Page 1: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction
Page 2: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

2

BOWLING GREEN-WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION (MPO)

FY 2016 – 2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

AMENDMENT # 2018.01

Page 3: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

3

The following table reflects the addition of federal STP funding for Design, ROW, Utility, and Construction phases for the US 31W widening project.

TABLE 1 SUMMARY OF HIGHWAY FUNDING TYPES

Bowling Green-Warren County MPO Transportation Improvement Program FY 2016-2020

Funding Type

FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TIP Total

Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue

BRO $5,850,000 $5,850,000 $5,850,000 $5,850,000

BRZ $635,000 $635,000 $635,000 $635,000

FTA $1,384,000 $1,384,000 $1,987,000 $1,987,000 $1,534,000 $1,534,000 $1,609,000 $1,609,000 $1,684,000 $1,684,000 $8,198,000 $8,198,000

IM $18,000,000 $18,000,000 $18,000,000 $18,000,000

NH $800,000 $800,000 $14,350,000 $14,350,000 $700,000 $700,000 $33,600,000 $33,600,000 $5,000,000 $5,000,000 $54,450,000 $54,450,000

SAF $505,000 $505,000 $505,000 $505,000

SPP $11,250,000 $11,250,000 $11,250,000 $11,250,000

STP $1,000,000 $1,000,000 $1,750,000 $1,750,000 $6,250,000 $6,250,000 $9,000,000 $9,000,000

TAP $177,474 $177,474 $177,474 $177,474 TOTAL $21,501,474 $21,501,474 $28,587,000 $28,587,000 $8,084,000 $8,084,000 $36,959,000 $36,959,000 $12,934,000 $12,934,000 $108,065,474 $108,065,474

The following table expresses the state funding amounts with the removal of the SP funding initially allocated for the US 31W widening project, for Design, ROW, Utility, and Construction phases.

INFORMATIONAL SUPPLEMENT SUMMARY OF FUNDING TYPE

Bowling Green-Warren County MPO

Funding Type

FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TIP Total Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue Est. Cost Revenue

SP $17,390,000 $17,390,000 $2,489,000 $2,489,000 $2,758,000 $2,758,000 $8,923,000 $8,923,000 $18,000,000 $18,000,000 $49,560,000 $49,560,000 SPP $16,340,000 $16,340,000 $7,700,000 $7,700,000 $29,010,000 $29,010,000 $7,300,000 $7,300,000 $13,500,000 $13,500,000 $73,850,000 $73,850,000

TOTAL $33,730,000 $33,730,000 $10,189,000 $10,189,000 $31,768,000 $31,768,000 $16,223,000 $16,223,000 $31,500,000 $31,500,000 $123,410,000 $123,410,000

Page 4: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

4

TABLE 4 FEDERALLY FUNDED TRANSPORTATION PROJECTS

Unauthorized Highway Plan Project Phases Bowling Green-Warren County MPO

Transportation Improvement Program FY 2016-2020

PROJECT ID

KYTC 6YP ID ROUTE LENGTH PROJECT DESCRIPTION FUND

TYPE YEAR

PHASE

PHASE COST

2016-1 03-16.04 I-65 - Surfacing for I-65 to US-31W Connector

including grade and drain on US-68 and US-31W.

IM 2016 C $18,000,000

2016-2 3-2042.20

WN-9007 0.200

Reconstruct the existing Natcher Parkway/US-231 interchange on west side

of Bowling Green (see item number 3-202 for design).

NH

2017 D $1,000,000 2017 R $1,650,000 2017 U $1,550,000 2019 C $10,800,000

2016-3 03-1077 KY-234 0.060 Replace bridge on KY-234 over Drakes Creek 0.097 east of Shaker Mill Rd (CR-

1121). BRO 2018 C $5,850,000

2016-4 03-1090 CR-1425 0.02

Replace bridge over branch of Indian Creek on Lodge Hall Rd (CR-1425) 1.4 mile west

of KY-185. BRZ

2016 D $250,000 2016 R $50,000 2016 U $75,000 2016 C $260,000

2016-5 03-8707 WN-9007 0.60

Construct a new interchange on the Natcher Parkway at Elrod Road in Bowling Green

(MP 3.4 - MP 4.0). NH

2016 D $800,000 2017 R $2,000,000 2017 U $950,000 2019 C $6,300,000

2016-6 03-9007 KY-526 0.10

Intersection improvements at the intersection of KY-526 and KY-1320;

purchase ROW for sight distance improvements on KY-526 from 0.046 mile west of KY-1320 to 0.099 mile west of CR-

1532A.

SAF

2016 R $70,000 2016 U $190,000

2016 C $220,000

2016-17 - N/A 0.25

Funding for this project will pay for construction of a new greenway path connecting Moss Middle School to an existing greenway on

Creekwood Drive. The project will include a bridge over Jennings Creek, lighting, benches

and a trailhead marker.

TAP 2016 $177,474

2016-18 3-924 KY-185 0.43

Safety improvements on KY-185 from US-68 to Double Springs Road to convert corridor from 4-lanes to 3-lanes (“Road Diet”) including micro-surfacing, striping, curbed island at crosswalk, and enhanced signage for pedestrian crossing.

SAF 2016 C $75,000

2017-19 3-2042.10 WN-9007 35.06

Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor.

Construction from the I-65 interchange (exit 2) in Bowling Green, extending north to the Butler-

Ohio county line, MP 37.143.

