BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00...

167
BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580 In compliance with the Americans with Disabilities Act of 1990, if you need special assistance to participate in a District meeting, or you need a copy of the agenda, or the agenda packet, in an appropriate alternative format, please contact the Board Clerk’s office at 510-276-4700. Notification of at least 48 hours prior to the meeting or time when services are needed will assist the District staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service. 1. Call to Order 2. Roll Call: Directors Becker, Dias, Duncan, Walters, Young 3. General Public (Members of the public wishing to comment on any item not on the agenda, but within the Board’s jurisdiction, should notify the Board at this time. Those wishing to comment on any item on the agenda should do so at the time the item is considered. Comments may be limited to three (3) minutes. Time limitations shall be at the discretion of the President.) AUDITED FINANCIAL STATEMENTS AS OF JUNE 30, 2016 Presentation 4. Presentation of Audited Financial Statements by Chavan & Associates, LLP (Sheldon Chavan, CPA, from Chavan & Associates, LLP, the District’s independent auditor, will present the audited financial statements to the Board.) Motion 5. Acceptance of Audited Financial Statements and Board Communication Letter as of June 30, 2016 (The Board will be asked to accept the audited financial statements for fiscal year 2015-2016.) CONSENT CALENDAR Motion 6. Approval of Board Minutes of October 4, 2016 (The Board will be asked to approve the minutes.) Motion 7. Approval of Financial Statements, September 2016 (The Board will be asked to approve the financial statements.) Motion 8. Approval of Monthly Compliance & Activity Reports, September 2016 (The Board will be asked to approve the monthly reports from the Engineering, Collections, Operations, and Maintenance Departments.)

Transcript of BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00...

Page 1: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

BOARD MEETING AGENDA

Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

In compliance with the Americans with Disabilities Act of 1990, if you need special assistance to participate in a District meeting, or you need a copy of the agenda, or the agenda packet, in an appropriate alternative format, please contact the Board Clerk’s office at 510-276-4700. Notification of at least 48 hours prior to the meeting or time when services are needed will assist the District staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service.

1. Call to Order 2. Roll Call: Directors Becker, Dias, Duncan, Walters, Young 3. General Public

(Members of the public wishing to comment on any item not on the agenda, but within the Board’s jurisdiction, should notify the Board at this time. Those wishing to comment on any item on the agenda should do so at the time the item is considered. Comments may be limited to three (3) minutes. Time limitations shall be at the discretion of the President.)

AUDITED FINANCIAL STATEMENTS AS OF JUNE 30, 2016

Presentation 4. Presentation of Audited Financial Statements by Chavan & Associates, LLP (Sheldon Chavan, CPA, from Chavan & Associates, LLP, the District’s independent auditor, will present the audited financial statements to the Board.)

Motion 5. Acceptance of Audited Financial Statements and Board Communication Letter as of June 30, 2016

(The Board will be asked to accept the audited financial statements for fiscal year 2015-2016.)

CONSENT CALENDAR

Motion 6. Approval of Board Minutes of October 4, 2016 (The Board will be asked to approve the minutes.)

Motion 7. Approval of Financial Statements, September 2016 (The Board will be asked to approve the financial statements.)

Motion 8. Approval of Monthly Compliance & Activity Reports, September 2016 (The Board will be asked to approve the monthly reports from the Engineering, Collections,

Operations, and Maintenance Departments.)

Page 2: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

COMMITTEE/CONFERENCE/ASSOCIATION MEETINGS

Information 9. Report from the Solid Waste Committee (Director Young will report on the October 10, 2016 meeting.)

Information 10. Report from the CASA Executive Board (Director Becker will report on the October 10, 2016 meeting.)

Information 11. Report from the Construction Committee (Director Becker will report on the October 11, 2016 meeting.)

Information 12. Report from the Finance & Insurance Committee (Director Dias will report on the October 17, 2016 meeting.)

Motion 13. Approval of Committee Minutes for Entry to District Record (The Board will be asked to approve the Committee minutes for entry to the District record by reference.)

NEW BUSINESS

Motion 14. Authorize the General Manager to Execute the 2016-2021 Memorandum of Understanding (MOU) with Stationary Engineers Local 39 – Plant Operating Unit

(The Board will be asked to authorize the General Manager to execute the MOU, in substantially the form presented, which reflects Board-approved terms.)

Motion 15. Memorandum of Understanding Between Save The Bay and Oro Loma Sanitary District Regarding Access Partnership to Site a Native Plant Nursery on Oro Loma Sanitary District Property

(The Board will be asked to authorize the General Manager to execute the Memorandum of Understanding.)

16. Staff/Director Comments (Board and/or staff members may comment on items of interest.)

17. Adjournment

Page 3: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

AGENDA ITEM NO: 4 AGENDA DATE: 10/18/16 Presentation of Audited Financial Statements by Chavan & Associates, LLP Written by: A. Wong BACKGROUND: Sheldon Chavan, CPA, from Chavan & Associates, LLP, will present the audited financial statements for the fiscal year ended June 30, 2016. The auditors will also answer Board questions on the financial statements. The Audited Financial Statements as of June 30, 2016 and 10-Year History of Revenues and Expenses (2007-2016) will be provided at the meeting. RECOMMENDATION: Information only. ATTACHMENTS: None

Page 4: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

FINANCIAL STATEMENTS JUNE 30, 2016

* * *

Page 5: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

2655 Grant Avenue, San Lorenzo, CA 94580 tel: (510) 276-4700 fax: (510) 276-1528

website: www.oroloma.org

June 30, 2016 ___________________________________________________________________________________

Board of Directors

Name Office

Timothy Becker President Shelia Young Vice President Daniel Walters Secretary Roland Dias Director Rita Duncan Director

District Management

Jason Warner General Manager/Treasurer

Arlene Wong Finance Manager

Page 6: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

Table of Contents

June 30, 2016

Independent Auditors’ Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 – 4 Management’s Discussion and Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 – 14 Basic Financial Statements: 15

Statement of Net Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 – 17

Statement of Revenues, Expenses and Changes in Net Position . . . . . . . . . . . . . . . . . . . . . . . 18 – 19

Statement of Cash Flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 – 21

Notes to Financial Statements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 – 53 Required Supplementary Information 55

Schedule of the District's Proportionate Share of the Plan's Net Pension Liability. . . . . . . . . 56

Schedule of the District's Contributions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

Schedule of Funding Progress for the Post-Retirement Medical Benefit Plan . . . . . . . . . . . . 57

Other Supplementary Information 59

Description of Funds Utilized . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

Combining Schedules Schedule 1 - Schedule of Net Position - All District Services . . . . . . . . . . . . . . . . . . . . . . 62 – 65

Schedule 2 - Schedule of Revenues, Expenses, and Changes in Net Position

- All District Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 – 67

Stewardship, Compliance and Accountability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

Schedules of Revenues, Expenses and Changes in Net Position - Budget vs. Actual

Schedule 3 - Sewer Services - Operations and Maintenance . . . . . . . . . . . . . . . . . . . . . . . 69

Schedule 4 - Sewer Services - Operations and Maintenance By Account Categories and Departments. . . . . . . . . . . . . . . . . . . . . . . . . . . .

70 – 71

Schedule 5 - Sewer Services - Renewal and Replacement . . . . . . . . . . . . . . . . . . . . . . . . . 72 Schedule 6 - Sewer Services - Capital Improvement Program. . . . . . . . . . . . . . . . . . . . . . 73 Schedule 7 - Solid Waste Services. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 Schedule 8 - Recycling Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 Other Independent Auditor’s Report 77 – 79

Page 7: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

This page intentionally left blank

Page 8: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

INDEPENDENT AUDITOR’S REPORT

1

Page 9: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1475 Saratoga Ave, Suite 180, San Jose, CA 95129Tel: 408-217-8749 • E-Fax: 408-872-4159

[email protected] • www.cnallp.com

INDEPENDENT AUDITOR’S REPORT

To the Board of DirectorsOro Loma Sanitary DistrictSan Lorenzo, California

Report on the Financial Statements

We have audited the accompanying financial statements of the Oro Loma Sanitary District (the “District"), as of and for the year ended June 30, 2016, and the related notes to the financial statements, which collectively comprise District’s basic financial statements as listed in the table of contents.

Management’s Responsibility for the Financial Statements

The District’s management is responsible for the preparation and fair presentation of these financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error.

Auditor’s Responsibility

Our responsibility is to express opinions on these financial statements based on our audit. We conducted our audit in accordance with auditing standards generally accepted in the United States of America, the standards applicable to financial audits contained in Government Auditing Standards, issued by the Comptroller General of the United States, and the State Controller's Minimum Audit Requirements for California Special Districts. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the District’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the District’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinions.

2

Page 10: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1475 Saratoga Ave, Suite 180, San Jose, CA 95129Tel: 408-217-8749 • E-Fax: 408-872-4159

[email protected] • www.cnallp.com

Opinions

In our opinion, the financial statements referred to above present fairly, in all material respects, the respective financial position of the Oro Loma Sanitary District, as of June 30, 2016, and the respective changes in financial position and cash flows thereof for the year then ended in accordance with accounting principles generally accepted in the United States of America.

Emphasis of a Matter

New Accounting Pronouncements

As discussed in Note 2 to the financial statements, the District adopted the provisions of GASBStatement No. 72, Fair Value Measurement and Application, GASB Statement No. 79, CertainExternal Investment Pools and Pool Participants, and GASB Statement No. 76, The Hierarchy ofGenerally Accepted Accounting Principles for State and Local Governments, effective June 30, 2016. Our opinion is not modified with respect to these matters.

Other Matters

Required Supplementary Information

Accounting principles generally accepted in the United States of America require that the management’s discussion and analysis, schedule of contributions for pension plans, schedule of proportionate share of net pension liability, schedule of funding progress for the retiree health benefit plan, and any other schedules as listed in required supplementary information section of the table of contents, be presented to supplement the basic financial statements. Such information, although not a part of the basic financial statements, is required by the Governmental Accounting Standards Board who considers it to be an essential part of financial reporting for placing the basic financial statements in an appropriate operational, economic, or historical context. We have applied certain limited procedures to the required supplementary information in accordance with auditing standards generally accepted in the United States of America, which consisted of inquiries of management about the methods of preparing the information and comparing the information for consistency with management’s responses to our inquiries, the basic financial statements, and other knowledge we obtained during our audit of the basic financial statements. We do not express an opinion or provide any assurance on the information because the limited procedures do not provide us with sufficient evidence to express an opinion or provide any assurance.

Supplementary Information

Our audit was conducted for the purpose of forming opinions on the financial statements that collectively comprise the District’s financial statements as a whole. The introductory, combining schedules, statistical, budgetary comparison information, and any other supplemental informationas listed in the table of contents, are presented for purposes of additional analysis and are not a required part of the financial statements. The introductory, descriptions of funds, stewardship and statistical sections have not been subjected to the auditing procedures applied in the audit of the basic financial statements and, accordingly, we do not express an opinion or provide any

3

Page 11: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1475 Saratoga Ave, Suite 180, San Jose, CA 95129Tel: 408-217-8749 • E-Fax: 408-872-4159

[email protected] • www.cnallp.com

assurance on them.

The combining schedules and budgetary comparison information are the responsibility of management and were derived from and relate directly to the underlying accounting and other records used to prepare the basic financial statements. Such information has been subjected to the auditing procedures applied in the audit of the basic financial statements and certain additional procedures, including comparing and reconciling such information directly to the underlying accounting and other records used to prepare the basic financial statements or to the basic financial statements themselves, and other additional procedures in accordance with auditing standards generally accepted in the United States of America. In our opinion, the budgetary comparison information is fairly stated, in all material respects, in relation to the basic financial statements as a whole.

Other Reporting Required by Government Auditing Standards

In accordance with Government Auditing Standards, we have also issued our report dated October 13, 2016 on our consideration of the District’s internal control over financial reporting and on our tests of its compliance with certain provisions of laws, regulations, contracts, and grant agreements and other matters. The purpose of that report is to describe the scope of our testing of internal control over financial reporting and compliance and the results of that testing, and not to provide an opinion on internal control over financial reporting or on compliance. That report is an integral part of an audit performed in accordance with Government Auditing Standards in considering the District’s internal control over financial reporting and compliance.

October 13, 2016San Jose, California

4

Page 12: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

MANAGEMENT DISCUSSION & ANALYSIS

5

Page 13: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

This page intentionally left blank

6

Page 14: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

Oro Loma Sanitary District (The District) was established in 1911 and subsequently reorganized in 1940. The District is empowered to own and operate sewage facilities, and to provide sewer, solid waste and recycling services to its customers. The elected Board of Directors oversees its operations, sets policies, establishes fees, and ensures that its mission in serving the public is achieved. This financial report consists of the following sections: independent auditor’s report, management’s discussion and analysis, basic financial statements, notes to the financial statements, required supplementary information, other supplementary information, and other independent auditor’s report. The management discussion and analysis (MD&A) is an overview of the District’s operations and financial performance during the fiscal year ended June 30, 2016. This information is presented in conjunction with the basic financial statements and the accompanying notes, which immediately follow this section.

Financial Highlights for the Fiscal Year Ended June 30, 2016

• The ending net position as of June 30, 2016 was $93,777,464, reflecting an increase of $2,866,289 (3.2%) from the prior year net position of $90,911,175. Prior period pension-related adjustments of $192,869 were made to the net position, pertaining to GASB Statement No. 68 requirements. The net result was an adjusted beginning net position of $91,104,044 for FY 2015-16.

• Total assets were $100,346,093, reflecting a increase of $2,341,393 (2.4%) from the prior year ($98,004,700). Cash and cash equivalents increased by $3,984,243 partly due to $2.5 million in matured securities being held for reinvestment. This was combined with increases in capital assets and accumulated depreciation, work in progress, and OPEB asset, and, decreases in accounts receivable and investment in East Bay Dischargers Authority (EBDA).

• Total liabilities were $7,460,749, reflecting an decrease of $3,479,374 (31.8%) from the prior year ($10,940,123). Increases in accounts payable were offset by decreases in other benefits set aside for day-to-day payments of post-employment benefits. The net pension liability decreased 41.8% from $8,249,005 last year to $4,797,739. This amount represents the District’s proportionate share of CalPERS’ Miscellaneous risk pool for the June 30, 2015 measurement date.

• Deferred outflows of resources decreased 19.9% from $7,131,734 to $5,714,923, while deferred inflows of resources increased 46.8% from $3,285,136 to $4,822,803. These items represent the different components required by GASB Statement No. 68. Deferred outflows reflect consumption of net assets that are applicable to a future reporting period and will increase the net position in a similar manner as assets. Deferred inflows are acquisition of net assets that are applicable to a future reporting and will decrease the net position in a similar manner as liabilities.

7

Page 15: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

Required Financial Statements

The District provides services to the public and generates revenues through fee-based business-type activities. The accounting methods used are similar to those used by private entities, utilizing an enterprise fund under a broad fund category, known as proprietary funds. Required financial statements are listed as follows:

• The Statement of Net Position presents information about assets and deferred outflows of resources, and, liabilities and deferred inflows of resources. It also provides a basis for evaluating liquidity, financial flexibility, and the capital structure.

• The Statement of Revenues, Expenses, and Changes in Net Position accounts for revenues and expenses. It shows current operations and provides a comparison to the prior year, and can be used to determine whether resources have been successfully recovered through user fees and other revenues.

• The Statement of Cash Flows provides information about cash receipts and disbursements, and net changes in cash resulting from operations, investing, and capital and non-capital financing activities. It shows various cash sources and uses, and the changes in cash and cash equivalents between years.

Financial Analysis of the District

Total net position increased by $2,866,289 (3.2%) during 2016. This was a combined result of a net prior period adjustment of $192,869 and current year’s increase in net position of $2,673,420. These changes are reflected in the following table. Table 1: Oro Loma Sanitary District – Statement of Net Position

Change in 2016 Change in 2015

Period Ended June 30 2016 2015 $ % 2014 $ %

Current and other assets 30,169,331 29,280,127 889,204 3.0% 34,832,988 (5,552,861) -15.9%

Capital assets 70,176,762 68,724,573 1,452,189 2.1% 66,742,699 1,981,874 3.0%

Total assets 100,346,093 98,004,700 2,341,393 2.4% 101,575,687 (3,570,987) -3.5%

Deferred outflows of resources 5,714,923 7,131,734 (1,416,811) -19.9% - 7,131,734 100%

Current liabilities 2,361,614 2,011,637 349,977 17.4% 2,395,438 (383,801) -16.0%

Non-current liabilities 5,099,135 8,928,486 (3,829,351) -42.9% 910,969 8,017,517 880.1%

Total liabilities 7,460,749 10,940,123 (3,479,374) -31.8% 3,306,407 7,633,716 230.9%

Deferred inflows of resources 4,822,803 3,285,136 1,537,667 46.8% - 3,285,136 100.0%

Net position

Net investment in capital assets 70,176,762 68,724,573 1,452,189 2.1% 66,742,699 1,981,874 3.0%

Unrestricted 23,600,702 22,186,602 1,414,100 6.4% 31,526,581 (9,339,979) -29.6%

Total net position 93,777,464 90,911,175 2,866,289 3.2% 98,269,280 (7,358,105) -7.5%

8

Page 16: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

This ending net position of $93,777,464 is made up of the following components:

� $70,176,762 – Net investment in capital assets. This amount represents investment in capital assets net of accumulated depreciation. There is no related debt. The capital assets are used to provide a variety of services. One of the biggest components of the assets category is the wastewater pollution control plant owned jointly by the District (75%) and Castro Valley Sanitary District (CVSD) (25%). Under a long-term agreement, CVSD reimburses the District and capitalizes its share of capital assets on its own financial records. Assets that do not pertain to the operations and maintenance of the water pollution control plant are fully owned by the District.

� $23,600,702 – Unrestricted category. This amount is comprised of:

• $6,331,498 Investment in sewage discharge facilities – EBDA

• $8,902,500 Reserves established by the Board for specific activities. The current reserve levels were adopted in March 2015 to reflect changing requirements in different programs and are noted below.

� $3,800,000 reserved for cash flow fluctuations. Sewer service and

recycling charges are collected on the Alameda County tax roll twice a year (December and April). There is a six-month delay between meeting current obligations and cash collections from the tax roll.

� $2,500 reserved for petty cash funds. � $4,600,000 reserved for capital reserves in capital improvement programs. � $500,000 reserved for self-insurance and catastrophic events. The

deductible is $250,000 per occurrence.

• $8,366,704 Unreserved/unrestricted net position

9

Page 17: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

Period Ended June 30 2016 2015 Change ($) Change (%) 2014 Change ($)

Operating revenues

District service charges $11,949,883 $11,678,040 $271,843 2.3% $11,583,176 $94,864

Agency treatment charges 2,430,769 2,190,362 240,407 11.0% 2,206,459 (16,097)

Permits and inspection fees 162,898 170,994 (8,096) -4.7% 126,143 44,851

Sanitary truck waste charges 90,621 56,454 34,167 60.5% 48,815 7,639

Grease receiving charges 158,967 142,005 16,962 11.9% 120,927 21,078

Grit receiving charges 4,860 - 4,860 100.0% - - Contract fees 937,750 791,397 146,353 18.5% 755,676 35,721

Recycling charges-residential/green waste 2,306,542 2,295,385 11,157 0.5% 2,286,977 8,408

Recycling charges-commercial/industrial 110,721 102,060 8,661 8.5% 87,783 14,277

Landfills fees-Measure D 319,719 329,606 (9,887) -3.0% 327,570 2,036

Others 586,197 682,873 (96,676) -14.2% 763,138 (80,265)

Total operating revenues 19,058,927 18,439,176 619,751 3.4% 18,306,664 132,512

Operating expenses

Engineering 684,704 698,221 (13,517) -1.9% 712,859 (14,638)

Sewage collections 2,637,991 2,897,622 (259,631) -9.0% 2,727,099 170,523

Sewage treatment operations 3,483,009 3,507,420 (24,411) -0.7% 3,768,468 (261,048) Sewage treatment maintenance 2,498,881 2,155,643 343,238 15.9% 1,951,508 204,135

Sewage disposal - EBDA 779,476 684,638 94,838 13.9% 645,786 38,852

Administration and general 1,256,629 1,332,934 (76,305) -5.7% 1,206,450 126,484

Pension expense - GASB 68 1,192,396 (547,141) 1,739,537 317.9% - (547,141)

OPEB expense and adjustments (315,916) (182,991) (132,925) -72.6% - (182,991) -100.0%

Depreciation 3,351,201 3,329,414 21,787 0.7% 3,179,437 149,977

Decrease in carrying value of EBDA 165,735 89,455 76,280 85.3% 95,162 (5,707)

Solid waste 306,213 305,189 1,024 0.3% 296,535 8,654

Recycling-residential and commercial 2,574,922 2,591,742 (16,820) -0.6% 2,599,618 (7,876)

Total operating expenses 18,615,241 16,862,146 1,753,095 10.4% 17,182,922 (320,776)

Operating income (loss) 443,686 1,577,030 (1,133,344) -71.9% 1,123,742 453,288 Non-operating revenues

Investment income 128,479 216,318 (87,839) -40.6% 217,367 (1,049)

Increase in the fair value of investments 86,020 - 86,020 100.0% 53,279 (53,279)

Rents, leases and personal license fees 79,956 92,741 (12,785) -13.8% 84,856 7,885

Gain on disposal of capital aseets - - - 0.0% 14,643 (14,643)

Recovery of uncollectible accounts 17,203 11,343 5,860 51.7% 11,702 (359)

Other miscellaneous revenues 339,028 140,798 198,230 140.8% 177,063 (36,265)

EBDA and other agreement refunds 79,371 79,371 - 0.0% 79,371 -

Total non-operating revenues 730,057 540,571 189,486 35.1% 638,281 (97,710) Non-operating expenses Grant expenses - - - 0.0% 10,725 (10,725)

Decrease in the fair value of investments - 58,326 (58,326) -100.0% - 58,326

Write-offs 1,515 863 652 75.6% 1,580 (717)

Total non-operating expenses 1,515 59,189 (57,674) -97.4% 12,305 46,884

Income before contributions and transfers 1,172,228 2,058,412 (886,184) -43.1% 1,749,718 308,694 Connection fees and other contributions 298,612 1,076,699 (778,087) -72.3% 136,237 940,462

Capital Grants 1,202,580 - 1,202,580 100.0% - -

Change in net position 2,673,420 3,135,111 (461,691) -14.7% 1,885,955 1,249,156

Net position – beginning, as reported 90,911,175 98,269,280 (7,358,105) -7.5% 96,383,325 1,885,955

Prior period adjustment-GASB 68 pension 192,869 (10,768,191) 10,961,060 101.8% - (10,768,191) -100.0%

Prior period adjustment-OPEB - 274,975 (274,975) -100.0% - 274,975 100.0%

Net position – beginning, as adjusted $91,104,044 $87,776,064 $3,327,980 3.8% $96,383,325 ($8,607,261) -8.9%

Net position – ending $93,777,464 90,911,175 $2,866,289 3.2% $98,269,280 ($7,358,105)

Table 2: Oro Loma Sanitary District - Statement of Revenues, Expenses and Changes in Net Position

100.0%

0.8%

-0.7%

35.6%

15.6%

Change (%)

0.6%

-10.5%

0.7%

17.4%

4.7%

0.4%

16.3%

0.0%

6.0%

10.5%

-100.0%

4.7%

-2.1%

6.3%

-6.9%10.5%

-6.0%

2.9%

-0.3%

-20.5%

-1.9%

40.3%

-0.5%

0.0%

-15.3%

-100.0%

9.3%

-100.0%

-3.1%

381.0%

-45.4%

-100.0%

2.0%

-7.5%

17.6% 690.3%

66.2%

0.0%

10

Page 18: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

As presented in Table 2:

Total Operating Revenues $19.1 million (2016) and $18.4 million (2015) – Operating revenues increased by $619,751 (3.4%) in 2016 and $132,512 (0.7%) in 2015. This was mainly due to changes in revenues in the following categories:

• District sewer service charges increased by $271,843 (2.3%) in 2016 and $94,864 (0.8%) in 2015. In 2016, a 3% sewer rate increase was implemented. This was the last increase within a five-year rate plan. The $279,369 growth in residential sewer revenues was partly offset by a $99,039 (5.8%) decrease in commercial sewer revenues, which were based on water consumption and continually impacted by the drought in the area. Revenues from significant industrial customers increased by $138,481 (18.5%), a recovery from last year’s decrease of $83,334 (10.0%). Sewer service charges from new permits decreased by $24,314 (71.9%), reflecting a return to its normal level, as compared to last year’s spike of $29,311 (over 600%) attributed to new residential developments in 2015.

• Agency treatment charges increased by $240,407 (11.0%) in 2016 and decreased by $16,097 (0.7%) in 2015. Of the 2016 increase, $192,550 was from operations and maintenance (O&M) and renewal and replacement (R&R) charges to CVSD, billed based on its contribution of sewage flow to the treatment plant. Revenues from the City of Hayward increased by $41,971 (36.2%), a portion of which was additional revenues assessed from the prior year. Charges to other agencies, City of San Leandro and EBDA, reflect modest increase from 2015.

• Permits and inspection fees decreased by $8,096 (4.7%) in 2016. The $14,888 (12.3%) decrease in engineering permit fees reflected an ease in pace in new construction activities compared to last year. In 2015, the number of engineering permits issued increased by almost 10% from 2014, in addition to $16,768 in plan check and inspection revenues being recognized from tract deposits. Increase in 2016 industrial permits ($6,792) partly offset the above decrease.

• Sanitary truck waste increased by $34,167 (60.5%) as a result of an acquisition of Ajax Portable Service by United Site Services, which has a larger customer base for potable toilet services.

• Rents and leases decreased by $12,785 (13.8%) due to the discontinuance of yard rental by a contractor in 2016.

• Contract fees increased by $146,353 (18.5%) in 2016 and $35,721 (4.7%) in 2015. The District provides solid waste services to its customers under an agreement with Waste Management of Alameda County (WMAC). The 2016 growth was a combination of two factors. First, a 1% increase (from 5% to 6%) was adopted in franchise fees from WMAC’s garbage revenues. Secondly, the contracted garbage rates went up in September 2015 based on the weighted average of the CPI and WMAC’s teamsters wage and benefit increases. The garbage rate increases were 2.63% in 2016 and 3.54% in 2015.

• All remaining operating revenue categories for 2016 and 2015 showed various fluctuations. Grease receiving charges increased by $16,962 (11.9%) in 2016 and $21,078 (17.4%) in 2015. Commercial and industrial recycling charges increased by $11,157 (0.5%) in 2016 and $14,277 (16.3%) in 2015 as a result of higher commercial recycling volume. Landfill fees - Measure D decreased by $9,887 (3.0%) in 2016 and $14,562 (4.3%) in 2015 as a result of less garbage being sent to the landfills.

11

Page 19: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

Total Operating Expenses $18.6 million (2016) and $16.9 million (2015) – Operating expenses increased by $1,753,095 (10.4%) in 2016 and $320,776 (1.9%) in 2015, and experienced significantly impact from the implementation of GASB Statement No. 68. In 2016, $1,192,396 in pension expense was recognized, and $496,315 in current year employer pension contributions was deferred to the next year. In 2015, $676,848 in employer pension contributions was deferred, and a negative pension expense of $547,141 was recognized. These amounts were calculated based on CalPERS’ valuation report for the measurement dates of June 30, 2015 and 2014. In addition, the District recorded an OPEB asset of $773,882 in 2016, an increase from $457,966 in 2015, resulting in a negative OPEB expense of $315,916 in 2016. For year to year comparison purposes, excluding the effects of pension and OPEB adjustments, net operating expenses were $34,050 (0.2%) lower than in 2015. Due to the $6.35 million pay down in pension liability in March 2015, the District recognized almost half a million in savings in its required employer’s contributions for 2016. Overall decrease in employee benefits from 2015 to 2016 was $270,339 (12.6%). This decrease was offset by several other factors such as a $252,058 (13.6%) increase in Renewal & Replacement projects being performed this year; and a $97,158 reduction in election expense due to the non-election year. Furthermore, a $89,251 (2.7%) savings in contractual services resulted largely from an operational change in sludge drying and full catch-up of sludge hauling in 2015. Other offsetting increases include $74,193 in operating supplies, repairs and maintenance (7.4%), $21,787 in depreciation (0.7%), and $76,280 in the of the carrying value of EBDA (85.3%). Total Non-operating Revenues $0.73 million (2016) and $0.54 million (2015) – Non-operating revenues increased by $189,486 (35.1%) in 2016 and decreased by $97,710 (15.3%) in 2015. In 2016, investment income dropped by $87,839 (40.6%) with a decreasing investment portfolio due to capital spending and a $1 million pension pay down in March 2016. This decrease was offset by a $86,020 increase in fair value of investments resulting from improving market conditions.

