Bomba VE VRZ EE14E-11162 VRZ Service Manual

download Bomba VE VRZ EE14E-11162 VRZ Service Manual

of 117

Transcript of Bomba VE VRZ EE14E-11162 VRZ Service Manual

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    1/117

    Pub. No. EE14E-11162

    SERVICE MANUAL REPAIR SERVICE& MAINTENANCE

    VRZ

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    2/117

    The following marks are used in this service manual to facilitate correct VRZ maintenance.

    Advice Procedures that must be performed to enable the best possible VRZmaintenance.

    Note Information assisting in the best possible VRZ maintenance.

    MEANINGS OF MARKS

    WARNINGS

    The following definitions and warning signs are used in this service manual.These are extremely important to safe operation.Important points are described to prevent bodily injury and property damage.They must be fully understood before beginning VRZ maintenance.

    CAUTION!! Improper maintenance can result in injury and property damage.CAUTION

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    3/117

    FOREWORDThe contents of the manual, includingillustrations, drawings and specifications werethe latest available at the time of printing.

    The right is reserved to make changes inspecifications and procedures at any timewithout notice.

    BOSCH K.K.Sales Automotive Aftermarket Division

    This service manual describes the disassembly,inspection, reassembly and adjustment of theVRZ (radial plunger system position-control

    distributor type fuel injection pump).Refer to the separate service manuals listedbelow to facilitate VRZ type injection pumpmaintenance.This manual is intended for use by vehiclemaintenance technicians or persons with anadequate knowledge of injection pumps.

    Service manual Publication number

    VRZ Construction and Operation EE14E-11150

    INJECTION PUMP TEST BENCH 10NP & 20 NP, Operation EC18E-11081

    CONTINUOUS MEASURING DEVICE ZCM & ZCD, Operation EC18E-11091

    CONTROLLER ASSEMBLY MC-02, FOR VRZ & COVEC-F EC14E-11022

    WITH EEP-ROM, Operation

    MC-02 TESTER SOFTWARE, ADJUSTMENT AND INSPECTION ED14E-11011

    DATA, FOR VRZ AND COVEC-F WITH EEP-ROM, Installation

    ECU ASSEMBLY, ADJUSTMENT AND INSPECTION DATA, ED14E-11021FOR VRZ AND COVEC-F WITH EEP-ROM, Installation

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    4/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    5/117

    SERVICE PRECAUTIONS

    - 1 -

    [1] Carrying the injection pump Never knock or drop the injection pump

    when carrying it.

    When carrying the injection pump, hold thepump by the bottom of the pump body.

    P-VRZR- 320

    P-VRZR- 321

    P-VRZR- 322

    P-VRZR- 323

    Pump body

    GE actuator

    GE actuator

    Wire harness

    Harness connectors

    GE actuator

    Wire harness

    Injection pump

    Injection pump

    Never hold the pump by the GE actuator orthe harnesses.Holding the pump by these components mayresult in damage or injury.

    CAUTION

    [2] Disassembly and reassembly Only the mechanical components of the

    injection pump body can be disassembledand reassembled.

    AdviceDo not disassemble the GE actuator otherthan directed in this manual. The GE actuator consists of electrical

    components. Do not damage them.

    When cleaning the injection pump, do notclean the GE actuator, the harnesses, or theharness connectors using fuel oil. Use onlyclean waste cloth.

    Injection pump

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    6/117

    SPECIAL TOOLS

    - 2 -

    20 21

    2233

    34

    24

    26

    8

    11

    12

    28

    23

    14

    15

    25

    16

    37

    36

    17

    35

    18

    19

    31

    32

    30

    10

    9

    5

    3, 4

    1

    2

    13

    27

    29

    6

    7

    1. DISASSEMBLY, INSPECTION AND REASSEMBLY TOOLS[1] Tool use locations

    P-VRZR- 324

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    7/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    8/117

    SPECIAL TOOLS

    - 4 -

    Keyno

    RBAJ part no Bosch part no Part name Qty Remarks

    30

    31

    32

    33

    34

    35

    36

    37

    157915-9700

    157928-4800

    157917-4920

    157977-8000

    026512-1640

    157971-0500

    157924-8520

    157928-4400

    9 681 610 686

    9 442 612 302

    9 681 610 711

    9 681 610 829

    9 421 617 041

    9 443 613 408

    9 681 611 028

    9 442 612 371

    Socket

    Plate

    Wrench

    Adapter

    Gasket

    Clip

    Base

    Pliers

    1

    1

    1

    1

    3

    1

    1

    1

    For removing and installing pump support

    bracket (T50)

    For temporarily holding feed pump

    For turning auxiliary gear

    For inlet piping

    For inlet piping

    For fixing plunger

    Stand for installing drive gear

    For removing and installing drive gear snapring

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    9/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    10/117

    SPECIAL TOOLS

    - 6 -

    10. 157928-4120(9 442 612 299)Extractor

    11. 157829-3520(9 681 610 171)Measuring device

    12. 157845-8900(9 681 610 626)Adapter

    13. 105782-4530(9 680 610 094)Measuring device

    14. 157917-4620(9 681 610 710)Wrench

    15. 157848-2300(9 681 611 027)Oil seal guide

    16. 157926-2421(9 681 610 773)Extractor

    17. 157927-4500(9 443 613 008)Puller

    18. 157928-5820(9 443 613 397)Hook

    46

    25 75

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    11/117

    SPECIAL TOOLS

    - 7 -

    19. 157928-3120(9 442 612 297)Clip

    20. 157928-3620(9 442 612 298)Holder

    21. 157928-4200(9 442 612 369)Guide

    22. 157928-4500(9 442 612 300)Set screw

    23. 157928-4700(9 442 612 301)Spacer

    24. 105782-4540(9 680 610 095)Measuring device

    25. 157847-0820(9 442 612 370)Coupling

    26. 157915-9820(9 681 610 687)Holder

    27. 157915-9201(9 681 610 684)Bit

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    12/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    13/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    14/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    15/117

    SPECIAL TOOLS

    - 11 -

    1. 105796-0000(1 688 010 129)Fixing stand

    2. 157808-4720(9 442 612 278)Injection pipe

    3. 157641-6820(9 443 612 974)Joint assembly

    4. 157811-9020(9 681 610 453)Flange

    5. 157829-0820(9 681 610 336)Adjusting device

    6. 157971-1020(9 443 613 442)Piping assembly

    8. 105793-0020(9 681 610 418)Adjusting device

    9 . 157845-9520(9 681 610 630)Pipe assembly

    7. 105781-0890(9 680 610 087)Stand

    200

    11

    M10X1.0

    M12X1.5

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    16/117

    SPECIAL TOOLS

    - 12 -

    [3] Adjustment controller assembly breakdown:Key no. 1: 105782-8360 (9 680 610 209)Note:The numbers in brackets below are Bosch part numbers.

    Adjustment controller assembly part table (for VRZ)

    1:105782-8360(9 680 610 209)

    1-1: 157966-4020(9 443 613 446)

    1-2: 157966-3720

    (9 443 613 456)

    1-3: 157966-3820(9 443 613 457)

    1-4: 157966-3920

    (9 443 613 458)

    1-1-1: 157966-4120 (9 443 613 447)

    1-1-9: 157966-5100 (9 443 613 455)

    1-1-8: 157966-5020 (9 443 613 454)

    1-1-7: 157966-4920 (9 443 613 453)

    1-1-6: 157966-4820 (9 443 613 452)

    1-1-5: 157966-4720 (9 443 613 451)

    1-1-4: 157966-4620 (9 443 613 450)1-1-3: 157966-4520 (9 443 613 449)

    1-1-2: 157966-4420 (9 443 613 448)

    Keyno

    RBAJ part no Bosch part no Part nameQty

    Remarks

    1-1 157966-4020 9 443 613 446 CONTROLLER ASSY 1

    1-1-1 157966-4120 9 443 613 447 Controller unit 1 Checker assy

    1-1-2 157966-4420 9 443 613 448 Wire harness 1 Power supply (Japan, USA)

    1-1-3 157966-4520 9 443 613 449 Wire harness 1 Power supply (EC)

    1-1-4 157966-4620 9 443 613 450 Wire harness 1 PC: COM1 ~ MC-02

    1-1-5 157966-4720 9 443 613 451 Wire harness 1 PC: COM2 ~ MC-021-1-6 157966-4820 9 443 613 452 Wire harness 1 FCV GND harness

    1-1-7 157966-4920 9 443 613 453 Main harness 1 Controller-Pump GE

    1-1-8 157966-5020 9 443 613 454 Main harness 1 Controller-Pump ROM

    1-1-9 157966-5100 9 443 613 455 CD-ROM 1 Software (Overseas Ver.) & (Calibration data)& Manual

    1-3 157966-3820 9 443 613 457 ECU assembly 1 For Mitsubishi 4M41 engines

    Note:Key number 1 (RBAJ part no.105782-8360, Bosch part no. 9 680 610 209) enables adjustment ofboth VRZ and COVEC-F pumps.With the VRZ, however, only key numbers 1-1 (RBAJ part no. 157966-4020, Bosch part no. 9 443613 446) and 1-3 (RBAJ part no. 157966-3820, Bosch part no. 9 443 613 457) are necessary.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    17/117

    SPECIAL TOOLS

    - 13 -

    1-1 157966-4020(9 443 613 446)CONTROLLER ASSY

    1-1-1 157966-4120(9 443 613 447)

    Controller unit

    1-1-4 157966-4620(9 443 613 450)Wire harness

    1-1-2 157966-4420(9 443 613 448)Wire harness

    1-1-5 157966-4720(9 443 613 451)Wire harness

    1-1-6 157966-4820(9 443 613 452)Wire harness

    1-1-7 157966-4920(9 443 613 453)Main harness

    1-1-8 157966-5020(9 443 613 454)Main harness

    1-1-9 157966-5100(9 443 613 455)CD-ROM

    1-1-3 157966-4520(9 443 613 449)Wire harness

    20002000

    2000

    1000

    2990

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    18/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    19/117

    DISASSEMBLY

    - 15 -

    161

    922

    100

    101

    160

    102

    878S

    925 923

    920

    912914

    90550

    22

    3537

    36

    33

    65

    34

    50

    11

    83

    80/7

    45

    38

    931 930

    46

    3132

    3530

    62

    53

    61

    50

    54 60

    51

    2018

    9

    8080/8

    1

    4243

    4140

    82

    66

    108

    76

    5

    15

    810S 856S2726

    2

    910911

    3

    56

    205

    17

    25

    16

    55

    948 949

    110

    949

    50

    111

    112

    50

    130

    150/8152

    150

    153

    956

    955

    151

    121

    120

    122

    1. PREPARATION Clean the outside of the injection pump

    before disassembly, removing all grease anddirt. Drain the fuel oil from the pump.

