DAILY DOWNTIME MONITORING    DATE 29Jul15 July WEEK 1    MONTHLY START DATE 1Jul15     CURRENT MA WEEK 2    MONTHLY END DATE 31Jul15 WEEK 3    MONTHLY EST WORKING (HRS) 744.00                        WEEK 4    MONTHLY HRS TO REPAIR 64.73                               MTBF 3.50                                                        WEEK 5    CURRENT WORKING HOURS 35.00                               MTTR 9.53                                                        CN BAT300 Sum of Period Down (hrs) Date BD Type 1 BD Type 2 BD Description Corrective Action Component MTBF count Total 7Jun15 BUS TBO Tyre Pos#1 leaks Inspect & Replace Tyre Wheel / Roller Drum 1 2.25    8Jun15 BUS TBO Tyre Pos#1 leaks Inspect & Replace Tyre Wheel / Roller Drum 0 3.47    9Jun15 BUS UBO ORing Hose Dump leaks Replace ORing Hose Dump leaks Hydraulic Plant 1 0.23    12Jun15 BUS UBO Work Lamp Broken Inspect & Replace Bolam Safety & Hazard 1 0.47    14Jun15 BUS UBO Hose Brake leaks Inspect & Replace Hose brake Hydraulic Plant 1 2.10    17Jun15 BS SBV 17.73 18Jun15 BUS UB2 Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 12.00 19Jun15 BUS UB2 Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 12.00 20Jun15 BUS UB2 Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 12.00 21Jun15 BS SBO Inspection performance Front_Diff Inspection performance Front_Diff PPM 0 0.07    BUS UBO Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 7.67    22Jun15 BUS UBO Hose Dump leaks Replace Hose Hydraulic Plant 1 3.00    24Jun15 BUS UBO Work lamp problem Replace Bolam H3 Safety & Hazard 1 0.10    26Jun15 BUS UBO Hose Brake leaks Replace Hose Hydraulic Plant 1 5.05    27Jun15 BUS UBO Drop Box, Abnormal noise Inspect Drop box, indication inner parts problem Transfer / Drop Box 1 8.42    28Jun15 BUS UBO Drop Box, Abnormal noise Inspect Drop box, indication inner parts problem Transfer / Drop Box 0 6.85    29Jun15 BUS UBO Oring hose dump leak Replace Hose Dump leaks Hydraulic Plant 1 0.62    30Jun15 BUS UBO Problem Busing Cylinder dump Welding Stoper Bearing Cylinder Dump Hydraulic Plant 1 1.33    Grand Total 95.35      REMAINING HRS TO REPAIR 30.62 87.18% PT. MUARA BUKIT BILLITON PLANT DIVISION

description

a

Transcript of Book1

Page 1: Book1

DAILY DOWNTIME MONITORING   DATE 29‐Jul‐15 July WEEK 1   MONTHLY START DATE 1‐Jul‐15     CURRENT MA WEEK 2   MONTHLY END DATE 31‐Jul‐15 WEEK 3   MONTHLY EST WORKING (HRS) 744.00                        WEEK 4   MONTHLY HRS TO REPAIR 64.73                               MTBF 3.50                                                        WEEK 5   CURRENT WORKING HOURS 35.00                               MTTR 9.53                                                       

CN BAT300

Sum of Period Down (hrs)Date BD Type 1 BD Type 2 BD Description Corrective Action Component MTBF count Total

7‐Jun‐15 BUS TBO Tyre Pos#1 leaks Inspect & Replace Tyre Wheel / Roller Drum 1 2.25   8‐Jun‐15 BUS TBO Tyre Pos#1 leaks Inspect & Replace Tyre Wheel / Roller Drum 0 3.47   9‐Jun‐15 BUS UBO O‐Ring Hose Dump leaks Replace O‐Ring Hose Dump leaks Hydraulic Plant 1 0.23   

12‐Jun‐15 BUS UBO Work Lamp Broken Inspect & Replace Bolam Safety & Hazard 1 0.47   14‐Jun‐15 BUS UBO Hose Brake leaks Inspect & Replace Hose brake Hydraulic Plant 1 2.10   17‐Jun‐15 BS SBV 17.7318‐Jun‐15 BUS UB2 Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 12.0019‐Jun‐15 BUS UB2 Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 12.0020‐Jun‐15 BUS UB2 Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 12.0021‐Jun‐15 BS SBO Inspection performance Front_Diff Inspection performance Front_Diff PPM 0 0.07   

BUS UBO Front_Diff Damage (Retaining Ring, Beari Replace Front_Diff Inner parts damage. Differential 0 7.67   22‐Jun‐15 BUS UBO Hose Dump leaks Replace Hose Hydraulic Plant 1 3.00   24‐Jun‐15 BUS UBO Work lamp problem Replace Bolam H3 Safety & Hazard 1 0.10   26‐Jun‐15 BUS UBO Hose Brake leaks Replace Hose Hydraulic Plant 1 5.05   27‐Jun‐15 BUS UBO Drop Box, Abnormal noise Inspect Drop box, indication inner parts problem Transfer / Drop Box 1 8.42   28‐Jun‐15 BUS UBO Drop Box, Abnormal noise Inspect Drop box, indication inner parts problem Transfer / Drop Box 0 6.85   29‐Jun‐15 BUS UBO O‐ring hose dump leak Replace Hose Dump leaks Hydraulic Plant 1 0.62   30‐Jun‐15 BUS UBO Problem Busing Cylinder dump Welding Stoper Bearing Cylinder Dump Hydraulic Plant 1 1.33   

Grand Total 95.35

     REMAINING HRS TO REPAIR ‐30.6287.18%