Total Non-operating Expenses $1,515 (2016) and $59,189 (2015) – Non-operating expenses decreased by $57,674 (97.4%) in 2016 due to the fair value of investments changing from a $58,326 unrealized loss in 2015 to a $86,020 unrealized gain (classified as non-operating revenue) in 2016.

Capital Assets

On June 30, 2016, the District had $70,176,762 (net of accumulated depreciation) invested in a broad range of capital assets, as compared to $68,724,573 in 2015. These assets include land, collection system subsurface lines and lift stations, the sewage treatment plant, machinery and equipment, vehicles, solid waste and recycling assets. In 2016, several major projects were finished and added to the capital asset inventory, including the completion of nearly 3 miles of sewer pipeline replacements for $2.2 million, installation of a $125,796 valve vault at Wickman lift station, modification of part of the aerator system to fine bubble technology for $494,562, and the upgrade of the SCADA network system for $427,968. Ongoing work includes finishing other pipeline replacement projects, and an 8-million gallon storage basin for wet weather equalization combined with a horizontal levee for demonstration of wetland for dry weather flows. The anticipated cost of the wet weather equalization project is $8.9 million, which was funded partly by a State grant of $1.9 million. The annual comparison of capital assets is shown in Table 3, reflecting a $4,781,058 (3.6%) increase in 2016 and $5,112,682 (4.0%) increase in 2015. Assets are recorded at cost and depreciated over their useful lives.

12

Page 20: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

Table 3: Oro Loma Sanitary District – Capital Assets, at Cost

Period Ended June 30 2016 2015 2014

Land $ 846,034 $ 846,034 $ 846,034

Construction in progress 6,279,801 4,724,765 6,352,012

Subsurface lines 59,547,118 57,339,635 57,154,775

Engineering 40,825 40,825 50,815

Collections 6,977,734 6,811,255 6,762,222

Operations 55,755,300 54,958,325 48,535,435

Maintenance 3,480,675 3,403,258 3,322,410

Administration 1,860,614 1,882,946 1,868,189

District vehicles 2,189,491 2,189,491 2,189,491

Subtotal – Sewer Services 129,851,757 126,625,735 119,883,337

Subtotal – Solid Waste 2,177 2,177 2,177

Subtotal – Recycling 26,045 26,045 28,514

Total capital assets $ 137,005,814 $ 132,224,756 $ 127,112,074

Increase (decrease) over prior year $ 4,781,058 $ 5,112,682 $ 7,705,491

Table 4 summarizes the changes in capital assets, net of accumulated depreciation. The net increase in capital assets was $1,452,189 (2.1%) in 2016 and $1,981,874 (3.0%) in 2015. Additional information on capital assets is presented in Note 4 to the financial statements.

Table 4: Oro Loma Sanitary District – Capital Assets, Net of Accumulated Depreciation

Period Ended June 30 2016 2015 2014

Balance at beginning of year $ 132,224,756 $ 127,112,074 $ 119,406,583

Additions 7,262,365 11,066,066 10,437,923

Retirements, write-offs and transfers (2,481,307) (5,953,384) (2,732,432)

Total capital assets 137,005,814 132,224,756 127,112,074

Accumulated depreciation at beginning of year (63,500,183) (60,369,375) (58,071,689)

Depreciation - retired assets 22,332 198,606 881,751

Annual depreciation (3,351,201) (3,329,414) (3,179,437)

Accumulated depreciation at end of year (66,829,052) (63,500,183) (60,369,375)

Capital assets at end of year, net of depreciation $ 70,176,762 $ 68,724,573 $ 66,742,699

Increase (decrease) over prior year $ 1,452,189 $ 1,981,874 $ 5,407,805

13

Page 21: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

MANAGEMENT’S DISCUSSION AND ANALYSIS

June 30, 2016

Debt Administration

The outstanding bonds in the amount of $3,389,904 were redeemed in August 2009. The District has been debt free ever since.

Economic Factors & Decisions for the Future

With the mission to provide customers with the best possible service at the lowest possible cost, the Board and staff take pride in efficiency, accountability, customer service, entrepreneurial spirit, and an attitude of stewardship. As a result, the District has maintained the lowest sewer service charge in Alameda County, and one of the lowest in the State of California. The single family residential sewer service charge for FY 2015-16 was $206, or 63% less than the average rate of $563 in Alameda County. The District took initiative in March 2015 to pay down $6.35 million of its $11.5 million unfunded pension liability, and additionally, a total of $2 million in March and July 2016. Capital projects have long been funded by using existing cash reserves. As a result, in 2015, cash on hand reached below $20 million for the first time since 1994. The Board closely examined a cash flow projection in April 2016, and approved a 5-year, 7.5% annual rate increase to rebuild cash reserves for meeting future needs. The single family residential charge effective July 1, 2016 is $221, and will progress towards $296 in five years. In 2015, the Ten-Year Strategic Plan was updated, which clarifies the mission statement and establishes a clear vision of commitment to continual improvements. Its purpose is to align resource allocation with actions to achieve the established vision. Strategic goals are identified in the areas of safety, collections, wastewater treatment, maintenance, operations, administration, solid waste and recycling. The Strategic Plan may be viewed at www.oroloma.org. Currently, the Board and staff are in the final stages of defining a communications plan for public outreach and community engagement. Plans for next year include using performance metrics with published industry benchmarks to achieve national best practices and to make prudent management decisions.

Request for Information

This report aims to provide the public with a financial overview, to maintain transparency, and to highlight the successes in fiscal responsibility. Additional information may be requested from the Finance Manager at 2655 Grant Avenue, San Lorenzo, CA 94580, or (510) 481-6979.

14

Page 22: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

BASIC FINANCIAL STATEMENTS

15

Page 23: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

STATEMENT OF NET POSITION

AS OF JUNE 30, 2016 AND 2015

2016 2015

Current assets

Cash and cash equivalents 7,209,536$ 3,225,293$

Investments at fair value 14,526,362 17,040,626

Interest receivable 60,063 69,130

Accounts receivable 1,165,315 1,882,392

Prepaid and other items 102,675 107,487

Total current assets 23,063,951 22,324,928

Non-current assets

Other post-employment benefits (OPEB) asset 773,882 457,966

Investment in sewage discharge facilities - EBDA 6,331,498 6,497,233

Capital assets

Land 846,034 846,034

Sewer service assets 129,851,757 126,625,735

Solid waste assets 2,177 2,177

Recycling assets 26,045 26,045

Construction in progress 6,279,801 4,724,765

Less: accumulated depreciation (66,829,052) (63,500,183)

Total capital assets (net of accumlated depreciation) 70,176,762 68,724,573

Total non-current assets 77,282,142 75,679,772

Total assets 100,346,093$ 98,004,700$

DEFERRED OUTFLOWS OF RESOURCES

Pension benefits and adjustments 5,714,923$ 7,131,734$

ASSETS

The accompanying notes are an integral part of these financial statements16

Page 24: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

STATEMENT OF NET POSITION

AS OF JUNE 30, 2016 AND 2015

(CONTINUED)

2016 2015

Current liabilities

Accounts payable 1,645,345$ 1,305,611$

Accrued salaries and wages 147,642 116,920

Customers deposit payable 271,697 277,106

Accrued compensated absences (current) 53,000 62,000

Other benefits set-aside (current) 243,930 250,000

Total current liabilities 2,361,614 2,011,637

Non-current liabilities

Accrued compensated absences 301,396 353,462

Other benefits set-aside - 326,019

Net pension liability 4,797,739 8,249,005

Total non-current liabilities 5,099,135 8,928,486

Total liabilities 7,460,749$ 10,940,123$

DEFERRED INFLOWS OF RESOURCES

Pension obligations and adjustments 4,822,803$ 3,285,136$

NET POSITION

Net investment in capital assets 70,176,762 68,724,573

Unrestricted 23,600,702 22,186,602

Total net position 93,777,464$ 90,911,175$

LIABILITIES

The accompanying notes are an integral part of these financial statements17

Page 25: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

STATEMENT OF REVENUES, EXPENSES

AND CHANGES IN NET POSITION

FOR THE FISCAL YEARS ENDED JUNE 30, 2016 AND 2015

2016 2015

Operating revenues

District service charges 11,949,883$ 11,678,040$

Agency treatment charges 2,430,769 2,190,362

Permits and inspection fees 162,898 170,994

Sanitary truck waste charges 90,621 56,454

Grease receiving charges 158,967 142,005

Grit receiving charges 4,860 0

Contract fees 937,750 791,397

Recycling charges - residential and green waste 2,306,542 2,295,385

Recycling charges - commercial and industrial 110,721 102,060

Landfills fees - Measure D 319,719 329,606

Other 586,197 682,873

Total operating revenues 19,058,927 18,439,176

Operating expenses

Engineering 684,704 698,221

Sewage collections 2,637,991 2,897,622

Sewage treatment operations 3,483,009 3,507,420

Sewage treatment maintenance 2,498,881 2,155,643

Sewage disposal - EBDA 779,476 684,638

Administration and general 1,256,629 1,332,934

Pension expense - GASB 68 1,192,396 (547,141)

OPEB expense and adjustments (315,916) (182,991)

Depreciation 3,351,201 3,329,414

Decrease in carrying value of EBDA 165,735 89,455

Solid waste 306,213 305,189

Recycling - residential, green waste commercial, industrial 2,574,922 2,591,742

Total operating expenses 18,615,241 16,862,146

Operating income 443,686$ 1,577,030$

The accompanying notes are an integral part of these financial statements

18

Page 26: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

STATEMENT OF REVENUES, EXPENSES

AND CHANGES IN NET POSITION

FOR THE FISCAL YEARS ENDED JUNE 30, 2016 AND 2015

(CONTINUED)

2016 2015

Non-operating revenues

Investment income 128,479$ 216,318$

Increase in the fair value of investments 86,020 -

Rents, leases and personal license fees 79,956 92,741

Recovery of uncollectible accounts 17,203 11,343

Other miscellaneous revenues 339,028 140,798

EBDA and other agreement refund 79,371 79,371

Total non-operating revenues 730,057 540,571

Non-operating expenses

Decrease in the fair value of investments - 58,326

Write-off of uncollectible accounts 1,515 863

Total non-operating expenses 1,515 59,189

Income before contributions 1,172,228 2,058,412

Connection and other developers’ fees 298,612 1,076,699

Capital Grants 1,202,580 -

Change in net position 2,673,420 3,135,111

Net position - beginning (as reported) 90,911,175 98,269,280

Prior period adjustment - GASB 68 pension adjustments 192,869 (10,768,191)

Prior period adjustment - OPEB adjustments - 274,975

Net position - beginning (as adjusted) 91,104,044 87,776,064

Net position - ending 93,777,464$ 90,911,175$

The accompanying notes are an integral part of the financial statements19

Page 27: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

STATEMENT OF CASH FLOWS

FOR THE FISCAL YEARS JUNE 30, 2016 AND 2015

2016 2015

Cash flows from operating activities

Receipts from customers and users 19,776,004$ 18,180,889$

Payments to suppliers (8,767,543) (7,791,787)

Payments to employees and employee benefit plans (6,975,408) (12,820,755)

Net cash provided by operating activities 4,033,053 (2,431,652)

Cash flows from non-capital financing activities

EBDA agreement refund 79,371 79,371

Other revenues 418,984 233,539

Recovery of uncollectible accounts 17,203 11,343

Net cash provided by non-capital and related financing activities 515,558 324,253

Cash flows from capital and related financing activities

Connection and other developers’ fees 298,612 1,076,699

Additions to property, plant and equipment (4,803,390) (5,311,288)

Capital grants 1,202,580 -

Net cash used by capital and related financing activities (3,302,198) (4,234,589)

Cash flows from investing activities

Interest on investments 137,546 196,811

Proceeds from investments 2,600,284 708,710

Net cash provided by investing activities 2,737,830 905,521

Net decrease in cash and cash equivalents 3,984,243 (5,436,468)

Cash and cash equivalents, beginning of year 3,225,293 8,661,761

Cash and cash equivalents, end of year 7,209,536$ 3,225,293$

The accompanying notes are an integral part of these financial statements.20

Page 28: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

STATEMENT OF CASH FLOWS

FOR THE FISCAL YEARS ENDED JUNE 30, 2016 AND 2015

(CONTINUED)

2016 2015

Reconciliation of operating income to net cash provided by (used for) operating activities

Operating income 443,686$ 1,577,030$

Adjustments to reconcile operating income to net cash provided (used) by operating activities

Depreciation expense 3,351,201 3,329,414

Pension expense adjustments - GASB 68 (303,919) (6,365,784)

Other post-employment benefit adjustments (315,916) (182,991)

Write off of uncollectible accounts (1,515) (863)

(Increase) decrease in accounts receivables 717,077 (258,287)

(Increase) decrease in other current assets 4,812 (4,338)

Decrease in EBDA discharge facilities 165,735 89,455

Increase (decrease) in accounts payable 339,734 (307,535)

Increase (decrease) in deposits payable (5,409) (97,810)

Increase (decrease) in accrued salaries and compensated absences (30,344) 24,525

Increase (decrease) in benefits set-aside (332,089) (234,469)

Net cash provided (used) by operating activities 4,033,053 (2,431,652)

End of period

Unrestricted cash and equivalents 7,209,536 3,225,293

Restricted assets - -

Total cash and cash equivalents 7,209,536$ 3,225,293$

Schedule of non-cash investing and financing activities

Change in fair value of investments not held as cash equivalents 86,020$ (58,326)$

The accompanying notes are integral part of these financial statements21

Page 29: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

This page intentionally left blank

22

Page 30: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

NOTES TO FINANCIAL STATEMENTS

23

Page 31: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 1 – DISTRICT OVERVIEW

Oro Loma Sanitary District was formed on August 7, 1911, and has one of the longest history among sanitary agencies in Alameda County. It was subsequently reorganized under the Sanitary District Act of 1923 of the State Health & Safety Code. Its service area is located about 13 miles south of Oakland, and 30 miles north of San Jose on the eastern shore of the San Francisco Bay. It encompasses 13 square miles, serving the communities of unincorporated Alameda County, including San Lorenzo, Ashland, Cherryland, Fairview, portions of Castro Valley, and designated areas of the Cities of Hayward an San Leandro. Sewage collected goes through primary and secondary treatment processes at the water pollution control plant, and is subsequently disposed through East Bay Dischargers Authority (EBDA), a joint powers agency formed by five local sanitation jurisdictions. The District also provides garbage and recycling services, through a contract with Waste Management. The District is governed by a five-member Board of Directors, elected in the Alameda County’s general election, for alternating four-year terms. The Board oversees policy decisions and appoints the General Manager to manage the day-to-day operations.

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

The accounting policies of the District conform to accounting principles generally accepted in the United States of America as applicable to enterprise governments. The Governmental Accounting Standards Board (GASB) is the accepted standard-setting body for governmental accounting and financial reporting principles. The GASB establishes standards for external financial reporting for all state and local governmental entities, which require a management discussion and analysis section, a statement of net position, a statement of revenues, expenses and changes in net position, and a statement of cash flows. It requires the classification of net position into three components: investment in capital assets, restricted net position, and unrestricted net position.

Financial Reporting Entity

For financial reporting purposes, component units are defined as legally separate organizations for which the elected officials of the primary government are financially accountable, and other organizations for which the nature and significance of their relationship with a primary government are such that exclusion would cause the reporting entity’s financial statements to be misleading or incomplete. The District has determined that there are no component units that meet these criteria as of June 30, 2016, and has reported all funds that are controlled by or are dependent upon its Board of Directors. Its relationship with East Bay Dischargers Authority (EBDA) is reflected based upon its proportionate share of the investment in the discharge facilities of the EBDA.

24

Page 32: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

Basis of Presentation and Accounting

The District is accounted for as an enterprise fund under the proprietary fund type. A fund is defined as an accounting entity with a self-balancing set of accounts recording the financial position and results of operations of a specific governmental activity. An enterprise fund accounts for operations that provide services on a continuous basis and its activities are substantially financed by revenues derived from user charges. Asset acquisitions and capital improvements are financed from existing cash resources, cash flow from operations, issuance of bonds, and contributed capital. Under the District’s enterprise fund are component funds that account for revenues and expenses of its three service types – sewer service, solid waste (garbage) and recycling. The sewer service component fund is further divided into three units – operations and maintenance, renewal and replacement, and capital improvement program. Measurement focus determines which transactions are recorded within the various financial statements. Proprietary fund types utilizes an economic resources measurement focus. The accounting objectives of this measurement focus are the determination of operating income, changes in net position, financial position, and cash flows. All assets and liabilities are reported. Fund equity is classified as net position. Basis of accounting refers to when transactions are recorded. The District utilizes the accrual basis of accounting in which all assets and deferred outflows of resources, liabilities and deferred inflows of resources are recorded on the Statement of Net Position. Revenues are recognized when earned, and expenses are recorded when the liability is incurred. The District applies all applicable GASB pronouncements for certain accounting and financial reporting guidance. In December of 2010, GASB issued Statement No. 62 – Codification of Accounting and

Financial Reporting Guidance Contained in Pre-November 30, 1989 FASB and AICPA Pronouncements.

This statement incorporates pronouncements issued on or before November 30, 1989 into GASB authoritative literature. This includes pronouncements by the Financial Accounting Standards Board (FASB), Accounting Principles Board Opinions (APB), and the Accounting Research Bulletins of the American Institute of Certified Public Accountants’ (AICPA) Committee on Accounting Procedure, unless those pronouncements conflict with or contradict with GASB pronouncements. Budgets and Budgetary Accounting

The District adopts a biennial budget, which includes both operating and capital expenditures. The budget serves as a financial plan and a management tool to maintain fiscal responsibility. Amendments are prepared by management and approved by the Board to reprioritize project spending if necessary.

Cash and Cash Equivalents

For purposes of the Statement of Cash Flows, cash represents balances that can be readily withdrawn without substantial notice or penalty. Cash equivalents are defined as short-term, highly liquid investments that are readily convertible to known amounts of cash, with original maturities of three months or less.

25

Page 33: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED) The District participates in an investment pool managed by the State of California known as the Local Agency Investment Fund (LAIF), which invests a portion of the pooled funds in structured notes and asset-backed securities. Refer to Note 3 for details. Investments

Investments are reported in the Statement of Net Position at fair value in accordance with GASB Statement No. 72, Fair Value Measurement and Application. Changes in fair value are recognized in the Statement of Revenues and Expenses and Changes in Net Position. Investment income includes interest earnings and any gains or losses realized upon maturity or sale of investments. See Note 3 for detailed disclosures.

Inventories

Inventories of fuel are held for consumption and are recorded at cost using the first-in-first-out (FIFO) method. Inventories are recognized as expenses when consumed rather than when purchased. Capital Assets

Capital assets are defined by the District as assets with an individual cost of $5,000 or more and an estimated useful life of more than one year. Such assets are recorded at cost on the Statement of Net Position. Capital costs for projects may include materials and equipment, direct labor, transportation, contractual and professional services. Costs of normal maintenance and repairs that do not add to the value of the assets or materially extend asset lives are not capitalized. Capital assets within the sewage treatment plant are owned jointly by the District (75%) and Castro Valley Sanitary District (25%). Assets that do not pertain to the treatment plant are 100% owned by the District. Note 4 presents in-depth information on capital assets.

Depreciation

The purpose of depreciation is to spread the cost of capital assets over their useful lives. Depreciation is reported as an operating expense. Accumulated depreciation is the total amount of depreciation recorded over the years and is reported on the Statement of Net Position as a reduction in gross value of the capital assets. Depreciation is computed using the straight-line method based on the estimated useful lives of asset classifications ranging from 2 to 80 years. Depreciation of capital assets starts in the year following acquisition.

Capital Contributions

Contributed capital assets are recorded at estimated fair value on the date contributed. Other capital contributions include connection and developer fees imposed on contractors and developers connecting new or existing properties to the District’s sewer system. These fees are reserved for the purpose of capital improvements.

26

Page 34: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED) Long-Term Debt

The District does not have any long-term debt at June 30, 2016. The last sewer revenue bonds were paid off on September 21, 2009. Consequently, there are no restricted net position associated with debt service presented on the Statement of Net Position. Compensated Absences

Compensated absences reported in the Statement of Net Position include accumulated earned but unused vacation, floating holiday and compensated time-off. The amount is computed using current employee pay rates and are carried as liability until used.

Balance at June 30, 2015 $ 415,462

Addition for employees with accrued compensated absences earned 47,685

Deduction for employees with accrued compensated absences used (108,751)

Net change in accrued compensated absences (61,066)

Balance at June 30, 2016 $ 354,396

The current portion of the compensated absences liability to be used within the next year is estimated by management to be $53,000 or approximately 15%.

Net Position

The Statement of Net Position is designed to display the financial position of the District. Net position is the excess of assets and deferred outflow of resources over liabilities and deferred inflow of resources, and is classified into the following components:

• Net investment in capital assets – consists of capital assets, including restricted capital assets, net of accumulated depreciation.

• Restricted – consists of constraints placed on net asset use by creditors or by law and constitutional provisions. The District has no restrictions on June 30, 2016.

• Unrestricted – consists of the net amount of assets, deferred outflows of resources, liabilities, and deferred inflows of resources that are not included in the determination of net investment in capital assets or the restricted component of net position.

Classification of Revenues and Expenses

Operating revenues consist primarily of sewer, garbage and recycling charges. Non-operating revenues consist of investment income and special charges that can be used for either operating or capital purposes, except those which by grant provisions may be designated for specific purposes. Operating expenses are those expenses that are essential to the primary operations, and include costs related to sewage collection and treatment, and cost of providing garbage and recycling services. All other expenses are reported as non-operating expenses.

27

Page 35: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

Pensions

For purposes of measuring the net pension liability and deferred outflows/inflows of resources related to pensions, and pension expense, information about the fiduciary net position of the District’s California Public Employees’ Retirement System (CalPERS) plans (Plans) and additions to/deductions from the Plans’ fiduciary net position have been determined on the same basis as they are reported by CalPERS. For this purpose, benefit payments (including refunds of employee contributions) are recognized when due and payable in accordance with the benefit terms. Investments are reported at fair value. Note 6 and the Required Supplementary Information section provide further details on pension liability and other related information.

Other Post-Employment Benefits (OPEB)

The District implemented GASB Statements No. 43 and No. 45 in fiscal year ended June 30, 2008. Biennial actuarial studies were performed to determine the annual required contributions (ARC) and unfunded liabilities. In addition, an OPEB trust has been established with CalPERS, and an in-house set-aside account is maintained, from which day-to-day OPEB obligations may be disbursed. See Note 7 for detailed disclosures.

Accounting Estimates

The preparation of the financial statements in conformity with accounting principles generally accepted in the United States of America requires management to make estimates and assumptions that affect the amounts reported in the financial statements and accompanying notes.

Subsequent Events

Management has reviewed subsequent events and transactions that occurred after the date of the financial statements through the date the financial statements were issued. The financial statements include all events and transactions required to be recognized in accordance with generally accepted accounting principles. Management has determined that there are no unrecognized subsequent events that require additional disclosure.

28

Page 36: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

Current and New Accounting Pronouncements

GASB Statement No. 68 – Accounting and Financial Reporting for Pensions - an amendment of GASB Statement No. 27, issued June 2012. The primary objective of this Statement is to improve accounting and financial reporting by state and local governments for pensions. It also improves information provided by state and local governmental employers about financial support for pensions that is provided by other entities. This Statement replaces the requirements of GASB Statement No. 27, Accounting for Pensions by

State and Local Governmental Employers, as well as the requirements of GASB Statement No. 50, Pension Disclosures, as they relate to pensions that are provided through pension plans administered as trusts or equivalent arrangements (hereafter jointly referred to as trusts) that meet certain criteria. This Statement establishes a definition of a pension plan that reflects the primary activities associated with the pension arrangement – determining pensions, accumulating and managing assets dedicated for pensions, and paying benefits to plan members as they come due. This Statement has been implemented for FY 2014-15, resulting in a prior period adjustment in that year. See Note 6 for information related to the financial statement impact of this statement. GASB Statement No. 69 – In January 2013, GASB issued Statement No. 69, Government Combinations

and Disposal of Government Operations. This Statement establishes accounting and financial reporting standards related to government combinations and disposal of government operations. As used in this Statement, combinations include a variety of transactions referred to as mergers, acquisitions, and transfers of operations. This Statement has no effect on the District's financial statements.

GASB Statement No. 70 – In April 2013, GASB issued Statement No 70, Accounting and Financial

Reporting for Non-exchange Financial Guarantees. Some governments extend financial guarantees for the obligations of another government, a not-for-profit entity, or private entity without directly receiving equal or approximately equal value in exchange (a non-exchange transaction). The District does not participate in non-exchange financial guarantees. This Statement has no effect on its financial statements.

GASB Statement No. 71 – In November 2013, GASB issued Statement No 71, Pension Transition for

Contributions Made Subsequent to the Measurement Date, an amendment of GASB Statement No. 68. The objective of this Statement is to address an issue regarding application of the transition provisions of GASB Statement No. 68, Accounting and Financial Reporting for Pensions. The issue relates to amounts associated with contributions, if any, made by a state or local government employer or non-employer contributing entity to a defined benefit pension plan after the measurement date of the government’s beginning net pension liability. The provisions of this Statement are required to be applied simultaneously with the provisions of GASB Statement No. 68 and have been implemented for FY 2014-15. See Note 6 for information related to the financial statement impact of this statement.

29

Page 37: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

GASB Statement No. 72 – In February 2015, GASB issued Statement No. 72, Fair Value Measurement

and Application. The definition of fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. This Statement provides guidance for determining fair value measurements for financial reporting purposes based on one the following valuation techniques:

• Market approach – Market price information on identical or comparable asset.

• Cost approach – Amount required to replace the present service capacity of an asset.

• Income approach – Future income discounted to current dollars. This Statement also establishes a hierarchy of inputs to the above valuation techniques:

• Level 1 inputs – Quoted prices in active markets for identical assets or liabilities.

• Level 2 inputs – Quoted prices for similar assets or liabilities, quoted prices for identical or similar assets or liabilities in markets that are not active, or inputs other than quoted prices that are observable for the asset or liability.

• Level 3 inputs – Unobserved inputs, such as management's assumption of the default rate among underlying mortgage-backed security, or a property valuation or appraisal.

This Statement has been implemented for FY 2015-16. Related financial disclosures are included in Note 3.

GASB Statement No. 73 – Accounting and Financial Reporting for Pensions and Related Assets That

are not within the Scope of GASB Statement No. 68, and Amendments to Certain Provisions of GASB

Statements No. 67 and No. 68. The requirements in this Statement are effective beginning FY 2015-16, except those provisions that address employers and governmental non-employer contributing entities for pensions that are not within the scope of GASB Statement No. 68, which are effective beginning FY 2016-17. The objective of this Statement is to improve the usefulness of information about pensions included in the general purpose external financial reports of state and local governments for making decisions and assessing accountability, creating additional transparency. This Statement also clarifies the application of certain provisions of GASB Statements No. 67 and No. 68 on the following issues:

• Information that is required to be presented as notes to the 10-year schedules of required supplementary information about investment-related factors that significantly affect trends in the amounts reported.

• Accounting and financial reporting for separately financed specific liabilities of individual employers and non-employer contributing entities for defined benefit pensions.

• Timing of employer recognition of revenue for the support of non-employer contributing entities not

in a special funding situation.

This Statement has no effect on the District's financial statements.

30

Page 38: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

GASB Statement No. 74 – Financial Reporting for Post-employment Benefit Plans Other Than Pension

Plans. This Statement replaces GASB Statement No. 43, and sets new reporting standards for Other Post-Employment Benefit (OPEB) plans administered through irrevocable trusts that provide OPEB to plan members in accordance with benefit terms. This Statement is effective beginning FY 2016-17, and may impact the financial reporting of the California Employers' Retirement Benefit Trust (CERBT) which administers the District's OPEB assets. The scope of this Statement includes OPEB plans – defined benefit and defined contribution, administered through trusts that meet the following criteria:

• Contributions from employers and non-employer contributing entities to the OPEB plan and earnings on those contributions are irrevocable.