    Keep the work bench and workshop cleanand tidy.

    Before beginning disassembly, recordperformance data for later reference tofacilitate the diagnosis of malfunctions anddefects, if any, in the pump.

    2. EXPLODED VIEW

    P-VRZR- 326

    Lay out the disassembled parts neatly andsequentially on the work bench, labellingthem if necessary, to facilitate laterreassembly.

    Prepare a container of clean fuel oil forplungers, delivery valves and other precisionparts.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    20/117

    DISASSEMBLY

    - 16 -

    3. ENGINE DRIVE GEAR REMOVAL(1) Fix the injection pump bracket in a vise.

    (2) Install wrench B so that it can turn the twogears (ie, the main gear and the sub-gear)clockwise.

    (3) Turn the main gear and the sub-gear usingwrench A until they are aligned. Then, inserta bolt through the two gears and tighten itus ing a torque wrench. (T ightentemporarily.)

    (4) Remove wrenches A and B and the torquewrench from the drive gear.

    (5) Install wrench B so that the main gear andthe sub-gear are in the center of wrench B.

    (6) Remove the bolt from the drive gear.(7) Align the main gear and the sub-gear using

    wrench A, then install the bolt and tightento the specified torque.

    Specified torque: 9 ~ 13 Nm{0.9 ~ 1.3 kgfm}

    Note:

    The drive gear is divided into the main gear andthe sub-gear.Wrench B is used to prevent drive gear rotation.Wrench A is used to align the main gear andthe sub-gear.

    Tool name Part no Remarks

    Wrench A 157917-4920

    Wrench B 157917-4620

    P-VRZR- 300

    P-VRZR- 301

    Injection pump body

    Drive gear

    Wrench A

    Wrench B

    Bolt (M6x1)

    P-VRZR- 318

    Drive gear

    Wrench A

    Wrench B

    Bolt (M6x1)

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    21/117

    DISASSEMBLY

    - 17 -

    (8) Remove wrench A.

    (9) Remove the roundnut (SW21) fixing thedrive gear.

    (10) Assemble puller A in the gap between the

    drive gear and the bracket and loosely fixthe bolts.

    (11) Assemble puller B to the drive shaft andpuller A.

    Tool name Part no Remarks

    Puller 157927-4500 Parts A and B

    P-VRZR- 302

    P-VRZR- 303

    P-VRZR- 305

    P-VRZR- 304

    Sub-gear

    Socket wrench

    Bolt

    Puller A

    Drive shaft

    Puller B

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    22/117

    DISASSEMBLY

    - 18 -

    (12) Tighten the puller bolt to remove the drivegear.

    AdviceHold the puller so that it does not drop whenthe gear is removed from the drive shaft.

    (13) Remove the drive shaft key.

    (14) Remove the nuts (at three locations).

    (15) Remove the bracket from the pumphousing and then remove the O-ring.

    P-VRZR- 306

    P-VRZR- 307

    P-VRZR- 319

    Drive gear

    Bolt

    Key

    Nuts (3)

    Bracket

    O-ring

    Drive shaft

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    23/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    24/117

    DISASSEMBLY

    - 20 -

    [2] Magnet valve removal(1) Remove the magnet valve harness grommet

    and then remove the harness nut.(2) Remove the magnet valve and the filter.AdviceDo not lose the armature spring.

    [3] GE actuator removal(1) Remove the GE actuators torx bolts and

    spring washers.

    (2) Remove the GE actuator.

    AdviceDo not damage the ball pin (refer to the GEactuator on page 35).

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9600 T30

    [4] Regulating valve removalAssemble the socket wrench to theregulating valve and then remove theregulating valve.

    Tool name Part no Remarks

    Socket wrench 157913-7000

    AdviceDo not remove the GE cover.

    P-VRZR- 020

    P-VRZR- 021

    P-VRZR- 023

    P-VRZR- 022

    Magnet valve

    Grommet Nut

    GE actuator Torx bolts (6)

    Spring washers (6)

    GE coverHolder

    Bit

    GE actuator

    S o c k e t

    wrenchRegulating valve

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    25/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    26/117

    DISASSEMBLY

    - 22 -

    (3) Remove the TPS, the adjusting shim, thetimer spring, the core rod and the TPSstandard point shim.

    AdviceLabel the TPS standard point shim and thetimer stroke adjusting shim to avoidmistaking them at reassembly.

    P-VRZR- 027

    TPS

    Adjusting shim

    TPS standard point shim Core rod

    (2) Remove the TPS bolts.

    P-VRZR- 026

    TPS bolts (2)

    TPS

    Timer spring

    (4) Remove the timer cover and the O-rings

    (large and small).

    P-VRZR- 028

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9600 T30

    O-ring (small)

    Timer cover

    O-ring (large)

    Bit Holder

    Torx bolts (2)

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    27/117

    DISASSEMBLY

    - 23 -

    Tool name Part no Remarks

    Socket wrench 157914-3600

    P-VRZR- 029

    [7] CPV (constant pressure valve)holder and plug removal

    (1) Loosen the CPV holders.

    (2) Remove the CPV holders and the gaskets.AdviceLine up the removed CPV holders in orderto match the positions (A, B, C, D) on thedistributor head from where they wereremoved.

    P-VRZR- 030

    (3) Remove the plug using a hexagon wrench

    (SW14mm).

    P-VRZR- 031

    Socket wrench

    Gaskets (4)

    CPV holders (4)

    Plug

    Hexagon wrench

    Distributor head

    CPV holders (4)

    (4) Remove the snapring and shim from therotor shaft.

    Note:The shim is easier to remove after removing thedistributor head assembly.

    P-VRZR- 032

    Shim

    Snapring

    Distributor head

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    28/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    29/117

    DISASSEMBLY

    - 25 -

    (2) Remove the rotor shaft assembly andremove the rollers and roller shoes from therotor shaft.

    Advice Do not drop the rollers or the roller shoes.

    Do not change the roller and roller shoecombinations.

    (3) Assemble the clip to prevent the plungerfrom dropping out of the rotor shaftassembly.

    P-VRZR- 036

    [11] Drive shaft removalRemove the drive shaft, the washer and theseal ring.

    P-VRZR- 038

    [10] Snapring removalInsert the hooks pin into the snaprings holeand tighten the butterfly nut to pull out thesnapring.

    P-VRZR- 037

    Tool name Part no Remarks

    Hook 157928-5820

    Rotor shaft assembly

    Spring

    Roller shoes

    Rollers

    Snapring

    Hook

    Drive shaft

    Seal ring

    Tool name Part no Remarks

    Clip 157971-0500

    Washer

    Pin

    Clip

    AdviceDo not disassemble the plunger from the

    rotor shaft.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    30/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    31/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    32/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    33/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    34/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    35/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    36/117

    COMPONENT INSPECTION

    - 32 -

    [7] Rotor shaft assembly(1) Replace the distributor head assembly if any

    of the rotor shaft assemblys sliding partsare peeling, gnawed or scorched.

    (2) Replace the washer with a new one if it isworn.

    P-VRZR- 056

    P-VRZR- 057

    P-VRZR- 058

    Timer slider

    Cam ring

    Rotor shaft assembly

    Drive shaft assembly

    (6) Replace the drive shaft assembly if there isany play between the rotor shafts ball pinand the drive shaft.

    [8] Cam ring(1) Replace the cam ring if the cam ring pin is

    worn.(2) Replace the cam ring if there is any play

    between the cam ring pin and the timerslider.

    Rotor shaft

    (3) Replace the cam ring if the cam rings camprofile is peeling or scorched.

    P-VRZR- 059

    Radial plungers

    Rollers

    Roller shoes

    Cam ring

    Ball pin

    Pin

    Washer

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    37/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    38/117

    COMPONENT INSPECTION

    - 34 -

    [11] CPV (constant pressure valve)holder

    Replace the CPV holder if the CPV holderseat is scratched.

    P-VRZR- 064

    P-VRZR- 065

    P-VRZR- 066

    CPV holder

    Control sleeve

    GE actuators ball pin

    (5) Assemble the GE actuators ball pin to thecontrol sleeve groove. If there is any play,replace the distributor head assembly.

    [12] Plug and rotor shaft spring(1) Replace the rotor shaft spring if it is rusted

    or damaged.(2) Replace the plug with a new one if it is burred

    or the thread is damaged.AdviceAlways replace the O-ring assembled to theplug with a new one.

    [13] Regulating valveReplace the regulating valve assembly if thepiston inside the regulating valve is sticking.

    Advice Always replace the O-rings with new

    ones. Do not disassemble the regulating valve

    unless necessary.

    P-VRZR- 067

    Plug Rotor shaft spring

    Regulating valve

    O-rings

    Stopper

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    39/117

    COMPONENT INSPECTION

    - 35 -

    6

    5

    3

    2

    1

    12

    11

    10

    9

    8

    7

    4

    [14] Magnet valve(1) Replace the magnet valve assembly if the

    armature is scorched or cracked.(2) Replace the magnet valve assembly if the

    spring is damaged or rusted.AdviceAlways replace the O-ring with a new one.(3) Check the magnet valve resistance and

    replace the magnet valve assembly if theresistance is not as specified.

    P-VRZR- 068

    P-VRZR- 069

    P-VRZR- 070

    [15] GE actuator(1) Replace the GE actuator if the ball pin isworn or if the plating is damaged or peeling.

    (2) Assemble the GE actuators ball pin in the

    control sleeve groove and confirm that thereis no play.If there is any play between the ball pin andthe control sleeve, replace the GE actuatoror the distributor head assembly or both.

    Control sleeve

    GE actuator

    GE actuator

    GE actuator terminals (reference)

    Terminal no. Name Remarks

    1 FCV Black, magnet valve

    2 Blank -

    3 Blank -

    4 CSP (OSC) Yellow

    5 TCV (+) Red

    6 GE (+) White

    7 TF (+) Blue, fuel temperature (+)

    8 CSP (MDL) Red

    9 TCV (-) Black

    10 GE (-) Green

    11 TF (-) Grey, fuel temperature (-)12 CSP (GND) BlackP-VRZR- 312

    Magnet valve

    O-ring

    Spring

    Armature

    Ball pin (4) Clean the gauze filter.

    Terminalnos

    Resistance( )

    Ambient temperature(C)

    1 - GND 8.01.2 235

    Gauze filter

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    40/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    41/117

    COMPONENT INSPECTION

    - 37 -

    P-VRZR- 314

    [18] Np sensorsMeasure the Np sensors resistances.

