: To determine occupancy status of units in a multiunit.
50.30.1050.30.10
Attempt Manager Visit
50.30.10
Attempt Manager VisitManager Visit
Successful?
No ManagerExists
50.30.3050.30.30
Complete Enumeration of
Each Unit by Proxy
50.30.30
Complete Enumeration of
Each Unit by ProxyHousing Status:
Yes
Vacant or DeleteStatus
Occupied Status
50.30.4050.30.40
Mark as Candidate for
Individual Enumeration
50.30.40
Mark as Candidate for
Individual Enumeration
No Determination
50.30.5050.30.50
Mark as Eligible for
Individual Enumeration
50.30.50
Mark as Eligible for
Individual Enumeration
50.30.2050.30.20
Mark all Units Eligible for
Individual Enumeration
50.30.20
Mark all Units Eligible for
Individual Enumeration
Manager not Available
No
18-3 NRFU Data Collection (In Part)
18-3.3 Perform NRFU Manager Visit
Page 5 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd50.30 Perform NRFU Manager Visit
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
Start Sub Process
End Sub Process
Unit should never be
grouped into one of the
combined multiunit
cases in the future
Unit is candidate for
continued grouping into
multiunit case for future
days’ assignments
50.40 Enumerate Housing UnitPurpose: To attempt to collect responses from a suitable respondent.
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
18-3.4 Perform NRFU Case Enumeration (In Part)
50.40.3050.40.30
Attempt
Interview
50.40.30
Attempt
Interview
No
Is there a Communication
Barrier?
Yes
No
50.40.4050.40.40Mark
Case as
Communication
Barrier
50.40.40Mark
Case as
Communication
Barrier
Refusal?
Yes
50.40.6050.40.60
Mark Case as
Refusal
50.40.60
Mark Case as
Refusal
No
Eligible Respondent Contacted?
50.40.5050.40.50
Leave Notice of
Visit
50.40.50
Leave Notice of
Visit
Yes
No
In-Mover?No
50.40.10050.40.100
Mark Case
as In-Mover
50.40.100
Mark Case
as In-Mover
Yes
50.40.12050.40.120
Attempt to
Enumerate Current
Resident for Prior
Address
50.40.120
Attempt to
Enumerate Current
Resident for Prior
Address
50.40.11050.40.110
Attempt to
Enumerate Current
HU
(by In-Mover Proxy)
50.40.110
Attempt to
Enumerate Current
HU
(by In-Mover Proxy)
50.40.9050.40.90
Complete
Enumeration of
HU
50.40.90
Complete
Enumeration of
HU
50.40.1050.40.10
Determine
Special Case
Status
50.40.10
Determine
Special Case
Status
Is there a Special Case
Status Condition?
Yes
50.40.2050.40.20Update
Case Status/Address
Data to Reflect
Special Case Status
50.40.20Update
Case Status/Address
Data to Reflect
Special Case Status
50.40.8050.40.80
Begin
Interview
50.40.80
Begin
Interview
18-3.4.1 Enumerate
Housing Unit
Page 6 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd50.40 Enumerate Housing Unit
Start Sub Process
EndSub Process
Special Case Status includes:
• Vacant Unit
• Unable to Locate
• Does not Exist
• Demolished/Burned Out
• Nonresidential
• Uninhabitable
• Empty Mobile Home
• Restricted Access
• Dangerous Address
• Group Quarter
• Other
50.50 Enumerate Housing Unit via Proxy InterviewPurpose: To attempt to collect responses from a suitable proxy.
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
18-3.4 Perform NRFU Case Enumeration (In Part)
50.50.1050.50.10
Attempt
Interview
50.50.10
Attempt
Interview
Is There a Communication
Barrier?
Yes
No
Is Eligible RespondentContacted?
50.50.2050.50.20
Mark Case as
Communication
Barrier
50.50.20
Mark Case as
Communication
Barrier
No
Yes
Refusal?
Yes
50.50.3050.50.30
Mark Case as
Refusal
50.50.30
Mark Case as
Refusal
No
50.50.7050.50.70
Complete
Enumeration of
HU
50.50.70
Complete
Enumeration of
HUIs there a
Special Case Status
Condition?