• OPEB plan assets are dedicated to providing OPEB to plan members in accordance with the benefit terms.

• OPEB plan assets are legally protected from the creditors of employers, non-employer contributing entities, and the OPEB plan administrator. If the plan is a defined benefit OPEB plan, plan assets also are legally protected from creditors of the plan members.

This statement will not have a direct impact on the District’s financial statements. GASB Statement No. 75 – Accounting and Financial Reporting for Post-employment Benefits Other

Than Pensions. The provisions in GASB Statement No. 75 are effective for FY 2017-18. The primary objective of this Statement is to improve accounting and financial reporting by state and local governments for other post-employment benefits (OPEB). It also improves information provided by state and local governmental employers about financial support for OPEB that is provided by other entities. This Statement replaces the requirements of GASB Statements No. 45, Accounting and

Financial Reporting by Employers for Post-employment Benefits Other Than Pensions, as amended, and No. 57, OPEB Measurements by Agent Employers and Agent Multiple-Employer Plans, for OPEB. GASB Statement No. 74, Financial Reporting for Post-employment Benefit Plans Other Than Pension

Plans, establishes new accounting and financial reporting requirements for OPEB plans. The scope of this Statement addresses accounting and financial reporting for OPEB that is provided to the employees of state and local governmental employers. This Statement establishes standards for recognizing and measuring liabilities, deferred outflows of resources, deferred inflows of resources, and expense. For defined benefit OPEB, this Statement identifies the methods and assumptions that are required to be used to project benefit payments, discount projected benefit payments to their actuarial present value, and attribute that present value to periods of employee service. Note disclosure and required supplementary information requirements about defined benefit OPEB are also addressed.

In addition, this Statement details the recognition and disclosure requirements for employers with payables to defined benefit OPEB plans that are administered through trusts that meet the specified criteria and for employers whose employees are provided with defined contribution OPEB. This Statement also addresses certain circumstances in which a non-employer entity provides financial support for OPEB of employees of another entity.

31

Page 39: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

In this Statement, distinctions are made regarding the particular requirements depending upon whether the OPEB plans through which the benefits are provided are administered through trusts that meet the following criteria:

• Contributions from employers and non-employer contributing entities to the OPEB plan and earnings on those contributions are irrevocable.

• OPEB plan assets are dedicated to providing OPEB to plan members in accordance with the benefit terms.

• OPEB plan assets are legally protected from the creditors of employers, non-employer contributing entities, the OPEB plan administrator, and creditors of the plan members.

This Statement will likely impact the District's FY 2017-18 financial statements through the recognition of an OPEB liability on the Statement of Net Position, which was last valued at $7.17 million (inclusive of the value of future subsidized premiums, per Actuarial Standard of Practice No. 6). GASB Statement No. 76 – The Hierarchy of Generally Accepted Accounting Principles for State and

Local Governments. This Statement redefines the GAAP hierarchy to two authoritative categories – GASB Statements of governmental accounting standards; and, GASB technical bulletins, implementation guides, and GASB-approved guidance from the AICPA. It also addresses the use of authoritative and non-authoritative literature for situations when GAAP does not dictate a specific accounting treatment. This Statement took effect in FY 2015-16. There is no material impact on the District's financial statements. GASB Statement No. 77 – Tax Abatement Disclosures. The requirements of this Statement are effective beginning FY 2016-17. This Statement requires governments that enter into tax abatement agreements to disclose information such as the tax being abated, the authority under which tax abatements are provided, eligibility criteria, the mechanism by which taxes are abated, provisions for recapturing abated taxes, commitments made by the tax abatement recipients and the government, and gross dollar amount of taxes abated during the period. This Statement has no effect on the District's financial statements. GASB Statement No. 78 – Pensions provided through Certain Multiple-Employer Defined Benefit

Pension Plans. This Statement amends the scope of GASB Statement No. 68 to exclude plans that are not a state or local government pension plan, that contain both government and non-government employers, with no predominant government employer in the plans. This exclusion eases the burden for governments with these non-governmental plans to obtain information for GASB 68 reporting. It takes effect beginning FY 2016-17, and has no impact on the District's financial statements. GASB Statement No. 79 – Certain External Investment Pools & Pool Participants. This Statement establishes criteria for an external investment pool to qualify for electing to report its investments at amortized cost, rather than fair value. It takes effect beginning FY 2015-16. There is no direct impact on the District’s financial statements.

32

Page 40: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 2 – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)

GASB Statement No. 80 – Blended Requirements for Certain Component Units – An Amendment of

GASB Statement No. 14. The objective of this Statement is to improve financial reporting by clarifying the financial statement presentation requirements for certain component units. It takes effect beginning FY 2017-18, and is not applicable to the District. GASB Statement No. 81 – Irrevocable Split-Interest Agreements. Split-interest agreements are arrangements by which a donor provides resources to two or more beneficiaries, including governments. This Statement requires that a government that receives resources pursuant to an irrevocable split-interest agreement recognize assets, liabilities and deferred inflow of resources at the inception of the agreement. Revenue is recognized when the resources become applicable to the reporting period. This Statement takes effect beginning FY 2017-18. The District does not have this type of agreement. The Statement has no effect on its financial statements. GASB Statement No. 82 – Pension Issues – An Amendment of GASB Statements No. 67, No. 68 & No.

73. This Statement amends the payroll basis used by GASB Statements No. 67, No. 68, and No. 73 from "covered-employee payroll" (the payroll of employees that are provided with pensions) to that of "covered payroll" (the payroll on which contributions to a pension plan are based). In addition, employer-paid member contributions will be classified as plan member contributions for Statement No. 67 and as employee contributions for Statement No. 68. It takes effect beginning FY 2016-17. This Statement has no material impact on the District’s financial statements.

NOTE 3 – CASH, CASH EQUIVALENTS AND INVESTMENTS

The District had $21,735,898 in cash, cash equivalents and investments, which are reported at fair value as of June 30, 2016. GASB Statement No. 72, Fair Value Measurement and Application, established a hierarchy of inputs to the valuation techniques. Below is the distribution of inputs used to measure the fair value of the District's cash equivalents and investments.

• Level 1 inputs – Quoted market prices U.S. Treasury Notes $1,753,487 U.S. Government Bonds $3,524,758 Certificates of Deposit $6,629,017 Corporate Bonds $2,619,100

• Level 2 inputs – Observable inputs other than quoted market prices California Local Agency Investment Fund (LAIF) $6,285,290 Wells Fargo Money Market Account $98,120 U.S. Bank Checking Account $823,626

33

Page 41: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 3 – CASH, CASH EQUIVALENTS AND INVESTMENTS (CONTINUED)

The following table provides details on the District's cash, cash equivalents and investments at June 30, 2016, as reported in the Statement of Net Position of the basic financial statements:

*Institutional Retirement & Trust (IRT) – custodial account maintained by Wells Fargo Bank for the District’s specific investments, based on the custodial agreement dated June 20, 2011.

Policies and Practices

Under the constraints prescribed by the Government Code of the State of California for permissible investments, the District’s investment policy allows the following investment instruments:

• Local Agency Investment Fund

• Certificates of Deposit (FDIC insured)

• U.S. Treasury instruments

• Federal Agency mortgage-backed securities and debentures

• Federal instrumentality debentures, discount notes, callable and step-up securities

• Money market mutual funds

• Bankers’ acceptances

• Other deposits with banks, savings and loan associations, credit unions, federal investment funds

• Commercial papers

• Medium-term corporate notes

Cash and cash equivalents $ 7,209,536 Investments 14,526,362

Total cash, cash equivalents and investments $ 21,735,898

Cash, cash equivalents and investments as of June 30, 2016 consist of: Petty cash $ 2,500 Deposits with financial institutions Checking account – U.S. Bank 823,626 Money market account – Wells Fargo IRT* 98,120 California Local Agency Investment Fund (LAIF) 6,285,290

Subtotal cash and cash equivalents 7,209,536

Investments U.S. Treasury Notes – Wells Fargo IRT* 1,753,487 U.S. Government Bonds – Wells Fargo IRT* 3,524,758 Certificates of Deposit – Wells Fargo IRT* Corporate Bonds – Wells Fargo IRT*

6,629,017 2,619,100

Subtotal investments 14,526,362 Total cash, cash equivalents and investments $ 21,735,898

34

Page 42: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 3 – CASH, CASH EQUIVALENTS AND INVESTMENTS (CONTINUED)

State code prohibits the District from investing in investments with a rating of less than A or equivalent. The District’s investment policy follows State code, except that investments in money market mutual funds may be made only if the fund has a rating of Aaa.

General Authorizations

Limitations as they relate to interest rate risk, credit risk, and concentration of credit risk are indicated in the schedule below:

State of California Limits

District

Policy

Authorized Investment Type with

Maximum

Maximum

Maximum

Maximum of

Portfolio / Minimum Rating Requirements Remaining of in Maximum in

where applicable . Maturity Portfolio Single Issuer Single Issuer U.S. Treasury obligations 5 years None None None U.S. Government1 and GNMA securities 5 years None None None / 30% Banker’s acceptance [A-1, A for senior debt]

180 days 40% 30% 20% / 5%

Commercial papers ["Prime"] 270 days 25% 10% 25% / 5% Negotiable certificates of deposit 2 5 years 30% None 30% Repurchase agreements 1 year None None Not permitted Reverse repurchase agreements 92 days 20% of base None Not permitted Money market mutual funds [Aaa] N/A 20% 10% 20% / 10% Local Agency Investment Fund N/A $50 million None $50 million Bank deposits N/A None None 20% Corporate notes, medium term [A] 5 years 30% None 30% / 5%

1 U.S. Government Securities – securities issued by agencies sponsored by the federal government such as the Federal Farm Credit Bank (FFCB), the Federal Home Loan Bank (FHLB), the Federal National Mortgage Association (FNMA), and the Federal Home Loan Mortgage Corporation (FHLMC).

2 All certificates of deposit purchased by the District must be insured by the Federal Deposit Insurance Corporation (FDIC).

The District investment policy is that investment maturities do not exceed 5 years.

35

Page 43: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 3 – CASH, CASH EQUIVALENTS AND INVESTMENTS (CONTINUED)

Interest Rate Risk and Credit Risk

Interest rate risk is the risk that changes in market interest rates will adversely affect the fair value of an investment. Generally, the longer the maturity of an investment, the greater the sensitivity of its fair value to changes in market interest rates. The District manages its exposure to interest rate risk by purchasing a combination of short-term and long-term investments, and by timing cash flows from maturities so that a portion of the portfolio is maturing or coming close to maturity evenly over time, as necessary to provide the cash flow and liquidity needed for operations. Credit risk is the risk that an issuer of an investment will not fulfill its obligation to the holder of the investment. This is measured by the assignment of a rating by a nationally recognized statistical rating organization. The following schedule provides information about the sensitivity of the fair values of the District’s investments to market interest rate fluctuation by showing the distribution by maturity. The actual ratings as of the June 30, 2016 for each investment type are shown. (Source: Moody’s)

Maturities of Instruments

Investment Type

12 months

or less

12 – 24 months

25 months or longer

Rating as of June 30,

2016 Total

Percentage of

Portfolio

U.S. treasury notes $ 1,753,487 $ - $ - Aaa $ 1,753,487 8% U.S. government bonds

FFCB - - 750,443 Aaa 750,443 3% FHLB - - 1,022,630 Aaa 1,022,630 5% FHLMC - - 750,225 Aaa 750,225 3% FNMA 1,001,460 - - Aaa 1,001,460 5%

Corporate bonds - 1,503,600 1,115,500 A2 – Aaa 2,619,100 13% Certificates of deposit 2,833,077 - 3,795,940 FDIC insured 6,629,017 30%

Total investments 5,588,024 1,503,600 7,434,738 14,526,362 67% Cash and money market 924,246 - - Not required 924,246 4% LAIF State investment pool 6,285,290 - - Not required 6,285,290 29% Total cash & investments $ 12,797,560 $ 1,503,600 $ 7,434,738 $21,735,898 100%

36

Page 44: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 3 – CASH, CASH EQUIVALENTS AND INVESTMENTS (CONTINUED)

Concentration of Credit Risk

Concentration of credit risk is the risk of a loss attributed to the magnitude of a government’s investment in a single issuer. The District's investment policy limits the amount that can be invested in any one issuer. As of June 30, 2016, all concentrations are within the amounts permitted.

Custodial Credit Risk - Deposits

This is the risk that in the event of a bank failure, deposits may not be returnable. California Government Code Sections 53651.6 and 53651(p) require that a financial institution secure deposits by pledging securities in an undivided collateral pool held by a depository regulated under State law. The fair value of the pledged securities in the collateral pool must equal at least 110% of the total amount deposited by the public agencies. The collateral and deposit pool balance is monitored by the Administrator of Local Security Program of the State of California. State law also allows financial institutions to secure public deposits by pledging first trust deed mortgage notes having a value of 150% of the secured public deposits, and letters of credit issued by the Federal Home Loan Bank of San Francisco having a value of 105% of the secured deposits. As of June 30, 2016, the amount of deposits in U.S. Bank ($1,691,191, before reduction for outstanding checks and addition of deposits in transit) was covered by the Federal Depository Insurance Corporation (FDIC) up to $250,000. The remaining amount was secured by collateral held in an undivided collateral pool, as described above.

Custodial Credit Risk - Investments

This is the risk that, in the event of the failure of the counterparty, the District will not be able to recover the value of its investments or collateral securities that are in possession of an outside party. The California Government Code does not contain legal or policy requirements that would limit the exposure to custodial credit risk. The District contracted with Cutwater Asset Management and Wells Fargo Securities, both authorized to carry out investment transactions in compliance with the requirements of the investment policy. Securities purchased through Cutwater Asset Management and Wells Fargo Securities are held with Wells Fargo Institutional Retirement and Trust (IRT) in the District’s name under a custody agreement dated June 20, 2011. As of October 1, 2015, Cutwater Asset Management has withdrawn its interest in providing investment advisory services.

Investment in the State's Investment Pool

The District participates in the Local Agency Investment Fund (LAIF) that is regulated by California government code Section 16429 under the oversight of the Treasurer of the State of California. The fair value of investments in the pool is reported in the accompanying financial statements at amounts based on the District’s pro-rata share of the fair value provided by LAIF for the entire portfolio (in relation to the amortized cost of that portfolio). The balance available for withdrawal is based on the accounting records maintained by LAIF, which is recorded on the amortized cost basis. The LAIF balance at June 30, 2016 was $6,285,290.

37

Page 45: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 4 – CAPITAL ASSETS

Capital asset activity for the year ended June 30, 2016 is summarized as follows:

Useful Balance Balance

Life June 30, 2015 Increases Decreases June 30, 2016

Non-depreciable capital assets

Land $ 846,034 $ - $ - $ 846,034

Construction in progress 4,724,765 4,014,011 (2,458,975) 6,279,801

Total non-depreciable capital assets 5,570,799 4,014,011 (2,458,975) 7,125,835

Depreciable capital assets

Sewer Service

Subsurface lines 20-80yrs 57,339,635 2,207,483 - 59,547,118

Engineering 5-20 yrs 40,825 - - 40,825

Collections 5-20 yrs 6,811,255 166,479 - 6,977,734

Operations 2-20 yrs 54,958,325 796,975 - 55,755,300

Maintenance 5-20 yrs 3,403,258 77,417 - 3,480,675

Administration 5-20 yrs 1,882,946 - (22,332) 1,860,614

District vehicles 5-10 yrs 2,189,491 - - 2,189,491

Subtotal - Sewer Service 126,625,735 3,248,354 (22,332) 129,851,757

Solid Waste

Subtotal - Solid Waste 5 yrs 2,177 - - 2,177

Recycling

Subtotal - Recycling 10 yrs 26,045 - - 26,045

Total depreciable capital assets 126,653,957 3,248,354 (22,332) 129,879,979

Total capital assets $ 132,224,756 $ 7,262,365 $ (2,481,307) $ 137,005,814

38

Page 46: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 4 – CAPITAL ASSETS (CONTINUED)

Balance Balance

June 30, 2015 Increases Decreases June 30, 2016

Less: accumulated depreciation

Sewer Service

Subsurface lines $ (26,940,318) $ (791,338) $ - $ (27,735,656)

Engineering (34,300) (2,175) - (36,475)

Collections (3,783,076) (245,986) - (4,029,062)

Operations (27,191,572) (1,996,496) - (29,188,068)

Maintenance (2,351,712) (184,652) - (2,536,364)

Administration (1,847,249) (5,970) 22,332 (1,830,887)

District vehicles (1,323,734) (120,584) - (1,444,318)

Subtotal - Sewer Service (63,471,961) (3,351,201) 22,332 (66,800,830)

Solid Waste

Subtotal – Solid Waste (2,177) - - (2,177)

Recycling

Subtotal – Recycling (26,045) - - (26,045)

Total accumulated depreciation (63,500,183) (3,351,201) 22,332 (66,829,052)

Net depreciable capital assets 63,153,774 (102,847) - 63,050,927

Net capital assets $ 68,724,573 $ 3,911,164 $ (2,458,975) $ 70,176,762

39

Page 47: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 4 – CAPITAL ASSETS (CONTINUED)

Construction commitments

The District has active construction projects as of June 30, 2016. Significant projects include sewer line replacements and repairs, lift station and treatment plant improvements, and the construction of a wet weather equalization basin with a horizontal levee. As of June 30, 2016, the total outstanding construction commitments was $3,570,850.

NOTE 5 – INVESTMENT IN EAST BAY DISCHARGERS AUTHORITY (EBDA)

East Bay Dischargers Authority (EBDA) was established in 1974 by the Cities of Hayward and San Leandro, and by the Oro Loma, Castro Valley, and Union Sanitary Districts under the Joint Exercise of Powers Act of the State of California. The purpose for creating the Authority was to plan, acquire, construct, manage and operate common use areas for sewage disposal facilities for its member agencies. The governing body of EBDA consists of five members, one appointed by each of its member agencies, all with equal vote. As a separate legal entity, EBDA exercises full power and authorities within the scope of the Joint Powers Agreement. Its obligations and liabilities are not those of its member agencies. EBDA holds a National Pollutant Discharge Elimination System Permit No. CA 0037869 issued by the California Regional Water Quality Control Board to discharge up to 189.1 MGD of secondary treated wastewater into the San Francisco Bay. It is EBDA’s responsibility to ensure that the treatment of wastewater by each member agency is in compliance with the Federal Water Pollution Control Act (P.L. 92-500) and as amended by the Clean Water Act of 1986. The financial activities for EBDA are not included in the accompanying financial statements as it is administered by a Commission separate from and independent of the District. Current fiscal year transactions with, and the investment in, the Joint Powers Authority are accounted for as follows:

• The District’s long-term investment in EBDA is reported as Investment in Sewage Discharge Facilities - EBDA under capital assets in the amount of $6,331,498 for 2016 and $6,497,233 for 2015. The respective changes of $165,735 and $89,455 are reported under Decrease in Carrying Value of EBDA, as operating expenses.

• The District’s share of payments to EBDA is reported as Sewage Disposal - EBDA, an operating expense on the financial statements. Payments were $779,476 and $684,638 respectively during the fiscal years ended 2016 and 2015.

• The District received from EBDA $79,371 per year in 2016 and 2015 for its share of revenues from the long-term agreement between EBDA and Livermore-Amador Valley Water Management Agency (LAVWMA). These amounts are reported as EBDA and Other Agreement Refunds under non-operating revenues.

40

Page 48: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 5 – INVESTMENT IN EAST BAY DISCHARGERS AUTHORITY (EBDA)

(CONTINUED)

The assets of EBDA are the costs of the property, plant, and equipment used to discharge treated effluent into the San Francisco Bay. Over $40 million of the construction costs and planning related thereto were primarily funded by federal and state sources as follows: 75% by the U.S. Environmental Protection Agency (EPA), and 12.5% by the State Water Resources Control Board (SWRCB). The remaining 12.5% was funded by EBDA’s member agencies.

Legal title and all pertinent grant documents and conditions for joint-use facilities remain with EBDA. Each agency owns an undivided portion of the joint facilities, including the portions funded by federal and state grants, based on its contributed percentage of project costs, as defined by the Joint Exercise of Powers Agreement. The financial statements of EBDA are available upon request from: East Bay Dischargers Authority, 2651 Grant Avenue, San Lorenzo, California 94580. Summary financial data taken from EBDA’s audited financial statements for its fiscal years ended June 30, 2015 and 2014 (latest available) is as follows:

Fiscal Year Ended June 30

2015 2014

Net position at beginning of year $ 33,655,699 $ 34,119,077

Prior period adjustment (518,711) -

Net income before depreciation 560,104 426,418

Depreciation (899,897) (889,796)

Changes in net position (858,504) (463,378)

Net position at end of year $ 32,797,195 $ 33,655,699

Comprised of

Total assets 34,069,451 34,477,100

Deferred outflow of resources 61,061 -

Total liabilities (1,084,270) (821,401)

Deferred inflow of resources (249,047) - Total net position $ 32,797,195 $ 33,655,699

The District’s investment in sewage discharge facilities (EBDA) at 19.305% is as follows*: Investment in sewage discharge facilities (EBDA) - beginning of year 6,497,233 6,586,688

Decrease in carrying value of sewage discharge facilities of EBDA (165,735) (89,455)

Investment in sewage discharge facilities (EBDA) - end of year (listed as a non-current asset on the Statement of Net Position) $ 6,331,498 $ 6,497,233 * 19.305% is derived from the District's share (65%) of the 29.7% of EBDA's facilities jointly owned by

the District and Castro Valley Sanitary District.

41

Page 49: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 6 – DEFINED BENEFIT PENSION PLANS – CALIFORNIA PUBLIC EMPLOYEES’

RETIREMENT SYSTEM (CALPERS)

Plan Description

Qualified employees are eligible to participate in one of the District’s three pension rate plans (Plans) administered by the California Public Employees’ Retirement System (CalPERS). Each Plan has a unique pension formula: 2.5% at 55 (Tier 1), 2.0% at 60 (Tier 2), and 2.0% at 62 (Tier 3, commonly known as the PEPRA Tier, as a result of the Public Employees’ Pension Reform Act of 2013). These Plans are established by Board resolutions and fall within CalPERS’ Miscellaneous Risk Pool, a cost-sharing multiple employer defined benefit pension plan for employers with less than 100 active members. Reports providing further information on the Risk Pool can be found on CalPERS’ website at www.calpers.ca.gov. Benefits Provided

CalPERS administers service and disability retirement benefits, annual cost of living adjustments, and death benefits to the Plans’ members and beneficiaries, based on the pension formula of the Plans, the member’s years of service, age, and final compensation. Benefit levels are established by State statute and based on the contract between CalPERS and the District. Members may elect to retire at an earlier age with statutorily reduced benefits. Cost of living adjustments are applied as specified by the Public Employees’ Retirement Law. Eligibility for disability retirement applies after five years of service with the District. The Plans’ provisions and benefits as of the measurement date of June 30, 2015 are summarized as follows:

Plan Information Tier 1 Tier 2 Tier 3

Date of employment

Before 6/27/2011

Between

6/27/2011 & 12/31/2012

On or After

1/1/2013

Benefit formula 2.5% @55 2.0% @60 2.0% @62

Benefits vesting schedule 5 Years 5 Years 5 Years

Benefit payments Monthly for life Monthly for life Monthly for life

Retirement age 55 60 62

Eligible age for early retirement 50 50 52 Benefits as a % of eligible compensation (applied to each year of service)

2.0% (age 50)

to 2.5% (age 55)

1.092% (age 50)

to 2.0% (age 60)

1.0% (age 52)

to 2.0% (age 62)

Required employee contribution rate (as of measurement date June 30, 2015)

8% 7% 6.5%

Required employer contribution rate (as of measurement date June 30, 2015)

16.601% 8.715% 6.7%

42

Page 50: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 6 – DEFINED BENEFIT PLANS – CALIFORNIA PUBLIC EMPLOYEES’

RETIREMENT SYSTEM (CALPERS) (CONTINUED)

Employees Covered

Participant Status

Number of

Participants

Inactive employees receiving benefits 66

Inactive employees entitled to but not receiving benefits 19

Active members 41

Total 126

Employer Contributions

Section 20814(c) of the California Public Employees’ Retirement Law requires that employer contribution rates for all public employers be determined on an annual basis by the actuary and shall be effective on July 1 following notice of a change in the rate. Funding contributions are determined annually on an actuarial basis as of June 30 by CalPERS. The actuarially determined rate is the estimated amount necessary to finance the costs of benefits earned by employees during the year, with an additional amount to finance any unfunded accrued liability. The amounts of employer contributions during the last three years are as follows.

Employer Contributions Tier 1 Tier 2 Tier 3 Total

FY 2013-14 $ 502,916 $ 21,486 $ 16,724 $ 541,126

FY 2014-15 7,024,743 17,040 33,403 7,075,186

FY 2015-16 1,428,734 17,869 49,712 1,496,315

43

Page 51: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 6 – DEFINED BENEFIT PLANS – CALIFORNIA PUBLIC EMPLOYEES’

RETIREMENT SYSTEM (CALPERS) (CONTINUED)

Total and Net Pension Liabilities

The District’s net pension liability is measured as a proportionate share of the Risk Pool’s net pension liability (NPL), measured as of June 30, 2015. The total pension liability of the Plan used to calculate the net pension liability was determined by CalPERS’ actuarial valuation as of June 30, 2014, rolled forward to June 30, 2015, using standard actuarial roll forward methods. The proportionate share of the Risk Pool’s net pension liability was based on a projection of the District’s long-term share of contributions relative to the projected contributions of all participating employers (actuarially determined). As of June 30, 2014 and June 30, 2015, the proportionate shares of the Risk Pool’s net pension liability and changes during the measurement period were as follows:

Net Pension Liability as of

Proportionate Share

of Risk Pool’s NPL

($)

Proportionate Share

of Risk Pool’s NPL

(%)

June 30, 2014 $8,254,184 0.132651%

June 30, 2015

$4,797,739 0.069898%

Change ($3,456,445) (0.062753%)

The District’s proportionate shares of the Risk Pool’s beginning and ending total pension liability, fiduciary net position and net pension liability were as follows:

Proportionate Share of Risk Pool’s

Total Pension

Liability

Fiduciary Net

Position

Net Pension

Liability

Balance at Valuation Date June 30, 2014

$48,636,258 $40,382,074 $8,254,184

Balance at Measurement Date

June 30, 2015

$49,414,283 $44,616,544 $4,797,739

Net Changes $778,025 $4,234,470 ($3,456,445)

44

Page 52: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 6 – DEFINED BENEFIT PLANS – CALIFORNIA PUBLIC EMPLOYEES’

RETIREMENT SYSTEM (CALPERS) (CONTINUED) Pension Expenses and Deferred Outflows/Inflows of Resources For the fiscal year ended June 30, 2016, the District recognized a pension expense of $1,192,396, a net decrease in deferred outflows of resources of $1,509,417, and a net increase in deferred inflows of resources of $1,643,109. The detailed balances of various deferred outflows and inflows at June 30, 2016 are as follows.

Description Deferred Outflows

of Resources

Deferred Inflows

of Resources

Differences between expected and actual experience

$ 46,614

$ -

Changes of assumptions

-

441,009

Net differences between projected and actual earnings on plan investments

-

221,083

Change in employer's proportion

95,885

3,899,771

Differences between the employer's contributions and the employer's proportionate share of contributions

4,076,109

260,940

Pension contributions subsequent to measurement date

1,496,315

-

Balances at June 30, 2016

$ 5,714,923 $ 4,822,803

Other deferred outflows and inflows or resources related to pensions are recognized as pension expense in the future years as follows.