    Np sensors

    [19] Fuel temperature sensorMeasure fue l temperature sensorresistances.See page 35 for GE actuator terminals.Reference values:

    Fuel temperature (C)

    (k)

    3 (+)

    2 (-)

    1

    P-VRZR- 163

    Resistance

    Terminalnos

    Resistance( )

    Fuel temperature (C)

    7 - 8 2 25

    (25, 2) = (fuel temperature, resistance)

    Terminal nos Resistance ( ) Remarks

    2 - 3 2.15k Main

    2 - 3 2.15k Backup

    AdviceWhen using a digital circuit tester,resistances cannot be measured unless youhold the minus probe against the No. 2terminal and the plus probe against the No.3 terminal.

    (+)

    (-)

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    42/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    43/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    44/117

    GEAR REASSEMBLY

    - 40 -

    P-VRZR- 333

    P-VRZR- 334

    P-VRZR- 335

    P-VRZR- 336

    (7) Attach the sub-gear to the main gear. Atthis time, hook the sub-gears pin to thespring.

    (8) Align the wrench with the sub-gears holesand attach it to the sub-gear.

    Tool name Part no RemarksWrench 157917-4920

    (9) Turn the wrench counterclockwise to align

    the main gears teeth with the sub-gearsteeth.

    (10) Screw in the socket head bolt (SW5) totighten the sub-gear to the main gear.

    Specified torque: 9 ~ 13 Nm{0.9 ~ 1.3 kgfm}

    Part namePart no

    (Mitsubishi part no)Remarks

    Socket head bolt149917-1500(ME204287)

    SW5

    CAUTION

    Socket head bolts cannot be reused.

    (11) Hold the snapring open using pliers andinstall it in the main gears snapring groove.

    Part namePart no

    (Mitsubishi part no)Remarks

    Snapring 149931-1600(ME204236)

    Tool name Part no Remarks

    Pliers 157928-4400

    Socket head bolt

    Wrench

    Sub-gear

    PliersSnapring

    Main gear

    Base

    Pin

    Sub-gear

    Spring

    Sub-gear

    Wrench

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    45/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    46/117

    REASSEMBLY

    - 42 -

    The reassembly of the VRZ type injection pumpis basically the reverse of the disassemblyprocedure. The following describes the standardreassembly procedure.Always replace gaskets and O-rings with new

    ones.1. REASSEMBLY[1] Feed pump assembly reassemblyAdvice Confirm that the blades grooves are

    positioned toward the inside. Blade and rotor orientation cannot be

    changed. The feed pumps liner is marked with an

    R for clockwise injection pump rotation

    or an L for counterclockwise injectionpump rotation. Install the liner so thatthe applicable mark can be seen whenthe liner is viewed from the head side.

    Tool name Part no Remarks

    Feed pump holder 157928-4320

    P-VRZR- 077

    P-VRZR- 078

    Blade

    Liner

    Rotor

    (2) Position the feed pump cover notch towardthe GE actuator side and insert the feedpump assembly into the pump housing untilthe feed pump is contacting the housing.

    (3) Hold the feed pump holder so that it doesnot move and turn the pump housing upsidedown.

    P-VRZR- 079

    Cover

    Feed pumpFeed pump holder

    Feed pump holder

    Pump housing

    Stamping

    Pins

    Chamfer

    Notch

    Notch

    (1) Position the feed pump assembly and the

    cover on the feed pump holder. Assemblethe holder pins in the feed pump holes (2).

    AdviceAlign the feed pump cover notch with thefeed pump holder chamfer.

    Notch

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    47/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    48/117

    REASSEMBLY

    - 44 -

    P-VRZR- 083

    P-VRZR- 084

    (10) Remove the set screw and install the othertwo torx bolts.

    (11) Tighten the four torx bolts uniformly. (Oneof the four torx bolts does not screw intothe pump housing.)

    Specified torque: 3.0 ~ 4.0 Nm{0.3 ~ 0.4 kgfm}

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9201 T15

    For feed pump Part no Remarks

    Short torx bolt149916-0400

    (9 443 612 874)1

    Long torx bolt149916-0300

    (9 443 612 873)3

    Holder

    Bit

    Head

    side

    Feed pump

    side

    Seal ring

    AdviceMove the rotor backward and forward andleft and right with your finger and check thatit moves smoothly. If it does not movesmoothly, loosen the feed pump cover andthen retighten it to the specified torque.

    (12) Insert the seal ring into the feed pump

    cover.AdviceBe careful with the assembly orientation ofthe seal ring and ensure it is securelyassembled to the feed pump cover.

    [2] Bearing reassembly(1) Assemble the holder to the bearing and

    press the holder button (to hold the bearing).(2) Install the bearing in the pump housing.

    P-VRZR- 085

    Tool name Part no Remarks

    Holder 157928-3620

    Holder

    Bearing

    Pump housing

    Button

    AdviceEnsure the bearing is positioned correctly.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    49/117

    REASSEMBLY

    - 45 -

    [3] Timer piston reassembly(1) Assemble the slider in the timer piston.

    P-VRZR- 086

    (2) Assemble the timer piston and slider in thepump housing.

    Advice

    Align the slider hole with the timer pistonhole.

    The slider is assembled in the timer withthe hole positioned toward the GEactuator side.

    Note:The timer pistons low pressure side ispositioned toward where the Q adjustment ROMis installed.

    P-VRZR- 087

    [4] Cam ring reassemblyAssemble the cam ring in the pump housing.At this time, insert the cam ring pin into thetimer pistons slider hole.

    AdviceConfirm that the timer piston slidessmoothly.

    P-VRZR- 088

    Slider

    Timer piston

    Timer piston

    Pump housing

    Cam ring

    Pump housing

    Cam ring pin

    Slider hole

    Timers low pressure side

    Timers low pressure side

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    50/117

    REASSEMBLY

    - 46 -

    [5] Drive shaft reassembly(1) Insert the holder into the bearing.(2) Press the holder button to hold the bearing

    and pull the bearing into the head.AdvicePull the bearing into the head so that a gapremains between the feed pump cover andthe bearing.

    (3) Insert the spacer into the pump housing.

    P-VRZR- 089

    P-VRZR- 090

    P-VRZR- 091

    Tool name Part no Remarks

    Spacer 157928-4700

    (4) Assemble the shim and the feed pumps

    drive side key on the drive shaft.(5) Assemble the oil seal guide on the drive

    shaft thread.Key

    Shim

    Oil seal guideDrive shaft

    (6) Confirm that the seal ring is inserted intothe feed pump cover (see bottom figure ofpage 44).

    (7) Align the drive shaft key with the feed pumprotor key groove and insert the drive shaftinto the feed pump.

    AdviceInsert the drive shaft gently into the feedpump while turning it clockwise and counterclockwise to align the key with the keygroove.

    P-VRZR- 092

    Tool name Part no Remarks

    Holder 157928-3620Holder

    Spacer

    Drive shaft

    Pump housing

    Spacer

    Bearing

    Tool name Part no Remarks

    Oil seal guide 157928-4000For 25 diashaft

    U-shaped

    ring

    Feed pump cover

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    51/117

    REASSEMBLY

    - 47 -

    ;

    ;

    [6] Snapring reassembly(1) Remove the spacer from the pump housing.

    AdviceConfirm that the drive shafts snapringgroove can be seen through the housingwindow.

    P-VRZR- 094

    (8) Lightly tap the drive shaft using a plastichammer to assemble the drive shaft with theend fully protruding from the drive side.

    Advice When tapping the drive shaft with the

    plastic hammer, ensure no burrs or dirtremain on the shaft.

    Insert the drive shaft so that the end ofthe drive shaft is 1 ~ 2 mm higher thanthe end of the inner cam (when viewedfrom above).

    After assembling the drive shaft, confirmthat the shaft rotates smoothly.

    (3) Position the snapring in the drive shafts ringgroove and push it straight down.

    (4) Remove the clip from the snapring and usethe end of the clip to push the snapring fullyinto the groove.

    AdviceConfirm that the snapring is fully insertedinto the groove and that the drive shaft canbe rotated.

    (2) Assemble the snapring to the clip.

    P-VRZR- 095

    P-VRZR- 096

    P-VRZR- 093

    Tool name Part no Remarks

    Clip 157928-3120

    Snapring

    Clip

    Plastic hammer

    Pump housing

    Spacer

    Snapring

    Clip AdvicePosition the snapring on the clip with theconvex face toward the clip.

    Drive shaft

    Inner cam

    Drive shafts snapring groove

    Convex face

    1 ~ 2 mm

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    52/117

    REASSEMBLY

    - 48 -

    P-VRZR- 097

    [7] Adjusting drive shaft axial play(1) Position the distributor head on the pump

    housing.AdviceDo not assemble the O-ring or the controlsleeve at this time.

    (2) Install and tighten two diametrically opposedtorx bolts of the four to install the distributorhead.

    Specified torque: 10.0 ~ 14.0 Nm{1.0 ~ 1.4 kgfm}

    Tool name Part no Remarks

    Measuring device 105782-4530

    P-VRZR- 100

    P-VRZR- 099

    (3) Attach the measuring device to the drive

    shaft.(4) Attach the dial gauge to the measuring

    device.

    P-VRZR- 098

    (5) Measure the drive shafts axial play.

    Specified value: 0.10.05 mm(with the head assembly installed)

    (6) If not as specified, select shims from thetable on the following page and exchangethe shims until the axial play is as specified.(Refer to page 49.)

    AdviceIf the axial play varies greatly from the

    specified value, repeat procedure [5] on page46 and [6] on page 47.

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9600 T30

    Measuring device

    Distributor head

    Pump housing

    Torx bolts (2)

    Bit

    Holder

    Drive shaft

    Measuring device

    Dial gauge

    Drive shaft

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    53/117

    REASSEMBLY

    - 49 -

    (7) Remove the dial gauge.(8) Remove the measuring device handle and

    attach the extractor.

    (9) Screw in the extractor to remove themeasuring device.

    P-VRZR- 102

    (10) Remove the torx bolts from the distributor

    head.(11) Remove the distributor head from the

    pump housing.

