BORGES-HD-520 Rev 0 HD Blow Down Flash Tank

download BORGES-HD-520 Rev 0 HD Blow Down Flash Tank

of 2

Transcript of BORGES-HD-520 Rev 0 HD Blow Down Flash Tank

  • 8/12/2019 BORGES-HD-520 Rev 0 HD Blow Down Flash Tank

    1/2

    AEM

    AMS

    APPROVED AMS

    DATE 03-11-11

    REV. 0

    1 Document code BORGES-1-IHD-IDO-520

    2 Blow Down Flash Tank

    3 BORGES-1-IPL-IDO-1011

    4 BB-V-500

    5 1x100%

    6 Quantity 1 Design capacity 2,5 m37

    8

    9 Testing Operating

    10 20,25 186,04

    11 186,04

    12 Number of Operating Hours Hr per Day Normal Steam Outlet Flowrate kg/h

    13 Number of equiv Operating Hours Hr per Year Max. Steam Outlet Flowrate kg/h

    14 Min. Ambient Temperature C Steam Outlet Pressure bar a

    15 Blow Down Inlets Number Normal Water Outlet Flowrate kg/h

    16 First Inlet Blow Down Flow kg/h Design Water Outlet Flowrate kg/h

    17 Total Working Inlet Blow Down Flow kg/h 3220 Water Outlet Pressure bar a

    18 Inlet Blow Down Flow Max. kg/h 3220 Min. Liquid Level m

    19 Inlet Blow Down Pressure bar a ~11,5 Normal Liquid Level m

    20 Blow down pressure from boiler bar a Max. Liquid Level m

    21

    22

    23

    24 Design Basis - Code/Specification

    25

    26

    27 m3

    28 m3

    29 m3

    30 mm

    31 mm

    32 mm

    33 mm

    34

    35

    36

    37

    38 Refractory

    39 Insulation

    40

    42

    43

    44 Item Quantity Rating

    45 N1 A 1500#

    46 N2 300#

    47 N3 300#

    48 N4 300#

    49 N5 A/B 300#

    50 N6 300#

    51 N7 300#

    52 N8 300#

    53 M 300#

    54

    55 Acc essories:

    56

    57 - Vessel Grounding System

    58

    59 - Insulation Clips

    60

    61 Note 1: Each Vessel must withstand the Temperature Cycling Operation (10000 cycles)

    62 Note 2: Fatigue analisys shall be done acc. ASME VIII Div 2

    63 Note 3: Material and thickness for internal reinforcement same as shell material. Material for other internals SS AISI 316L / AISI 304L

    Supports A36 Mist eliminator -

    - Nozzles acc. "Nozzle schedule chart" - Nozzles location to be confirmed by detailed engineering

    1/2"

    1 1/2"

    1

    3"

    4"

    1 1/2"

    2"

    24"

    REMARKS & SPECIAL REQUIREMENTS

    Manhole

    1 1/2"

    - Anchoring bolts and associated elements

    1

    1

    1

    Drain

    1 Spare 2"

    A193 B7/A194 2H bicromatedBolting

    NONote 3Shell

    A516 Gr.70

    Spiral wound - SS 304LPainting

    Sandblasting SA 2 & Zinc Silicate

    1 x 75 microns

    120 mm

    Supports (n x type)

    A106 Gr.B / A105

    4 x legs

    Gaskets

    Internals

    Nozzles

    Design

    350

    1005

    1005

    Total Height

    1,22

    11,5

    max. 11,5

    2220

    0 24

    4511

    -3,9

    1

    PRESSURE VESSEL DESIGN

    0,23

    0,76

    Steam

    12,56-108,85

    Design Conditions

    Explosion Risk

    Vessel Dimensions

    1,3

    2,5

    2220

    max. 11,5

    Corr.Allow. mm

    Joint Efficiency

    Location

    3220

    2,333

    Heat Treatment

    Cylinder Height B

    Total Volume

    Weights kg

    Weld Exam'ed % External Diameter D

    16578

    PID number

    NAME

    UTE TERMOSOLAR BORGES

    VERTICAL PRESSURE VESSEL DATA SHEET

    Project No.

    Project Title

    Unit Blow Down System

    Termosolar Borges. Bloque de potencia

    Equipment Tag Numbers

    PREP. BY

    CHKD. BY

    Pressure bar a

    11,5

    Operating

    Testing

    Fluid

    Plant Location

    Working

    section

    Client

    MATERIALS

    A516 Gr.70

    Heads

    Design

    13,5

    2

    SW flanged; RF with stand pipe

    SW flanged; RF

    Water Outlet

    Temperature C

    Type

    PROCESS DESIGN CONDITIONS

    Remarks

    NOZZLE SCHEDULE

    1

    SW flanged; RJ

    WN flanged; RF

    Size DN

    Oper. Weight

    Test Weight

    Empty Weight

    Net Fab Weight

    and full vacuum

    Wall Th'ss t

    2606

    Note 1Operation Type

    ASME VIII Div 1 (Note 2)

    MECHANICAL DESIGN CONDITIONS

    Outdoors

    min 0,85

    Design Volume

    Required Volume

    1066

    Expansion nozzles dimensions

    Address

    Boiler Blow Down 880,2

    Operating Fluid

    Name

    UTE TERMOSOLAR BORGES

    Density kg/m3

    Water

    Les Borges Blanques (LLeida)

    1

    Pressure transmiter

    Purpose

    Blow Down Inlet 1

    Steam Outlet

    Pressure Relief Valve

    Level Transmitter

    1

    SO; RF; with blind flange and hinge

    SW flanged; RF

    Threaded Male NPT

    SW flanged; RF

    SW flanged; RF; blind flange

    Pgina 1 de 2

  • 8/12/2019 BORGES-HD-520 Rev 0 HD Blow Down Flash Tank

    2/2

    AEM

    AMS

    APPROVED AMS

    DATE 03-11-11

    REV. 0

    1 Document code BORGES-1-IHD-IDO-520

    2 Blow Down Flash Tank

    3 BORGES-1-IPL-IDO-1011

    4 BB-V-500

    5 1x100%

    6 Quantity 1 Design capacity 2,5 m3

    16578

    PID number

    NAME

    UTE TERMOSOLAR BORGES

    VERTICAL PRESSURE VESSEL DATA SHEET

    Project No.

    Project Title

    Unit Blow Down System

    Termosolar Borges. Bloque de potencia

    Equipment Tag Numbers

    PREP. BY

    CHKD. BY

    Plant Location

    Client

    Type

    Address

    UTE TERMOSOLAR BORGES

    Les Borges Blanques (LLeida)

    64

    65

    66

    67

    68

    69

    70

    71

    72

    73

    74

    75

    76

    77

    78

    79

    80

    8182

    83

    84

    85

    86

    87

    88

    89

    90

    91

    92

    93

    94

    95

    96

    97

    98

    99

    100

    101

    102

    103

    104

    105

    106

    107

    108

    109

    110

    111

    112

    113

    114

    115

    116117

    118

    119

    120

    121

    122

    123

    124

    125

    126

    127

    128

    129

    130

    131

    132

    133

    134135

    SKETCH

    Pgina 2 de 2