Fiscal Year Ending June 30,

Deferred Outflows (Inflows) of Resources

to be Recognized as Pension Expense

2017 $ (337,468)

2018 (319,129)

2019 (230,196)

2020 282,598

45

Page 53: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 6 – DEFINED BENEFIT PLANS – CALIFORNIA PUBLIC EMPLOYEES’

RETIREMENT SYSTEM (CALPERS) (CONTINUED)

Actuarial Assumptions

For the measurement period ended June 30, 2015 (the measurement date), total pension liability was determined by rolling forward the June 30, 2014 total pension liability. Both the June 30, 2014 and June 30, 2015 total pension liabilities were based on the following actuarial methods and assumptions:

Actuarial cost method Entry Age Normal Amortization method/period Based on the method used in the June 30, 2012 funding valuation report Asset valuation method Actuarial value of assets Inflation 2.75% Salary increases Varies by entry age and service Payroll growth 3.00% Investment rate of return 7.50%. net of pension plan investment and administrative expenses;

includes inflation. Retirement age The probabilities of retirement are based on the 2010 CalPERS

Experience Study for 1997-2007. Mortality rate table The probabilities of mortality are based on the 2010 CalPERS Experience

Study for 1997-2007. Pre-retirement and Post-retirement mortality rates include 5 years of projected mortality improvement using Scale AA published by the Society of Actuaries.

Sensitivity of the Proportionate Share of Net Pension Liability to Changes in the Discount Rate The following presents the District’s proportionate share of the Risk Pool’s net pension liability, calculated using the discount rate of 7.65%, as well as what it would be if it were calculated using a discount rate that is one percentage point lower (6.65%) or one percentage point higher (8.65%) than the current rate.

Changes in Discount Rate

Discount Rate Proportionate Share

of Risk Pool’s NPL

1% decrease 6.65% $11,527,306

Current discount rate 7.65% $4,797,739

1% increase 8.65% ($758,300)

46

Page 54: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 7 – OTHER POST-EMPLOYMENT MEDICAL BENEFITS (OPEB)

Description of Benefits

The District provides other post-employment benefits (OPEB) to eligible employees and Board members in accordance with various labor contracts. Employees hired before July 1, 2006 are eligible to receive 50% to 100% of Kaiser's 2-party premium, at age 55 or older and with at least 15 years of service. Employees hired between July 1, 2006 and June 26, 2011 need to be at least age 60 to be eligible for the same benefit. Coverage for those with hire dates after June 26, 2011 is further adjusted to Kaiser's 1-party premium. The District manages accountability for OPEB benefits through an in-house account known as Other Benefits Set-Aside, from which payments are distributed. As presented in the Statement of Net Position, the account totaled $249,930 in 2016 and $576,019 in 2015.

California Employers’ Retiree Benefit Trust (CERBT)

GASB Statement No. 43 requires actuarial reporting by the retiree health benefits trust fund and Statement No. 45 requires that an employer’s expense be determined using actuarial methods so that costs accrue over the employees’ working lifetimes. In January 2008, the District established an account with CalPERS’ California Employees’ Retiree Benefit Trust (CERBT) with an initial deposit of $5 million to prefund its OPEB costs. The objective of the CERBT is to seek favorable returns through a diverse asset allocation and market exposure. Participating employers own units of the portfolio that invests in accordance with the approved strategic asset allocation. They do not have direct ownership of the securities in the portfolio. The unit value changes with market condition. The CERBT is a self-funded program. The program cost is charged to each participating employers based on average daily balance of assets. Copies of the CalPERS’ annual financial report may be obtained from the CalPERS Executive Office, 400 P Street, Sacramento, CA 95814. The following is a summary of the fair value of the CERBT account, as of June 30 of each year.

2016 2015 2014

Fair value – beginning of year $ 7,184,581 $ 7,199,979 $ 6,083,475

Contributions - - -

Gain (loss) on investment 74,621 (8,140) 1,125,720

Administrative expenses (5,926) (7,258) (9,216)

Fair value – end of year $ 7,253,276 $ 7,184,581 $ 7,199,979

Change 1.0% (0.2%) 18%

47

Page 55: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 7 – OTHER POST-EMPLOYMENT MEDICAL BENEFITS (OPEB) (CONTINUED)

Actuarial Value of Assets, Methods & Assumptions

The CERBT requires biennial valuation. To comply with this requirement, an actuarial analysis of retiree health benefits as of July 1, 2015 was performed by an independent actuary. Based on that analysis, the annual required contributions (ARC) and annual OPEB cost (AOC) for fiscal years 2015-16 and 2016-17 were established. The actuary used the following actuarial method and assumptions:

Valuation date July 1, 2015

Actuarial cost method Projected Unit Credit

Amortization period method Open 10-year period, level percentage of payroll

Average remaining period 10 years as of the Valuation Date

Asset valuation method Closed 5-year spread of gain/loss vs. assumed return

Investment rate of return 7.28%

Projected salary increases 3.00% of covered payroll

Inflation General-3.00% per year; Medical Premium increases 5% for 2017 and later

Rates of death and disability 2014 CalPERS OPEB Assumptions Model for Miscellaneous Public Employees

Number of retirees receiving benefits 42

Annual OPEB Cost, Net OPEB Obligation, Funded Status & Progress

The following table, based on the July 1, 2015 actuarial valuation, shows the components of the annual OPEB cost, amounts actually contributed to the plan, and changes in the net OPEB obligation (asset).

Funding & Net OPEB Obligation (Asset)

2016 2015 2014

Annual required contribution (ARC) $154,214 $127,000 $117,200

Interest on OPEB obligation (33,340) - (10,239)

Adjustment to annual required contribution 58,608 - 16,424

Annual OPEB cost (AOC) 179,482 127,000 123,385

Contributions made (332,089) (309,991) (261,844)

Subsidized Premiums (163,309) - -

Increase in net OPEB obligation (315,916) (182,991) (138,459)

Net OPEB obligation (asset) – beginning (457,966) (274,975) (136,516)

Adjustment to OPEB obligation - - -

Net OPEB obligation (asset) – ending ($773,882) ($457,966) (274,975)

48

Page 56: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 7 – OTHER POST-EMPLOYMENT MEDICAL BENEFITS (OPEB) (CONTINUED)

The following table shows the AOC, actual OPEB contributions in dollars and as a percentage of the AOC, the value of subsidized premiums, and net OPEB obligation (asset) for the last three fiscal years:

Fiscal Year

Ended

Annual

OPEB Cost

(AOC)

Contributions

Subsidized

Premiums

Contributions

as % of AOC

Net OPEB

Obligation

(Asset)

June 30, 2014 $123,385 $261,844 $ - 212.2% ($274,975)

June 30, 2015 $127,000 $309,991 $ - 244.1% ($457,966)

June 30, 2016 $179,482 $332,089 $163,309 215.3% ($773,882)

The following summarizes the funded status and progress of the plan as of June 30, 2016.

Actuarial accrued liability (AAL) $7,166,078

Actuarial value of plan assets 7,224,470

Unfunded actuarial accrued liability (UAAL) ($58,392)

Funded ratio (actuarial value of plan assets / AAL) 100.8%

Projected covered payroll (active plan members) $4,430,000

UAAL as of % of covered payroll (1.3%)

NOTE 8 – OTHER DEFERRED OR DEFINED COMPENSATION PLANS

Section 457(b) Deferred Compensation Plan

The District maintains a deferred compensation plan, qualified under section 457(b) of the Internal Revenue Code, in which all full-time employees may participate. Employees and the District each contributes 0.32% of gross salary into the plan. In addition, $0.50 for each $1.00 of employee voluntary contributions is matched, up to a maximum of $750 per employee per calendar year. Employees may defer additional amounts up to the Internal Revenue Code limits (from all sources). Generally, deferred compensation is available for withdrawal upon retirement, termination of employment, disability, or death. Contributions are made to, and accumulated in, a trust maintained by the administrator, Lincoln Financial Group, for the benefit of individual participants.

49

Page 57: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 8 – OTHER DEFERRED OR DEFINED COMPENSATION PLANS (CONTINUED)

Changes in the plan assets for fiscal years ended June 30, 2016 and 2015 are summarized as follows:

Lincoln – 457(b) 2016 2015

Plan assets – beginning of year $ 7,830,365 $ 7,751,693 Contributions by: Employer 39,080 41,133 Employee pre-tax deductions 342,439 369,887 Employee rollover 71,869 3,399 Investment earnings 95,263 100,379 Withdrawals and fees (1,181,334) (436,126)

Plan assets – end of year $ 7,197,682 $ 7,830,365

Neither the assets nor the liabilities of this plan are those of the District.

Section 457(b) Public Agency Retirement System-Alternate Retirement System (PARS-ARS)

The PARS-ARS plan was put into effect on July 1, 2008. It is an alternative to Social Security, a qualified defined contribution plan under Section 457(b), and tax-exempt under Section 501(a) of the Internal Revenue Code, and is available to part-time employees and Board members who are not eligible for CalPERS. It is administered by Public Agency Retirement System (PARS). Enrollment in the PARS-ARS plan is mandatory for all qualified employees upon employment. The selection of investment choices for the plan resides with the District. Participating employees contribute 6.20% of salary, the District contributes 2.20%. Contributions are pre-tax. Combined annual contributions to the plan and to any other qualified 457(b) deferred compensation plans shall not exceed the limits established by the Internal Revenue Service. Changes in the plan’s assets for the fiscal years ended June 30, 2016 and 2015 are summarized as follows:

PARS-ARS – 457(b) 2016 2015

Plan assets – beginning of year $ 99,055 $ 90,812

Contributions by:

Employer 3,444 3,318

Employee (pre-tax) 9,705 9,350

Investment earnings 1,339 1,520

Withdrawals and fees (21,735) (5,945)

Plan assets – end of year $ 91,808 $ 99,055

Neither the assets nor the liabilities of this plan are those of the District.

50

Page 58: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 8 – OTHER DEFERRED OR DEFINED COMPENSATION PLANS (CONTINUED)

Section 401(a) Defined Contribution Plan

The defined contribution plan (IRS Section 401(a)) was established in 1997. Eligible participants include the General Manager, management and confidential employees, and Board members. The plan was amended in 2007 in accordance with current Internal Revenue Service regulations. The administrator of the plan is ICMA Retirement Corporation.

Changes in the plan assets for fiscal years ended June 30, 2016 and 2015 are summarized as follows:

ICMA – 401(a) 2016 2015

Plan assets – beginning of year $ 1,609,405 $ 1,540,672

Contributions by:

Employer 84,882 82,090

Employee (pre-tax) 41,240 40,545

Employee loan repayments (pre-tax) 3,073 2,482

Investment earnings (22,488) 31,753

Withdrawals and fees (312,731) (88,137)

Plan assets – end of year $ 1,403,381 $ 1,609,405

Neither the assets nor the liabilities of this plan are those of the District.

NOTE 9 – RISK MANAGEMENT AND INSURANCE

The District is exposed to various risks of loss related to torts, theft and damage of assets, errors and omissions, injuries to employees and natural disasters. It is a member of the California Sanitation Risk Management Authority (CSRMA), a joint powers authority (JPA) and a public entity risk pool currently operating as a common risk management and insurance program for its member entities. The purpose of CSRMA is to spread the adverse effects of losses among its member entities and to purchase excess insurance as a group, thereby reducing costs. The layers of coverage within the general and automobile liability program are as follows:

$ 0 To $ 250,000 Oro Loma Insurance Fund (self-insured)

$ 250,001 To $ 500,000 CSRMA

$ 500,001 To $15,500,000 CSRMA/Excess (reinsurance) liability coverage with Munich Reinsurance America

$15,500,001 To $25,500,000 Excess (reinsurance) liability coverage with

Ironshore Specialty Insurance Co.

Above $25,500,001 Oro Loma Insurance Fund (self-insured)

51

Page 59: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 9 – RISK MANAGEMENT AND INSURANCE (CONTINUED) The District also obtains coverage for property, errors & omissions, workers’ compensation insurance, public entity pollution liability, and cyber liability. The District paid $994, $708 and $0 in insurance claims during fiscal years ended June 30, 2016, 2015 and 2014 respectively, and has no outstanding claims, or carried no liabilities related thereto in its financial statements. The amount of claims paid were within the $250,000 deductible limit. Insurance related expenses for fiscal years ended June 30 are summarized as follows:

2016 2015 2014

Administration $ 167,768 $ 156,899 $ 149,887 Insurance premiums 201,289 211,226 230,424 Losses and settlements 994 708 -

$ 370,051 $ 368,833 $ 380,311

Since no liabilities for claims has been provided in the financial statements as of June 30, 2016, 2015, and 2014, the indicated claims paid above represent the claims experience for the last three fiscal years.

As of June 30, 2016, the District has no current or anticipated litigation. Insurance related expenses are distributed to the following departments.

2016 2015 2014

Engineering $ 29,340 $ 23,912 $ 22,308

Collections 106,173 106,099 117,386

Operations 128,590 136,581 138,378

Maintenance 72,714 70,801 72,414

Administration 33,234 31,440 29,825

$ 370,051 $ 368,833 $ 380,311

52

Page 60: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

NOTES TO FINANCIAL STATEMENTS

JUNE 30, 2016

_____________________________________________________________________________

NOTE 10 – CONTRACT FOR COLLECTION OF SOLID WASTE AND LANDFILL

CLOSURE/POST-CLOSURE COSTS

On September 1, 1997, under a 10-year franchise agreement, the District contracted with Waste Management of Alameda (WMAC) to provide solid waste, residential and green waste recycling services. On March 1, 2004, the original agreement was extended. On January 1, 2012, a new agreement was signed with an expiration date of August 31, 2024. Highlights of the provisions included in the current agreement are as follows: Customer-related:

• Residential recycling and green waste rates will remain unchanged for the term of the Agreement.

• All other solid waste fees and charges will be adjusted every September 1 by a combination factor as follows: [0.5 x (April CPI-U for all urban consumer items in San Francisco, Oakland, and San Jose, as published by the US Department of Labor, Bureau of Statistics – Series CUURA422SA0)] + [0.5 x (Weighted average of Teamsters Wage, benefits and pension contract increases for the following year)].

District-related:

• Under the new agreement, WMAC purchased new collection vehicles and placed them into service within the District’s service area.

• WMAC assumes full responsibility for expenses related to closure/post-closure of its landfill (Altamont Landfill).

• Throughout the current contract period and extension(s), WMAC shall accept the District’s biosolids at the Altamont Landfill for use as alternative daily cover (ADC). To qualify as ADC, the biosolids must comply with certain criteria for metals, pathogens and water content in accordance with local, state and federal regulations. Once WMAC accepts delivery of the biosolids, the District ceases to have any responsibility or liability for their content or for their compliance with any regulations for use as ADC.

• WMAC shall furnish a performance bond in the amount of $6,000,000, adjusted every September 1 by a combination factor as follows: [0.5 x (April CPI-U for all urban consumer items in San Francisco, Oakland, and San Jose, as published by the US Department of Labor, Bureau of Statistics – Series CUURA422SA0)] + [0.5 x (Weighted average of Teamsters wage, benefits and pension contract increases for the following year)].

• As part of the agreement, WMAC maintains a Public Education Account on behalf of the District. These funds are used to support public outreach, information and education campaigns – newsletters, bill inserts, Earth Day poster contests, and other events. The balance in this account as of June 30, 2016 was $171,783.

53

Page 61: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

This page intentionally left blank

54

Page 62: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

REQUIRED SUPPLEMENTARY INFORMATION

55

Page 63: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

REQUIRED SUPPLEMENTARY INFORMATION

JUNE 30, 2016

_____________________________________________________________________________

Schedule of the District’s Proportionate Share of the Plan’s (PERF C) Net Pension Liability

Fiscal Year Ended

June 30, 2016

June 30, 2015

Measurement date

June 30, 2015

June 30, 2014

District’s proportion of net pension liability

0.069898%

0.132651%

District’s proportionate share of net pension liability

$4,797,739

$8,254,184

District’s covered-employee payroll for fiscal year ended on measurement date

$4,332,992

$3,885,932

District’s proportionate share of net pension liability as a % of covered-employee payroll

110.73%

212.41%

Plan’s fiduciary net position as a % of Plan’s total pension liability

78.40%

79.82%

Schedule of the District’s Contributions

Fiscal Year Ended

Contributions for the fiscal year ended

June 30, 2016

June 30, 2015

Actuarially determined contribution

$ 496,315

$ 727,291

Contributions in relation to actuarially determined contribution

1,496,315

7,075,186

Contribution deficiency (excess)

(1,000,000)

(6,347,895)

District’s covered-employee payroll for the fiscal year

4,373,734

4,332,992

Contributions as a % of covered-employee payroll

34.21%

163.29%

56

Page 64: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

REQUIRED SUPPLEMENTARY INFORMATION

JUNE 30, 2016

_____________________________________________________________________________

Schedule of Funding Progress for the Post-Retirement Medical Benefit Plan

Actuarial

Valuation

Date

Actuarial

Value

Of Assets

(AVA)

(a)

Actuarial

Accrued

Liability

(AAL)

Entry Age

(b)

Unfunded

Accrued

Liabilities

(UAAL)

(b)-(a)

Funded

Ratio

(a) / (b)

Employee-

Covered

Payroll

(c)

UAAL as a

% of

Covered

Payroll

((b)-(a)) /(c)

July 1, 2009 $ 4,530,000 $ 5,262,000 $ 732,000 86.09% $ 3,977,000 18.41%

July 1, 2011 $ 5,327,900 $ 5,405,200 $ 77,300 98.57% $ 3,900,000 1.98%

July 1, 2013 $ 5,791,000 $ 5,497,800 $ (293,200) 105.33% $ 4,220,000 (6.95%)

July 1, 2015 $ 7,224,470 $ 7,166,078 $ (58,392) 100.81% $ 4,430,000 (1.32%)

57

Page 65: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

This page intentionally left blank

58

Page 66: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

OTHER SUPPLEMENTARY INFORMATION

59

Page 67: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

This page intentionally left blank

60

Page 68: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

DESCRIPTION OF FUNDS UTILIZED

JUNE 30, 2016

_______________________________________________________________________

The District utilizes an enterprise fund structure. To facilitate management and budgetary control, individual funds are established to account for activities in different services provided by the District. These funds are combined to account for the financial position and results of operations reflected in the District’s financial statements. Following is a brief description of the funds by type of service: Sewer Services

Operations and Maintenance – accounts for both general sewage activities performed by the District in the collection, treatment, and disposal of sewage, as well as for accumulation of resources for the payment of long-term sewer revenue bonds, if applicable.

Renewal and Replacement – accounts for scheduled major repairs and maintenance of existing collection system and water pollution plant and equipment.

Capital Improvement Program – accounts for sewer system construction projects involving pipelines, building improvements, new operational facilities, and new equipment.

Solid Waste / Garbage Services

Solid Waste / Garbage – accounts for the collection and proper handling of solid waste from homes and businesses located in the District.

Recycling Services

Recycling – accounts for the collection and proper handling of recyclable materials and green waste collected from residences, and commercial recycling programs in the District’s jurisdiction. Recycling programs are required by California Assembly Bill 939 (AB939) and Alameda County Measure D mandates.

61

Page 69: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Sewer Services

Operations and Renewal and Capital

Maintenance Replacement Improvement

ASSETS

Current assets

Cash and cash equivalents 7,702,491$ (3,744,037)$ 1,264,705$

Investments at fair value - 6,629,017 7,897,345

Interest receivable 9,833 13,610 33,901

Accounts receivable 968,210 (3,896) 30,787

Prepaid and other items 102,675 - -

Total current assets 8,783,209 2,894,694 9,226,738

Non-current assets

Other post-employment benefits (OPEB) asset 773,882 - -

Investment in sewage discharge facilities - EBDA 6,331,498 - -

Capital assets

Land 846,034 - -

Sewer service assets 129,851,757 - -

Solid waste assets - - -

Recycling assets - - -

Construction in progress - - 6,279,801

Less: accumulated depreciation (66,800,830) - -

Total capital assets 63,896,961 - 6,279,801

Total non-current assets 71,002,341 - 6,279,801

Total assets 79,785,550$ 2,894,694$ 15,506,539$

DEFERRED OUTFLOWS OF RESOURCES

Pension benefits and adjustments 5,714,923$ -$ -$

ORO LOMA SANITARY DISTRICT

SCHEDULE 1

WITH COMPARATIVE TOTALS AS OF JUNE 30, 2015

AS OF JUNE 30, 2016

ALL DISTRICT SERVICES

COMBINING SCHEDULE OF NET POSITION

62

Page 70: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

.

Solid Waste Services Recycling Services

Residential, Green Waste, Combined June 30, $ %

Garbage Commercial & Industrial Recycling 2016 2015 Change Change

912,367$ 1,074,010$ 7,209,536$ 3,225,293$ 3,984,243$ 123.5%

- - 14,526,362 17,040,626 (2,514,264) -14.8%

1,173 1,546 60,063 69,130 (9,067) -13.1%

123,267 46,947 1,165,315 1,882,392 (717,077) -38.1%

- - 102,675 107,487 (4,812) -4.5%

1,036,807 1,122,503 23,063,951 22,324,928 739,023 3.3%

- - 773,882 457,966 315,916 40.8%

- - 6,331,498 6,497,233 (165,735) -2.6%

- - 846,034 846,034 - 0.0%

- - 129,851,757 126,625,735 3,226,022 2.5%

2,177 - 2,177 2,177 - 0.0%

- 26,045 26,045 26,045 - 0.0%

- - 6,279,801 4,724,765 1,555,036 32.9%

(2,177) (26,045) (66,829,052) (63,500,183) (3,328,869) 5.2%

- - 70,176,762 68,724,573 1,452,189 2.1%

- - 77,282,142 75,679,772 1,602,370 2.1%

1,036,807$ 1,122,503$ 100,346,093$ 98,004,700$ 2,341,393$ 2.4%

-$ -$ 5,714,923$ 7,131,734$ (1,416,811)$ -19.9%

COMBINING SCHEDULE OF NET POSITION

SCHEDULE 1 (continued)

ALL DISTRICT SERVICES

ORO LOMA SANITARY DISTRICT

AS OF JUNE 30, 2016

WITH COMPARATIVE TOTALS AS OF JUNE 30, 2015

63

Page 71: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

COMBINING SCHEDULE OF NET POSITION

ALL DISTRICT SERVICES

AS OF JUNE 30, 2016

WITH COMPARATIVE TOTALS AS OF JUNE 30, 2015

SCHEDULE 1 (continued)

Sewer Services

Operations and Renewal and Capital

Maintenance Replacement Improvement

LIABILITIES

Current liabilities

Accounts payable 219,689$ 307,696$ 921,016$

Accrued salaries and wages 147,642 - -

Customers deposit payable 146,748 27,221 97,728

Accrued compensated absences (current) 53,000 - -

Other benefits set-aside (current) 243,930 - -

Total current liabilities 811,009 334,917 1,018,744

Non-current liabilities

Accrued compensated absences 301,396 - -

Other benefits set-aside - - -

Net pension liability 4,797,739 - -

Total non-current liabilities 5,099,135 - -

Total liabilities 5,910,144$ 334,917$ 1,018,744$

DEFERRED INFLOWS OF RESOURCES

Pension obligations and adjustments 4,822,803$ -$ -$

NET POSITION

Net investment in capital assets 63,896,961$ -$ 6,279,801$

Unrestricted 10,870,565 2,559,777 8,207,994

Total net position 74,767,526$ 2,559,777$ 14,487,795$

64

Page 72: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

.

Solid Waste Services Recycling Services

Residential, Green Waste, Combined June 30, $ %

Garbage Commercial & Industrial Recycling 2016 2015 Change Change

14,291$ 182,653$ 1,645,345$ 1,305,611$ 339,734$ 26.0%

- - 147,642 116,920 30,722 26.3%

- - 271,697 277,106 (5,409) -2.0%

- - 53,000 62,000 (9,000) -14.5%

- - 243,930 250,000 (6,070) -2.4%

14,291 182,653 2,361,614 2,011,637 349,977 17.4%

- - 301,396 353,462 (52,066) -14.7%

- - - 326,019 (326,019) -100.0%

- - 4,797,739 8,249,005 (3,451,266) -41.8%

- - 5,099,135 8,928,486 (3,829,351) -42.9%

14,291$ 182,653$ 7,460,749$ 10,940,123$ (3,479,374)$ -31.8%

-$ -$ 4,822,803$ 3,285,136$ 1,537,667$ 46.8%

-$ -$ 70,176,762$ 68,724,573$ 1,452,189$ 2.1%

1,022,516 939,850 23,600,702 22,186,602 1,414,100 6.4%

1,022,516$ 939,850$ 93,777,464$ 90,911,175$ 2,866,289$ 3.2%

COMBINING SCHEDULE OF NET POSITION

ORO LOMA SANITARY DISTRICT

SCHEDULE 1 (continued)

WITH COMPARATIVE TOTALS AS OF JUNE 30, 2015

AS OF JUNE 30, 2016

ALL DISTRICT SERVICES

65

Page 73: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

COMBINING SCHEDULE OF REVENUES, EXPENSES AND CHANGES IN NET POSITION

ALL DISTRICT SERVICES

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

WITH COMPARATIVE TOTALS FOR THE FISCAL YEAR ENDED JUNE 30, 2015

SCHEDULE 2

Sewer Services

Operations and Renewal and Capital

Maintenance Replacement Improvement

Operating revenues

District service charges 8,349,883$ 3,600,000$ -$

Agency treatment charges 2,238,483 192,286$ -

Permits and inspection fees 162,898 - -

Sanitary truck waste charges 90,621 - -

Grease receiving charges 158,967 - -

Grit receiving charges 4,860 - -

Contract fees - - -

Recycling charges - residential and green waste - - -

Recycling charges - commercial and industrial - - -

Landfills fees - Measure D - - -

Other 586,197 - -

Total operating revenues 11,591,909 3,792,286 -

Operating expenses

Engineering 682,832 1,872 -

Sewage collections 1,400,964 1,237,027 -

Sewage treatment operations 3,225,555 257,454 -

Sewage treatment maintenance 2,020,181 478,700 -

Sewage disposal - EBDA 660,226 119,250 -

Administration and general 1,239,813 16,816 -

Pension expense - GASB 68 1,192,396 - -

OPEB expense and adjustments (315,916) - -

Depreciation 3,351,201 - -

Decrease in carrying value of EBDA 165,735 - -

Solid waste - - -

Recycling - residential, green waste, commercial and industrial - - -

Total operating expenses 13,622,987 2,111,119 -

Operating income (loss) (2,031,078) 1,681,167 -

Non-operating revenues

Investment income 26,075 68,951 27,167

Increase in the fair value of investments - 26,436 59,584

Rents, leases and personal license fees 79,956 - -

Recovery of uncollectible accounts - - -

Other miscellaneous revenues 293,899 159 33,162

EBDA and other agreement refunds - - 79,371 - - -

Total non-operating revenues 399,930 95,546 199,284

Non-operating expenses

Decrease in the fair value of investments - - -

Write-off of uncollectible accounts - - -

Total non-operating expenses - - -

Income (loss) before contributions and transfers (1,631,148) 1,776,713 199,284

Connection and other developers' fees - - 298,612

Transfers in (out) of capital assets 3,248,353 - (3,248,353)

Capital Grants - - 1,202,580

Equity transfers in (out) 123,000 (3,000,000) 3,000,000

Change in net position 1,740,205 (1,223,287) 1,452,123

Net position - beginning (as reported) 72,834,452 3,783,064 13,035,672

Prior period adjustment - GASB 68 pension adjustments 192,869 - -

Prior period adjustment - OPEB adjustments - - -

Net position - beginning (as adjusted) 73,027,321 3,783,064 13,035,672

Net position - ending 74,767,526$ 2,559,777$ 14,487,795$

66

Page 74: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Solid Waste Services Recycling Services

Residential, Green Waste, Combined June 30, Change Change

Garbage Commercial & Industrial Recycling 2016 2015 $ %

-$ -$ 11,949,883$ 11,678,040$ 271,843$ 2.3%

- - 2,430,769 2,190,362 240,407 11.0%

- - 162,898 170,994 (8,096) -4.7%

- - 90,621 56,454 34,167 60.5%

- - 158,967 142,005 16,962 11.9%

- - 4,860 - 4,860 100.0%

937,750 - 937,750 791,397 146,353 18.5%

- 2,306,542 2,306,542 2,295,385 11,157 0.5%

- 110,721 110,721 102,060 8,661 8.5%

- 319,719 319,719 329,606 (9,887) -3.0%

- - 586,197 682,873 (96,676) -14.2%

937,750 2,736,982 19,058,927 18,439,176 619,751 3.4%

- - 684,704 698,221 (13,517) -1.9%

- - 2,637,991 2,897,622 (259,631) -9.0%

- - 3,483,009 3,507,420 (24,411) -0.7%

- - 2,498,881 2,155,643 343,238 15.9%

- - 779,476 684,638 94,838 13.9%

- - 1,256,629 1,332,934 (76,305) -5.7%

- - 1,192,396 (547,141) 1,739,537 317.9%

- - (315,916) (182,991) (132,925) -72.6%

- - 3,351,201 3,329,414 21,787 0.7%

- - 165,735 89,455 76,280 85.3%

306,213 - 306,213 305,189 1,024 0.3%

- 2,574,922 2,574,922 2,591,742 (16,820) -0.6%

306,213 2,574,922 18,615,241 16,862,146 1,753,095 10.4%

631,537 162,060 443,686 1,577,030 (1,133,344) -71.9%

3,134 3,152 128,479 216,318 (87,839) -40.6%

- - 86,020 - 86,020 100.0%

- - 79,956 92,741 (12,785) -13.8%

17,203 - 17,203 11,343 5,860 51.7%

220 11,588 339,028 140,798 198,230 140.8%

- - 79,371 79,371 - 0.0%- - - - -

20,557 14,740 730,057 540,571 189,486 35.1%

- - - 58,326 (58,326) -100.0%

1,515 - 1,515 863 652 75.6%

1,515 - 1,515 59,189 (57,674) -97.4%

650,579 176,800 1,172,228 2,058,412 (886,184) -43.1%

- - 298,612 1,076,699 (778,087) -72.3%

- - - - - 0.0%

- - 1,202,580 - 1,202,580 100.0%

(123,000) - - - - 0.0%

527,579 176,800 2,673,420 3,135,111 (461,691) -14.7%

494,937 763,050 90,911,175 98,269,280 (7,358,105) -7.5%

- - 192,869 (10,768,191) 10,961,060 101.8%

- - - 274,975 (274,975) -100.0%

494,937 763,050 91,104,044 87,776,064 3,327,980 3.8%

1,022,516$ 939,850$ 93,777,464$ 90,911,175$ 2,866,289$ 3.2%

COMBINING SCHEDULE OF REVENUES, EXPENSES AND CHANGES IN NET POSITION

ORO LOMA SANITARY DISTRICT

SCHEDULE 2 (continued)

WITH COMPARATIVE TOTALS FOR THE FISCAL YEAR ENDED JUNE 30, 2015

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

ALL DISTRICT SERVICES

67

Page 75: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

STEWARDSHIP, COMPLIANCE AND ACCOUNTABILITY

JUNE 30, 2016

_______________________________________________________________________

Budgetary Information The District is not required by statute to adopt a budget. However, in its commitment to maintain fiscal responsibility, the District adopts a biennial budget as follows:

• Prior to June 30 of a budget year, the General Manager submits a proposed budget to the Board of Directors.

