BOQ -Proposed STP Civil works BOQ -Proposed STP Civil works Page 1 of 13 PARK SHERATON TOWER RENOVATION - CHENNAI BILL NO : 1 - PROPOSED STP CIVIL WORKS S.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT GENERALLY PREAMBLE NOTES Cost to include necessary scaffolding wherever required Use wall cutter / breaker in place of hand tools STP TANK - CIVIL WORKS 1.00 1a From 0 to 3000mm 41.00 Cum 775 31,775.00 Notwithstanding Preamble Notes of the Standard Method of Measurement of Building Works, the Contractor shall refer to the Specification and Drawings for full particulars and descriptions of materials and workmanship and shall include for the full intent a The Contractor shall read the drawings, visit the site and fully ascertain the nature and extent of the Works, and limitations and restrictions as to means of access, working, shifting and storage space and any other relevant factors prior to tendering as Tenderers are instructed to quote "rate only" for all QRO items without fail and not to enter any amount in the amount column. The rates quoted under QRO items is negotiable during the evaluation of the tender and the rationalized rate only will be consid The dimensions shown in the drawings shall have to be verified by the contractor at site before execution of the items and necessary allowance's have to be made as per the actual dimensions available at site. Items of work provided in this schedule but not covered in the specifications shall be executed strictly as per instructions of the engineer. The quantities of the various items mentioned in the schedule of items are approximate and may vary up to any extent or be deleted altogether. The quoted rates of each item shall remain firm as long as the variation in the total value of the works execute Provision of all materials required for site safety including provision of safety helmets, safety belts and safety shoes for the employees. The Contractor shall provide for all transport for labour and for the movement of plant and equipment to and from site, erection, dismantling, moving about site as necessary and including allowance for all idle time. The Contractor shall provide all necessary labour, plant and tools for the proper and efficient execution of the Works including that required for the nominated subcontractors works. The Contractor shall provide adequate and competent site supervisory and administrative staffs for the proper execution of the works Provision, maintenance and removal of temporary office accomodation for staff, sanitation and other facilities for the workmen and staff The facilities shall be maintained in a clean and orderly condition. Temporary water and electricity shall be provided at one source by the Employer. Distribution to required place with all works shall be in Tenderer's scope. Power shall be distributed with ELCB's The Contractor shall provide all necessary Personal Protection Equipments (PPE : Safety Helmet, shoes, reflective jackets etc The rate for all demolishing and dismantling to include carting and disposal of the debris outside the site The rate for all demolition ,dismantling , removing & disposal should be with due consideration on scrap/ salvage value Serviceable material after dismantling shall be the property of the owner and the same has to be disposed outside the premises as per the direction of Engineer-in-Charge. Rate shall be for all heights, floors, levels, depths and lead. murrum, hard murrum / gravel or mixture of any kind, etc.), in loose and slushy condition, to the required level from existing ground level or approved strata for foundations, UG tanks etc.; including disposing off excess excavated material away from site as per direction of the Engineer -In-Charge and backfilling sides of foundation/ working space with the excavated material (WIth good quality earth approved by PMC/Client) in layers of 150mm high, consolidation, compacting etc complete. The rate shall be inclusive of required dewatering by bailing / pumping out water to keep the site dry at all times until completion, making temporary stepping / sloping, shoring , sectioning, trimming, dressing of sides, leveling or grading, cleaning, removing and excavating loose pockets as directed by the EIC all complete to his entire

Transcript of BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

Page 1: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

BOQ -Proposed STP Civil works

BOQ -Proposed STP Civil works Page 1 of 8

PARK SHERATON TOWER RENOVATION - CHENNAI

BILL NO : 1 - PROPOSED STP CIVIL WORKS

S.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT

GENERALLY

PREAMBLE NOTES

Cost to include necessary scaffolding wherever required

Use wall cutter / breaker in place of hand tools

Notwithstanding Preamble Notes of the Standard Method of Measurement of Building Works, the Contractor shall refer to the Specification and Drawings for full particulars and descriptions of materials and workmanship and shall include for the full intent a