    Tool name Part no Remarks

    Extractor 157926-2421

    P-VRZR- 101

    P-VRZR- 103

    RBAJ part no Bosch part no Thickness (mm)

    149602-0000149602-0100149602-0200149602-0300149602-0400149602-0500149602-0600149602-0700149602-0800149602-0900149602-1000

    9 443 612 8099 443 612 8109 443 612 8119 443 612 8129 443 612 8139 443 612 8149 443 612 8159 443 612 8169 443 612 8179 443 612 8189 443 612 819

    1.901.952.002.052.102.152.202.252.302.352.40

    [8] Selecting the rotor shaft shimPurposeThe rotor shafts axial play is measured and thenthe play is adjusted to the specified value usingthe shim.

    Procedure 1 Adjusting the dial gauges 0point

    (1) Insert the rotor shaft into the distributor head.

    (2) Install the snapring in the rotor shaftssnapring groove.AdviceDo not assemble the shim at this time.

    Snapring

    Rotor shaft

    Extractor

    Distributor head

    Pump housing

    Distributor head

    Measuring device

    Shims

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    54/117

    REASSEMBLY

    - 50 -

    P-VRZR- 104

    (3) Attach the adapter to the head and thenattach the measuring device to the adapter.

    P-VRZR- 105

    Tool name Part no Remarks

    Adapter 157845-8900

    Measuringdevice

    157829-3520 For measuringVE cam lift

    (4) Pull the rotor shaft fully to the left and setthe dial gauge to the 0 position.

    P-VRZR- 106

    Procedure 2 C a l c u l a t i n g t h e s h i m

    thickness(1) Push the rotor shaft fully to the right and

    measure the full stroke from the dial gauge.AdviceThe rotor shafts groove must not catch onthe head.

    P-VRZR- 107

    (2) Select a shim using the formula below.Shim thickness = full stroke0.2 (mm)

    RBAJ part no(key no. 53)

    Bosch part noThickness

    (mm)

    149720-0000149720-0100149720-0200149720-0300

    9 443 612 8519 443 612 8529 443 612 8539 443 612 854

    2.12.22.32.4

    (3) Install the selected shim and the snapring

    to the rotor shaft.(4) After inserting the shim, confirm that thestroke is as specified. If not as specified,repeat Procedure 1 and Procedure 2.Specified stroke: 0.20.1 mm

    Adapter

    Measuring device

    Head

    Rotor shaft

    Head

    Head

    Adapter

    Adapter

    Measuring device

    Measuring device

    Shim Snapring

    Rotor shaft

    Distributor head

    Rotor shaft

    Rotor shaft

    Dial gauge

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    55/117

    REASSEMBLY

    - 51 -

    P-VRZR- 108

    (5) Remove the dial gauge and adapter fromthe head.

    (6) Remove the snapring.

    [9] TPS and timer cover reassembly(1) Assemble the TPS to the pump housing.Specified torque: 7.0 ~ 10.0 Nm

    {0.7 ~ 1.0 kgfm}AdviceDo not mistake the positions of the TPSstandard point shim and the adjusting shim.

    (2) Assemble the O-rings (at two locations) and

    then assemble the high pressure side timercover on the pump housing.

    Specified torque: 7.0 ~ 10.0 Nm{0.7 ~ 1.0 kgfm}

    P-VRZR- 109

    P-VRZR- 110

    [10] Pump removalRemove the pump housing from bracket C.

    Pump housing

    TPS

    Pump housing

    Pump housing

    Timer cover

    Bracket C

    TPS standard point shim

    Adjusting shim

    Core rod

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    56/117

    REASSEMBLY

    - 52 -

    Cam ring

    Timer piston

    Cam link pin

    Link plate

    Timing link shaft ball pin

    Control sleeve

    Timing link shaft

    Angle of cam rotation ()

    VRZ pre-stroke (substitute)

    Beginning of

    cam lift

    Beginning of pressure

    delivery

    Originalpre-stroke

    Caml

    ift(mm)

    Pre-stroke adjustment values

    2. PRE-STROKE ADJUSTMENT

    Fundamentally, pre-stroke is the amount of lift from the cams bottom dead center position to thebeginning of pressure delivery position. With the VRZ pump, however, because it is not possibleto measure the cam lift with the pump assembled, the cam angle is instead measured from the

    beginning of cam lift position to the beginning of pressure delivery position.The beginning of pressure delivery position can be changed by changing the phase (ie, the angle)between the cam link and the control sleeve, which are connected by the timing link shaft.Consequently, by changing the position of the link plate groove, we can change the phase of thecam link and the control sleeve to adjust the pre-stroke (ie, substituting the angle instead).

    Pre-stroke adjustment sequence(1) Attach the measuring device to the pump.(2) Align the measuring devices measuring terminal with the standard cylinder Bs cam position.(3) Find the cams bottom dead center position using the dial gauge, then zero the dial gauge.(4) Rotate the pump in the specified direction of rotation and set the cam lift to 0.70 mm using the

    dial gauge.(5) Set the 0 point using the KMA device to display cam lift as an angle.(6) Turn the pump back 10 in the direction opposite to the specified direction of rotation. Turn the

    pump 5 in the specified direction of rotation (to prevent backlash).(7) Confirm that the dial gauge displays 0 mm.(8) Using the KMA device, reset the 0 point. (Using the KMA device, begin cam lift.)

    P-VRZC- 034 P-VRZR- 315

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    57/117

    REASSEMBLY

    - 53 -

    (4) Install the pre-stroke measuring device.Specified torque: 10.0 ~ 14.0 Nm

    {1.0 ~ 1.4 kgfm}

    Tool name Part no Remarks

    Measuring device 105782-4540

    [1] Measuring device installation

    P-VRZR- 111

    P-VRZR- 112

    Drive shaft key position

    for 4M41 model engine

    Measuring device Drive shaftExisting bolts (2)

    CAUTION

    The pump test bench drive motor must beturned OFF.

    Injury or damage may result if the pump testbench drive motor is turned ON.

    Advice Align the drive shafts key groove and the

    measuring devices measuring terminal

    with the drive shaft. Ensure the end of the measuring device

    is securely assembled to the drive shaftgroove.

    P-VRZR- 316

    FlangeInjection pump

    Fixing stand Tool name Part no Remarks

    Fixing stand 105796-0000 For 20NP

    Flange 157811-9020 For VRZ

    (1) Temporarily attach the fixing stand to thepump test bench and attach the injectionpump to the fixing stand.

    (2) Align the key groove with the standardcylinder Bs pressure delivery cam positionas shown at left.

    P-VRZR- 317

    (3) Align the drive shaft key groove and the

    measuring devices measuring terminal.Note: The pre-stroke can be measured on any

    cylinder. Because the pump is set at thestandard cylinder B, however, measure thepre-stroke for this cylinder.

    I f the dr ive shaft key groove and themeasuring devices measuring terminal arenot aligned, pre-stroke cannot be adjustedfrom cylinder B when the rotor shaft is

    assembled.

    Assembly position

    of measuring

    devices measuring

    terminal

    Drive shaft key groove

    Measuring device

    Measuring terminal

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    58/117

    REASSEMBLY

    - 54 -

    (6) Move the fixing stand to assemble thecoupling teeth to the pump test bench drivecoupling.

    AdviceEnsure approximately 1 mm axial clearancebetween the coupling and the drive coupling.

    P-VRZR- 116

    P-VRZR- 115

    (7) Securely tighten the fixing stand installation

    bolts and nuts and the drive coupling sockethead bolt to fix the injection pump to thepump test bench.

    (8) Turn the pump test bench flywheel using thelever to confirm that the injection pumprotates smoothly.

    (5) Assemble the key to the drive shaft. Alignthe coupling with the key, assemble it to thedrive shaft and then fix it using the nut.

    Specified torque: 167 ~ 185 Nm{17.0 ~ 19.0 kgfm}

    P-VRZR- 114

    Fixing stand

    Coupling

    Fixing stand

    Test bench drive coupling

    Flywheel

    Lever

    CAUTION

    Remove the lever after operating theflywheel.Operating the test bench without removing

    the lever can cause serious injury anddamage the test bench.

    Tool name Part no Remarks

    Coupling 157847-0820 Shaft dia 25

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    59/117

    REASSEMBLY

    - 55 -

    [2] Setting the 0 point for pre-strokeadjustment

    (1) Turn the pump test benchs main switch ONand set the KMA (continuous measuringdevice) as described below. [Refer to theKMA (continuous measuring deviceoperation manual): Publication No EC18E-11091.]

    Select the angle measurement display

    Press F6 Select Settings

    Press Enter Set the direction of rotationPress F2

    P-VRZR- 164

    Flywheel

    P-VRZR- 118

    Monitor display example

    Dial gauge

    angle measurement

    F1 F2 F3 F4 F5 F6 F7 F8

    1 2 4 5 63 7 8 10 11 129

    (2) Turn the pump test bench flywheel in the

    direction of pump rotation to find thestandard cylinders bottom dead centerposition on the measuring device dial gauge.(Refer to the data sheet for the standardcylinder.)

    (3) Zero the dial gauge.(4) Turn the flywheel in the direction of rotation

    so that the dial gauge reading is 0.7 mm.

    P-VRZR- 117

    Dial gauge

    F2

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    60/117

    REASSEMBLY

    - 56 -

    P-VRZR- 119

    (5) Set the continuous measuring device asdescribed below.Press F2 Press both shift keys (press bothshift keys at the same time to activate anglecontrol) the monitor will display the dialog

    position control unit error: control circuitopen) Press Enter the monitor displaywill change to(---.-) Press F6 Selectzero point setting Press Enter. (Thepump test bench angle measurement is nowset at 0.)

    (6) To absorb backlash, turn the flywheel backat leas t 10 and then set the anglemeasurement display at 355 (ie, turn theflywheel back 5).

    (7) Check that the dial gauge reading is 0mm.(8) Set the continuous measuring device asdescribed below.Press F6 Select zero point setting

    Press Enter.(The pump test bench angle measurementis now set at 0.)

    AdviceDo not alter the continuous measuringdevice angle measurement menu after this.Note:

    The beginning of cam lift position is now set.

    Flywheel

    Measuring device

    P-VRZR- 165

    Monitor display example

    (9) Remove the measuring device.

    a n g l e m e a s u r e m e n t

    F 1 F 2 F 3 F 4 F 5 F 6 F 7 F 8

    1

    0 . 0

    5 6 2 4 3

    P-VRZR- 120

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    61/117

    REASSEMBLY

    - 57 -

    P-VRZR- 122

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9301 T20

    (10) Remove the TPS from the pump housing.(11) Remove the timer cover from the pump

    housing.