• The Board conducts a budget work session, open to the public, and adopts the budget through resolution.

• The budget is used as a management control tool during the year. A transfer of funds, not to exceed $50,000, may be approved by the General Manager. However, the General Manager may not over-expend a departmental or fund budget without obtaining Board approval. Any revision that increases the total budget must be approved by the Board of Directors by resolution.

The Two-Year Budget for Fiscal Years 2015-16 and 2016-17 was approved by Resolution No. 3612, dated May 19, 2015, and was subsequently amended by the following Board actions: The budget for FY 2015-16 was amended by:

• Resolution No. 3620 – Amendment No. 1, dated October 20, 2015, with a net increase to Renewal & Replacement and Capital Improvement Program of $1,138,650.

• Subsequent funding allocations by Board motions between January and June 2016, authorizing a total net increase to Renewal & Replacement and Capital Improvement Program of $1,065,000.

These adjustments were necessary due to newly identified needs and reprioritization of projects in the Renewal and Replacement and Capital Improvement Program.

Budget Accounting

• The budget provides annual provisions of revenue and expenses for the District’s sewer, solid waste, and recycling services.

• The budget includes operating costs to repair and maintain District's facilities through Renewal & Replacement, as well as capital expenditures in the Capital Improvement Program. Capital expenditures have an effect on the District’s net position but does not affect net income.

Budgetary Comparisons The following schedules present the District’s budgetary comparison with actual revenues, expenses, and changes in net position for the year ended June 30, 2016 for each service.

68

Page 76: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

SCHEDULE OF BUDGETARY COMPARISON WITH ACTUAL

REVENUES, EXPENSES AND CHANGES IN NET POSITION

SEWER SERVICES - OPERATIONS AND MAINTENANCE

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

SCHEDULE 3 Variance with

Final Budget-

Budgeted Actual Favorable

Amounts Amounts (Unfavorable)

Operating revenues

District service charges 8,148,800$ 8,349,883$ 201,083$

Agency treatment charges 2,222,000 2,238,483 16,483

Permits and inspection fees 113,000 162,898 49,898

Sanitary truck waste charges 50,000 90,621 40,621

Grease receiving charges 120,000 158,967 38,967

Grit receiving charges - 4,860 4,860

Other 580,000 586,197 6,197

Total operating revenues 11,233,800 11,591,909 358,109

Operating expenses

Engineering 862,100 682,832 179,268

Sewage collections 1,691,000 1,400,964 290,036

Sewage treatment operations 4,112,500 3,225,555 886,945

Sewage treatment maintenance 2,255,800 2,020,181 235,619

Sewage disposal - EBDA 674,000 660,226 13,774

Administration and general 1,634,900 1,239,813 395,087

Pension expense - GASB 68 - 1,192,396 (1,192,396)

OPEB expense and adjustments - (315,916) 315,916

Depreciation 3,600,000 3,351,201 248,799

Decrease in carrying value of EBDA 100,000 165,735 (65,735)

Total operating expenses 14,930,300 13,622,987 1,307,313

Operating income (loss) (2,031,078)

Non-operating revenues

Interest income 16,000 26,075 10,075

Rents and leases 80,000 79,956 (44)

Other miscellenous revenues 100,000 293,899 193,899

Total non-operating revenues 196,000 399,930 203,930

Non-operating expenses

Write-off of plant and equipment - - -

Write-off of uncollectible accounts 10,000 - 10,000

Other expenses 1,160,000 - 1,160,000

Total non-operating expenses 1,170,000 - 1,170,000

Income (loss) before contributions and transfers (4,670,500)$ (1,631,148)$ 3,039,352$

Transfers of plant and equipment from Capital Improvement Program 3,248,353

Equity transfers in (out) 123,000

Change in net position 1,740,205

Net position - beginning (as reported) 72,834,452

Prior period adjustment - GASB 68 pension adjustments 192,869

Prior period adjustment - OPEB adjustments -

Net position - beginning (as adjusted) 73,027,321

Net position - ending 74,767,526$

69

Page 77: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

SCHEDULE OF BUDGETARY COMPARISON WITH ACTUAL EXPENSES

SEWER SERVICES - OPERATIONS AND MAINTENANCE

BY ACCOUNT CATEGORIES AND DEPARTMENTS

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

SCHEDULE 4

Actual Variance with

Amounts Final Budget

Budgeted by Account Favorable

Amounts Category (Unfavorable)

Operating expenses

Salaries 4,145,700$ 3,872,463$ 273,237$

Employee benefits 2,232,100 1,379,643 852,457

Directors' benefits and fees 210,000 163,966 46,034

Election expenses - - -

Gasoline, oil and fuel 101,800 61,910 39,890

Insurance 552,500 370,051 182,449

Office expenses 53,600 41,963 11,637

Operating supplies 707,600 531,738 175,862

Safety supplies 32,100 32,774 (674)

Contractual services 1,119,000 932,145 186,855

Professional services 191,300 149,231 42,069

Memberships, printing and publications 79,000 59,968 19,032

Rents and leases 23,200 20,965 2,235

Repairs and maintenance 467,500 506,254 (38,754)

Research and monitoring 102,000 57,520 44,480

Travel, meetings and training 106,800 69,529 37,271

Recognition program 35,100 24,582 10,518

Utilities 397,000 294,643 102,357

Departmental expenses 10,556,300 8,569,345 1,986,955

Sewage disposal - EBDA 674,000 660,226 13,774

Pension expense - GASB 68 - 1,192,396 (1,192,396)

OPEB expense and adjustments - (315,916) 315,916

Depreciation 3,600,000 3,351,201 248,799

Decrease in carrying value of EBDA 100,000 165,735 (65,735)

Non-departmental expenses 4,374,000 5,053,642 (679,642)

Total operating expenses 14,930,300 13,622,987 1,307,313

Non-operating expenses:

Write-off of uncollectible accounts 10,000 - 10,000

Other miscellaneous expenses 1,160,000 - 1,160,000

Total non-operating expenses 1,170,000 - 1,170,000

Total expenses 16,100,300$ 13,622,987$ 2,477,313$

70

Page 78: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Annual Departmental Expenses vs. Budget

Sewage Sewage

Sewage Treatment Treatment Administration

Engineering Collections Operations Maintenance and General

Department Department Department Department Department

Operating expenses

Salaries 334,260$ 785,775$ 1,486,854$ 854,475$ 411,099$

Employee benefits 193,264 241,672 437,490 266,270 240,947

Directors' benefits and fees - - - - 163,966

Election expenses - - - - -

Gasoline and oil 2,157 31,224 9,534 18,464 531

Insurance 29,340 106,173 128,590 72,714 33,234

Office expenses 5,275 1,669 4,701 2,937 27,381

Operating supplies 2,789 44,640 453,438 30,871 -

Safety supplies 1,362 10,181 11,418 9,075 738

Contractual services 80,177 32,998 402,640 263,573 152,757

Professional services 3,385 3,155 13,518 21,069 108,104

Memberships, printing and publications 4,772 1,088 9,980 6,885 37,243

Rents and leases - - 8,666 10,253 2,046

Repairs and maintenance 3,665 58,676 5,204 434,678 4,031

Research and monitoring - - 56,297 1,223 -

Travel, meetings and training 7,669 3,265 15,993 16,235 26,367

Recognition program 1,598 2,002 4,135 2,556 14,291

Utilities 13,119 78,446 177,097 8,903 17,078

Departmental expenses FY 2015-16 682,832$ 1,400,964$ 3,225,555$ 2,020,181$ 1,239,813$

Departmental budget 862,100$ 1,691,000$ 4,112,500$ 2,255,800$ 1,634,900$

% of budget used 79% 83% 78% 90% 76%

Departmental expenses FY 2014-15 697,559$ 1,361,622$ 3,454,880$ 2,014,808$ 1,309,910$

Change in FY 2015-16 ($) (14,727)$ 39,342$ (229,325)$ 5,373$ (70,097)$

Change in FY 2015-16 (%) -2.1% 2.9% -6.6% 0.3% -5.4%

BY ACCOUNT CATEGORIES AND DEPARTMENTS

SCHEDULE 4 (continued)

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

ORO LOMA SANITARY DISTRICT

SCHEDULE OF BUDGETARY COMPARISON WITH ACTUAL EXPENSES

SEWER SERVICES - OPERATIONS AND MAINTENANCE

71

Page 79: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

SCHEDULE OF BUDGETARY COMPARISON WITH ACTUAL

REVENUES, EXPENSES AND CHANGES IN NET POSITION

SEWER SERVICES - RENEWAL AND REPLACEMENT

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

SCHEDULE 5Variance with

Final Budget

Budgeted Amounts Actual Favorable

Original Final Amounts (Unfavorable)

Operating revenues

3,600,000$ 3,600,000$ 3,600,000$ -$

223,400 317,990 192,286 (125,704)

Total operating revenues 3,823,400 3,917,990 3,792,286 (125,704) Project # Project costs

Collections system

104.00 Collections Asset Management - Lift Stations 30,000 8,000 6,713 1,287

141.00 Collections Asset Repair and Maintenance 1,250,000 1,250,000 1,038,085 211,915

144.10 Collections System GIS Updates and Maintenance 25,000 65,000 39,894 25,106

151.10 Easement Clearing and Road Maintenance 50,000 50,000 35,000 15,000

154.00 Hayward High School Easement Road Repair 50,000 50,000 49,447 553

144.00 Source Detection/Hydraulic Model Update 10,000 48,000 43,913 4,087

100.00 Lift Stations - General 80,000 1,000 - 1,000

100.14 Lift Stations - Canyon Drive - 5,000 4,197 803

100.07 Lift Stations - Deer Trail - 4,000 3,591 409

100.06 Lift Stations - Monika - 4,000 450 3,550

100.01 Lift Stations - Trojan - 10,000 9,984 16

900.91 Unanticipated Critical Equipment - 15,000 5,754 9,246

Postponed or Cancelled Projects - - - -

1,495,000 1,510,000 1,237,028 272,972

Treatment plant

204.00 Asset Management - Treatment Plant 50,000 50,000 9,588 40,412

323.01 Building and Roadway Lighting Repair 30,000 30,000 8,169 21,831

289.00 Concrete Assessment & Rehabilitation 50,000 50,000 - 50,000

281.00 Digesters Facilities Services - 12,400 1,637 10,763

289.01 Headworks Concrete Coating 250,000 315,000 18,030 296,970

305.00 Gate and Valve Replacements 50,000 43,000 20,596 22,404

237.00 Mosquito Abatement - 25,000 24,572 428

213.00 Pre-Design Studies 20,000 45,000 38,637 6,363

395.06 Recurring Maintenance - Landscaping and Grounds 25,000 28,000 27,181 819

395.01 Recurring Maintenance - Painting 150,000 377,500 377,080 420

395.07 Recurring Maintenance - Paving/Road Maintenance 40,000 26,000 5,033 20,967

395.02 Recurring Maintenance - Roof Maintenance 25,000 25,000 6,217 18,783

213.02 Recycled Water Study 75,000 151,000 145,939 5,061

239.00 Safety Improvements 30,000 20,000 19,050 950

900.93 Critical Renewal and Replacements 70,000 39,500 34,424 5,076

Projects Postponed or Tranferred to CIP - - -

865,000 1,237,400 736,153 501,247

Administration & Engineering

595.40/45 Computers and Network Maintenance 20,000 20,000 1,872 18,128

524.00 Fiscal Agent Fees - 8,000 6,864 1,136

900.95 Critical Renewal and Replacements 30,000 30,000 9,952 20,048

626.00 EBDA replacement assessment 106,000 119,250 119,250 -

156,000 177,250 137,938 39,312

Total project costs 2,516,000 2,924,650 2,111,119 813,531

Project costs assigned to category of operating expenses:

Operating expenses

Engineering 1,872

Sewage collections 1,237,027

Sewage treatment operations 257,454

Sewage treatment maintenance 478,700

Sewage disposal - EBDA 119,250

Administration 16,816

Total operating expenses 2,111,119

Operating income (loss) 1,681,167

Non-operating revenues (expenses)

Investment income 45,000 45,000 68,951 23,951

Increase (decrease) in the fair value of investments - - 26,436 26,436

Other miscellaneous revenues - - 159 159

Total non-operating revenues 45,000 45,000 95,546 50,546

Income (loss) before contributions and transfers 1,352,400$ 1,038,340$ 1,776,713$ 738,373$

Equity transfers in (out) (3,000,000)

Change in net position (1,223,287)

Net position - beginning 3,783,064

Net position - ending 2,559,777$

District service charges

Agency treatment charges

72

Page 80: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

SCHEDULE OF BUDGETARY COMPARISON WITH ACTUAL

REVENUES, EXPENSES AND CHANGES IN NET POSITION

SEWER SERVICES - CAPITAL IMPROVEMENT PROGRAM

FOR THE FISCAL YEAR ENDED JUNE 30 , 2016

SCHEDULE 6

Variance with

Final Budget

Budgeted Amounts Actual Favorable

Original Final Amounts (Unfavorable)

Project # Project costs

Collections system

100.00 Lift Stations - General 50,000$ 9,000$ 8,144$ 856$

100.13 Lift Stations - Blackstone Surge Suppression 22,500 31,700 3,571 28,129

100.15 Lift Stations - Canyon Ridge Surge Suppression 22,500 28,700 3,521 25,179

100.09 Lift Stations - Clausen Rehabilitation 87,500 87,500 6,594 80,906

100.10 Lift Stations - Edgebrook Rehabilitation 87,500 87,500 - 87,500

100.01 Lift Stations - Trojan MCC / Pump - 74,600 38,225 36,375

100.05 Lift Stations - Wickman Valve Vault 140,000 126,000 125,797 203

105.00 Lift Stations - Remote Site PLC Upgrades 100,000 80,000 - 80,000

143.02 Pipeline Replacements FY 2014-15 - 70,000 69,266 734

143.03 Pipeline Replacements FY 2015-16 2,000,000 3,020,000 2,070,701 949,299

143.04 Pipeline Replacements FY 2016-17 Design 75,000 60,070 14,930

Postponed or Cancelled projects 50,000 - - -

2,560,000 3,690,000 2,385,889 1,304,111

Treatment plant

213.01 Aerator Modifications - 340,000 311,956 28,044

227.00 Chlorine Contact Basin Water Champ Replacement 20,000 20,000 19,884 116

298.03 Cogeneration Breaker Replacement 75,000 77,000 76,988 12

305.00 Gate and Valve Replacements - 7,000 6,368 632

284.00 Influent Grinder Rebuild 30,000 31,000 30,920 80

314.00 Laboratory Remodeling 10,000 20,000 19,468 532

308.00 Maintenance Shop Vehicle Lift 50,000 20,000 19,867 133

231.00 Old Heater Building Pipe Trench Sump 35,000 35,000 14,166 20,834

239.00 Safety Improvements - New Heater Building Monorail - 28,000 27,036 964

319.00 SCADA Network System Replacement and Upgrades 30,000 185,000 182,898 2,102

316.00 Vehicle Replacements 35,000 35,000 - 35,000

293.02 Wet Weather Equalization / Ecotone Project 3,564,000 3,851,000 2,851,141 999,859

900.93 Critical Equipment - Plant 70,000 70,000 42,793 27,207

Postponed or Cancelled projects 135,000 - - -

4,054,000 4,719,000 3,603,485 1,115,515

Administration & Engineering

595.40/45 Computers/Network Upgrades 20,000 20,000 - 20,000

900.95 Critical Equipment - Administration HVAC Replacement 10,000 10,000 - 10,000

30,000 30,000 - 30,000

Total project costs 6,644,000 8,439,000 5,989,374 2,449,626

Less:

Additions to plant and equipment (789,378)

Additions to construction in progress (4,014,010)

Castro Valley Sanitary District capital assets (1,185,986)

Operating income (loss) -

Non-operating revenues (expenses)

Investment income 55,000 55,000 27,167 (27,833)

Increase (decrease) in the fair value of investments - - 59,584 59,584

EBDA agreement refund 80,000 80,000 79,371 (629)

Other miscellaneous revenues - - 33,162 33,162

Total non-operating revenues (expenses) 135,000 135,000 199,284 64,284

Income (loss) before contributions and transfers 135,000$ 135,000$ 199,284$ 64,284$

Connection and other developer fees 298,612

Transfer of plant and equipment to Operations and Maintenance (3,248,353)

Capital Grants 1,202,580

Equity transfers in (out) 3,000,000

Change in net position 1,452,123

Net position - beginning 13,035,672

Net position - ending 14,487,795$

73

Page 81: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

SCHEDULE OF BUDGETARY COMPARISON WITH ACTUAL

REVENUES, EXPENSES AND CHANGES IN NET POSITION

SOLID WASTE SERVICES - GARBAGE

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

SCHEDULE 7

Variance with

Final Budget-

Budgeted Actual Favorable

Amounts Amounts (Unfavorable)

Operating revenues

900,000$ 937,750$ 37,750$

Total operating revenues 900,000 937,750 37,750

Operating expenses

Salaries 172,500 135,997 36,503

Overhead 181,500 144,317 37,183

Directors' fees 9,000 8,320 680

Office expenses 3,000 1,180 1,820

Safety supplies 500 - 500

Contractual services 3,000 1,222 1,778

Professional services 15,000 6,323 8,677

Memberships, printing and publications 16,500 7,973 8,527

Repairs and maintenance 500 - 500

Travel, meetings and training 1,000 249 751

Recognition program 600 155 445

Utilities 500 477 23

Depreciation - - -

Contingency and other reserves 50,000 - 50,000

Total operating expenses 453,600 306,213 147,387

Operating income (loss) 631,537

Non-operating revenues (expenses)

Investment income 1,700 3,134 1,434

Recovery of uncollectible accounts 10,000 17,203 7,203

Other miscellenous revenues - 220 220

Write-off of uncollectible accounts (3,000) (1,515) 1,485

Total non-operating revenues (expenses) 8,700 19,042 10,342

Income (loss) before contributions and transfers 455,100$ 650,579$ 195,479$

Equity transfers in (out) (123,000)

Change in net position 527,579

Net position - beginning 494,937

Net position - ending 1,022,516$

Contract fees

74

Page 82: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICT

SCHEDULE OF BUDGETARY COMPARISON WITH ACTUAL

REVENUES, EXPENSES AND CHANGES IN NET POSITION

RECYCLING SERVICES

FOR THE FISCAL YEAR ENDED JUNE 30, 2016

SCHEDULE 8

Variance with

Final Budget

Budgeted Actual Favorable

Amounts Amounts (Unfavorable)

Operating revenues

2,290,000$ 2,306,542$ 16,542$

Recycling charges - commercial and industrial 96,000 110,721 14,721

Landfill fees - Measure D 330,000 319,719 (10,281)

Total operating revenues 2,716,000 2,736,982 20,982

Operating expenses

Salaries 172,500 144,217 28,283

Overhead 172,500 144,217 28,283

Office expenses 5,000 134 4,866

Contractual services 2,320,000 2,225,659 94,341

Professional services 2,000 - 2,000

Memberships, printing and publications 42,000 25,526 16,474

Travel, meetings and training 500 - 500

San Leandro Measure D 40,000 35,169 4,831

Depreciation - - -

Contingency reserve 30,000 - 30,000

Total operating expenses 2,784,500 2,574,922 209,578

Operating income (loss) 162,060

Non-operating revenues (expenses)

Investment income 2,300 3,152 852

Other miscellenous revenues 18,000 11,588 (6,412)

Grant expenses - - -

Write-off of uncollectible accounts (200) - 200

Total non-operating revenues (expenses) 20,100 14,740 (5,360)

Income (loss) before contributions and transfers (48,400)$ 176,800$ 225,200$

Equity transfers in (out) -

Change in net position 176,800

Net position - beginning 763,050

Net position - ending 939,850$

Recycling charges - residential and green waste

75

Page 83: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

This page intentionally left blank

76

Page 84: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

OTHER INDEPENDENT AUDITOR’S REPORT

77

Page 85: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1475 Saratoga Ave, Suite 180, San Jose, CA 95129Tel: 408-217-8749 • E-Fax: 408-872-4159

[email protected] • www.cnallp.com

INDEPENDENT AUDITOR’S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING AND ON COMPLIANCE AND OTHER MATTERS BASED ON AN AUDIT OF

FINANCIAL STATEMENTS PERFORMED IN ACCORDANCE WITH GOVERNMENT AUDITING STANDARDS

To the Board of DirectorsOro Loma Sanitary District

We have audited, in accordance with auditing standards generally accepted in the United States of America and the standards applicable to financial audits contained in Government Auditing Standards issued by the Comptroller General of the United States, the financial statements of the Oro Loma Sanitary District (the “District”) as of and for the year ended June 30, 2016, and the related notes to the financial statements, which collectively comprise the District’s basic financial statements, and have issued our report thereon dated October 13, 2016.

Internal Control over Financial Reporting

In planning and performing our audit of the financial statements, we considered the District’s internal control over financial reporting (internal control) to determine the audit procedures that are appropriate in the circumstances for the purpose of expressing our opinions on the financial statements, but not for the purpose of expressing an opinion on the effectiveness of the District’s internal control. Accordingly, we do not express an opinion on the effectiveness of the District’s internal control.

A deficiency in internal control exists when the design or operation of a control does not allow management or employees in the normal course of performing their assigned functions, to prevent, or detect and correct misstatements on a timely basis. A material weakness is a deficiency, or a combination of deficiencies, in internal control, such that there is a reasonable possibility that a material misstatement of the entity’s financial statements will not be prevented, or detected and corrected on a timely basis. A significant deficiency is a deficiency, or a combination of deficiencies, in internal control that is less severe than a material weakness, yet important enough to merit attention by those charged with governance.

Our consideration of internal control over financial reporting was for the limited purpose described in the first paragraph of this section and was not designed to identify all deficiencies in internal control over financial reporting that might be material weaknesses or significant deficiencies. Given these limitations, during our audit we did not identify any deficiencies in internal control over financial reporting that we consider to be material weaknesses. However, material weaknesses may exist that have not been identified.

Compliance and Other Matters

As part of obtaining reasonable assurance about whether the District’s financial statements are free of material misstatement, we performed tests of its compliance with certain provisions of laws, regulations, contracts, and grant agreements, noncompliance with which could have a direct and material effect on the determination of financial statement amounts. However, providing an opinion on compliance with those provisions was not an objective of our audit, and accordingly, we do not express such an opinion. The results of our tests disclosed no instances of noncompliance or other matters that are required to be reported under Government Auditing Standards.

78

Page 86: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1475 Saratoga Ave, Suite 180, San Jose, CA 95129Tel: 408-217-8749 • E-Fax: 408-872-4159

[email protected] • www.cnallp.com

Purpose of this Report

The purpose of this report is solely to describe the scope of our testing of internal control and compliance and the results of that testing, and not to provide an opinion on the effectiveness of the entity’s internal control or on compliance. This report is an integral part of an audit performed in accordance with Government Auditing Standards in considering the entity’s internal control and compliance. Accordingly, this communication is not suitable for any other purpose.