The Contractor shall read the drawings, visit the site and fully ascertain the nature and extent of the Works, and limitations and restrictions as to means of access, working, shifting and storage space and any other relevant factors prior to tendering as

Tenderers are instructed to quote "rate only" for all QRO items without fail and not to enter any amount in the amount column. The rates quoted under QRO items is negotiable during the evaluation of the tender and the rationalized rate only will be consid

The dimensions shown in the drawings shall have to be verified by the contractor at site before execution of the items and necessary allowance's have to be made as per the actual dimensions available at site.

Items of work provided in this schedule but not covered in the specifications shall be executed strictly as per instructions of the engineer.

The quantities of the various items mentioned in the schedule of items are approximate and may vary up to any extent or be deleted altogether. The quoted rates of each item shall remain firm as long as the variation in the total value of the works execute

Provision of all materials required for site safety including provision of safety helmets, safety belts and safety shoes for the employees.

The Contractor shall provide for all transport for labour and for the movement of plant and equipment to and from site, erection, dismantling, moving about site as necessary and including allowance for all idle time.

The Contractor shall provide all necessary labour, plant and tools for the proper and efficient execution of the Works including that required for the nominated subcontractors works.

The Contractor shall provide adequate and competent site supervisory and administrative staffs for the proper execution of the works

Provision, maintenance and removal of temporary office accomodation for staff, sanitation and other facilities for the workmen and staff The facilities shall be maintained in a clean and orderly condition.

Temporary water and electricity shall be provided at one source by the Employer. Distribution to required place with all works shall be in Tenderer's scope. Power shall be distributed with ELCB's

The Contractor shall provide all necessary Personal Protection Equipments (PPE : Safety Helmet, shoes, reflective jackets etc

The rate for all demolishing and dismantling to include carting and disposal of the debris outside the site

The rate for all demolition ,dismantling , removing & disposal should be with due consideration on scrap/ salvage value

Serviceable material after dismantling shall be the property of the owner and the same has to be disposed outside the premises as per the direction of Engineer-in-Charge. Rate shall be for all heights, floors, levels, depths and lead.

Page 2: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

BOQ -Proposed STP Civil works

BOQ -Proposed STP Civil works Page 2 of 8

PARK SHERATON TOWER RENOVATION - CHENNAI

BILL NO : 1 - PROPOSED STP CIVIL WORKS

S.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT

STP TANK - CIVIL WORKS

1.00

1a From 0 to 3000mm 41.00 Cum 775 31,775.00

1b From 3000 to 6000 mm 41.00 Cum 775 31,775.00

1c From 6000 to 9000 mm 7.00 Cum 900 6,300.00

2.00

Below to Raft 2.50 Cum 2,350 5,875.00

3.00

Below to Raft 2.00 Cum 5,651 11,302.40

4.00

4a Raft 3.00 Cum 6,004 18,013.20

4b RC Walls 18.00 Cum 6,004 108,079.20

4c Cover slab / Walk way slabs 3.00 Cum 6,004 18,013.20

4c Caping Beam - Top of Pile 1.50 Cum 6,004 9,006.60

5.00

5a Raft 300.00 Kg 95 28,500.00

5b RC Walls 2,400.00 Kg 95 228,000.00

5c Cover slab / Walkway 300.00 Kg 95 28,500.00

5d Caping Beam - Top of Pile 200.00 Kg 95 19,000.00

Excavation by mechanical means in all kinds of soil, wet or dry (such as yellow murrum, hard murrum / gravel or mixture of any kind, etc.), in loose and slushy condition, to the required level from existing ground level or approved strata for foundations, UG tanks etc.; including disposing off excess excavated material away from site as per direction of the Engineer -In-Charge and backfilling sides of foundation/ working space with the excavated material (WIth good quality earth approved by PMC/Client) in layers of 150mm high, consolidation, compacting etc complete. The rate shall be inclusive of required dewatering by bailing / pumping out water to keep the site dry at all times until completion, making temporary stepping / sloping, shoring , sectioning, trimming, dressing of sides, leveling or grading, cleaning, removing and excavating loose pockets as directed by the EIC all complete to his entire satisfaction.

