Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use and is appreciative to all the communities who took time to share information about their history and culture as well as their valued knowledge and perspectives with regards to the Bipole III study area and Project. The ATK that has been shared assisted Manitoba Hydro in: developing a greater understanding of the study area; identifying potential Project effects; planning and designing the Project; developing potential mitigation measures, some of which can be found throughout this document. PART II

Transcript of bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro...

Page 1: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

Aboriginal Traditional Knowledge

Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas

of use and is appreciative to all the communities who took time to share information about their

history and culture as well as their valued knowledge and perspectives with regards to the Bipole

III study area and Project. The ATK that has been shared assisted Manitoba Hydro in: developing a

greater understanding of the study area; identifying potential Project effects; planning and

designing the Project; developing potential mitigation measures, some of which can be found

throughout this document.

PART II

Page 2: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

SPRU CE SPRU CE WOOD SWOOD S

PROVI NC IA L PROVI NC IA L PAR KPAR KCR ID DL E/VAN ECR ID DL E/VAN E

HOM ESTEA DHOM ESTEA DPROVI NC IA L PROVI NC IA L

PAR KPAR K

SETONSETONPROVI NC IA L PROVI NC IA L

PAR KPAR K

Sp ru ce W oo ds

For es t R es er ve

BEA UD RYBEA UD RYPROVI NC IA L PROVI NC IA L

PAR KPAR K

STEPH ENF IEL DSTEPH ENF IEL DPROVI NC IA L PA RKPROVI NC IA L PA RK

DELTA M ARSH W MA

LANGRUT HWMA

WHITEMU DWATERSH ED WMA

WHITEMU DWATERSH ED

WMA

WHITEMU DWATERSH ED

WMA

PORTAGESANDHILLS WMA

WHITEMU DWATERSH ED

WMA

WHITEMU DWATERSH ED

WMA

LAKE FRANCIS

WMA

OAK HAMMOCK

MARSH WMA

Lake Irwin

Whitemu d R iver

Whitemud RiverBig

Lake

ChandlerLake

SeagullLake

JackfishLake

Big

Grass

River

Pi ne

Creek

Cypr e

ss

River

Boyne

Riv er

BoyneRiv

er

La Salle

R iv er ASSINIBOINE

RIVER

L aSal l

e

Ri ver

LakeFrancis

ASSI N IB OINERIVER

NEEPAWAGLADSTONE

CARBERRY

LONG PLAINFIRST NATION

DAKOTA PLAINSFIRST NATION

PORTAGE LA PRAIRIE

INDIAN GARDENS 8

SWAN LAKE FIRST

NATION

DAKOTA TIPIFIRST NATION

STONEWALL

CITY OFWINNIPEG

L A K EM A N I T O B A

CypressRiverGlenboro

Holland

Treherne

Rathwell

St.Claude

HaywoodElmCreek

Fannystelle

Culross

Starbuck

Springstein

Sanford La Salle

Oak Bluff

Ste.Agathe

Domain

Osborne

Brunkild

Treesbank

Wawanesa

SprucewoodsShilo

Brookdale Wellwood

Ingelow

Sidney

AustinMacGregor

Gregg Firdale Bagot

Stockton

Lavenham

Rossendale LongPlainDakota

Plains

DakotaTipi

Southport

Pratt

Macdonald

HighBluff

Oakville

Edwin

Newton

St.Ambroise

DeltaBeach

Oakland

PoplarPoint

St.Eustache

FortierBénard

Elie

Dacotah

St.FrançoisXavier

St.Marks

GrosseIsle

Woodlands

WarrenStonewall

StonyMountain

Headingley

Teulon

Balmoral

GuntonLake

Francis

St.Laurent

Argyle

Langruth

Woodside

Westbourne

Katrime

Plumas

Keyes

Helston

Edrans

Mayfeld

Hallboro

FranklinNeepawa

Eden

Birnie

Tenby

Arden

¾À260

¾À242

¾À352

¾À342

¾À321

¾À241

¾À464

¾À351

¾À350

¾À221

¾À332

¾À424

¾À330

¾À200

¾À340

¾À411

¾À415

¾À236

¾À518

¾À530

¾À265

¾À244

¾À240

¾À220

¾À409

¾À334