October 13, 2016San Jose, California

79

Page 87: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 88: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 89: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

MINUTES OF THE REGULAR MEETING

OF THE SANITARY BOARD OF ORO LOMA SANITARY DISTRICT

October 4, 2016

The regular meeting of the Sanitary Board of Oro Loma Sanitary District was called to order by President Timothy Becker at 3:00 p.m. on Tuesday, October 4, 2016, at the District offices at 2655 Grant Avenue, San Lorenzo. President Becker noted that Directors Roland Dias, Rita Duncan, Dan Walters and Shelia Young were present. Also in attendance were Jason Warner, General Manager (attending by telephone); William Halsted, District Engineer; Arlene Wong, Finance Manager; Sally Green, District Secretary; Jimmy Dang, Senior Project Engineer; Kristopher Decker, Field Engineer; Jose Rivas, Junior Engineer; Jen Faught, District Legal Counsel; and Vanessa Barberis, from Waste Management. No general public was in attendance. Director Young moved approval of the single Consent Calendar item, based on staff recommendation: 4) Approval of Board Minutes of September 20, 2016. The motion was seconded by Director Duncan and carried unanimously, 5-0. President Becker introduced Agenda Item 5, Introduction of New Employee: Jose Rivas, Junior Engineer. District Engineer Halsted introduced Jose to the Board, saying that he is a graduate of Cal Poly San Luis Obispo with a degree in Civil Engineering. He added that Jose was previously employed by a design firm that developed commercial and residential subdivisions, and in the course of his work, he has interacted with Oro Loma’s Engineering Department. President Becker greeted Jose, and said that this is an involved, working Board, with an unmatched attention to detail. He introduced the Board members to Jose and spoke of their backgrounds, contributions to the Board, and tenure. The Directors greeted Jose warmly, congratulated him on his new position, and welcomed him to the District. Director Walters reported on the September 21, 2016 meeting of the Operations Committee. Standing topics included August 2016 data for Natural Gas Usage, Overview of Power Production and Plant Demand, Monthly Activity Reports for the Collections, Maintenance and Operations Departments, and Monthly Power & Chemical Costs. Director Walters noted that the operating costs (chemicals, electricity, and gas) continue on a two-year downward trend. For District Operations Overview, 1) Collection System Manager Lenny Rather reported on monthly activities, including that staff assisted Operations in cleaning the grease receiving tank, and that Lead Worker Christopher Brown recently attended a California Alliance for Sewer System Excellence (CASSE) meeting. 2) Operations Manager Manuel Talledo-Garcia reported that Operations staff assisted with the plant bypass, helped with the startup for the Headworks Coating Project, and coordinated plant shutdowns and reduced flows for EBDA’s work on the outfall pipe system. 3) Maintenance Manager Scott von der Lieth presented an overview of the hypo line repair/replacement, and showed some fuel samples taken from the fuel tanks at the plant and lift stations for the recent California Hazardous Test Fuel testing. Some of the samples indicated that some of the fuel tanks needed cleaning. The Committee reviewed the updated draft of the MOU between the District and Save the Bay, which will come before the Board for approval at the October 18, 2016 meeting. President Becker reported on the September 22, 2016 meeting of the East Bay Dischargers Authority. Highlights included the announcement that Superintendent of Operations and

Page 90: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Oro Loma Sanitary District Minutes, Meeting of October 4, 2016 Page 2 of 3

Maintenance David Stoops plans to retire in late 2017, expenses for the fourth quarter of FY 2015-16 were about 10% under budget, and EBDA is contracting with the Tamayo Group consulting firm to develop a strategic plan. Other topics discussed were the NPDES Permit status report, Enterococcus Regrowth in the EBDA Transport System, Proposed EPA Selenium Standards, and the emergency repair of the No. 3 diesel pump by California Generator Service, at a cost of $130,000. Director Young reported on the September 28, 2016 meeting of the Alameda County Waste Management Authority. Topics discussed included approval of a Financial Services Manager position and recommended elimination of the Chief Financial Officer position; Reusable Bag Ordinance Expansion and Adoption of Addendum to Environmental Impact Report (upon adoption, the ordinance would take effect in May 2017); the Authority Board’s unanimous support of Proposition 67, the Plastic Bag Ban Referendum; and Board participation in a Priority-Setting Exercise. Director Duncan reported on the September 30, 2016 meeting of the Personnel/Safety/Public Information Committee, beginning with a review of the updated draft of key messages for the District’s Communications Plan. The Committee suggested a few additional edits before the messages are presented to the full Board at an upcoming work session. Other topics included Approval of the General Manager’s Goals and Objectives for FY 2016-17, which comes before the Board as Item 11 on this agenda; and notification of a two-year contract extension with VSP for vision insurance. Director Young moved approval of the Committee minutes for entry to the District record by reference. The motion was seconded by Director Dias and carried unanimously, 5-0. Director Young MOVED APPROVAL OF THE GENERAL MANAGER’S GOALS AND OBJECTIVES FOR FY 2016-17. Director Duncan seconded the motion, and President Becker opened the floor for discussion, inviting General Manager Warner to speak first. Warner said that the goals and objectives are a roadmap for him and staff to follow in the coming year, and the course of his work can be adjusted if the Board so chooses. The Directors discussed a few of the goals, President Becker called for the vote, and approval of the General Manager’s Goals and Objectives for FY 2016-17 carried unanimously, 5-0. District Engineer Halsted opened Staff/Director comments by advising the Board that the District was awarded the CSRMA Workers’ Compensation Excellence Award for 2015-16, which recognized the District’s ergonomic assessments of plant and field operations, and its focus on preventing back injuries. General Manager Warner expressed his appreciation to the Board, and said that he is looking forward to attending the next Board meeting in person. Director Duncan congratulated District Engineer Halsted for hiring Jose Rivas, and said that she is glad that the Engineering Department is fully staffed. Director Walters said that he recently spent five hours with David Stoops, EBDA’s Superintendent of Operations and Maintenance, and during that time he learned that EBDA’s process is amazing. He highly recommended the experience to his fellow Board members, if they are interested.

Page 91: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Oro Loma Sanitary District Minutes, Meeting of October 4, 2016 Page 3 of 3

Director Young mentioned that the Hayward Household Hazardous Waste facility on West Winton Avenue is temporarily closed due to a water line rupture, and that the other HHW locations remain open. She also congratulated Administrative Services Manager Simion and District Engineer Halsted on the “phenomenal” jobs they have done during the General Manager’s absence. President Becker announced that Jason Warner has been selected Chairman of the Planning Committee for CASA conferences for the coming year. There being no further business to come before the Board, he adjourned the meeting at 4:04 p.m. Dan Walters Secretary (Recording Secretary: Sally Green)

Page 92: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 93: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 94: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 95: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 96: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 97: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 98: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 99: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 100: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 101: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1

Collections Department September 2016

Monthly Activity Report

LINEAL FEET OF SEWER LINES CLEANED/CCTV INSPECTED (in feet)

CLEANING CCTV TOTAL

Scheduled 34,360 77,200 111,560

High Frequency 38,245 0 149,805

September Goals 97,095 50,000 147,095

Total For Month 72,605 77,200 149,805 (+2%)

Total for FY 256,486 237,283 493,769

MAINTENANCE AND CONSTRUCTION

Requests for Engineering Services 7

% of System on High Frequency Cleaning 14.99%

New Service Connections Inspected 1

Completed Repairs Inspected 13

New Tracts/Line Replacements Inspected 3 line replacement segments

Horizontal Boring Jobs Inspected 2

CUSTOMER SERVICE

SERVICE CALLS NORMAL WORK

HOURS

AFTER NORMAL HOURS

TOTAL

Service Calls requiring response 9 0 9

Service Calls handled by phone 0 0 0

Stoppages Serviced 0 0 0

Average Response Time (min) 13.5 0 13.5

Fiscal Year-to-Date (# calls) 17 1 18

Page 102: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

2

MISCELLANEOUS

Damage Claims Filed 0

Safety Meetings Conducted 2

Sick Leave Usage (hours) 0

Lost Time Accident (hours) 0

Vacation Days (days) 13

Days Utility Worker/Temp/ Intern used (days) 0

REQUEST FOR ENGINEERING SERVICES

DATE ASSET LOCATION DESCRIPTION

1 09/02 2136-F28+2136-K28 Beatty Street Repair joint w/heavy roots

2 09/06 2136-R33+2136-R30 Fargo Avenue Broken pipe w/channel repair

3 09/12 1836-X23+1836-Y24 Elvina Drive Broken pipe

4 09/13 3638-Y31+3636-E33 John Drive Repair hammer-tap w/roots in main

5 09/13 1834-L27+1834-K28 Burkhart Avenue Abandon 123’ main with I/I

6 09/22 3338-V06+3338-S07 Kent Avenue Roots infiltrating 2 new connections

7 09/28 2136-R12+2136-U12 Inverness Street Large joint separation

STOPPAGES/OVERFLOWS

DATE TIME LOCATION OVERFLOW

AMOUNT CAUSE

None to report

Stoppages for Fiscal Year (not resulting in an SSO)

0

Overflows for Fiscal Year

0

Overflow Amounts

Over 1,000: 0 100 - 1,000: 0 Under 100: 0

Page 103: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

3

SPECIAL TRAINING:

● 09/14 – Tailgate, Disaster Preparedness Exercise Shelter in Place.

● 09/15 – CWEA- SFBS Collection System Vendor Faire- Event held at Union Sanitary District, all 3 crews given time to attend show.

● 09/28 – Tailgate, Electrical Safety, Arc Flash – Lock-out / Tag-out by Safety Compliance Management. Safety Committee Meeting, G. Grimsley and L. Rather.

● 09/29 – Advanced Confined Space Rescue Training, entire crew (3 hrs.). This training was scheduled for 10/14/16 but was moved up to avoid conflicts with that day.

SPECIAL PROJECTS, COMMENTS and NON-CLEANING RELATED DUTIES:

● 09/01 – Perform CCTV inspections of 1 spot repair and confirm sag repair on line replacement section.

● 09/02 – Perform CCTV inspection of E. 14th Street line replacement (1 section).

● 09/08 – Vacuum out Bockman Lift Station wet well. (2 hrs.).

● 09/12 – Fill water tank at Railroad Lift Station. Perform CCTV inspection of Camino Dolores line replacement (1 section).

● 09/13 – Perform CCTV inspection of Hesperian Blvd. line replacement (1 section) and 2 spot repairs.

● 09/14 – Perform CCTV inspection of 1 spot repair.

● 09/15 – Hydro lines at the treatment plant. (4 hrs.)

● 09/16 – Perform CCTV inspections of 2 spot repairs.

● 09/19 – Perform CCTV inspection of 1 spot repair for.

● 09/20 – Perform CCTV inspection of 1 spot repair, one new connection, one line replacement punch-list item and 2 cross bores.

● 09/22 – Perform CCTV inspections of 2 spot repairs.

● 09/26 – Perform CCTV inspection of 1 spot repair.

● 09/27 – Perform CCTV inspections of 2 spot repairs and 1 line replacement punch-list item.

● 09/28 – Take Hydro 48 to George Oren for tire replacements and CCTV van 27 in for smog check. (3 hrs.).

● 09/29 – Perform CCTV inspection of 1 spot repair.

● 09/30 – Take CCTV Van 50 in for smog check. The department was asked to cover CVSD crews while they attended a team building meeting. Crews provided coverage from 8am – 4pm, and received no calls.

Page 104: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

4

COLLECTION SYSTEM/FIELD MAINTENANCE STATISTICS

SERVICE CALLS STOPPAGES CLEARED

2016 2015 2014 2013 2012 2016 2015 2014 2013 2012

Jan 13 13 18 16 17 0 1 0 0 0

Feb 13 7 17 16 9 0 0 0 0 0

Mar 11 10 8 12 6 0 1 0 0 0

Apr 9 15 17 10 11 1 0 0 0 1

May 9 11 8 10 5 0 1 0 0 0

Jun 14 10 7 12 13 0 0 0 0 0

Jul 4 9 8 13 20 0 0 0 0 0

Aug 5 5 9 9 13 0 0 1 0 0

Sep 9 12 7 8 9 0 0 0 0 0

Oct 12 23 14 14 0 0 1 0

Nov 5 14 12 5 0 0 0 0

Dec 9 13 9 14 0 0 0 0

Avg. 9.6 9.8 12.4 11.8 11.3 .11 .25 .1 .1 .1

LINE FOOTAGE CLEANED/CCTV INSPECTED

2016 2015 2014 2013 2012

Jan 162,475 190,787 193,228 202,503 197,218

Feb 194,098 153,222 146,306 181,745 147,312

Mar 183,533 187,606 159,978 181,381 172,411

Apr 188,700 176,620 192,848 184,716 175,814

May 192,260 166,043 177,181 184,423 161,024

Jun 151,305 154,081 156,356 188,685 177,839

Jul 161,316 182,329 164,717 183,611 176,384

Aug 182,648 170,107 164,689 196,930 191,620

Sep 149,805 148,832 168,598 169,267 190,699

Oct 171,307 164,301 202,278 185,204

Nov 154,456 161,515 180,469 175,097

Dec 151,281 167,755 161,637 150,140

Total 1,566,140 2,006,671 2,017,473 2,217,648 2,100,732

Avg. 174,016 167,223 168,123 184,804 175,064

Page 105: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 106: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 107: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 108: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 109: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 110: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 111: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Oro Loma Sanitary District MEMORANDUM

TO: Board of Directors

FROM: Solid Waste Committee – Director Young and Director Walters

DATE: October 10, 2016

SUBJECT: MEETING MINUTES OF OCTOBER 10, 2016

The Solid Waste Committee meeting was called to order by Director Young on Monday, October 10, 2016, at 2:00 PM. Director Walters was present. Staff in attendance included Acting General Manager Andreea Simion and Solid Waste Consultant Natasha Neves; and representing Waste Management, Operations Manager Tom Gallardo, Route Supervisor Sierrah Hanna, new Recycling Coordinator Beverly Perez, and Public Sector Manager Vanessa Barberis. There were no members of the public present. ● PUBLIC COMMENTS None. ● REVIEW BUSINESS COMPLIANCE REPORT

At the Committee’s request from September 2016, staff presented a report on commercial customers and their participation in recycling and organics programs, by area. As of June 30, 2016, the recycling participation in L1 (Unincorporated) was 56%, 84% in L2 (Hayward), and 77% in L3 (San Leandro). Additionally, 24% of L1 commercial customers have organics collection programs in place, with 27% in L2, and 31% in L3. The emphasis over the past couple of years has been on large commercial customers, who generate more than 4 cubic yards of trash per week. Of those, 73% have recycling in L1, 94% in L2, and 89% in L3. It should be noted that only businesses that generate “significant amounts” of food waste are mandated to implement organics programs. Per Stopwaste, “significant amounts” translate into more than 10 gallons of food waste per week for cart service, or more than 20 gallons per week for bin service. Staff then discussed the next steps in increasing participation; a new round of letters are about to be mailed to customers who do not currently subscribe to recycling and/or organics service. Aside from outlining the state and county mandates, the letter offers assistance at no cost to the customers – waste assessments, right sizing of cart and bins, signage and training. Chair Young asked how many food establishments there are in Oro Loma, and staff responded that, out of a total of 1,011 commercial customers, approximately 80 are considered food waste generators. The Committee accepted the report.

● ROUTE AUDIT REPORT Staff reported on the solid waste route audit completed on September 27, 2016. Common themes were tipped-over green waste carts, and open lids after collection, also on green waste carts. Simion said that the list of findings was emailed to WM Route Supervisor Sierrah Hanna, who addressed them right away and provided resolution back to the District. Sierrah said that she had

Page 112: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Solid Waste Committee Minutes October 10, 2016 Page #2

a coaching session with the green waste driver from that route, she processed repair tickets for the couple of carts with broken lids, and checked that overage charges were applied in the case of an overflowing 32-gal trash cart. The Committee accepted the report.

● PUBLIC OUTREACH UPDATE Natasha reported that she will start performing school audits this week, to verify that the service

levels in WM’s database conform to the reality at the schools. She will also check on the food scraps recycling programs and provide additional supplies, training or signage, if needed. She will then perform an audit of multi-family properties, to ensure that those with recycling programs continue to use them, and determine if new waste assessments are needed. She will also provide tenant packets and signage. In the near future, Natasha will conduct a few visits to commercial and multi-family customers with new WM Recycling Coordinator Beverly Perez, to train her on the most efficient ways to present information that meets the needs of the customers. Lastly, Natasha reported that she is working with Sierrah on determining the best District area for the “residential decal pilot program.” Grant funds were obtained earlier this year to study the effectiveness of placing decals on carts and determine if customers are more inclined to place the right materials in the right containers.

The Committee accepted the report. ● SOLID WASTE PROGRAM UPDATE

Sierrah Hanna provided the monthly report, discussing the following topics: the “two feet apart” stickers have arrived at WM, and the drivers will start placing them on carts; increased usage of customer service tags; an increase in the number of overage charges processed; and an increase in motor oil collection. It was also noted that, while more used motor oil is placed at the curb for collection, it is often placed in unapproved containers. Director Walters asked if the overage charges represent a financial incentive for WM, and Tom Gallardo responded in the affirmative. Sierrah added that she has called customers and offered to increase their service levels to avoid overage charges in the future; most customers responded that they don’t mind paying the overage charge once in a while. The Committee suggested that more educational materials be made available to the public regarding approved used motor oil containers. Staff said that customers receive information about used motor oil collection at least once a year in billing inserts, and the same information is published in Oro Loma Newsletters, annual recycling schedules, recycling calendars, and on the website. Natasha added that information about used motor oil and used batteries will be incorporated into the cart decals discussed before. The Committee accepted the report.

● DIRECTOR COMMENTS Chair Young welcomed Beverly Perez to Oro Loma, and thanked WM staff for attending the meeting.

● ADJOURNMENT There being no further business to come before the Committee, Chair Young adjourned the meeting at 2:48 PM.

Page 113: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 114: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 115: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Oro Loma Sanitary District MEMORANDUM

TO: Board of Directors FROM: Construction Committee Directors Becker and Dias DATE: October 11, 2016 SUBJECT: MINUTES, MEETING OCTOBER 11, 2016

The Construction Committee, consisting of Oro Loma Directors Becker and Dias, and Castro Valley Director Johnson, met on Tuesday, October 11, 2016, at 9:30 am. Also in attendance were Acting Oro Loma General Manager Simion; Oro Loma District Engineer Halsted; Senior Engineer Dang; and Field Engineer Decker. No members of the public were present. Items discussed included:

PUBLIC COMMENTS: None

CONSTRUCTION COMMITTEE MEETING MINUTES – SEPTEMBER 14, 2016

The Committee accepted the minutes as presented.

TEN-YEAR R&R AND CIP TREATMENT PLANT PROJECTED COSTS, FIVE-YEAR CIP COLLECTIONS PROJECTED COSTS, FIVE-YEAR TOTAL PROJECTIONS Halsted reported that there were no changes to the Five and Ten-Year CIP.

The Committee accepted the report.

EQUALIZATION/WETLAND TREATMENT PROJECT Proposed FY 2016/17 Budget $2,484,800 Decker reported that the contractor has made great progress over the last month. The underground conduits were installed, and all the yard piping was completed. The nitrification facility is nearly complete, and the pump station piping is currently being installed. Within the next month, the contractor is expected to complete the equalization basin grading, finish construction of the berm, and make the electrical connections. Startup and testing for the EQ basin could be as early as November. Once the electrical terminations are finished, the project will be substantially complete. In December, Oro Loma is expected to contract with Save the Bay to harvest cattails and tules from Delta Diablo and plant them in the EQ basin. The project is 90% complete, and staff projects that the existing budget will be adequate to complete it.

The Committee accepted the report.

CLAUSEN LIFT STATION REHABILITATION PROJECT FY 2016/17 Budget $105,000 Dang reported on the completion of the Clausen Lift Station Rehabilitation Project. The project provided for the repair and coating of the Clausen Lift Station Wet Well, the

Page 116: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Construction Committee Minutes: October 11, 2016 Page 2 of 2

replacement of the access hatch, and the installation of a new PLC. The contractor is expected to finish two remaining punch list items in November. The project construction resulted in one credit change order of $4,500, reducing the overall construction cost to $80,400. Staff and overhead costs were $22,400, which included training new staff on the project. The PLC cost $14,000 for installation, and there were some miscellaneous project costs of $1,350, for a grand total of $118,150, which was approximately $13,000 over the 2015/16 and 2016/17 budget. The budget overage can be covered from the Lift Station General Budget; no additional funds are needed. Staff sought authorization to take closeout of this project to the full Board upon completion of the punch list items.

The Committee accepted the report and authorized staff to take the notice of completion to the full Board upon completion of the punch list items.

SEWER LINE REPLACEMENT PROJECTS FY 2016/17 Budget $3,500,000 FY 2016/17 PIPELINE REPLACEMENT

Decker reported on the ongoing construction of this project, which is 1% complete. The contractor has completed the work on Hesperian Boulevard to stay ahead of the City’s paving project. Work is expected to continue through the wet weather, and remains on schedule for completion in late summer 2017. SUPPLEMENTAL FY 2016/17 PIPELINE REPLACEMENT - VIA DESCANSO

Decker reviewed the construction progress on this project. The contractor successfully completed the auger boring portion of the work. The project is 80% complete and is expected to be finished by the end of the month.

The Committee accepted the report.

POINT REPAIRS 2015/16 NO. 2 Contract Value - $748,888

Decker reviewed the project scope of work, which includes completion of 83 point repairs. The contractor has currently completed 18 repairs, representing approximately 22% of the work. Completion is expected by the end of December.

The Committee accepted the report.

ADJOURNMENT There being no further business to come before the Committee, the meeting adjourned at 10:30 am.

Page 117: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 118: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Oro Loma Sanitary District MEMORANDUM TO: Board of Directors FROM: Finance & Insurance Committee

Directors Dias and Becker

DATE: October 17, 2016 S UBJECT: MINUTES, MEETING OF OCTOBER 17, 2016 The Finance and Insurance Committee, consisting of Directors Dias and Becker, General Manager Warner, and Finance Manager Wong met on Monday, October 17, 2016 at 11:00 a.m. Administrative Services Manager Simion was also present. There were no members of the public. Items discussed included the following: FY 2015-16 FINAL REPORTING

AUDITED FINANCIAL STATEMENTS AS OF JUNE 30, 2016 The Committee had a telephone conference with auditor Sheldon Chavan from Chavan & Associates, LLP, and reviewed the highlights of the District's FY 2015-16 audited financial statements. The auditor issued an opinion that the District's financial statements as of June 30, 2016 present fairly, in all material respects, the financial position of the District for the year, and are in accordance with accounting principles generally accepted in the United States. Topics discussed included implementation of GASB Statement No. 72 Fair Value Measurement and Application, and second year implementation of GASB Statement No. 68 Accounting and Financial Reporting for Pensions. The auditor indicated that there were no misstatements in the District's financial statements, and no deficiencies in internal control. He recommended that the District continue to maintain its cash flow to fund its upcoming capital improvement program. The Committee accepted the audited financial statements and the auditor's comments. FY 2015-16 operating revenues were $19.1 million, and operating expenses were $18.6 million ($18.2 million if the effect of GASB 68 was excluded). The District's net position at June 30, 2016 was $93.8 million, $70.2 million of which were invested in net capital assets. The net position was $2.9 million higher than at June 30, 2015. A net pension liability of $4.8 million was reported based on CalPERS' GASB 68 evaluations. Readers of the financial statements should note that the $1 million payment of unfunded liability to CalPERS in March 2016 and employer contributions for FY 2015-16 in the amount of $496,315 were deferred per GASB 68 requirements, and were not reflected on the income statement.

The Committee accepted the reports, and recommended Board approval of the Audited Financial Statements as of June 30, 2016. The Audited Report, SAS 1-14 Board Communications Letter, and Management Letter will be provided to the Board at its October 18, 2016 meeting.

Page 119: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Finance and Insurance Minutes October 17, 2016 Page 2 of 4

TEN-YEAR SUMMARY OF DISTRICT REVENUES BY ACCOUNT AND STATEMENT OF REVENUES, EXPENSES AND CHANGES IN NET POSITION FOR THE YEARS ENDED JUNE 30, 2007 TO 2016 The Committee reviewed the Ten-Year Summary of Revenues by Account, and the Ten-Year Statement of Revenues, Expenses and Changes in Net Position.

The Committee accepted the reports. The Ten-Year Summary of Revenues by Account, and the Statement of Revenues, Expenses and Changes in Net Position 2007-2016 are attached to these minutes.

FY 2016-17 CURRENT ITEMS

MONTHLY FINANCIAL REPORTS, SEPTEMBER 30, 2016 The Committee reviewed the September 2016 financial reports and check register. All records were found to be in accounting compliance, and expenses were on reasonable target for the 3-month interval. The cash and investment position was $16.8 million, which included $157,606.07 for day-to-day management of OPEB obligations. The cash position was $5 million lower than in June 2016, and $1.5 million lower than in September 2015.

The following checks were reviewed and found to be in good order: EFT#1058 Natasha Neves $2,900.00 #58168 Babbitt Bearing Co. $6,319.38 #58172 Bayfab Metals $2,374.90 #58173 Bearing Engineering $529.87 #58175 C.H. Bull Co. $7,381.24 #58182 Crocker & Crocker $24,137.50 #58208 ONLC Training Center $295.00 #58217 Safety Kleen Systems $897.88 #58218 San Lorenzo Carwash $160.98 #58224 Sitech Norcal, Inc. $6,470.77 #58230 The Electrical Testing Co. $2,880.00 #58233 The Rueck Co. $1,283.16 #58310 The Rueck Co. $2,401.58 #58313 Psychological Resources, Inc. $475.00 The Committee recommended Board approval of the financial reports.

ECONOMIC ACTIVITY & MARKET RATES UPDATE The Committee reviewed a Wells Fargo commentary on current economic conditions and the latest CPI data. The District's overall investment yield in September 2016 was 1.125%. LAIF's interest rate was 0.634%. There were no investment activities this month.

The Committee accepted the information. A copy of the Summary of Investment Yields is attached to these minutes.

Page 120: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Finance and Insurance Minutes October 17, 2016 Page 3 of 4

QUARTERLY UPDATE ON CASH FLOW FROM INVESTMENTS The Committee reviewed a graph on scheduled cash inflows from the District's current investment portfolio of $13.8 million (at face value). The average yield is 1.211% with an average duration of 2.11 years.

The Committee accepted the information.

ATTORNEY’S INVOICE The Committee reviewed the September 2016 attorney’s invoice, in the amount of $2,165.59. The Committee accepted the invoice.

DISCUSSION OF CREDIT CARD USAGE & REPORTING Following up on the September 6, 2016 Board review of the annual report on vendors paid over $10,000 in FY 2015-16, in which it was noted that the U.S. Bank Visa line item was generally described as miscellaneous expenses, the Committee discussed current credit card usage and reporting practices, as well as the option of issuing individual credit cards for all managers to allow segregation of purchases by department. General Manager Warner said that the issue has been raised internally several times. Warner noted that all items acquired are accounted for and documentation for each purchase is included with the invoices. In weighing the tradeoff between convenience and controls, Warner advised limiting convenience to maximize controls. The District currently has three Visa cards, issued to the following individuals: General Manager, Finance Manager and Maintenance Manager. The Maintenance Manager's card was most recently activated in May 2016, and has enabled treatment plant purchases to be reconciled separately from administrative and engineering purchases, thereby providing a clearer categorization of the expenses. After much discussion, the Committee recommended that future annual reports of vendors paid over $10,000 shall label the U.S. Bank Visa line item in a more descriptive way. The Committee concurred to maintain current credit card practices, and instructed staff to provide an alternative description for the U.S. Bank Visa line item on future annual vendor reports.

DISCUSSION OF CUSTODIAL SERVICES FOR INVESTMENTS Staff presented an overview of current custodial services for District investments, provided by Wells Fargo Institutional Retirement & Trust since 2011. The custodian's level of service, responsiveness and reliability have been excellent, and the fees charged were within market competitiveness. There have been no occurrence of unethical marketing tactics recently reported in the media on consumer banking. The Committee requested staff to explore available options and present a recommendation on whether to continue the current custodial relationship at the next Committee meeting. The Committee requested staff to present a recommendation on custodial services at the next meeting.

Page 121: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Finance and Insurance Minutes October 17, 2016 Page 4 of 4

ANNUAL ALAMEDA COUNTY BILLING SUMMARY FY 2016-17 The Committee reviewed the FY 2016-17 billing summary for sewer service, recycling and garbage delinquency submitted for billing on the Alameda County tax roll. Total sewer services charges are $10.2 million, recycling charges $2.3 million, garbage delinquency recovery $265,008. The total amount entered onto the tax roll was $12.7 million. The first major revenue receipt (50% of the total) is expected for December 2016. The Committee accepted the information.

ADJOURNMENT There being no further business to come before the Committee, the meeting adjourned at 1:20 p.m.

