Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial...

15
Chris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System

Transcript of Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial...

Page 1: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Chris Ferguson

Boeing

February 6, 2013

Boeing Commercial Crew Transportation System

Page 2: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Boeing Brings History of Human Space Flight & Commercial Airplanes Together

Copyright © 2011 Boeing. All rights reserved.

Page 3: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Commercial Crew Transportation System (CCTS)

• Complete transportation system – Crew/Launch Vehicle – Ground/Mission Operations

• High TRL systems and proven components – Safe and reliable – Low development risk /

cost

• Compatible with a variety of launch vehicles – Atlas V for initial flight tests

and verification

• Operational in 2016

Boeing CST-100 Partners & Subs

Bigelow Aerospace PWR

General Dynamics Airborne Systems

Spincraft

3

Page 4: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Concept of Operations

4

Page 5: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Spacecraft Segment (CST-100)

Crew

Module

Service

Module

Ascent Cover

CM SM Umbilical

Radiators Thruster

Doghouse

Side Hatch

Forward Window

5

Page 6: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Launch Abort System

• Abort capability from the launch pad

through orbit insertion. Protects for:

– Complete or partial loss of ascent propulsion

– Loss of attitude/trajectory control

–Time-critical system failures

Full Envelope Abort Capability

Bantam Engine

Launch Abort Engine Test Firing

OMAC RCS Engine Test Firing 6

Page 7: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CST-100 Key Design Features

Reusable Crew Module (CM)

Expendable Service Module (SM)

Land Landing on Airbags

Crew of Seven or

Combination of Crew and Cargo

Liquid Propellant

Launch Abort System

7

Page 8: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Atlas V: TDRS – K Launch

617th launch for Atlas program since 1957

206th mission for the Centaur upper stage

35th launch of an Atlas V since 2002

27th Atlas V under United Launch Alliance

8th NASA launch on Atlas V

4th TDRS launched on an Atlas vehicle

1st Atlas V launch for TDRS

Page 9: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Landing Opportunities

Nominal returns to WSMR

Emergency water landing opportunities

Edwards AFB available for additional landing opportunities

9

Page 10: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CST-100 CCDev Design Landing Drop Tests

10

Page 11: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CM/SM Assembly in KSC OPF-3

Base Heat Shield Installation

Fueling Operations Before Flight

11

Page 12: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CCTS Design Maturation Under CCiCap Thru Jan 2013

Integrated System Review

Production Design Review

Phase 1 Safety Review Board

CST-100 Interior Layout Evaluation

Software Engineering Release 2.0

Landing & Recovery/Ground Comm

Design Review

12

Page 13: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

CCTS Design Maturation Under CCiCap 2013 Milestones

13

Boeing’s CCTS 2013 Plan:

– CST-100 / Atlas V integration

– Mission Control demonstrations

– Continued re-development of the ULA Dual Engine Centaur

– Launch Vehicle Adapter PDR & CDR

– Continued development of KSC OPF-3

Page 14: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.

Reliable, Safe Transportation Soon

Affordable Access to LEO Enables Exploration Beyond

Boeing Commercial Crew Summary

• Significant Progress under CCDev and

CCiCap

– Critical Design Review in Apr, 2014

• Low Risk Development

– Simple systems

– Proven launch vehicles

– Commercial approach with NASA

involvement

• Low Operational Costs

– Leverages Boeing’s commercial

aircraft experience

– Multiple mission capsule

14

Page 15: Boeing Commercial Crew Transportation SystemChris Ferguson Boeing February 6, 2013 Boeing Commercial Crew Transportation System · 2013-2-26

Copyright © 2012 Boeing. All rights reserved.