Bop Diagram 1

1
BOP Stack 03+000ABRAXAS PETROLEUM CORP RAVEN RIG NO. 1 11/03/2011 RKB= 0' Total length/GL-top trip nipple Floor= Rotary Beam to G/L= 0' to Top of Rotating Head 0" Height BX-160 0' G/L to Top Hydril 13-5/8" 5M Hydril 0" Height BX-160 13-5/8" 5M x 13-5/8" 0" Height BX-159 10M DSA 13-5/8" 10M - Pipe Rams 0" Height Blind Rams BX-159 /16" 10M 0" Height BX-15 BX-159 13-5/8" 10M - Pipe Rams 0" Height Ground Level / Matting Board Ground Level / Matting Board Spool set @ 3" below G/L BX-159 13-5/8" 10M Spool Spool = 24" BX-159 DSA = 5" 13-5/8" 10M x 11" 5M DSA RX-54 / R-54 Wellhead @ 32" below G/L 11" 5M x 9-5/8" SOW C-22 Profile 2-1/16" 10m BX-152 H.C.R. TO MUD TANKS 11" 5M 13-5/8" 10M 13-5/8" 10M DSA 13-5/8" 5M 13-5/8" 10M 13-5/8" 10M Mud cross Cross

Transcript of Bop Diagram 1

BOP Stack

ABRAXAS PETROLEUM CORP RAVEN RIG NO. 1

11/03/2011

0' Total length/GL-top trip nipple

RKB= Floor= Rotary Beam to G/L=

0' to Top of Rotating Head

0" Height

TO MUD TANKS

13-5/8" 5M

BX-160 13-5/8" 5M Hydril

0' G/L to Top Hydril

0" Height

0" Height

BX-160 BX-159

13-5/8" 5M x 13-5/8" 10M DSA

13-5/8" 10M - Pipe Rams 0" Height Blind Rams

2-1/16" 10m BX-152 0" Height

13-5/8" 10M Mud cross 13-5/8" 10M

BX-159 4-1/16" 10M H.C.R. BX-159 BX-15

13-5/8" 10M - Pipe Rams 0" Height

Ground Level / Matting Board Spool set @ 3" below G/L Spool = 24"

13-5/8" 10M

Ground Level / Matting Board BX-159 13-5/8" 10M Spool BX-159 13-5/8" 10M x 11" 5M DSA RX-54 / R-54 11" 5M x 9-5/8" SOW

13-5/8" 10M

DSA = 5" Wellhead @ 32" below G/L

DSA11" 5M

C-22 Profile