ATTACHMENTS: Ten-Year District Revenues by Account Statement of Revenues, Expenses and Changes in Net Position from June 30, 2007 to

June 30, 2016 Summary of Investment Yields July 2016 to September 2016 F:\FINANCE\F&I\Minutes\2016\fi 10-17-16 min.doc

Page 122: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

ORO LOMA SANITARY DISTRICTTEN-YEAR HISTORY OF REVENUES BY CATEGORY AND BY ACCOUNT

15 40 45 15 / 40/ 45 85 86 TOTALDESCRIPTION O&M R&R CIP SEWER SOLID WASTE RECYCLING (10) (9) (8) (7) (6) (5) (4) (3) (2) (1)

SERVICES SERVICES SERVICES FY 2015-16 FY 2014-15 FY 2013-14 FY 2012-13 FY 2011-12 FY 2010-11 FY 2009-10 FY 2008-09 FY 2007-08 FY 2006-07

OPERATING REVENUES

DISTRICT SERVICE CHARGES

3001 ALAMEDA COUNTY 5,869,568 3,600,000 9,469,568 9,469,568 9,190,199 8,957,311 8,684,520 8,394,587 8,162,753 8,150,016 8,143,127 8,572,584 8,535,948

3002 E.B.M.U.D. 1,610,941 1,610,941 1,610,941 1,709,980 1,811,642 1,805,997 1,591,452 1,464,396 1,474,167 1,514,472 1,670,988 1,651,268

3003 HILLSHIRE FARMS 108,546 108,546 108,546 106,065 96,105 86,408 78,068 82,180 89,859 89,957 130,699 133,055

3004 KRAFT 14,117 14,117 14,117 16,625 18,489 15,460 22,117 17,636 33,012 25,634 16,121 21,859

3005 GHIRARDELLI 185,025 185,025 185,025 173,027 152,128 141,975 113,364 121,813 109,423 87,989 130,019 112,946

3006 CINTAS 0 0 0 0 0 0 0 10,948 54,188 59,131 85,947

3007 THARCO 29,404 29,404 29,404 28,605 25,204 25,996 14,699 13,947 11,644 18,713 21,295 22,209

3008 SANTINI 550,787 550,787 550,787 425,076 540,806 640,280 366,396 345,395 264,640 171,702 132,679 85,287

3023 SEWER SERVICE CHGS ON NEW PERMITS 9,482 9,482 9,482 33,795 4,485 1,134 183 1,246 356 4,510 16,598 11,194

3024 SEWER SERVICE CHGS ON INDUSTRIAL WASTE 3,802 3,802 3,802 8,421 5,523 6,862 5,798 10,213 13,054 9,923 5,281 6,248

3021 EAST BAY REGIONAL PARK DISTRICT 2,884 2,884 2,884 2,800 2,730 2,646 2,562 2,492 2,492 4,598 8,530 2,702

3022 HAYWARD AREA RECREATION & PARKS DISTRICT 0 0 0 0 0 0 3,916 3,916 3,916 4,246 4,246

3099 REFUNDS - DISTRICT SERVICE CHARGES (34,673) (34,673) (34,673) (16,553) (31,247) (42,347) (50,204) (42,300) (42,966) (29,984) (29,089) (21,443)

TOTAL DISTRICT SERVICE CHARGES 8,349,883 3,600,000 11,949,883 11,949,883 11,678,040 11,583,176 11,368,931 10,539,022 10,183,687 10,120,561 10,098,745 10,739,082 10,651,466AGENCY TREATMENT CHARGES

3260 CVSD 1,626,570 192,286 1,818,856 1,818,856 1,626,306 1,585,542 1,750,224 1,805,782 1,634,998 1,757,890 1,852,939 1,635,697 1,587,812

3262 CITY OF HAYWARD 157,769 157,769 157,769 115,799 137,796 128,659 128,188 116,388 113,992 106,954 93,019 86,838

3263 CITY OF SAN LEANDRO 266,916 266,916 266,916 265,518 259,026 247,986 239,026 215,712 206,541 207,792 215,183 209,834

3264 EBDA 187,228 187,228 187,228 182,739 224,095 214,693 183,512 146,398 134,880 154,286 121,302 133,574

3260.50 JEFFERSON ELEMENTARY SCHOOL 0 0 0 0 0 0 0 0 0 0 0

TOTAL AGENCY TREATMENT CHARGES 2,238,483 192,286 2,430,769 2,430,769 2,190,362 2,206,459 2,341,562 2,356,508 2,113,496 2,213,303 2,321,971 2,065,201 2,018,058PERMITS & INSPECTIONS

3120 ENGINEERING PERMITS 105,735 105,735 105,735 120,624 75,691 57,798 52,187 56,262 66,708 67,125 134,511 97,209

3121 INDUSTRIALPERMITS 57,163 57,163 57,163 50,370 50,452 47,324 53,314 62,387 65,826 71,763 74,900 77,375

TOTAL PERMITS & INSPECTIONS 162,898 162,898 162,898 170,994 126,143 105,122 105,501 118,649 132,534 138,888 209,411 174,584

3266 SANITARY TRUCK WASTE CHARGES 90,621 90,621 90,621 56,454 48,815 44,614 34,119 33,369 43,921 48,960 63,160 56,752

3267 GREASE RECEIVING CHARGES 158,967 158,967 158,967 142,005 120,927 113,397 100,964 47,248 7,135 0 0 0

3268 GRIT RECEIVING CHARGES 4,860 4,860 4,860 0 0 0 0 0 0 0 0 0

3241/42/43/45CONTRACT FEES - ALL AREAS 0 937,750 937,750 791,397 755,676 728,946 1,014,122 1,177,161 1,231,477 1,249,130 1,205,948 1,198,607

3246 RECYCLING CHARGES - RESIDENTIAL & GREEN WASTE 0 2,306,542 2,306,542 2,295,385 2,286,977 2,287,810 2,285,609 2,281,257 2,277,595 2,272,570 2,266,025 2,257,179

3248 COMMERCIAL & INDUSTRIAL RECYCLING 0 110,721 110,721 102,060 87,783 71,686 96,011 99,721 80,824 59,895 37,731 36,958

3099 REFUNDS - RECYCLING CHARGES 0 0 0 0 (2,042) 0 0 (311) 0 0 0

3247 LANDFILL FEES - MEASURE D 0 319,719 319,719 329,606 327,570 342,132 322,360 337,996 358,386 311,732 452,342 496,637

3279 OVERHEAD REVENUE 586,197 586,197 586,197 682,873 763,138 719,682 761,461 812,882 753,313 828,072 848,235 672,065

TOTAL OPERATING REVENUES 11,591,909 3,792,286 0 15,384,195 937,750 2,736,982 19,058,927 18,439,176 18,306,664 18,121,840 17,615,677 17,205,466 17,218,738 17,329,963 17,887,135 17,562,306

NON-OPERATING REVENUES

3250 INVESTMENT INCOME 26,075 68,951 27,167 122,193 3,134 3,152 128,479 216,318 217,367 194,227 157,237 190,115 197,078 584,497 1,122,335 1,452,998

3251 FAIR MARKET VALUE ADJS (classified as non-op exp) 26,436 59,584 86,020 86,020 0 53,279 19,345 (157,399) 0 0 0 0 0

3220 RENTS & LEASES 79,956 79,956 79,956 92,741 84,856 79,405 77,617 58,563 65,596 48,458 43,847 38,507

3244 PERSONAL LICENCE FEES 0 0 0 0 52,754 316,524 316,524 316,524 316,524 351,580 526,860

3292 GAIN ON DISPOSAL OF ASSETS 0 0 0 0 14,643 0 0 0 0 0 0 0

3277 GARBAGE DELINQUENCY RECOVERY OLSD'S SHARE 0 17,203 17,203 11,343 11,702 9,821 16,172 69,587 0 0 0 0

3291 CVSD PENSION REIMBURSEMENTS 190,000 190,000 190,000 1,206,100 0 0 0 297,151 0 0 0 0

3290 OTHER MISCELLANEOUS REVENUES 103,899 33,071 136,970 220 11,588 148,778 140,385 176,421 219,402 199,982 170,844 202,305 230,891 315,524 311,560

3150 SALES 159 91 250 250 413 642 1,098 528 1,002 820 1,221 1,214 1,586

3264 EBDA LAVWMA REFUND 79,371 79,371 79,371 79,371 79,371 79,371 79,371 79,371 79,371 89,138 82,010 87,011

3950 GRANT REVENUES 0 0 0 0 36,504 (34,623) 466,938 114,973 (90,693) 9,493 1,563

TOTAL NON-OPERATING REVENUES 399,930 95,546 199,284 694,760 20,557 14,740 730,057 1,746,671 638,281 691,927 655,409 1,650,095 976,667 1,180,036 1,926,003 2,420,085

TOTAL REVENUES 19,788,984 20,185,847 18,944,945 18,813,767 18,271,086 18,855,561 18,195,405 18,509,999 19,813,138 19,982,391

OTHER RECEIPTS

3261 CAPITAL REPAYMENTS - CVSD 1,185,986 1,185,986 1,185,986 1,440,269 1,813,090 705,522 329,341 796,730 388,159 506,706 460,315 730,898

3230 CONNECTION FEES 298,612 298,612 298,612 1,076,699 135,600 69,759 112,127 99,905 49,953 367,611 1,198,135 455,873

3280 CAPITAL GRANTS (HORIZONTAL LEVEE) 1,202,580 1,202,580 1,202,580 0 0 0 0 0 0 0 0 0

3130 SEWER UPSIZING FEES 0 0 0 0 0 0 0 0 0 0 0 168,519

ACCOUNT #

FY 2015-16 REVENUE DETAILS

F:\FINANCE\Audit\FY 2015-16\REV1516.XLS

Page 123: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Excl GASB 68& OPEB Adjs

1 2 3 4 5 6 7 8 9 10 % change 10 % change

from 2015 from 2015 audit report

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 to 2016 2016 to 2016 audit report

Operating Revenues District service charges $ 10,651,466 $ 10,739,082 $ 10,098,745 $ 10,120,561 $ 10,183,687 $ 10,539,022 $ 11,368,931 $ 11,583,176 11,678,040 $ 11,949,883 2.3% $ 11,949,883 2.3% Agency treatment charges 2,018,058 2,065,201 2,321,971 2,213,303 2,113,496 2,356,508 2,341,562 2,206,459 2,190,362 2,430,769 11.0% 2,430,769 11.0% Permits and inspection fees 174,584 209,411 138,888 132,534 118,649 105,501 105,122 126,143 170,994 162,898 -4.7% 162,898 -4.7% Sanitary truck waste charges 56,752 63,160 48,960 43,921 33,369 34,119 44,614 48,815 56,454 90,621 60.5% 90,621 60.5% Grease receiving charges 0 0 0 7,135 47,248 100,964 113,397 120,927 142,005 158,967 11.9% 158,967 11.9% Grit receiving charges 0 0 0 0 0 0 0 0 0 4,860 100.0% 4,860 100.0% Contract fees 1,198,607 1,205,948 1,249,130 1,231,477 1,177,161 1,014,122 728,946 755,676 791,397 937,750 18.5% 937,750 18.5% Recycling charges - residential 2,257,179 2,266,025 2,272,570 2,277,284 2,281,257 2,285,609 2,285,768 2,286,977 2,295,385 2,306,542 0.5% 2,306,542 0.5% Recycling charges - commercial 36,958 37,731 59,895 80,824 99,721 96,011 71,686 87,783 102,060 110,721 8.5% 110,721 8.5% Landfills fees - Measure D 496,637 452,342 311,732 358,386 337,996 322,360 342,132 327,570 329,606 319,719 -3.0% 319,719 -3.0% Overhead revenue 672,065 848,235 828,072 753,313 812,882 761,461 719,682 763,138 682,873 586,197 -14.2% 586,197 -14.2% Total operating revenues 17,562,306 17,887,135 17,329,963 17,218,738 17,205,466 17,615,677 18,121,840 18,306,664 18,439,176 19,058,927 3.4% 19,058,927 3.4%

Operating Expenses Engineering 723,286 813,103 631,004 637,505 756,806 585,037 694,142 712,859 800,448 757,407 -5.4% 684,704 -1.9% Sewage collections 1,667,692 2,076,666 2,880,750 2,350,901 2,426,428 2,207,219 2,375,275 2,727,099 2,989,963 2,712,953 -9.3% 2,637,991 -9.0% Sewage treatment operations 3,761,510 4,470,520 4,262,868 4,405,258 3,616,626 3,833,846 3,961,746 3,768,468 3,727,106 3,638,821 -2.4% 3,483,009 -0.7% Sewage treatment maintenance 1,903,645 1,705,618 1,895,607 1,846,305 1,831,130 2,419,194 2,100,408 1,951,508 2,317,461 2,603,506 12.3% 2,498,881 15.9% Sewage disposal - EBDA 511,412 543,574 501,112 478,693 638,715 696,967 682,807 645,786 684,638 779,476 13.9% 779,476 13.9% Administration 1,354,111 1,247,944 1,246,174 1,168,674 1,320,909 1,215,432 1,405,494 1,206,450 1,433,710 1,344,842 -6.2% 1,256,629 -5.7% Pension Expense - GASB 68 1,192,396 317.9% OPEB Expense & adjustments (315,916) -72.6% Depreciation 2,131,024 3,053,867 3,079,226 3,148,568 3,134,347 2,993,361 3,133,447 3,179,437 3,329,414 3,351,201 0.7% 3,351,201 0.7% Decrease in carrying value of EBDA 68,875 41,273 13,365 78,973 98,084 104,088 92,055 95,162 89,455 165,735 85.3% 165,735 85.3% Solid waste 215,554 503,793 516,185 435,618 397,390 395,554 330,769 296,535 305,189 306,213 0.3% 306,213 0.3% Recycling - residential & commercial 2,567,667 2,601,130 2,656,868 2,657,699 2,688,271 2,662,165 2,682,645 2,599,618 2,591,742 2,574,922 -0.6% 2,574,922 -0.6% Total operating expenses 14,904,776 17,057,488 17,683,159 17,208,194 16,908,706 17,112,863 17,458,788 17,182,922 18,269,126 18,235,076 -0.2% 18,615,241 10.4%Operating Income (Loss) 2,657,530 829,647 (353,196) 10,544 296,760 502,814 663,052 1,123,742 170,050 823,851 384.5% 443,686 -71.9%

% change in operating income from prior year -68.8% -142.6% -103.0% 2714.5% 69.4% 31.9% 69.5% -84.9% 384.5% 160.9%

Non-Operating Revenues Investment income 1,452,998 1,122,335 584,497 197,078 190,115 157,237 194,227 217,367 216,318 128,479 -40.6% 128,479 -40.6% Increase in fair value of investments 0 0 0 0 0 (157,399) 19,345 53,279 0 86,020 100.0% 86,020 100.0% Rents, leases and personal license fee 565,367 395,427 364,982 382,120 375,087 394,141 132,159 84,856 92,741 79,956 -13.8% 79,956 -13.8% Gain on disposal of capital assets 0 0 0 0 0 0 0 14,643 0 0 0.0% 0 0.0% Recovery of uncollectible account 0 0 0 0 69,587 16,172 9,821 11,702 11,343 17,203 51.7% 17,203 51.7% CVSD reimbursements 0 0 0 0 297,151 0 0 0 1,206,100 190,000 -84.2% included in misc rev

Other miscellaneous revenues 313,146 316,738 232,112 203,125 171,846 200,510 220,500 177,063 140,798 149,028 5.8% 339,028 140.8% EBDA and other agreement refunds 87,011 82,010 89,138 79,371 79,371 79,371 79,371 79,371 79,371 79,371 0.0% 79,371 0.0% Grant revenues 57,677 58,481 154,170 134,213 497,206 0 36,948 0 0 0 0.0% 0 0.0% Total non-operating revenues 2,476,199 1,974,991 1,424,899 995,907 1,680,363 690,032 692,371 638,281 1,746,671 730,057 -58.2% 730,057 35.1%

Non-Operating Expenses CalPERS pension contributions 0 0 0 0 1,640,762 0 0 0 6,347,895 1,000,000 -84.2% 0 0.0% Interest on bonds payable 195,626 173,576 150,926 4,367 0 0 0 0 0 0 0.0% 0 0.0% Grant expenses 56,114 48,988 244,863 19,240 30,268 34,623 444 10,725 0 0 0.0% 0 0.0% Decrease in fair value of investments 58,326 0 -100.0% 0 -100.0% Write-off of plant and equipment 92,303 51,020 8,837 0 389 260,034 0 78 0 0 0.0% 0 0.0% Write-off of uncollectible accounts 25,590 25,376 31,398 8,824 466 2,217 8,757 1,502 863 1,515 75.6% 1,515 75.6% Other miscellaneous expenses 3,015,644 15,544 15,544 139,370 0 0 0 0 0 0 0.0% 0 0.0% Total non-operating expenses 3,385,277 314,504 451,568 171,801 1,671,885 296,874 9,201 12,305 6,407,084 1,001,515 -84.4% 1,515 -97.4%

Income Before Contributions $1,748,452 $2,490,134 $620,135 $834,650 $305,238 $895,972 $1,346,222 $1,749,718 ($4,490,363) $552,393 -112.3% $1,172,228 -43.1%

Connection fees 455,873 1,198,135 367,611 49,953 99,905 112,127 69,759 135,600 1,076,699 298,612 -72.3% 298,612 -72.3% Sewer upsizing fees 168,519 0 0 0 0 0 0 0 0 0 0.0% 0 0.0% Contributions & Capital Grants 0 103,525 0 0 0 0 0 637 0 1,202,580 100.0% 1,202,580 100.0%Change in Net Position $2,372,844 $3,791,794 $987,746 $884,603 $405,143 $1,008,099 $1,415,981 $1,885,955 ($3,413,664) $2,053,585 -160.2% $2,673,420 -14.7%

% change in net position from prior year 59.8% -74.0% -10.4% -54.2% 148.8% 40.5% 33.2% -281.0% -160.2% -178.3%

Net Position - Beginning of Year 85,517,115 87,889,959 91,681,753 92,669,499 93,554,102 93,959,245 94,967,344 96,383,325 98,269,280 90,911,175 -7.5% 90,911,175 -7.5%Prior Period Adjustment - GASB 68 Pension (10,768,191) 192,869 192,869Prior Period Adjustment - OPEB 274,975 0 0Current Period GASB 68 & OPEB Entries 6,548,775 619,835 included above

Net Position - End of Year $ 87,889,959 $ 91,681,753 92,669,499 $ 93,554,102 $ 93,959,245 $ 94,967,344 $ 96,383,325 $ 98,269,280 90,911,175 $ 93,777,464 3.2% $ 93,777,464 3.2%

Total Revenues 20,038,505 19,862,126 18,754,862 18,214,645 18,885,829 18,305,709 18,814,211 18,944,945 20,185,847 19,788,984 -2.0% 19,788,984 -2.0%Total Expenses 18,290,053 17,371,992 18,134,727 17,379,995 18,580,591 17,409,737 17,467,989 17,195,227 24,676,210 19,236,591 -22.0% 18,616,756 -24.6%

Oro Loma Sanitary DistrictTen-Year History of Revenues, Expenses & Changes in Net Position (Based on Operational Results, Excludes GASB 68 & OPEB Adjustments)

Excludes prior & current GASB 68& OPEB Adjs Includes GASB & OPEB Adjs

Audit Report

F:\FINANCE\Audit\FY 2015-16\10 YR HIST 2007-16.xls

Page 124: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

Investment

Portfolio Value ($) % Value ($) % Value ($) %

LAIF 3,796,565$ 0.588% 3,096,565$ 0.614% 2,096,565$ 0.634%

Wells Fargo Trust-Cash 106,789$ 0.010% 136,991$ 0.010% 161,314$ 0.010%

Wells Fargo Trust-Investments 14,520,473$ 1.228% 14,019,301$ 1.211% 14,019,301$ 1.211%

Weighted Average 18,423,827$ 1.089% 17,252,858$ 1.094% 16,277,181$ 1.125%

Oro Loma Sanitary DistrictSUMMARY OF INVESTMENT YIELDS

August 2016 September 2016July 2016

weighted among all securities

weighted among all securities

weighted among all securities

F:\FINANCE\Monthly Reporting\FY 2016-17\Investment Yields 2016-09.xls10/19/2016

Page 125: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580
Page 126: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

AGENDA ITEM NO: 14 AGENDA DATE: 10/18/16 Authorize the General Manager to Execute the 2016-2021 MOU with the Stationary Engineers Local 39 – Plant Operating Unit Written by: A. Simion BACKGROUND: On June 21, 2016, the Board approved the terms of the Tentative Agreement with the Stationary Engineers Local 39 – Plant Operating Unit, and instructed staff to develop an MOU to reflect those terms. Staff worked with the bargaining units’ representatives to develop the draft, which was then forwarded to legal counsel. The attorney provided a thorough review, and confirmed that the MOU is ready to be executed. RECOMMENDATION: Authorize the General Manager to execute the 2016-2021 MOU with the

Stationary Engineers Local 39 – Plant Operating Unit ATTACHMENTS: Memorandum of Understanding – Stationary Engineers Local 39 – Plant

Operating Unit

Page 127: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

MEMORANDUM OF UNDERSTANDING

Stationary Engineers Local 39 Plant Operating Unit

June 20, 2016 – June 27, 2021

Page 128: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

2

Memorandum of Understanding

STATIONARY ENGINEERS LOCAL 39 PLANT OPERATING UNIT

INDEX DISTRICT RIGHTS AND RESPONSIBILITIES ..................................................................................1 General....................................................................................................................................1 Management............................................................................................................................1 EMPLOYEE RIGHTS ......................................................................................................................1 General....................................................................................................................................1 Agency Shop…………………...............................................................................................2 Union Recognition …….........................................................................................................4 I. SALARIES & MISCELLANEOUS COMPENSATION ........................................................4 A. Compensation .........................................................................................................................4 B. Overtime .................................................................................................................................4 1. General..............................................................................................................................4 2. Relief Operator..................................................................................................................5 3. Compensatory Time in Lieu Of ........................................................................................5 4. Meals.................................................................................................................................6 C. Mileage Allowance .................................................................................................................6

D. Shift Differential .....................................................................................................................6 E. Incentive Pay...........................................................................................................................7 F. Acting Pay...............................................................................................................................7 G. Additional Pay for Plant Operator I after Seven Years….......................................................8

H. Longevity Pay…. ....................................................................................................................8 I. Educational Incentive Pay …..................................................................................................8

II. HEALTH & WELFARE BENEFITS .......................................................................................8 A. Flexible Benefits Program ......................................................................................................8 B. Miscellaneous .........................................................................................................................9 C. Post-Retirement Medical Benefit Plan....................................................................................9 III. LEAVE …...............................................................................................................................15 A. Vacations...............................................................................................................................15 B. Maximum Annual Vacation Accrual ....................................................................................15 C. Holidays ................................................................................................................................16 D. Sick Leave.............................................................................................................................17 E. Workers' Compensation........................................................................................................18 F. Limited Duty Policy..............................................................................................................18 G. Military Leave.......................................................................................................................19

Page 129: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

3

H. Jury Leave.............................................................................................................................19 I. Leave of Absence without Pay .............................................................................................19 IV. HOURS OF WORK, REST PERIODS ..................................................................................19 A. Hours of Work ......................................................................................................................19 B. Rest Periods ..........................................................................................................................20 C. Clean-up Time ......................................................................................................................20 V. SAFETY ...................................................................................................................................20 A. Uniforms, Shoes, Prescription Safety Glasses......................................................................20 B. Safety Committee..................................................................................................................21 VI. DISCIPLINE, GRIEVANCE AND APPEAL PROCEDURE..............................................21 A. Discharge and Discipline ......................................................................................................21 B. Grievance Procedure.............................................................................................................21 C. No Strike-No Lockout...........................................................................................................22 D. Layoffs/Severance Plan ........................................................................................................23 VII. MISCELLANEOUS .................................................................................................................24 A. Separability ...........................................................................................................................24 B. No Discrimination.................................................................................................................24 C. Retirement System................................................................................................................24 D. Past Practices ........................................................................................................................26 E. Job Descriptions and Announcements ..................................................................................26 F. Employee Qualification Improvement Program...................................................................26 G. State Disability Insurance .....................................................................................................27 H. Deferred Compensation .......................................................................................................27 I. Traffic Management Exposure Pay ..................................................................................... 27 J. Other ...................................................................................................................................27 K. Meet and Confer ...................................................................................................................28 VIII. DURATION...............................................................................................................................28 IX. RECIPROCITY ........................................................................................................................28 Exhibit A – Classifications in the Stationary Engineers Local 39 Unit and Monthly Salary

Schedule

Page 130: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1

Memorandum of Understanding STATIONARY ENGINEERS LOCAL 39

Plant Operating Unit The authorized representatives of Oro Loma Sanitary District (herein called “District”) and Stationary Engineers Local 39 (herein called “Local 39” or “Union”) have heretofore met and conferred in good faith as required by law. The District and Local 39 have freely exchanged information, opinions, and proposals, and each has fully considered presentations made by each other. As a result, the aforesaid have reached the following understanding, which, in accordance with Section 3505.1 of the California Government Code, has been presented to the Board of Directors of Oro Loma Sanitary District for consideration and approval. This Memorandum of Understanding (MOU) shall apply equally to all Classified Employees of the District represented by Local 39 and is subject to all existing laws of the State of California applicable to the District, including the Meyers-Milias-Brown Act (Section 3500-3511 of the California Government Code), ordinances, resolutions, and administrative rules of the District, except as expressly provided to the contrary herein. DISTRICT RIGHTS AND RESPONSIBILITIES GENERAL: The rights of the District include, but are not limited to, the exclusive right to determine the nature and extent of services to be performed, as well as the right to determine and implement its public function and responsibility; manage and control all property, facilities, and operations of the District, including the methods, means, and employees by which the District’s operations are to be conducted; determine the size and composition of the working force; determine the procedures and standards of selection for employment; relieve its employees from duty because of lack of work, funds, or for other legitimate reasons; maintain the efficiency of governmental operations; determine the content of class description; take all necessary actions to carry out its mission in emergencies; exercise complete control and discretion over its organization and technology of performing its work; and take such other and further action as may be necessary to organize and operate the District in the most efficient and economical manner and in the best interest of the public it services. The District shall administer the provisions of this MOU in accordance with its contract with CalPERS. MANAGEMENT: The management rights of the District to promote, demote, reprimand, suspend, discharge, or otherwise discipline employees for cause are subject to the grievance procedure hereinafter provided. EMPLOYEE RIGHTS GENERAL: Employees of the District shall have the right to form, join, and participate in the activities of employee organizations of their own choosing for the purpose of representation on all matters of employee relations, including, but not limited to, wages, hours, and other terms and conditions of employment. No employee shall be interfered with, intimidated, restrained, coerced, or discriminated against by the District or by any employee organization because of exercising these rights.

Page 131: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

2

AGENCY SHOP:

a. General: 1) As a condition of continued employment, all employees who are paid one or more hours salary

during a bi-weekly pay period shall be a member of the Union and pay an Agency Shop Service Fee to the Union in an amount determined as set forth in subsection (b) below.

2) No employee shall be required to pay the service fee during the first sixty (60) calendar days of employment.

3) The provisions of this Section shall remain in effect during the term of this Agreement and any mutually agreed upon extension of that term.

b. Service Fee:

The service fee required in subsection (a) shall be an amount not to exceed the Union’s uniformly-applied initiation fee, periodic dues and general assessments. In computing such amounts, the Union shall exclude expenditures for members’ only benefits and Union expenditures for political and ideological purposes unrelated to collective bargaining, contract administration and grievance adjustment. Any dispute as to the service fee or the amount thereof shall be directed solely to the Union, and the District shall not be a party to the dispute. Both the service fee and the Union dues may be paid to the Union through payroll deductions as set forth below. There is no obligation on the part of the District to provide payroll deductions for the three (3) organizations listed in subsection (c).

c. Religious Objections: Any employee otherwise required to pay a service fee under this Section, and who is a member of a

bona fide religion, body or sect which has historically held conscientious objections to joining or financially supporting public employee organizations shall not be required to join or financially support any public employee organizations as a condition of continued employment. Such an employee shall be required as a condition of continued employment, in lieu of the service fee, to pay a sum equal to the service fee otherwise payable under this Section to a non-religious, non-labor charitable fund exempt from taxation under the Internal Revenue Code Section 501(c)(3). Upon request of the Union, such employee shall be required to submit to the Union proof of payment of the in-lieu-of service fee. For purposes of this Section, such employees shall choose from the following three (3) organizations:

March of Dimes United Way Red Cross

Employees claiming a religious exemption shall be required to file a written statement under oath or affirmation with the Union, which identifies the religious organization by name, if any, and which provides in detail that the employee and the organization meet all of the requirements for claiming the religious exemption.

d. Disclosure and Reporting: The Union shall keep an adequate itemized record of its financial transactions and shall make available

annually, to the District and to the employees covered by this Section within sixty (60) days after the end of its fiscal year, a detailed written financial report thereof in the form of a balance sheet and an operating statement, certified as to accuracy by its president and treasurer or corresponding principal officer, or by a certified public accountant. The Union, if required to file financial reports under the Labor-Management Disclosure Act of 1959 covering employees governed by this Agreement, or if

Page 132: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

3

required to file financial reports under Section 3546.5 of the Government Code, shall instead provide the District with a copy of such financial reports.

e. Hold Harmless: The Union shall promptly refund to the District any amounts paid to the Union in error under this

Section. The Union expressly agrees to indemnify and hold the District harmless from any and all claims,

demands, costs (including any costs incurred by the District in defense of a lawsuit), expenses, damages or other monetary losses arising out of or in any way connected with any action or inaction of the District in the adoption or administration of this Section. This hold harmless and indemnity agreement shall include but not be limited to employee legal actions of any sort of nature against the District based upon or related to this Section. Further, in the event that the District undertakes disciplinary action against an employee pursuant to this Section, this hold harmless and indemnity agreement shall cover all costs and expenses, including any costs incurred by the District in defense of a lawsuit.

f. Change of Law: In the event there is a change in the law whereby any provision hereof becomes invalid or if for any

reason any provision of this Section is rendered unlawful by any published appellate court decision, this Section shall be forthwith deemed amended to comply with the change or decision in question.

g. Discipline Procedure: No employee shall be terminated under this Section unless:

(1) The Union first has notified the employee by letter, explaining that he/she is delinquent in not rendering the required service fee, or payment in lieu of service fee pursuant to subsections (c) and (d) above, specifying the current amount of the delinquency, and warning the employee that unless such service fee, or payment in lieu of service fee, is tendered within thirty (30) days, the employee will be reported to the District for termination as provided in this Section; and

(2) The Union has furnished the District with written proof that the procedure of subsection (1)

above has been followed, or has supplied the District with a copy of the letter sent to the employee and notice that he/she has not complied with the request. The Union must further provide, when requesting the District to terminate the employee, the following written notice:

“The Union certifies that ________________ (employee’s name) has failed to tender the

agency shop service fee, or payment in lieu of service fee, required as a condition of employment under this Agreement and that under the terms thereof, the District shall terminate the employee.”