    P-VRZR- 121

    [3] Component reassembly(1) Rotor shaft reassembly(1) Select a forked plate as described below and

    then assemble the plate.Selecting a forked plate

    Head assembly Cam ring Forked plate marked G

    Replaced Replaced Replaced

    ReplacedNot

    replacedReplaced

    Not replaced Replaced Replaced

    Not replacedNot

    replacedDo not replace (use theinstalled forked plate)*

    * If the installed forked plate fork is worn,assemble a forked plate marked G.(Refer to the table on page 67.)

    Specified torque: 3.0 ~ 5.0 Nm{0.3 ~ 0.5 kgfm}

    (2) Rotate the drive shaft so that the rotor shaft

    pin is positioned toward the GE actuator asshown at left.

    Note:The rotor shaft does not contact the forked pate.(3) Remove the clip from the rotor shaft.

    P-VRZR- 123

    Forked plate

    Holder Bit

    Tool name Part no Remarks

    Clip 157971-0500

    Timer cover

    Pump housing

    TPS

    Clip

    Spring

    (4) Assemble the radial plungers, the rollershoes and the rollers to the rotor shaft.

    (5) With the spring assembled to the rotor shaft,

    assemble the rotor shaft assembly to thedrive shaft groove.

    AdviceDo not drop the roller shoes or the rollers.

    Rotor shaft assembly

    Drive shaft

    Rotor shaft

    Rotor shaft pin

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    62/117

    REASSEMBLY

    - 58 -

    P-VRZR- 124

    (2) Distributor head assembly reassembly(1) Assemble the O-ring on the distributor head.(2) Assemble the control sleeve in the

    distributor head.Advice

    The face with the larger chamfer ispositioned toward the head.

    (3) Assemble the distributor head assembly tothe rotor shaft.

    (4) Tighten diagonally opposed torx bolts to

    loosely install the distributor head.AdviceDo not tighten the distributor head assembly.Leave it loose.(5) Assemble the distributor head assembly to

    the pump housing.AdviceMove the timer piston to align the forkedplate groove with the distributor headassembly pin.

    P-VRZR- 126

    (6) Move the timer piston and confirm that thecontrol sleeve rotates, and then graduallytighten two diametrically opposed torx bolts.

    (7) If the timer piston does not move smoothly,loosen the torx bolts and repeat procedure(6) above.

    Note:If the timer piston does not move smoothly, thecontrol sleeve will not move smoothly, the pinmay not engage the plate when the head istightened, and either the plate or the pin may

    be damaged.(8) Tighten the torx bolts until the distributor

    head assembly is securely tightened to thepump housing.

    P-VRZR- 125

    Distributor head

    Pump housing

    Distributor head

    Control sleeve

    Large chamfer Small chamfer

    Head side

    Pump housing

    Distributor head

    Torx bolts

    O-rings (2)

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    63/117

    REASSEMBLY

    - 59 -

    (10) Assemble the shim and snapring to therotor shaft.

    (11) Install the plug to the distributor head

    together with a new O-ring.

    P-VRZR- 128

    (9) Install the other two torx bolts and thentighten all four torx bolts to the specifiedtorque.

    Specified torque: 10.0 ~ 14.0 Nm{1.0 ~ 1.4 kgfm}

    (12) Tighten the plug using a hexagon wrench

    (SW14mm).Specified torque: 20.0 ~ 29.0 Nm

    {2.0 ~ 3.0 kgfm}

    (3) CPV holder reassembly(1) Assemble the gaskets and CPV holders to

    the distributor heads cylinders A, C and D.AdviceThe CPV holders must be reassembled tothe distributor head in their original positionsA, C and D marked on the head.(2) Assemble the dummy holder and gasket to

    the distributor heads cylinder B.

    P-VRZR- 130

    P-VRZR- 127

    P-VRZR- 129

    Tool name Part no Remarks

    Holder 157845-9500Part of pipe assembly157845-9520.

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9600 T30

    Torx bolts (4)

    Holder

    Bit

    Snapring

    Shim

    O-ring

    CPV holders (3)

    Distributor head

    Plug

    Plug

    Gaskets (4)

    Hexagon wrench

    Dummy holder

    Cylinder B

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    64/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    65/117

    REASSEMBLY

    - 61 -

    (5) Timer cover and TPS (timer pistonsensor) reassembly

    (1) Assemble the timer cover and the small andlarge O-rings (new) to the high pressure side.(See below for the assembly procedure.)

    P-VRZR- 135

    P-VRZR- 136

    (2) Push the small O-ring securely into the pumphousing using your finger.

    (3) Push the large O-ring securely into the timer

    cover using your finger and install the timercover using the torx bolts.

    Specified torque: 7.0 ~ 10.0 Nm{0.7 ~ 1.0 kgfm}

    (6) Secure the TPS to the pump housing usingthe torx bolts and a socket wrench (M6).

    Specified torque: 7.0 ~ 10.0 Nm{0.7 ~ 1.0 kgfm}

    P-VRZR- 137

    (4) Assemble the TPS standard point shim, the

    core rod, the timer spring and the timerstroke adjusting shim in the pump housing.

    AdviceDo not mistake the assembly positions of theTPS standard point shim and the timer strokeadjusting shim.(5) Assemble the TPS to the pump housing.AdviceEnsure the O-rings are not damaged.

    P-VRZR- 138

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9600 T30Holder

    Bit

    T imer

    cover

    Large O-ringSmall O-ring

    Torx bolts (2)

    Pump housing

    TPS

    Core rod

    Timer spring

    Timer stroke

    adjusting shim

    O-ring

    Pump housing

    Timer

    cover

    Pump housing

    Socket wrench

    TPS

    Torx bolts (2)

    Standard point shim

    Large O-ring

    Small O-ring

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    66/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    67/117

    REASSEMBLY

    - 63 -

    (3) Assemble the GE actuator pin in the controlsleeve groove.

    (4) Move the GE actuator in an axial directionas shown by the arrow in the figure at leftand confirm that the actuator moves

    smoothly.Advice Do not force the GE actuator. Forcing it

    may damage the seal ring. The GE actuator will not move if its pin

    is not inserted into the control sleevegroove. If it will not move, remove theGE actuator and again insert the pin intothe groove.

    (5) Move the GE actuator fully toward the full

    side (ie, the head side).AdviceIf the GE actuator is positioned toward thedrive shaft side, it may not be possible tomeasure the pre-stroke.

    (6) Secure the GE actuator to the pump housingusing the torx bolts.

    AdviceTighten diagonally opposed torx boltsgradually and uniformly to the specifiedtorque.Specified torque: 7.0 ~ 10.0 Nm

    {0.7 ~ 1.0 kgfm}

    Tool name Part no Remarks

    Holder 157915-9820

    Bit 157915-9600 T30

    P-VRZR- 143

    P-VRZR- 144

    P-VRZR- 145

    P-VRZR- 146

    GE actuator

    GE actuator

    GE actuator pin

    Holder

    Pump housing

    Torx bolts (6)

    Bit

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    68/117

    REASSEMBLY

    - 64 -

    (8) Magnet valve assembly installation(1) Install the magnet valve assembly to the GE

    actuator.AdviceEnsure the filter is installed securely.

    P-VRZR- 147

    P-VRZR- 148

    (2) Tighten the magnet valve assembly using atorque spanner.

    Specified torque: 20.0 ~ 25.0 Nm

    {2.0 ~ 2.5 kgfm}

    (9) Pre-stroke adjustment

    (1) Connect the fuel hose to the injection pumpusing the adapter.

    P-VRZR- 149

    P-VRZR- 150

    (2) Install plugs to where the distributor headand GE actuator overflow valves wereremoved.

    AdviceInstall any suitable plugs to maintain pumpchamber air tightness.

    Tool name Part no Remarks

    Adapter 157977-8000

    Gasket 026512-1640

    Magnet valve assembly

    Magnet valve assemblyGE actuator

    Spanner

    Hose

    Adapter

    Injection pump

    Plugs

    Gaskets (2)

    Armature

    O-ring

    Spring

    Gauze filter

    Magnet valve

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    69/117

    REASSEMBLY

    - 65 -

    Tool name Part no Remarks

    Pipe assembly 157845-9520

    (3) Remove cylinder Bs delivery valve holderand assemble the pipe assembly to cylinderB.

    (5) Turn the pump test bench drive switch ON.

    (6) Supply test oil to the injection pump at thespecified pressure (20.0 kPa {0.2 kgf/cm2}).

    AdviceLeave the drive switch ON. Do not turn thedrive switch OFF until pre-stroke adjustmenthas been completed.

    P-VRZR- 153

    (7) Turn the pump test bench flywheel aboutone turn in the specified direction of rotationusing the lever and use the anglemeasurement display to confirm that it turnssmoothly.

    P-VRZR- 154

    P-VRZR- 152

    P-VRZR- 151

    (4) Connect the direct current harness to themagnet valve.

    Advice

    Magnet valve supply voltage 12V specification: 12V

    Injection pump

    Lever

    Flywheel

    Magnet valve assembly

    Pipe assembly

    Direct current harness

    Cylinder B

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    70/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    71/117

    REASSEMBLY

    - 67 -

    Forked plates for 4 cylinders

    (12) Tighten the CPV holder using a socketwrench.

    Specified torque: 44.0 ~ 54.0 Nm{4.5 ~ 5.5 kgfm}

    Tool name Part no Remarks

    Socket wrench 157914-3600

    P-VRZR- 159

    (11) Remove the pipe assembly from cylinder

    B and replace it with the CPV holder.Replace the gasket at the same time.

    P-VRZR- 158

    CPV holder

    (13) Remove the plugs.