¾À567

¾À353

¾À425

¾À357

¾À471

¾À246

¾À465

¾À449

¾À427¾À248

¾À338

¾À412

¾À323

¾À305

¾À462

¾À453

¾À331

¾À466

¾À569

¾À227

¾À322

¾À430

¾À247

¾À416

STUV

[\26

[\5

[\2

[\34

[\17

[\90

[\7

[\18

[\13

[\6

[\101

[\50

[\67

[\75

[\3

³²1A

³²1

270

271

272

273

274

275

276

277

278

279

280 281 282

283

284

285

286

287

288

289

290

291

292293 294

295

296297 298 299 300 301 302 303 304 305 306

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, Stantec, ProvMB, NRCANDate Created: April 14, 2014 ±

1:450,000

Bipole III Transmission ProjectConstruction Environmental Protection Plan

S1 Planning SectionMap Index

0 2010 Kilometres

0 105 Miles Draft: For Discussion Purposes Only

XW

XW

90°W

95°W

95°W

100°W

100°W

55°N55°N

50°N 50°N

Bipole III Transmission Project

N1

N2N3

N4

C1

C2

S1S2

LegendBPIII S1 SectionFinal Preferred RouteLocal Study AreaMap Index Grid (1:10,000)

! ! Transmission Line

First NationMineral RightsNational/Provincial ParkProvincial ForestWildlife Management Area

Page 3: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

!(!( !(!( !(!(!(!(!(!(!(!( !(!(

N1-S07

LimestoneRiver

crossing 1

N1-Soils-140N1-Soils-139

N1-Soils-141

N1-Soils-138

N1-Wild-100

N1-Aqua-123N1-Hert-101

N1-Hert-100127127128129130131132133134

L1

L2

LIMESTONE RIVER

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: December 09, 2013

±

1:10,000

0 250 500125

Metres

Map 17

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N1Environmentally Sensitive Site Locations

DO

CU

ME

NT

PA

TH

: G

:\_G

IS_

PR

OJE

CT

_F

OLD

ER

\00_

HY

DR

O\1

114

4005

4_B

PII

I_E

PP

\AR

CM

AP

\ES

S_

N1

\BP

III_

CE

NV

PP

_N1N

2N3N

4C1S

EC

TIO

NB

AS

EM

AP

_MA

PB

OO

K_

BT

B_S

TAN

TE

C_2

0131

207.

MX

D

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

WildlifeBirds and Habitat

Soils and TerrainPermafrost

Points of Access*!( Proposed Access Point

!( Major Stream Crossing

Abandoned Rail Crossing

Rail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of Way

BPIII Final Preferred Route

Angle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

SASSASASASSS PPLLPPPPPPPLPPPPPLLLLLLLPPPPPPPPPPPPPPP

Page 4: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

MAP NUMBER : 17 1

ESS Group : Water Crossing 2

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

ZoneChannel Width

WetWidth

Fish Habitat Class

Habitat Sensitivity

N1-S07 N1-Aqua-123

Limestone River 754280 6280471 14N 12m 12m Low Important

Potential Effects: 4

Habitat loss & contamination from structure foundations & installations; increased erosion & sedimentation of streams; damage to stream banks; loss of riparian vegetation; fish habitat disturbance & impeded fish movement

Specific Mitigation: 5

Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes

ESS Group : Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance

N1-S07 N1-Wild-100

Limestone River crossing; movement route for raptors and waterfowl

Site: L1 toL2

E- 754292N- 6280478

E- 754267N- 6280463 14N 29 m

Potential Effects: 4

Higher risk of wire collision, risk of wire collision is localized to the right-of-way

Specific Mitigation: 5

Adhere to reduced risk timing windows for protection of birds (August 1- April 30) Maintain setback during timing window

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N1-S07 N1-Soils-138 Permafrost Site: 127 to 128 E-755259N-6281038

