BOP Handling
-
Upload
leonardovianna -
Category
Documents
-
view
13 -
download
1
description
Transcript of BOP Handling
-
SUBSEA HANDLING EQUIPMENT
BOP HANDLING SEMIS& DRILLSHIPS
BOP Handling System designs must address thetesting sequences, storage, sea-fastening, guidanceand assembly of the constituent components of BOPstack, along with the running and retrieval of the fullyassembled stack.
There are several ways in which this can be achievedusing combinations of Carriers, Transporters,Elevators, Overhead Cranes, Spider Beams andGantry Cranes.
Being on-board floating vessels, it is imperative thatsuitable guidance systems are employed to safelyescort the BOP Stack / its components duringhorizontal transfers as well as vertical deploymentthrough the moonpool area. Safety of crew, andprotection of equipment and structure from damageare critical considerations in designing such a system.
Elevation on transporter,overhead BOP crane & BOP
stack.
Overhead BOP Crane
Elevating fork-type BOPtransporter
Bulkhead guidance
DESIGNED & CONSTRUCTEDTO OPERATE IN ZONE 1 & SAFE AREAS
-
Block 1, Units 3-7Souterhead RoadAltensAberdeen AB12 3LF Scotland UKT: +44 (0) 1224 249355F: +44 (0) 1224 249339E: [email protected]
1424 West Sam Houston Parkway NorthSuite 140HoustonTexas 77043 USAT: +1 713 468 5325F: +1 713 468 3498E: [email protected]
65 Victoria RoadGuiseleyLeedsLS20 8DQEngland UKT: +44(0)1943 870 822E: [email protected]
11c Tuas RoadSingapore638509T: +65 6794 5261E: [email protected]
www.efcgroup.net
PRODUCT NAMEHERE
SUBSEA HANDLING EQUIPMENT
BOP HANDLING SEMIS& DRILLSHIPS
Testing & assembly of LMRP & BOP(overhead systems or deck mounted systems)Transfer to / from well centreBulkhead guidanceLMRP guidanceSea fixing arrangementsTest stump mechanismsSpider beamsRiser and casing hang-off (up to 1000Te)Moonpool equipment management, power and controlIntegrated Xmas tree handling systems
BOP Carrier Skids Spider beams
BOPElevator