    RBAJ part no Bosch part no Stamping Pre-stroke variation ()

    149615-0001 9 443 612 824 A -3.03

    149615-0101 9 443 612 825 B -2.50

    149615-0201 9 443 612 826 C -1.97

    149615-0301 9 443 612 827 D -1.43

    149615-0401 9 443 612 828 E -1.07

    149615-0501 9 443 612 829 F -0.54

    149615-0601 9 443 612 830 G 0

    149615-0701 9 443 612 831 H 0.54

    149615-0801 9 443 612 832 I 1.07

    149615-0901 9 443 612 833 J 1.43

    149615-1001 9 443 612 834 K 1.97

    149615-1101 9 443 612 835 L 2.50

    149615-1201 9 443 612 836 M 3.03

    Plugs

    Socket wrench

    CPV holder

    Cylinder B

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    72/117

    ADJUSTMENT

    - 68 -

    1. ADJUSTMENT CONDITIONS[1] Test equipment(1) Pump test bench EPS815(2) KMA802(3) Oil cooler (1 687 010 130)(4) Adjustment software operating environment

    [2] Fuel piping(1) Injection system piping diagram

    Nozzle and nozzle holder assembly (1 688 901 035) Tubes

    Joint assembly (157641-6820)Injection pipes (157808-4720) P-VRZR- 390

    Cooling unit

    Injection tubes

    Windows OSWindows 2000 PRO (at least Service Pack 2.0) English language version;Control Panel - Regional Options, Your locale: English (United Kingdom or United States)

    Clock speed Personal computer equipped with Pentium CPU (clock speed at least 333 MHz)

    Memory At least 128 MB usable memory

    Hard disk At least 20 MB space

    Display Resolution: at least 1027 x 768, number of display colors: high color minimum (16 bit)

    Drive devices CD-ROM drive, floppy disk drive

    Additional devicesAt least 2 communication ports (2 necessary for controller assembly)Mouse, keyboard

    Note:Refer to the Installation Manual, MC-02 TESTER SOFTWARE, ADJUSTMENT AND INSPECTIONDATA, Publication No. ED14E-11011, for details of personal computer settings and softwareinstallation procedures.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    73/117

    ADJUSTMENT

    - 69 -

    Key no RBAJ part no Bosch part no Part name Qty Remarks

    1

    1/1

    1/2

    1/3

    1/4

    1/5

    1/6

    1/7

    157971-1020

    157971-1100

    026512-1640

    029711-2180

    157971-1000

    017211-2010

    157986-8100

    026510-1340

    9 443 613 442

    9 443 613 443

    9 421 617 041

    9 442 610 444

    9 443 613 444

    9 442 611 983

    9 443 613 445

    9 442 610 043

    Piping assembly

    Bolt

    Gasket

    Eye

    Adapter

    Hose clip

    Hose

    Gasket

    -

    1

    6

    2

    1

    2

    1

    1

    For VRZ overflow fuel piping

    For distributor head overflow

    For distributor head overflow

    For distributor head overflow

    For distributor head overflow

    For distributor head overflow

    For distributor head overflow

    For distributor head overflow

    Piping outline

    Overflow measurement hose

    P-VRZR- 391

    (2) Fuel piping

    Multi-way cock

    Test oil hose

    Temperature sensor cable

    1/2

    1/2

    1/1

    1/41/5

    Pump chamber pressure

    measurement hose

    Pressure gauge

    1/3

    1/6

    1/5

    1/7

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    74/117

    ADJUSTMENT

    - 70 -

    [3] Wiring outline(1) Controller assembly wiring

    (2) Wiring connections inside controller unit

    PC

    COM2 COM1

    RS232CCOM225 pin

    RS232CCOM29 pin

    ROM writer

    ECUlamp

    ECUlamp

    ECUlamp WL

    (COVEC-F)ECU

    4M41(VRZ)ECU

    4D56(COVEC-F)

    ECU

    ROMcable

    Maincable

    Maincable

    Maincable

    ROM

    GE

    CSP

    TPS

    TCV

    TF

    FCV

    FCV lineFCV line

    FCVswitch

    FCV switch

    FCV lineFCV switch

    Selectorswitch

    12

    3

    4

    0

    Sub-switch

    ROMlamp

    DC 5VConstant

    power supply

    DC 24VConstant

    power supply

    DC 12VConstant

    power supply

    Powerlamp

    Main powerswitch

    ACsocket

    AC100 - 120V200 - 240V

    VRZ & COVEC-F (ROM) CONTROLLER

    Injectionpump

    P-VRZR- 395

    P-VRZR- 392

    ROM harness

    (157966-5020)

    Personal computer

    Tool connection 232C cable

    Connection: straight connection

    (157966-4620)

    Tool connection 232C cable

    Connection: cross connection (2 pin, 3 pin cross)

    (157966-4720)

    Dsub 9 pin

    Injection pump

    Main harness

    (157966-4920)

    Dsub 25 pin

    Dsub 7 pin

    VRZ and COVEC-F

    controller unit

    Dsub 9 pin

    Earth to injection pump

    or pump test bench

    To AC100V - AC120V or

    AC200V - 240V power source

    (157966-4420 or 157966-4520)

    Intermediate harness

    (157966-2421) Intermediate harness

    (157966-5720)

    FCV GND harness

    (157966-4820)

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    75/117

    ADJUSTMENT

    - 71 -

    No. Publication No. Remarks

    1 ED14E-11021When installing the ECU assembly for the controller unit, refer to the installationinstructions included with the controller unit.

    2 ED14E-11011When installing the adjustment software, refer to the installation manual included with theCD-ROM.

    [4] Related materials

    Note:Where updating of adjustment data and inspection data is indicated, copy the data from the ESPI(ZW)s CD-ROM.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    76/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    77/117

    ADJUSTMENT

    - 73 -

    Keyno

    Name Use and purpose

    11 ECU changeover switch

    Turn to align with ECU in use.0: All OFF1: No. 1 ECU

    2: No. 2 ECU3: No. 3 ECU4: Spare ECU

    12 Sub-switchPower sub-switch for controller unit for VRZ adjustment. Press once to turn ON.When turned ON for use, orange lamp lights. Press once again to turn OFF.

    13 ROM pilot lamp Green lamp lights when ROM in use.

    14ROM wire harness connectingterminal

    For connecting injection pump's ROM harness connector to ROM controllerusing wire harness.

    If you smell any unusual smell or see smoke or sparks when using the controller unit, turn thepower switch OFF immediately and stop using the controller unit.Fire may result if you continue to use the controller unit.

    Advice

    Do not use the controller unit with oily hands. The oil may stick to the dials and causeimproper resistor contact inside the controller unit, preventing proper operation.

    Before turning the power switch ON, confirm that the wire harnesses are properlyconnected.

    CAUTION

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    78/117

    ADJUSTMENT

    - 74 -

    Keyno

    Name Use and purpose

    1 AC100V - 120V power orAC 200V - 240V power terminal

    Connect to AC100V - 120V, 50/60Hz power source orAC 200V - 240V power source, 50/60Hz.

    2 Main switch (breaker)Controller unit power switch.

    Turn ON when in use (position at 'I'). Position at 'O' to turn OFF.

    3D-sub 9 pin cable connection(COM1)

    Connects RS232C cable to personal computer (for GE).

    4D-sub 25 pin cable connection(COM2)

    Connects RS232C cable to personal computer (for Q-ROM)

    [2] Rear panel

    If you smell any unusual smell or see smoke or sparks when using the controller unit, turn thepower OFF immediately and stop using the controller unit.Fire may result if you continue to use the controller unit.

    CAUTION

    CE

    4

    2

    3

    1

    Advice

    Do not use the controller unit with oily hands. The oil may stick to the dials and causeimproper resistor contact inside the controller unit, preventing proper operation.

    Before turning the power switch ON, confirm that the wire harnesses are properlyconnected.

    P-VRZR- 345

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    79/117

    -

    75-

    2. ECU selection

    [1] 4D56

    [2] 4M41

    [3] WL[4] Manual operation

    [5] Workshop name registration

    [6] Exit

    Part no. input

    [1] Adjustment

    [2] Inspection

    Agreement

    [1] or [2] or [3] [4] [5]

    Disagreement

    1. Password input

    Input item

    [1] Workshop name

    [2] Address

    [3] Telephone[4] Fax

    [5] Operator's name

    [6] Password

    Push [MENU] button(= Registration change

    completed)

    Step 1-XX Adjustment

    StepXX + 1 ROM compensation

    StepXX + 2 ROM writing

    Adjustment

    Step 1-XX Inspection

    Inspection

    Adjustment result

    OK

    Repeatmeasurement

    Print result Cancel

    Final confirmation

    Pre-check 1.

    Manual operation

    Inspection result

    OK Repeatmeasurement

    Print result Cancel

    OK

    Final confirmation

    Select "Registration" butto

    Confirmation

    Workshop name registrati

    P-VRZR-396

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    80/117

    ADJUSTMENT

    - 76 -

    Exit

    Workshop name registration

    Manual operation

    ROM COVEC-F MITSUBISHI 12VInspection/adjustment

    VRZ MITSUBISHI 12VInspection/adjustment

    ROM COVEC-F MAZDA 12VInspection/adjustment

    RBAJService tools for pump adjustment Version1.0Copyright(C) 2001-2003 by Bosch Automotive Systems Corporation

    MC-02 TESTER

    4. PUMP ADJUSTMENT TOOL MONITOR SCREEN

    No. Name Use and purpose

    1 4D56 model engine's COVEC-F typeinjection pump inspection / adjustment key

    Select for inspection / adjustment of COVEC-F injection pump forMitsubishi 4D56 model engine

    2 4M41 model engine's VRZ type injectionpump inspection / adjustment key

    Select for inspection / adjustment of VRZ injection pump forMitsubishi 4M41 model engine

    3 WL model engine's COVEC-F typeinjection pump inspection / adjustment key

    Select for inspection / adjustment of COVEC-F injection pump forMazda WL model engine

    4 Manual operation key For adjusting injection pump and engine's installation timing

    5 Workshop registration key For workshop registration

    6 Exit key To exit adjustment software

    5

    4

    3

    6

    2

    1

    P-VRZR- 346

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    81/117

    ADJUSTMENT

    - 77 -

    5. PUMP ADJUSTMENT TOOL MONITOR SCREEN OUTLINEInspection and adjustment step screen

    Pump adjustment tools for service Input part no.Inspection and adjustment steps

    monitor screen

    0N r/min44-666644-3032

    000000000b00000-000-0000b

    VRZ 4M41

    VRZ(12V)

    MELCO

    Pump information

    MENU

    2001-01-15 11:28:44

    0.0T

    V

    Sequence

    No. STEP N

    03

    03 / 32

    1000rpm

    Soll

    2.91v

    Soll-cor

    0.00mv

    TCVF

    60Hz

    DTCV

    100%

    04 500rpm 2.50v 60Hz 0%

    0.000

    0.0

    Pt MPa

    Qo l/h

    TF V

    0.0Q

    VTPS V

    TPS V

    TA mm

    0.0DQ

    Ua-ist

    deg C

    mm /st3

    Rotation

    ECU

    Right

    4 cylinders

    Mode

    Pump type

    Adjustment

    Part number input

    Zero set

    Soll-cor

    Step information

    Step status

    Next

    Comment

    Select

    PT standard point

    After values are input, push 'Next' button.

    P_cham_ADJ

    mm /st3

    215

    9

    8

    4

    3

    7

    6

    2

    1

    14

    10

    15

    11

    16

    12

    17

    13

    18

    20

    19

    22

    23

    24

    25

    Only items necessary for each

    step are displayed.

    Back Next

    Circled numbers indicate fields

    where input is necessary.