E-754819N-6280783 14N 509 m

Potential Effects: 4

Melting or loss of permafrost due to disturbance of the active layer

Specific Mitigation: 5

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Remove trees by low-disturbance methods

*ESS and mitigation shown includes only a sample of actual mitigation for the ESS features listed; refer to the Construction Environmental Protection plan for all specific mitigation measures recommended

3

3

3

KEY to SAMPLE MITIGATION TABLE

1 Map on which ESS listed in the ESS Location Summary tables are illustrated

2 ESS Group classification of ESS shown on the map

3 ESS location summary; includes the following fields:• Sec-Seg - ID of the construction section (i.e. N1) and segment (i.e. S03) for ESS location• ESS ID - Site specific ID assigned to each ESS according to naming convention listed below• ESS Name - Brief name/description of ESS• Easting/Northing - UTM coordinates of ESS location (for points only)• Location - site identification numbers for the start and stop site points of ESS intersection

with the ROW (lines and polygons only)• Start/Stop - UTM coordinates of the start/stop identification numbers listed in the “Location”

field (lines and polygons only)• Characteristics of stream crossings identified in the ESS Location Summary tables (where

applicable and as information is available)

4 Potential effects identified for ESS listed in the ESS Location Summary table

5 Mitigation measures identified for ESS listed in the ESS Location Summary table

CATEGORY GROUP (Number Series Representing Group)

ESS ID(Section ID-Category-Group Number)

Access Intersection (100) N1-Acss-100Ecosystem Habitat (100) N1-Eco-100

Research (200) N1-Eco-200Species of Concern (300) N1-Eco-300

Heritage Archaeological (100) N1-Hert-100Cultural (200) N1-Hert-200Historic (300) N1-Hert-300

Land Use Conservation (100) N1-LUse-100Crown Land Encumbrance (200) N1-LUse-200Recreation (300) N1-LUse-300Residential (400) N1-LUse-400

Resource Use Agriculture (100) N1-RUse-100Food/Medicinal (200) N1-RUse-200Forestry (300) N1-RUse-300Hunting/Fishing (400) N1-RUse-400Trapping (500) N1-RUse-500

Soils and Terrain Permafrost (100-200) N1-Soils-100Erosion (300) N1-Soils-300Terrain (400) N1-Soils-400

Water Water Crossing (100) N1-Aqua-100Groundwater (200) N1-Aqua-200Wetlands (300) N1-Aqua-300

Wildlife Birds and Habitat (100) N1-Wild-100Mammal and Habitat (200) N1-Wild-200Reptiles/Amphibians and Habitat (300) N1-Wild-300

ESS NAMING CONVENTION

SAMPLE MITIGATION TABLE (see adjacent KEY for additional information)

Page 5: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

[\50

C2-S09

S1-S01

Tower 117E-520847, N-5589104

S1-Eco-300

S1-Wild-100S1-Aqua-100

LANGRUTH WILDLIFE MANAGEMENT AREA

End of C2 SectionBeginning of S1 Section

LANGRUTH WILDLIFE MANAGEMENT AREA

LANGRUTH WILDLIFE MANAGEMENT AREA

1L1

L2

1

12

13

18

19

24

6

7

TWP017RGE10W1M

TWP017RGE09W1M

NE

NW

SW

SW

SE

SW

SE

NE

SW

NW

SE

NW

NW

NE

NE

SE

SE

NW

SW

SW

NE

NW

NE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 270

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S1Environmentally Sensitive Site Locations

ESS FeaturesWater!( Water Crossing

WildlifeBirds and Habitat

EcosystemSpecies of Concern

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management DatabaseTownship/Range

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes OnlyMining

Page 6: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

Version: DRAFT

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S1-S01 S1-Aqua-100

Unnamed Creek 520826 5588398 14N N/A N/A None None

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30 ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Wild-100 Nearby black tern colony Site: L1 to L2 E-520847 N-5588926

E-520846 N-5588414 14N 511m

Potential Effects:

Higher risk of wire collision, Disturbance during breeding and nesting, Risk of wire collision is localized to the right-of-way while construction disturbance can effect colonies up to 400 meters away

Specific Mitigation:

• Adhere to reduced risk timing windows for protection of birds (August 1- April 30) • Maintain applicable setback during nesting and breeding timing window • Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites

ESS Group: Species of Concern

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Eco-300 Species of Concern (Plant) Site: 1 to 2 E-520847 N-5588813

E-520879 N-5573746 14N 15067m

Potential Effects: Potential loss of previously known plants of conservation concern from clearing, construction, maintenance and decommissioning activities. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Use existing access roads and trails to the extent possible • Remove trees by low-disturbance methods • Confine vehicle traffic to established trails to the extent possible • Stabilize sites immediately after construction and re-vegetate disturbed areas in accordance with site Rehabilitation

Plan

MAP NUMBER: 270

Page 7: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

S1-S01S1-Aqua-101

S1-Eco-300

LANGRUTH WILDLIFE MANAGEMENT AREA

MAP SEGMENT FULLY WITHIN THE S1-ECO-300 FEATURE

3 4

125

3031

36

6

TWP016RGE10W1M

TWP017RGE10W1M

TWP016RGE09W1M

TWP017RGE09W1M

SENE

NW

SW

NE

SW

NW

SE

NWNW

NE NE

SW

SE

SW

NW

NE SE NE

NW

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 271

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S1Environmentally Sensitive Site Locations

ESS FeaturesWater

Water CrossingEcosystem

Species of Concern

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management DatabaseTownship/Range

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes OnlyMining

Page 8: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

Version: DRAFT

ESS Group: Species of Concern

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Eco-300 Species of Concern (Plant) Site: 1 to 2 E-520847 N-5588813

E-520879 N-5573746 14N 15067m

Potential Effects: Potential loss of previously known plants of conservation concern from clearing, construction, maintenance and decommissioning activities. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Use existing access roads and trails to the extent possible • Remove trees by low-disturbance methods • Confine vehicle traffic to established trails to the extent possible • Stabilize sites immediately after construction and re-vegetate disturbed areas in accordance with site Rehabilitation

Plan ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Aqua-101 Small, unnamed waterbody Site: 3 to 4 E-520841 N-5583360

E-520841 N-5583351 14N 8 m

Potential Effects: Increased erosion and sedimentation; rutting of floodplains; loss of riparian vegetation Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 271

Page 9: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

NW-24-16-10-W SW-24-16-10-W

NE-24-16-10-W SE-24-16-10-W NE-13-16-10-W

SW-25-16-10-W NW-13-16-10-W

SE-13-16-10-WSE-25-16-10-W

SW-13-16-10-W

SW-18-16-9-W

SE-18-16-9-WSE-19-16-9-W

NW-19-16-9-W

NE-19-16-9-W NE-18-16-9-W

NW-18-16-9-WSW-19-16-9-W

SE-30-16-9-W

SW-30-16-9-W

SE-13-16-10-W

SW-13-16-10-W

SW-18-16-9-W

SE-18-16-9-W

¾À265

S1-S0164RT

S1-Aqua-102

S1-Eco-300

S1-Aqua-103

MAP SEGMENT FULLY WITHIN THE S1-ECO-300 FEATURE

5 6

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 24, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 272

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S1Environmentally Sensitive Site Locations

ESS FeaturesWater!( Water Crossing

WaterWater Crossing

EcosystemSpecies of Concern

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management DatabaseParcel Fabric

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes OnlyMining

Page 10: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

Version: DRAFT

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S1-S01 S1-Aqua-103

Unnamed drain 520836 5581809 14N N/A N/A None None

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30 ESS Group: Species of Concern

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Eco-300 Species of Concern (Plant) Site: 1 to 2 E-520847 N-5588813

E-520879 N-5573746 14N 15067m

Potential Effects: Potential loss of previously known plants of conservation concern from clearing, construction, maintenance and decommissioning activities. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Use existing access roads and trails to the extent possible • Remove trees by low-disturbance methods • Confine vehicle traffic to established trails to the extent possible • Stabilize sites immediately after construction and re-vegetate disturbed areas in accordance with site Rehabilitation

Plan

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Aqua-102 Small, unnamed waterbody Site: 5 to 6 E-520840 N-5581955