NH

2017 D $2,000,000 2017 R $200,000

2019 C $15,000,000

2017-20 3-8702.10 US 231 - Intersection improvement at US 231 and Three Springs Road/Ken Bale Blvd for paving, striping,

and median removal. STP 2017 C $200,000

2017-21 3-2081.00 KY 446 0.97 Pavement rehabilitation on KY 446 from US 31W to I-65 (MP 0.0 - MP 0.97). NH 2017 C $5,000,000

2016-15 03-8857 US-31W 1.238

Major widening/reconstruction from Campbell Lane (US-231) to University Blvd

(US-231X) (MP 10.561 to MP 11.688). STP

2017 D $800,000 2019 R $1,750,000 2020 U $2,000,000 2020 C $4,250,000

Page 5: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

5

Federally Funded Transportation Project

BOWLING GREEN-WARREN COUNTY MPO (FY 2016-2020) Project ID KYTC 6YP ID Route LENGTH Project Description

2016-15 3-8857 US-31W 1.238 Major widening/reconstruction from Campbell Lane (US-231) to University Blvd (US-231X) (MP 10.561 to MP 11.688).

Fund Type Phase FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Future Total Funding

STP

Design $800,000 $800,000

ROW $1,750,000 $1,750,000

Utility $2,000,000 $2,000,000

Construction $4,250,000 $4,250,000

$800,000 $1,750,000 $6,250,000 $8,800,000

Page 6: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction
gramk91
Typewritten Text
TIP Amendment 2018.01 Public Notices & Public/Agency Comments
gramk91
Typewritten Text
gramk91
Typewritten Text
gramk91
Typewritten Text
gramk91
Typewritten Text
gramk91
Typewritten Text
Page 7: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction
Page 8: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

Bowling Green-Warren County MPO 1141 State Street, Bowling Green, KY 42101 [PHONE] 270.842.1953 [FAX] 270.842.1282 www.warrenpc.org/mpo

July 21, 2017

PUBLIC NOTICE

BOWLING GREEN-WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION SEEKING PUBLIC INPUT ON AMENDMENT TO TRANSPORTATION IMPROVEMENT PROGRAM

# # #

The Bowling Green-Warren County Metropolitan Planning Organization (MPO) is requesting your agency’s input and comments regarding an Amendment to the 2016-2020 Transportation Improvement Program (TIP) during the mandatory 15-day review period, from July 21, 2017 through August 4, 2017. The TIP is a financially constrained document listing federally funded and regionally significant transportation projects (roadways, pedestrian facilities, and transit facilities) for the Bowling Green-Warren County MPO area. This Amendment to the 2016-2020 TIP will reflect funding changes to the US 31W (Nashville Road) widening project from Campbell Lane to University Blvd in Bowling Green. This amendment moves the listed project from the Informational Supplement portion of the TIP, to the Federally Funded portion, as Surface Transportation Program (STP) funds have become available for this project. Please reference the enclosed documents for more information. Additionally, the 2016-2020 TIP Amendment can be viewed online at:

http://warrenpc.org/mpo/pdf/TipAmendment_2018.01.pdf

Please notify the MPO of any comments or concerns you may have regarding this Amendment. All comments may be directed to Karissa Lemon, MPO Coordinator, at the address listed below, or at [email protected].

MPO Coordinator City-County Planning Commission 1141 State Street Bowling Green, KY 42101

Thank you for your time and corporation in this process, as your input is greatly appreciated.

Page 9: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

28 July 2017

Bowling Green – Warren County Metropolitan Planning Organization Attn: Karissa Lemon 1141 State Street Bowling Green, KY 42101 RE: 2016-2020 Transportation Improvement Program (TIP) US 31W Widening Project Warren County, Kentucky Dear Ms. Lemon: The Kentucky Department of Fish and Wildlife Resources (KDFWR) has received your request for information pertaining to the subject project. Due to the nature of the project, KDFWR does not have any specific comments as is relates to this amendment. I hope this information is helpful to you, and if you have questions or require additional information, please call me at (502) 564-7109 extension 4453.

Sincerely,

Dan Stoelb Environmental Scientist

Cc: Environmental Section File

Page 10: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction
Page 11: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction
Page 12: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

1

Karissa Lemon

From: Doug HawkinsSent: Tuesday, July 25, 2017 5:08 PMTo: Karissa LemonSubject: Amendment to 2016-2020 TIP - Nashville Road Widening

Karissa,  The Bowling Green Police Department has no opposition or reservation to the widening of Nashville Rd. (US 31W) between Campbell Lane and University Blvd.  It would be ideal if a sidewalk extension from Potter Children’s Home to University Blvd. was part of the project.  Thanks, Chief Doug Hawkins  Chief Doug Hawkins Bowling Green Police Department [email protected] 270‐393‐4544  

Page 13: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction

1

Karissa Lemon

From: Bishop, Ross (EEC) <[email protected]>Sent: Monday, July 31, 2017 9:44 AMTo: Karissa LemonCc: Dutta, Ramendra (EEC)Subject: BG-WCo Metropolitan Planning Organization TIP 2018.01Attachments: WarrenCo-MetroPlanningOrgTIP 2018.01AREA.png

Ms. Lemon,  The attached drawing indicates a Karst Topography where sink holes play an important part of the local drainage.   KRS 151.250 provides an exception for structures constructed by the “Department of Highways” from permitting regulations involving the Division of Water Floodplain Management Section. There may be other permits required. Please retain this message for your records.   

Ross Bishop, P.E. Floodplain Section Surface Water Permit Branch Division of Water (502)782‐6891 [email protected]  

Page 14: BOWLING GREEN-WARREN COUNTY · SAF 2016 C $75,000 2017-19 3-2042.10 WN-9007 35.06 Modernize the existing William H. Natcher Parkway to create the I-65 Spur corridor. Construction