Supplying and filling with river sand in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering for all leads and lifts, etc complete as as directed by Engineer-in Charge

Providing and laying plain cement concrete (PCC) 1:5:10 mix using 40 mm nominal size well-graded approved quality aggregate and river sand as directed by the EIC; including compacting, curing, establishing approved dewatering system to keep site dry all time during works below ground, cleaning, preparing surfaces, junctions, etc. including required shuttering all complete at all heights and leads as per specifications to the entire satisfaction of the EIC.

Providing and laying Ready Mix concrete M25 Grade Concrete with minimum cement content 340 Kg/m3 using 20 mm nominal size well-graded aggregate with maximum water cement ratio 0.42 including vibrating / compacting, curing, etc. complete; excluding centering/shuttering and reinforcement; as directed by the Engineer-In Charge complete for all depths, heights, levels and leads.

Providing, straightening, cutting, bending and binding in position FE 500 reinforcement bars, to correct shape and size as per detailed drawings, specifications and as per approved bar bending schedule by Engineer In charge, for all reinforced concrete work in sub and superstructure such as walls, columns / stub columns, beams, slabs, rafts etc.; with correct size PVC cover blocks or approved concrete cover blocks of same grade as of concrete and tying with annealed binding wire of 18 gauge; provide required labour and machines / equipments / tools / tackles for handling, shifting, bending, binding, etc. all complete to the satisfaction of the Engineer Incharge at all depths, height, levels & leads.

Page 3: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

BOQ -Proposed STP Civil works

BOQ -Proposed STP Civil works Page 3 of 8

PARK SHERATON TOWER RENOVATION - CHENNAI

BILL NO : 1 - PROPOSED STP CIVIL WORKS

S.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT

6.00

6a Raft 5.00 Sqm 750 3,750.00

6b RC Wall - Outer and inner walls 200.00 Sqm 750 150,000.00

6c Cover slab 20.00 Sqm 750 15,000.00

6d Caping Beam - Top of Pile 6.60 Sqm 750 4,950.00

7.00

7a PCC - Plinths / Flooring QRO Sqm 250

7b RCC - Plinths / Flooring QRO Cum 250

7c Masonry - Plinths / Flooring QRO Cum 250

SECTION TOTAL - STP TANK - CIVIL WORKS 717,840

TAXES

WCT / VAT -

SERVICE TAX

TOTAL TAXES -

TOTAL INCLUDING TAXES 717,839.60

Providing, fabricating, erecting and fixing in position 12mmthick Plastic coated marine resistant plyboard / MS Sheet Centering and Shuttering true to line and level, including accrow span / Wooden battens with mild steel propping, staging, applying shuttering removal emulsion / oil as approved, required bracing, chamfering corners (of exposed edges) of beams, columns, walls making leak proof joints using medium duty brown self adhesive tape; including MS ties, PVC spacers; and also including removing and dismantling the aforesaid assembly after specified or as approved period from the day of casting of concrete, etc as diercted by the Engineer Incharge, complete at all levels, depths and leads

Breaking and removing the existing Plinths/ flooring without damaging the surroundings and adjacent structure and disposal of all unserviceable material/debris outside the premises as per the direction of Engineer-in-charge. The rates shall be for all depths.