E-520840 N-5581889 14N 65 m

Potential Effects: Increased erosion and sedimentation; rutting of floodplains; loss of riparian vegetation Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 272

Page 11: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

S1-S01S1-Aqua-104

S1-Eco-300

LAKEVIEW COMMUNITY PASTURELAKEVIEW COMMUNITY PASTURE

MAP SEGMENT FULLY WITHIN THE S1-ECO-300 FEATURE

7 8

11213

18

31

36

67

TWP015RGE10W1M

TWP016RGE10W1M

TWP015RGE09W1M

TWP016RGE09W1M

NW SW

SE

NE SE

SW

SE

NW

NE

SW

SW

NW

SE

SW

NE

NE

NW

NE

SE

SWNWNW

SENE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 273

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S1Environmentally Sensitive Site Locations

ESS FeaturesWater

Water CrossingEcosystem

Species of Concern

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management DatabaseTownship/Range

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes OnlyMining

Page 12: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

Version: DRAFT

ESS Group: Species of Concern

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Eco-300 Species of Concern (Plant) Site: 1 to 2 E-520847 N-5588813

E-520879 N-5573746 14N 15067m

Potential Effects: Potential loss of previously known plants of conservation concern from clearing, construction, maintenance and decommissioning activities. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Use existing access roads and trails to the extent possible • Remove trees by low-disturbance methods • Confine vehicle traffic to established trails to the extent possible • Stabilize sites immediately after construction and re-vegetate disturbed areas in accordance with site Rehabilitation

Plan ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Aqua-104 Small, unnamed waterbody Site: 7 to 8 E-520867 N-5576333

E-520867 N-5576318 14N 15 m

Potential Effects: Increased erosion and sedimentation; rutting of floodplains; loss of riparian vegetation Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 273

Page 13: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

S1-S01S1-Eco-300

LAKEVIEW COMMUNITY PASTURELAKEVIEW COMMUNITY PASTURE

2

19

2425

3031

36

TWP015RGE10W1M

TWP015RGE09W1M

SWNW

SENE NE

SW

SE

SE

NW

NE

NW

SW

NE

SE

NW

SENE

SW

NW

SW

NESE

SW NW

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 274

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S1Environmentally Sensitive Site Locations

ESS FeaturesEcosystem

Species of Concern

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management DatabaseTownship/Range

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes OnlyMining

Page 14: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

Version: DRAFT

ESS Group: Species of Concern

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Eco-300 Species of Concern (Plant) Site: 1 to 2 E-520847 N-5588813

E-520879 N-5573746 14N 15067m

Potential Effects: Potential loss of previously known plants of conservation concern from clearing, construction, maintenance and decommissioning activities. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Use existing access roads and trails to the extent possible • Remove trees by low-disturbance methods • Confine vehicle traffic to established trails to the extent possible • Stabilize sites immediately after construction and re-vegetate disturbed areas in accordance with site Rehabilitation

Plan

MAP NUMBER: 274

Page 15: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

[\50

S1-S01S1-Aqua-105 S1-Aqua-106

9 10 11 12

11213

18

19

24

67

TWP015RGE10W1M

TWP015RGE09W1M

NE

NW

NW

NE

NW

NE

SW

SESE

SW

NE

NW

NE

NW

SW

SE

SE

SW

SE

SW

SW

SE NE

NW

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 275

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S1Environmentally Sensitive Site Locations

ESS FeaturesWater

Water Crossing

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management DatabaseTownship/Range

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes OnlyMining

Page 16: bpiii cenvpp s1 mapbook maps 270to275€¦ · Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use

Version: DRAFT

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S1-S01 S1-Aqua-105 Small, unnamed waterbody Site: 9 to 10 E-520889 N-5569667

E-520889 N-5569638 14N 29 m

S1-S01 S1-Aqua-106 Small, unnamed waterbody Site: 11 to 12 E-520892 N-5568136

E-520892 N-5568100 14N 36 m

Potential Effects: Increased erosion and sedimentation; rutting of floodplains; loss of riparian vegetation Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 275