    P-VRZR- 347

    No. Name Use and purpose

    1 Pump speed input N: pump speed Input the pump's speed.

    2 Test oi l temperature input T: test oi l temperature Input the test oi l temperature.

    3 Actual control sleeve position voltagedisplay

    U soll: actual control sleeve positionvoltage

    Displays actual control sleeve position voltage.

    4 Pump injection quantity input Q: pump injection quantity Input pump's injection quantity.

    5 Pump chamber pressure input Pt: pump chamber pressure Input pump's chamber pressure.

    6 Pump overflow quantity input Qo: pump overflow quantity Input pump's overflow quantity.

    7 TF output display TF: fuel temperature Displays fuel temperature output voltage.

    8 VTPS output display VTPS: voltage at 0 mm timer stroke Displays VTPS output voltage (voltage at 0 mm timer stroke).

    9 TPS output display TPS: timer piston sensor output voltage Displays TPS (timer piston sensor) output voltage.

    10 TA output display TA: timer stroke Displays TA (timer stroke) output.

    11 Variation between cylinders display DQ: variation between cylinders Input pump's variation between injection quantities.

    12 Zero setting key TPS output voltage at TA = 0 mm can be set at 0 V.

    13 Target control sleeve position

    compensation voltage key

    Any control sleeve position can be set by setting the compensation

    voltage.14 NEXT key To set at next step.

    15 Keys for moving to next or previous step To set at any step ( BACK, NEXT).

    16 Menu key To set at MENU display.

    17 Part number input key To set at part number input display.

    18 Step status display Displays step status. Changes from red to green when all itemsare within specifications.

    19 Part number, serial number display Displays pump information part number (specifi cation, pump) andserial number (pump, GE).

    20 Specification display Displays pump information specifications.

    21 Measurement mode display Displays pump information measurement mode (inspection,adjustment).

    22 Measurement date display Displays date and time of measurements.

    23 Status display Displays step status. Green: within specifications; red: outside ofspecifications.

    24 Current step display Displays current step items.

    25 Next step display Displays next step's items.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    82/117

    ADJUSTMENT

    - 78 -

    GE Soll

    Item UnitValue

    Item UnitValue

    ECU reader data

    ECU configuration data

    1. Values must be input for GE soll, TCV Duty and TCV Frequency.2. Np values do not appear at VRZ pump adjustment.

    Input

    Select ECU

    GE Vist V

    Item UnitValue

    VTPS Vist

    Item UnitValue

    r/minNpTF deg C

    V

    GE Soll-cor mV

    TCV Duty %

    TCV Frequency Hz

    Initialize ECU

    Menu

    Manual operationMC-02 TESTER

    ROM COVEC-F MITSUBISHI 12V VRZ MITSUBISHI 12V ROM COVEC-F MAZDA 12V

    6. MANUAL OPERATION DISPLAYSecond timing adjustment (manual operation)

    Pump adjustment tools for service Second timing adjustment (manual operation)

    No. Name Remarks

    1 Control sleeve position actual voltagedisplay

    Displays actual control sleeve position voltage.

    2 Control sleeve position target voltagedisplay

    By operating the input keys, the control sleeve position can be setfor the engine specified in No. 5.

    3 Initialize ECU Clear display values

    4 MENU Displays MENU screen.

    5 Select ECU Select the ECU for the engine.

    1

    2

    3

    4

    5

    P-VRZR- 348

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    83/117

    ADJUSTMENT

    - 79 -

    Menu Registration

    Input items and select Registration button.

    Workshop name RBAJ

    Address JAPAN

    Telephone 000-000-0000

    Fax 111-111-1111

    Operator's name sse

    Password ****

    Workshop name registrationMC-02 TESTER

    Exit

    Workshop name registration

    Manual operation

    ROM COVEC-F MITSUBISHI 12VInspection/adjustment

    VRZ MITSUBISHI 12VInspection/adjustment

    ROM COVEC-F MAZDA 12VInspection/adjustment

    RBAJService tools for pump adjustment Version1.0Copyright(C) 2001-2003 by Bosch Automotive Sys tems Corporation

    MC-02 TESTER

    Menu Registration

    Input items and select Registration button.

    Workshop name RBAJ

    Address JAPAN

    Telephone 000-000-0000

    Fax 111-111-1111

    Operator's name sse

    Password ****

    Workshop name registrationMC-02 TESTER

    7. WORKSHOP DISPLAYSecond timing adjustment (manual operation)

    Pump adjustment tools for service Workshop name registration

    No. Name Remarks

    1 Workshop name Input comany name.

    2 Address Input company address.

    3 Telephone Input telephone number.

    4 Fax Input fax number.

    5 Operator's name Input operator's name.

    6 Password Input password and change password.

    7 MENU Can be used to set MENU display.

    8 Registration For keeping registered items.

    1

    3

    4

    56

    P-VRZR- 350

    7

    2

    8

    (1)

    (3)

    (2)

    P-VRZR- 346

    P-VRZR- 350

    WORKSHOP REGISTRATION(1) Select Workshop name registration.

    (2) Input the company name, etc, in the fieldson the screen.

    (3) Click the Registration button.Note:The default password at setup is RBAJ.Input a new password if desired. (The only limitto the number of figures and letters in thepassword is the size of the input field.)

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    84/117

    ADJUSTMENT

    - 80 -

    8. ADJUSTMENTAdjustment sequence

    Preparation

    Pre-stroke adjustment

    Pump chamber pressure adjustment

    Timer stroke and characteristic confirmation

    Pump chamber pressure confirmation

    Magnet valve operation confirmation

    Finish

    Standard injection quantity point adjustment

    Non-injection confirmation

    Injection quantity compensation point adjustment

    Compensation ROM interpolation calculation

    Writing to the compensation ROM

    Second timing adjustment

    Part no. input and installation confirmation

    Warming-up operation

    Recording the pump and GE serial numbers See page 81 [1]

    See page 81 [2], 82 [3]

    See page 88 [11]

    See page 83 [4]

    See page 64 (9)

    See page 84 [5]

    See page 85 [6]

    See page 86 [8]

    See page 88 [10]

    See page 86 [7]

    See page 89 [12]

    See page 89 [13]

    See page 90 [14]

    See page 90 [15]

    See page 94 (4)

    See page 87 [9] TPS zero setting

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    85/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    86/117

    ADJUSTMENT

    - 82 -

    Password is required to actuate adjustment tools.

    Input password and press ENTER key.

    Precaution

    MC-02 TESTER

    (8) Reconfirm that the coupling and the fixingstand bolts and nuts are securely tightened.

    (9) Set the 20NP pump test benchs test oiloutlet temperature at 45C.

    (10) Set the cooling unit oil delivery pressure

    lever at 80 kPa {0.8 kgf/cm2} or less.

    (11) Connect the wire harness to the controllerunits No 2 ECU connector.

    (12) Turn the main switch on the rear of the

    controller unit ON.(13) Set the No 1 ~ No 4 changeover switch at

    No 2.(14) Turn the FCV (magnet valve) ON/OFF

    switch ON to energize the magnet valve.(15) Turn the sub switch on the front of the

    controller unit ON.

    [3]Adjustment software set up:preparation

    (1) Turn the computer and the monitor powerswitches ON.

    (2) Start the Service tools for pump adjustmentsoftware.

    (3) Input the password and press the Enter key.AdviceInput the initial default password RBAJ oryour own password.

    Fixing stand

    FCV (magnet valve) ON/OFF switch

    E C U f o r V R Z t y p e

    injection pump

    Sub-switch

    No. 1 ~ No. 4 changeover switch

    Monitor power switch

    Computer power switch

    (3)

    P-VRZR- 355

    P-VRZR- 397

    P-VRZR- 210

    P-VRZR- 357

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    87/117

    ADJUSTMENT

    - 83 -

    Menu

    4. Operation sequence

    3. Adjustment controller wiring

    2. Overflow piping

    1. Injection system piping

    Back Next

    Installation confirmationClick on appropriate itemand explanatory illustration is displayed.

    If necessary to proceedafter confirmation, push Next button.

    Setup confirmationMC-02 TESTER

    Key no.

    1

    2

    3

    4

    Part name Part no. Note

    Injection pipe

    Nozzle & nozzle holder assembly

    Joint

    Injection tube

    157808-4720

    1 688 901 035

    Same as VP44

    4

    3

    2

    1

    Menu NextClear

    If number input is correct, select Next button.If you need to input a different number, select Clear button.

    446613

    443062

    System specifications

    Pump serial no.(10 digits)

    GE serial no.(13 digits)

    Specified part no.(6 digits)

    Pump part no.(last 6 digits)

    0880052496

    5062008852056

    Engine model VRZ_4M41Rotation Right

    Pump cylinders 4 cylindersECU MELCO

    Mode Adjustment

    Part number inputMC-02 TESTER

    1. Specified part no.

    2. Pump part no.Example:

    Full pump no.

    109144-3052

    104700-0551

    Input pump part no.

    443052

    000551

    Pumppart no.

    104700-304*

    104700-305*

    104700-306*

    109144-305*

    109144-306*

    104700-055*

    Pumptype OEM

    Specified part no.

    COVEC-F

    VRZ

    COVEC-F

    003040

    003051

    003060

    008040

    008051

    008060

    44-6613 44-8813

    008550000550MAZDA

    MITSUBISHI

    Adjustment Inspection

    Exit

    Workshop name registration

    Manual operation

    ROM COVEC-F MITSUBISHI 12VInspection/adjustment

    VRZ MITSUBISHI 12VInspection/adjustment

    ROM COVEC-F MAZDA 12VInspection/adjustment

    RBAJService tools for pump adjustment Version1.0Copyright(C) 2001-2003 by Bosch Automotive Syst ems Corporation

    MC-02 TESTER

    [4] P a r t n um b e r i n p u t a n dconfirmation

    (1) Select the VRZ [Mitsubishi 12V] Inspection/adjustment button.

    (2) When the dialog shown at left appears, inputthe specified part number (6 digits) andpress Enter.

    (3) Input the pump part number (last 6 digits)and press Enter.

    (4) Input the pump serial number (10 digits) andpress Enter.

    (5) Input the GEs serial number (13 digits) andpress Enter.

    (6) Press the Next key.

    (7) Confirm that the screen changes to the

    injection system piping display.Note:Clicking the different buttons (1. Injection systempiping, 2. Overflow piping, 3. Adjustmentcontroller wiring, and 4. Operation sequence)displays different Setup confirmation screens.