Page 4: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

STP MEASUREMENT SHEETSite: Park Sheraton Hote & Towers.Date: 06/12/112

Slno Description Qty Length Width Depth Total Unit1 Excavation work

1 5.75 4.06 5.48 127.9306Total 127.9306 CUM

2 M25 gradeRcc workPile top caping

building side 1 6.35 0.3 0.23 0.43815East side 1 2.7 0.3 0.23 0.1863West side 1 4.06 0.3 0.23 0.28014

Total 0.90459 CUM

3 Fe500 reinforcementPile top caping 1 140 140

Total 140 KG'S

4 ShutteringPile top caping 1 26.82 0.27 7.2414

Total 7.2414 SQM

Page 5: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

#48/331,Triplicane High Road,

Triplicane , Chennai-05

phone: 044-64101550

Bill No: 092/14-12 TIN NO: 33221367040Date:14/12/12. CST NO: 1014967 Dt: 26-03-10Site: Park sheraton Hotels & Towers. PAN NO: AHHPV5100ARef.AGHL/DW/STW/2012/WO-070.

To,Mr.Vinish Goyal,Director,Adyar Gate Hotels Ltd,132,TTK Road,Alwarpet,Chennai-17

Sub: RA Bill-1 for STP civil work.

Page 6: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

Sl.No Description Length Breadth Depth Qty Unit Rate Total

1 6.44 4.0 5.52 142.20 Cum 775 110,201.28

2

Caping Beam - Top of Pile 13.11 0.3 0.23 0.90 Cum 6,004 5,431.52

3

Excavation by mechanical means in all kinds of soil, wet or dry (such as yellow murrum, hard murrum / gravel or mixture of any kind, etc.), in loose and slushy condition, to the required level from existing ground level or approved strata for foundations,

UG tanks etc.; including disposing off excess excavated material away from site as per direction of the Engineer -In-

Charge and backfilling sides of foundation/ working space with the excavated material (WIth good quality earth approved by

PMC/Client) in layers of 150mm high, consolidation, compacting etc complete. The rate shall be inclusive of

required dewatering by bailing / pumping out water to keep the site dry at all times until completion, making temporary

stepping / sloping, shoring , sectioning, trimming, dressing of sides, leveling or grading, cleaning, removing and excavating loose pockets as directed by the EIC all complete to his entire

satisfaction.

Providing and laying Ready Mix concrete M25 Grade Concrete with minimum cement content 340 Kg/m3 using 20 mm nominal size well-graded aggregate with maximum water

cement ratio 0.42 including vibrating / compacting, curing, etc. complete; excluding centering/shuttering and reinforcement; as

directed by the Engineer-In Charge complete for all depths, heights, levels and leads.

Providing, straightening, cutting, bending and binding in position FE 500 reinforcement bars, to correct shape and size

as per detailed drawings, specifications and as per approved bar bending schedule by Engineer In charge, for all reinforced

concrete work in sub and superstructure such as walls, columns / stub columns, beams, slabs, rafts etc.; with correct size PVC cover blocks or approved concrete cover blocks of same grade as of concrete and tying with annealed binding wire of 18 gauge; provide required labour and machines / equipments / tools / tackles for handling, shifting, bending,

binding, etc. all complete to the satisfaction of the Engineer Incharge at all depths, height, levels & leads.

Page 7: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

Caping Beam - Top of Pile 149.00 Kgs 95 14,155.00

Page 8: BoQ- Proposed STP Civil Works 01Oct 12-2 Final Invoice

4Caping Beam - Top of Pile 26.82 0.27 7.24 Sqm 750 5,431.05

Total 135218.85Rs: One Lack Thirty Five Thousand Two Hundred and Eighteen Only.

Thanks & Regards,

M.Senthil Kumar9941229502

Providing, fabricating, erecting and fixing in position 12mmthick Plastic coated marine resistant plyboard / MS Sheet Centering

and Shuttering true to line and level, including accrow span / Wooden battens with mild steel propping, staging, applying

shuttering removal emulsion / oil as approved, required bracing, chamfering corners (of exposed edges) of beams, columns, walls making leak proof joints using medium duty brown self

adhesive tape; including MS ties, PVC spacers; and also including removing and dismantling the aforesaid assembly

after specified or as approved period from the day of casting of concrete, etc as diercted by the Engineer Incharge, complete at

all levels, depths and leads