50.50.5050.50.50
Begin
Interview
50.50.50
Begin
Interview
50.50.6050.50.60
Determine Unit Status
as of Census Day
50.50.60
Determine Unit Status
as of Census Day
Yes
Occupied on CensusDay?
Yes
No
No
18-3.4.2 Enumerate Housing
Unit via Proxy Interview
Page 7 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd50.50 Enumerate Housing Unit via Proxy Interview
Start Sub Process
EndSub Process
Special Case Status being verified as of
Census Day includes:
• Vacant Unit
• Does not Exist
• Demolished/Burned Out
• Nonresidential
• Uninhabitable
• Empty Mobile Home
50.60 Perform NRFU Reinterview Data CollectionPurpose: To attempt to collect a reinterview response (short or full) from a prior respondent.
50.60.1050.60.10
Attempt
Reinterview
50.60.10
Attempt
Reinterview
Is there a Communication
Barrier?
Yes
No
50.60.2050.60.20
Mark Case as
Communication
Barrier
50.60.20
Mark Case as
Communication
Barrier
50.60.5050.60.50
Begin
Reinterview
50.60.50
Begin
Reinterview
Previously Contacted?
Yes
No
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
Refusal?
Yes
50.60.3050.60.30
Mark Case as
Refusal
50.60.30
Mark Case as
Refusal
No
50.60.6050.60.60
Complete Full
Interview
50.60.60
Complete Full
Interview
18-3.5 Perform NRFU Reinterview Data Collection
No
18-3 NRFU Data Collection (In Part)
Is Eligible RespondentContacted?
Yes
Start Sub Process
50.60.8050.60.80
Complete
Short Interview
(Short Form)
50.60.80
Complete
Short Interview
(Short Form)
EndSub Process
50.60.9050.60.90
Closeout
Contact Attempt
50.60.90
Closeout
Contact Attempt
Page 8 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd50.60 Perform NRFU Reinterview Data Collection
This includes
Non-ID cases
identified to
RPO
50.70 Closeout Contact Attempt Purpose: To complete the action and send response data, status, and paradata.
50.70.1050.70.10
Update Case
Notes
50.70.10
Update Case
Notes
50.70.2050.70.20
Update Contact
Attempts
50.70.20
Update Contact
Attempts
50.70.3050.70.30
Send Response
Data and Status to
RPO
50.70.30
Send Response
Data and Status to
RPO
Case Status/Response/
AddressData
50.70.4050.70.40
Send NRFU
Paradata to PM
50.70.40
Send NRFU
Paradata to PM
Paradata
18-3.6.1 Update Case Information
18-3.6 Closeout Contact Attempt
18-3.6.2 Send Data
18-3 NRFU Data Collection (In Part)
Page 9 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd50.70 Closeout Contact Attempt
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
StartSub-process
EndSub-process
60 Adjudicate Reinterview Results Purpose: To compare reinterview data with production data and determine reinterview outcome.
60.2060.20
Set Final RI Outcome
and Send to RPO
60.20
Set Final RI Outcome
and Send to RPO
“Hard Fail” Recommended?
No
60.3060.30
Perform Resolution
Research
(Field Staff)
60.30
Perform Resolution
Research
(Field Staff)
Yes
60.4060.40
Stop Work
(Field Staff)
60.40
Stop Work
(Field Staff)
“Hard Fail” Determination?
Yes
No
RI Outcome
18-4.1 NRFU Quality Control Adjudication (In Part)
18-4.1.2 Adjudicate Reinterview Results
60.1060.10Perform Comparison/
Resolution Research and Make
Recommendations
(Clerical Resolution Staff)
60.10Perform Comparison/
Resolution Research and Make
Recommendations
(Clerical Resolution Staff)
Page 10 of 102020 Census 18. Nonresponse Followup Operation (NRFU) BPM v7.1.vsd60 Adjudicate Reinterview Results
BusinessProcess
Modeling &Analysis Toolkit
BusinessProcess
Modeling &Analysis Toolkit
Start Sub-process
End Sub-process
Clerical Recommendations:
• Pass
• Fail
• “Hard Fail” - Enumerator
Falsification
Can Include Supplemental
RI Selection