    (2)

    (3)

    (4)

    (5)

    (1)

    (6)

    P-VRZR- 346

    P-VRZR- 358

    P-VRZR- 359

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    88/117

    ADJUSTMENT

    - 84 -

    Next

    Step status

    Status Item Unit Specification ToleranceMeasured / input value

    0N r/min

    deg C

    After values are input, push Next button.Sequence

    Present stepNo. S tep name N

    02

    02 / 31

    1000r/min

    Soll

    2.91v

    Soll-cor

    0.00mv

    0.00mv

    Frequency

    60Hz

    Duty

    100%Warm-up

    03 1000r/min 2.91v 60Hz 100%P-cham_ADJ

    Warm-up

    Select

    Comment

    Specifiedpartno.

    Pump part no.

    Pump serial no.

    GE serial no.

    Engine model

    Rotation

    Mode

    Pump type

    Pump cylinders

    ECU

    44-6613

    44-3062

    0880052496

    50620-088-52056

    VRZ_4M41

    Right

    Adjustment

    VRZ (12V)

    4 cylinders

    MELCO

    Pump information

    Step information

    Menu Part number input

    05/04/03 13:21:45

    0.0

    0.0

    T

    Ua-ist V

    Q

    Service tools for pump adjustment Adjustment display

    3mm /st

    Next

    Step status

    Status I tem Unit Specification ToleranceMeasured / input value

    0N r/min

    deg C

    After values are input, push Next button.Sequence

    Present stepNo. S tep name N

    01

    01 / 31

    300r/min

    Soll

    2.80v

    Soll-cor

    0.00mv

    0.00mv

    Frequency

    60Hz

    Duty

    100%Warm-up

    02 1000r/min 2.91v 60Hz 100%Warm-up

    Check for fuel leaks.

    Select

    Comment

    Specifiedpartno.

    Pump part no.

    Pump serial no.

    GE serial no.

    Engine model

    Rotation

    Mode

    Pump type

    Pump cylinders

    ECU

    44-6613

    44-3062

    0880052496

    50620-088-52056

    VRZ_4M41

    Right

    Adjustment

    VRZ (12V)

    4 cylinders

    MELCO

    Pump information

    Step information

    Menu Part number input

    05/04/03 13:20:52

    0.0

    0.0

    T

    Ua-ist V

    Q

    Service tools for pump adjustment Adjustment display

    3mm /st

    [5] Warming-up operation(1) Set the pump test bench delivery pressure

    at the specified 40 kPa {0.4 kgf/cm2}.(2) Confirm that the sequence is 01/31.(3) Run the injection pump at the specified

    speed N (see figure at left).(4) Measure N, T and Q on the pump test bench

    and input the values.Note:U ist is displayed automatically.(5) Confirm that the Step status field is green.(6) Proceed to the next step.AdviceIf U ist values are not as specified, pressthe Next button several times. Then, return

    to Step 01/31 using the back arrow.Repeat the Step 01/31 and confirm that U ist values are as specified.Note:If not as specified after confirming U ist severaltimes, the GE may be faulty.

    (7) Confirm that the sequence is 02/31.

    (8) Run the injection pump at the specifiedspeed N (see figure at left).

    (9) Measure N, T and Q on the pump test benchand input the values.

    Note:U ist is displayed automatically.(10) Confirm injection.(11) Confirm that no fuel leaks from the

    injection pump fuel piping connections.

    CAUTION

    If there are any fuel leaks, if there is noinjection or if any unusual noises occurduring operation, stop test bench operationimmediately and inspect the pump.

    (12) Confirm that the injection pump isoperating normally.

    (13) Confirm that the Step status field is green.(14) Proceed to the next step.AdviceBecause the test oil temperature takeslonger to increase in cold weather, turn thepump test bench on earlier.

    P-VRZR- 360

    P-VRZR- 361

    (2)

    (5)

    (7)

    (6)

    (13)

    (14)

    (4)

    (9)

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    89/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    90/117

    ADJUSTMENT

    - 86 -

    Next

    Step status

    Status I tem Unit Specification ToleranceMeasured / input value

    0N r/min

    deg C

    After values are input, push Next buttonSequence

    Present stepNo. S tep name N

    05

    05 / 31

    1000r/min

    Soll

    2.91v

    Soll-cor

    0.00mv

    0.00mv

    Frequency

    60Hz

    Duty

    100%P-cham_ADJ

    06 500r/min 2.50v 60Hz 100%Zero_set

    Reconfirmation of PT standard point

    Select

    Comment

    Specifiedpartno.

    Pump part no.

    Pump serial no.

    GE serial no.

    Engine model

    Rotation

    Mode

    Pump type

    Pump cylinders

    ECU

    44-6613

    44-3062

    0880052496

    50620-088-52056

    VRZ_4M41

    Right

    Adjustment

    VRZ (12V)

    4 cylinders

    MELCO

    Pump information

    Step information

    Menu Part number input

    05/04/03 13:23:42

    0.0

    0.000

    T

    Ua-ist V

    I/h0.0Qo

    TF V

    Pt MPa

    Service tools for pump adjustment Adjustment display

    Next

    Step status

    Status I tem Unit Specification ToleranceMeasured / input value

    0N r/min

    deg C

    After values are input, push Next button.Sequence

    Present stepNo. S tep name N

    04

    04 / 31

    1000r/min

    Soll

    2.91v

    Soll-cor

    0.00mv

    0.00mv

    Frequency

    60Hz

    Duty

    100%Rough-Q_ADJ

    05 1000r/min 2.91v 60Hz 100%P-cham_ADJ

    Standard Q adjustment (GE adjustment)

    Select

    Comment

    Specifiedpartno.

    Pump part no.

    Pump serial no.

    GE serial no.

    Engine model

    Rotation

    Mode

    Pump type

    Pump cylinders

    ECU

    44-6613

    44-3062

    0880052496

    50620-088-52056

    VRZ_4M41

    Right

    Adjustment

    VRZ (12V)

    4 cylinders

    MELCO

    Pump information

    Step information

    Menu Part number input

    05/04/03 13:23:05

    0.0

    0.0

    T

    Ua-ist V

    0.0DQ

    Q

    Service tools for pump adjustment Adjustment display

    mm /st3

    3mm /st

    [7] Standard injection quantity pointadjustment

    (1) Confirm that the sequence is 04/31.(2) Run the injection pump at the specified

    speed N (see figure at left).(3) Measure N, T, Q and DQ on the pump test

    bench and input the values.Note:U ist is displayed automatically.(4) If Q is as specified, perform steps (9) and

    (10). If Q is not as specified, adjust asdescribed below.

    [ 8 ] P u m p c h a m b e r p r e s s u r e

    confirmation(1) Confirm that the sequence is 05/31.(2) Run the injection pump at the specified

    speed N (see figure at left).(3) Measure N, T, Pt and Qo on the pump test

    bench and input the values.Note:U ist and TF are displayed automatically.(4) Confirm the pump chamber pressure.(5) Confirm that the Step status field is green.(6) Proceed to the next step.

    AdviceRecheck the feed pump.

    (3)

    (1)

    (9)

    (10)

    (3)

    (5)

    (6)

    P-VRZR- 363

    P-VRZR- 355

    P-VRZR- 364(1)

    Injection quantity decrease

    (move GE actuator toward drive side)

    Injection quantity increase

    (move GE actuator toward

    distributor head side)

    GE actuator

    Move GE actuator to adjust

    (5) To adjust the fuel injection quantity, loosenthe torx bolts so that the GE actuator canmove a little.

    (6) Move the GE actuator in the drive shaftsaxial direction to adjust the full load injectionquantity. (To increase the injection quantity,move the GE actuator toward the distributorhead. To decrease the injection quantity,move the GE actuator toward the drive side.)Record the measured injection quantity andthe position of the GE actuator to facilitateadjustment.

    (7) Following adjustment, tighten the torx bolts

    to the specified torque.Specified torque: 7 ~ 10 N.m{0.7 ~ 1.0 kgf.m}

    (8) Measure N, T, Q and DQ again on the pumptest bench and input the values.

    (9) Confirm that the Step status field is green.(10) Proceed to the next step.

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    91/117

  • 7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual

    92/117

    ADJUSTMENT

    - 88 -

    Next

    Step status

    Status I tem Unit Specification ToleranceMeasured / input value

    0N r/min

    deg C

    After values are input, push Next button.Sequence

    Present stepNo. S tep name N

    17

    17 / 31

    2300r/min

    Soll

    0.87v

    Soll-cor

    0.00mv

    0.00mv

    Frequency

    60Hz

    Duty

    100%Q_characteristics

    18 1900r/min 3.73v 60Hz 100%Cor-Q_ADJ

    Confirm no nozzle injection.

    Select

    Comment

    Specifiedpartno.

    Pump part no.

    Pump serial no.

    GE serial no.

    Engine model

    Rotation

    Mode

    Pump type

    Pump cylinders

    ECU

    44-6613

    44-3062

    0880052496

    50620-088-52056

    VRZ_4M41

    Right

    Adjustment

    VRZ (12V)

    4 cylinders

    MELCO

    Pump information

    Step information

    Menu Part number input

    05/04/03 13:35:08

    0.0

    0.0

    T

    Ua-ist V

    mm /st3

    3

    0.0DQ

    Q mm /st

    Service tools for pump adjustment Adjustment display

    Next

    Step status

    Status I tem Unit Specification ToleranceMeasured / input value

    0N r/min

    deg C

    After values are input, push Next button.Sequence

    Present stepNo. S tep name N

    07

    07 / 31

    100r/min

    Soll

    2.41v

    Soll-cor

    0.00mv

    0.00mv

    Frequency

    60Hz

    Duty

    100%Timer_TA

    08 50r/min 2.41v 60Hz 100%Timer_TA

    100r/min

    Select

    Comment

    Specifiedpartno.

    Pump part no.

    Pump serial no.

    GE serial no.

    Engine model

    Rotation

    Mode

    Pump type

    Pump cylinders

    ECU

    44-6613

    44-3062

    0880052496

    50620-088-52056

    VRZ_4M41

    Right

    Adjustment

    VRZ (12V)

    4 cylinders

    MELCO

    Pump information

    Step information

    Menu Part number input

    05/04/03 13:20:52

    0.0

    0.000

    T

    Ua-ist V

    VVTPS

    TA mm

    Pt MPa

    Service tools for pump adjustment Adjustment display

    Confirm 50 revolutions (Step 08/31) ~ 1,900

    revolutions (Step 16/31) using the sameprocedure used for 100 revolutions (Step 7/31)above.AdviceRepeat Step 06/31 if the timer stroke is notas specified.

    [11] Non-injection confirmation(1) Confirm that the sequence is 17/31.(2) Run the inject