No employee who is on injury-on-duty time under the District’s MOU shall be terminated under this Section.

h. Membership and Dues Check-off: Employees who are members of Local 39 and have authorized and who may authorize in the future

deductions for their Local 39 Dues and assessments shall have such dues and assessments deducted for the remainder of this agreement. The District will forward the deducted funds once monthly to the Union.

Page 133: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

4

UNION RECOGNITION: Exclusive Bargaining Representation: The District recognizes the Union as the sole and exclusive collective bargaining representative of all the employees covered by the Memorandum of Understanding, for the purposes of collective bargaining and the handling of all matters within the scope of this agreement. This District further agrees to bargain collectively only with duly authorized representatives of the Union. Classifications Covered: Plant Operator I and Plant Operator II

I. SALARIES & MISCELLANEOUS COMPENSATION A. COMPENSATION

Schedule of Salaries: The salary plan shall provide seven graduated salary steps for all classes of positions in the classified service. Salary step increases shall be earned, shall be subject to satisfactory service, and shall not be considered a right of the employee. After satisfactory completion of the required probationary period, which is 12 months of continuous service in the same position unless extended, an employee is eligible for his/her first step increase upon recommendation of his/her supervisor and/or Department Head. Thereafter, when he/she completes additional consecutive twelve (12) months of continuous service in the same position, the employee may be advanced to the next higher rate of compensation as set forth in the schedule, upon recommendation of his/her supervisor and/or Department Head, until he/she reaches top salary step. After reaching the top step, the employee shall remain at that rate while he/she continues to serve in the same position and provides satisfactory work performance.

At the beginning of each contract year (first day of payroll #14), the salaries for all classifications in the Local 39 Bargaining Unit will be increased by the actual Consumer Price Index (82/84=100 Wage Earners San Francisco-Oakland Bay Area) for the period of April through April of the preceding year, at a minimum increase of 2% and a maximum increase of 5%. The annual CPI increases will be processed with the following effective dates: June 20, 2016; June 19, 2017; June 18, 2018; June 17, 2019; and June 15, 2020. Should the actual said Consumer Price Index reach 6% or higher, this contract shall be re-opened no more than once per year for the sole purpose of salary negotiations. The salaries listed in Appendix A include a one-time 7.30% market adjustment for Plant Operator II, a one-time 1.45% internal equity adjustment for Plant Operator I, and a 2.6% CPI increase for both, effective June 20, 2016.

B. OVERTIME 1. General

Overtime for the purposes of this Section shall be deemed to be that time worked by employees beyond 40 hours per workweek or eight hours per day when regular schedule provides for eight hours of work; 10 hours per day when regular schedule provides for 10 hours of work; or 12 hours per day when regular schedule provides for 12 hours of work. A regular workweek is defined as Monday 00:00 through Sunday 24:00. The supervisor will make his/her best effort to seek volunteers, but reserves the right to assign overtime to the most qualified individual to work on a particular project.

Compensation for overtime, regardless of classification, Sunday, holiday or other consideration, shall be paid at the rate of one and one-half (1-1/2) times the hourly rate based on the employee’s

Page 134: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

5

monthly salary, or time off with pay at the rate of one and one-half (1-1/2) times the hourly rate, based on the employee’s monthly salary.

Overtime for employees who work either before or after their daily work schedule shall be computed from either the time the employee reports to work to the beginning of the normal shift, or from the end of the normal shift until the employee leaves for his/her home after having performed the work as required, including clean-up.

2. Relief Operator: Plant Operators assigned to relief duty shall be credited with two (2) hours of

overtime if they are not advised of a specific shift assignment prior to reporting for work for the day shift. Shift assignments for relief operators shall not be considered overtime, regardless of when assigned, provided that relief operators shall be paid overtime for hours in excess of the operator’s regular shift assigned (i.e. eight (8), 10, or 12 hours in a 24-hr period) or 40 hours in any workweek as defined by the rules and regulations.

A relief operator who is returning to day shift after working the previous swing shift shall be allowed to return at 8:00 a.m. on that day, but be paid as though he/she had returned at 6:00 a.m. When a relief operator is needed to work the next graveyard shift, the following provisions shall apply: (a) if the relief operator is notified before 10:00 a.m., he/she shall be allowed to go home at 10:00 a.m., but receive credit for and be paid regular pay for eight (8) hours work; (b) in the event the supervisor requests the operator to stay past 10:00 a.m., the operator shall be paid at the overtime rate for any time worked between 10:00 a.m. and 2:00 p.m.; (c) if he/she is notified after 10:00 a.m., he/she will be allowed to work until 2:00 p.m., but shall be paid the last four hours of the shift at the overtime rate.

Relief operators notified to return to the plant less than sixteen (16) hours in advance shall be paid two (2) hours of overtime. Any operator required to work swing shift and the following day shift, shall be allowed to return to work two (2) hours after the normal start of the shift and be credited eight (8) hours. Sunday work is overtime when a relief operator is called in to cover when the regular operator is out on unscheduled leave. In consideration of the relief operators, the District requires all employees in the Operations Department to submit time off requests for planned use of vacation, floating holiday or compensatory time off no less than 14 days prior to the beginning of the time off.

3. Compensatory Time In Lieu Of: An employee may elect to receive compensatory time off in

lieu of overtime pay until a maximum of 60 hours of compensatory time off has been accumulated.

Accrued compensatory time up to the maximum of 60 hours shall be used when requested by the employee and approved by the supervisor, provided, however, that the District shall have the right to deny such request when, in the sole judgment of the supervisor/Department Head, said employee is needed to effectively staff District operations. To be eligible for compensatory time off, the employee shall request from his/her supervisor, as soon as possible, the scheduling of said compensatory time off, but no later than twenty-four (24) hours prior to the commencement of said compensatory time off.

Page 135: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

6

Upon the resignation or retirement of an employee, the employee shall, at his/her option, either be granted time off or be paid a lump sum for all authorized accrued compensatory time, according to District rules.

4. Meals: When overtime extends two (2) hours beyond a shift, and for each four (4) hours

thereafter, a meal allowance of $10.50 shall be added to the employee’s compensation. Meal allowances shall not apply to overtime for which twenty-four (24) hours’ notice was provided.

C. MILEAGE ALLOWANCE Mileage shall be computed as the actual distance from the employee’s home to the Treatment Plant

and back by the most direct route and shall be compensated at the rate provided for by the Internal Revenue Service. Mileage allowance shall only apply when the employee is called back to work with less than 24-hour notice or for emergency callouts.

D. SHIFT DIFFERENTIAL

Employees shall be assigned one of the following shift formats: 12-10-10-8 hours per workweek 12-12-8-8 hours per workweek 8-8-8-8-8 hours per workweek 10-10-10-10 hours per workweek The following are the District’s shift categories:

i. Normal day hours – 06:00-14:00 ii. Lone-man shift – Hours worked alone

iii. Weekend shift – Hours worked from Saturday 00:00 to Sunday 24:00 iv. Swing shift – Hours worked outside of normal day hours that do not fall under either

lone-man shift or weekend shift Employees assigned to work shifts shall be compensated as follows:

$2.60/hour in addition to base pay for employees working the following daily schedules: o Monday 18:00-06:00 or 14:00-22:00 o Tuesday 22:00-06:00 or 14:00-22:00 o Wednesday 22:00-06:00 or 18:00-02:00 or 14:00-22:00 o Thursday 20:00-06:00 or 14:00-22:00 o Friday 20:00-06:00 or 14:00-22:00

$2.90/hour in addition to base pay for employees working from Saturday 00:00 to Sunday 24:00.

$3.30/hour in addition to base pay for employees working lone-man shift. The three pay rates described above are non-stackable, and the District shall only pay the highest single rate applicable. The same shift differential pay rates shall apply to overtime hours worked within the time frames detailed above. For timesheet purposes, the hours for the entire shift will be entered for the day on which the shift ends. Examples:

i. Shift starts Monday at 22:00 and ends Tuesday at 06:00 – considered a Tuesday shift; enter all 8 hours on Tuesday;

Page 136: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

7

ii. Shift starts Friday at 18:00 and ends Saturday at 06:00 – considered a Saturday shift; enter all 12 hours on Saturday.

E. INCENTIVE PAY

Plant Operators are required to obtain State Water Resources Control Board (SWRCB) certification. Required certification for the various classifications is as follows:

Plant Operator I Grade I, Wastewater Treatment Plant Operator Plant Operator II Grade III, Wastewater Treatment Plant Operator

Effective June 20, 2016, if an employee exceeds the grades of certification in his/her classification as set out above, he/she shall receive the following amounts, paid on a monthly basis through the payroll system:

One step above the required grade $46.75 /month Two steps above the required grade $57.75/month Three steps above the required grade $68.75/month

Certification pay will be effective retroactive to the date the certificate was acquired, and upon submittal of a copy of the certificate to the District.

Employees are required to maintain valid certification and provide proof of such.

The District shall also incentivize employees for the acquisition and maintenance of certifications in other trades (collections or maintenance). However, regardless of the number of certifications an employee may acquire, the District shall only pay for a maximum of three steps above the employee’s required certification. Employees qualified to provide specialized training (e.g. CPR, First Aide, Forklift Training, Mainsaver, etc.) to other District employees, shall receive 5% in addition to base salary when actually providing training, on an hour-per-hour basis. The training must be formalized (scheduled and agendized) and pre-approved/authorized by the supervisor in order to qualify for additional compensation. This provision does not apply to regular training provided by Plant Operators II to lower classifications within the unit. The District is committed to providing assistance for the training and improvement of employees, and will allow the use of the Employee Qualification Improvement Program, detailed in Section VII.F of the Memorandum of Understanding, for approved certification training.

The District acknowledges that the job descriptions provide two years to obtain certain certification, which may not be able to be accommodated through the time scheduling of the SWRCB. In this event, the employees may request an extension of time from the General Manager to obtain the required certification at the soonest possible date.

F. ACTING PAY

In the event any classified employee is temporarily assigned and performs duties in a classification higher than his/her own for an uninterrupted period of 24 work hours or more, the District will pay the employee Step A of the higher classification or five percent (5%) above the employee’s normal

Page 137: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

8

hourly rate, whichever is greater, for each full day worked in both classified and unclassified positions. Should the employee be required to work overtime while on an acting assignment, he/she shall be compensated at one and one-half times the hourly rate of the acting assignment. Should an observed holiday fall within the assignment to a higher classification, the employee will not be eligible for acting pay on that day. Should the employee use sick leave, vacation, floating holiday leave or compensatory time off at any time while performing the duties of the higher classification, the employee will not be eligible for acting pay.

Employees available for temporary job assignments will be considered on the basis of both:

• Ability to perform work • Seniority rotation

Of the two criteria, the employees’ performance record and ability to perform the work will be considered before seniority. The District may continue its practice of combining crews during vacations or protracted absences.

G. ADDITIONAL PAY FOR PLANT OPERATOR I AFTER SEVEN YEARS When an employee completes seven uninterrupted years of satisfactory service as a Plant Operator I;

and the employee has attained a Grade III or higher Wastewater Treatment Plant Operator certificate; and the employee has not been offered a promotion to Plant Operator II during those seven years, he/she becomes eligible for a one-time 2.5% increase in salary. If a promotion is offered to an employee and not accepted at any time for the duration of this MOU, the 2.5% wage increase shall be rescinded as of the date the District’s offer was rejected.

H. LONGEVITY PAY

Employees who complete 25 years of satisfactory service with OLSD, and who are 58 years old or older, shall receive a one-time 2.5% increase to base salary. The increase shall be effective the first pay period following the 25th employment anniversary for employees 58 years old or older, or the first pay period following the 58th birthday for employees who have completed at least 25 years of satisfactory service to the District by that date.

I. EDUCATIONAL INCENTIVE PAY When an employee acquires and maintains CWEA Grade II Mechanical Technologist Certification and passes an in-house aptitude test, he/she becomes eligible for an additional 2.5% increase in base salary. The parties have met and conferred on the SOP regarding the implementation of the Educational Incentive Pay.

II. HEALTH & WELFARE BENEFITS A. FLEXIBLE BENEFITS PROGRAM

For the duration of this contract, the District will contribute certain amounts per month, per full-time employee, for benefits covered under the District’s flexible benefit program. The monthly amounts will not exceed the combined premiums for the Kaiser health insurance (based on individual enrollment status – one party, two party, or family), dental insurance (family), vision insurance (employee only), life insurance ($20,000 coverage), and $140.00, which the employee may allocate to a higher-cost benefit, to a medical reimbursement and/or dependent care reimbursement account, to purchase additional life insurance coverage, or receive as cash. If the employee enrolls in a health

Page 138: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

9

plan with a premium lower than Kaiser, the employee may allocate the difference to a medical reimbursement and/or dependent care reimbursement account, purchase additional life insurance, or receive as cash. In accordance with IRS regulations, and under the District’s flexible benefits program, employees will also be allowed to contribute pre-tax dollars, to be used for reimbursement of qualified medical expenses and/or dependent care expenses. The Flexplan amount shall be adjusted by the District annually by the actual increases in Kaiser rates (one party, two party, or family), dental, vision, and life insurance premiums, if applicable.

1. Cash-Back in Lieu of Medical Coverage. Effective January 1, 2017, an employee who

chooses to waive the medical coverage offered by the District, and provides written documentation indicating that he/she receives such benefit under the medical plan of a spouse or domestic partner, may elect, each year during the open enrollment period, to receive a monthly “cash-back” benefit in an amount equal to the Kaiser one-party rate for that calendar year. However, the employee can re-enroll in one of the District’s medical plans during the annual open enrollment period, or at any time throughout a year in which a qualifying event occurs that generates a loss of coverage. This provision is intended to reduce costs to the District by incentivizing employees not to enroll for medical coverage that they do not need. The cash-back in lieu of medical coverage provision does not apply to dental, vision, and life insurance coverage. The employee is responsible for all taxes on the cash-back amount, as provided by the IRS.

2. Medical Plan Payments, Unpaid Leave Status: Medical plan payments for employees in an

unpaid leave status will be made by the District in conformance with the CalPERS medical plan guidelines.

Employees who are not in a full pay status for the month will receive a pro rata share of the monies allocated by the District toward the flexible benefit program.

B. MISCELLANEOUS

In the event that it becomes possible for the District to provide hospital-medical insurance, life insurance, and dental and vision coverage as nearly comparable as possible to the most economical benefit plan available to employees under this MOU, without additional cost to the employees, the District may substitute new insurance carriers or institute a self-insurance program. Local 39 will be given an opportunity to review the coverage afforded under such substitute plans, and such plans shall be acceptable to Local 39 before they are implemented.

C. POST-RETIREMENT MEDICAL BENEFIT PLAN 1. General

Upon retirement from Oro Loma Sanitary District through the California Public Employees Retirement System (CalPERS) and active enrollment into one of the District’s CalPERS health plans at the time of retirement, all eligible employees will be entitled to post-retirement medical benefits in accordance with Oro Loma’s Post-Retirement Medical Benefit Plan described herein. Eligibility is based on age and years of service with Oro Loma Sanitary District and assumes the employee to be a full-time, regular employee receiving District benefits. For purposes of this Program, the words retire, retirement, retiree, retired, etc., all mean that the employee has applied for, and is currently receiving, a pension benefit from CalPERS. In the event that an employee should cease retirement and re-enter the CalPERS system, retiree entitlement to medical benefits under this Plan shall cease for the period that the employee is employed and earning service

Page 139: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

10

credit in CalPERS. Former employees whose benefits have been temporarily suspended are entitled to begin receiving benefits under this Plan after having provided evidence of again being retired from CalPERS. Part-time and temporary employees who do not receive District benefits do not accrue service credit for purposes of this post-retirement medical benefit.

2. Eligibility for Retiree Medical Benefit Plan

For the purpose of determining eligibility for post-retirement medical benefits, active District employees are divided into four categories:

1. Employees hired before June 30, 2006, vested and eligible to retire under the PERS system on or before June 30, 2006, and who are 55 or older on or before June 30, 2006, will retain the August 19, 2002 post-retirement medical benefits plan, as outlined in the District’s 2001-2006 MOUs. In addition, employees hired before June 30, 2006, who have completed 20 or more years of satisfactory service to the District on or before June 30, 2006, will retain the August 19, 2002 post-retirement medical benefits plan, as outlined in the District’s 2001-2006 MOUs.

2. Employees hired before June 30, 2006, and who have completed less than 20 years of

service to the District as of June 30, 2006, will be eligible for post-retirement medical benefits up to the applicable Kaiser two-party member rate, based on age and years of service, as indicated in Table A below. The minimum benefit (50% of the Kaiser two-party member rate) will be afforded at the age of 55, with 15 years of OLSD service.

YEARS AGE PERCENTAGE Minimum Age 55

15 55 50% 16 56 60% 17 57 70% 18 58 80% 19 59 90% 20 60 100%

Minimum age and service to collect benefits is 15 years @ age 55

For combinations of age and years of service not specified above, the higher percentage benefit

applies. Table A

Example #1: An employee hired before June 30, 2006, who has completed less than 20 years of OLSD service as of June 30, 2006, and who retires at age 55 with 20 years of service receives 100% of the benefit. Example #2: An employee hired before June 30, 2006, who has completed less than 20 years of OLSD service as of June 30, 2006, and who retires at age 58 with 16 years of service receives 80% of the benefit.

Page 140: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

11

Example #3: An employee hired before June 30, 2006, who has completed less than 20 years of OLSD service as of June 30, 2006, and who retires at age 58 with 18 years of service receives 80% of the benefit. Example #4: An employee hired before June 30, 2006, who has completed less than 20 years of OLSD service as of June 30, 2006, and who retires at age 60 with 15 years of service receives 100% of the benefit.

3. Employees hired between July 1, 2006 and June 26, 2011 will be eligible for post-

retirement medical benefits up to the applicable Kaiser two-party member rate, based on age and years of service, as indicated in Table B below. The minimum benefit (50% of the Kaiser two-party member rate) will be afforded at the age of 60, with 15 years of OLSD service.

4.

YEARS AGE PERCENTAGE Minimum Age 60

15 60 50% 16 60 60% 17 60 70% 18 60 80% 19 60 90% 20 60 100%

Minimum age and service to collect benefits is 15 years @ age 60

Table B

The actual reimbursement benefit will be modified downward to reflect any deletion(s) occurring after retirement, such as the death or divorce of retiree/spouse, death of a dependent, and/or dependent child losing his/her PERS eligibility status at the end of the month in which this change in status occurs. In the event the retiree dies, his/her enrolled spouse and/or eligible dependent(s) will be entitled to continue receiving benefits under this Plan based on the retiree’s percent entitlement at the time of retirement. For purposes of this Plan, eligible dependent shall mean a spouse or child by birth or legal adoption. After retirement, should the retiree wish to add any person(s) to his/her medical coverage, the retiree shall be solely responsible for the added coverage and this amount is not reimbursable by the District.

4. Employees hired on or after June 27, 2011 will be eligible for post-retirement medical

benefits up to the applicable Kaiser one-party rate, based on age and years of service, as indicated in Table C below. The minimum benefit (50% of the Kaiser one-party member rate) will be afforded at the age of 60, with 15 years of OLSD service.

Page 141: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

12

YEARS AGE PERCENTAGE

Minimum Age 60 15 60 50% 16 60 60% 17 60 70% 18 60 80% 19 60 90% 20 60 100%

Minimum age and service to collect benefits is 15 years at age 60. Table C

In the event the retiree dies, his/her enrolled spouse will be entitled to continue receiving

benefits under this Plan based on the retiree’s percent entitlement at the time of retirement. After retirement, should the retiree wish to add any person(s) to his/her medical coverage, the retiree shall be solely responsible for the added coverage and this amount is not reimbursable by the District.

3. Determination of Service Years for Purposes of Benefit Entitlement

Years of service at Oro Loma is determined by a calculation using the anniversary date of regular full-time employment from which the employee began receiving benefits and assumes that the employee has been in a full-time employment status (2,080 hours per year) during his/her entire tenure with Oro Loma. The total number of service years must be full years of service and there is no provision for partial years.

However, if an employee has reduced his/her work hours at any time during their employment with Oro Loma, through either a paid or unpaid leave of absence, or has/had been granted a schedule modification authorized by the General Manager which allowed a less than full-time work schedule, then total years of Oro Loma service time shall be calculated by commencing with his/her anniversary date of regular employment from which the employee began receiving benefits and shall be pro-rated by defining 2,080 paid hours as equal to one (1) service year.

An employee who works a reduced work schedule of less than 40 hours per week will need more than 52 weeks to achieve the required 2,080 hours per service year. The calculation to determine service credit for those employees in a less than full-time work status shall be done through a pro-ration process to determine total number of service years as follows:

Employee in Less than Full-Time Status - Example of 30 Hours/Week Total number of weeks in a year 52 Multiplied by number of paid hours in a week x 30 Equals total number of paid hours in a year 1,560 Number of hours to equal one service year 2,080 Number of hours worked in 30-hour week - 1,560 Number of additional hours needed 520

Page 142: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

13

In this 30 hrs/week example: Number of additional hours needed 520 Divided by employee’s 30 hrs/wk ÷ 30 Number of additional weeks needed 17.33

Therefore, an employee working 30 hours per week for a twelve-month period will need a total of 69.33 weeks in order to achieve one (1) service year. For example, 52 weeks + 17.33 additional weeks required = 69.33 weeks total required for one service year.

4. Actual Reimbursement of Post-Retirement Medical Expenses

a. Employees enrolled in the Public Employees Medical and Hospital Care Act

(PEMHCA) The reimbursement is generated from the District’s Accounts Payable system, made payable to the Retiree, and mailed to the Retiree by the District on a quarterly basis. This reimbursement includes the mandatory PEMHCA Minimum Employer Contribution, which the District is required to contribute on behalf of active employees, pursuant to its written agreement with CalPERS. The amount that Oro Loma pays directly to CalPERS on behalf of the Retiree is included when calculating the total monthly allowance. As of January 1, 2017, that amount is $128.00 per month. The employer’s mandatory contribution will be adjusted annually by the CalPERS Board of Administration to reflect changes in the medical care component of the Consumer Price Index. Take the example of a married employee who retires and is eligible for 100% medical reimbursement of the Kaiser Bay Area two-party plan rate. Assume that the Kaiser two-party premium is $1,500/month. The District, pursuant to its written agreement with CalPERS, must pay $128.00 per month directly to CalPERS on behalf of the retiree. The remaining $1,372 per month ($1,500.00 - $128.00) is withheld from the employee’s retirement check by CalPERS, and is then reimbursed by the District to the retiree directly, on a quarterly basis. The reimbursement amount will always consist of the difference between the premium amount and the PERS-mandated Minimum Employer Contribution. Consequently, the reimbursement amounts will change when the PERS-mandated Minimum Employer Contributions change.

b. Employees not enrolled in the Public Employees Medical and Hospital Care Act (PEMHCA) For employees for whom Board-approved agreements exist, authorizing reimbursement of post-retirement medical expenses outside of PEMHCA, the reimbursement is generated from the District’s Accounts Payable system, made payable to the Retiree, and mailed to the Retiree by the District on a quarterly basis. The District requires appropriate documentation, acceptable to the District, at least quarterly prior to reimbursing retirees for out-of-pocket costs for which reimbursement is being requested. This reimbursement includes the mandatory PEMHCA Minimum Employer Contribution, which the District is required to contribute on behalf of active employees, pursuant to its written agreement with CalPERS. The Minimum Employer Contribution will be adjusted annually by the CalPERS Board of Administration to reflect changes in the medical care component of the Consumer Price Index.

Page 143: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

14

5. Cash-Back in Lieu of Post-Retirement Medical Coverage A vested retired employee who elects not to receive retiree medical benefits from the District may elect, on an annual basis, to receive a “cash-back” benefit in an amount equal to one-half of the Kaiser rate based on the applicable percentage of which he/she would then otherwise be entitled to if the employee were actually enrolled in a retirement medical plan as defined in Section 2. The retiree may elect to receive cash-back in lieu of post-retirement medical coverage at intervals not less than annually, and after written notification to the District. The written notification shall be submitted to the District no later than October 31st of each year, for an effective date of January 1st the following year. The election period established by the District may be modified from time to time. This provision is intended to reduce costs to the District by incentivizing retirees not to enroll for medical coverage that they do not need.

Take the example or a married employee who retires and is eligible for 80% of the two-party Kaiser Bay Area plan rate. If that same employee elects to receive a cash-back benefit in lieu of post-retirement medical benefits, then the District will reimburse the retiree one-half of the 80% entitlement.

Calculation to determine cash-back in lieu of post-retirement medical coverage:

This sample calculation assumes the example above: The retiree is married at the time of retirement, and is entitled to 80% of the benefit.

Sample Calculation: The 2-party Kaiser Bay Area rate $778.76 Entitlement percentage X 80% Dollar value of benefit $623.01 Reduction % for cash-back in lieu of medical benefits X 50% Cash-Back entitlement $311.50

In the event the retired employee who has elected to receive the cash-back benefit dies, then his/her surviving spouse is entitled to receive the cash-back benefit as outlined herein and further detailed in Section 2. Said entitlement shall cease upon his/her remarriage.

6. Medicare Eligibility Upon reaching Medicare eligibility, the medical reimbursement will be paid at the same percentage as at retirement for the employee’s selected supplemental plan premium for actual costs up to the “applicable Kaiser Bay Area Medicare rate.” The applicable rate will be based on the Kaiser Bay Area Medicare supplemental rate, or if only one spouse is Medicare age eligible, the benefit is blended to include the costs of the Kaiser Bay Area active member and Kaiser Bay Area Medicare supplemental rate. Employees shall not be eligible for reimbursement of Medicare Part B premiums, or for any other payments made to the Social Security Administration.

7. Pre-Retirement Medical Death Benefit

In the event a married employee eligible for a CalPERS retirement and post-retirement benefits under the guidelines of this Plan, dies prior to retiring from the CalPERS Retirement System, said surviving spouse shall be eligible to receive post-retirement medical benefits under the same guidelines and requirements as if the deceased spouse had actually retired on the date of death.

Page 144: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

15

Example #1: If an employee hired before June 30, 2006 dies at age 54, after completing 20 years of service, the surviving spouse or eligible dependent is not eligible to receive post-retirement medical benefits. Example #2: If an employee hired before June 30, 2006 dies at age 57, after completing 17 years of service, the surviving spouse or eligible dependent is eligible to receive 70% of the post-retirement medical benefits.

III. LEAVE A. VACATIONS

During each calendar year, each employee shall earn 7.34 hours of vacation per month of service for the first five years of service. Commencing with the sixth year through the 15th year of service, vacation will be earned at the rate of 10.00 hours of vacation per month of service. Commencing with the 16th year through the 20th year of service, vacation will be earned at the rate of 13.34 hours of vacation per month of service. Commencing with the 21st year of service and thereafter, the employee will earn an additional 0.67 hours of vacation per month of service, through the 25th year of service, for a maximum of 200 hours of vacation per year after 25 years of service.

Length of Service Maximum Annual Vacation Earned (Days or

Hours/Pay Period) 1 through 5 years 11 days or 3.38 hrs/pp 6 through 15 years 15 days or 4.62 hrs/pp 16 through 20 years 20 days or 6.15 hrs/pp Beginning of 21st year 21 days or 6.46 hrs/pp Beginning of 22nd year 22 days or 6.77 hrs/pp Beginning of 23rd year 23 days or 7.08 hrs/pp Beginning of 24th year 24 days or 7.38 hrs/pp Beginning of 25th year and thereafter 25 days or 7.69 hrs/pp

Vacations scheduled by April 30 of each year shall be approved by seniority. Vacations scheduled after April 30 shall be approved on a first come-first served basis (seniority will prevail if more than one request is received on the same day). Supervisory approval, in all circumstances, shall be determined by operational staffing requirements. If the requirements of the District service are such that part or all of an employee's vacation must be deferred beyond a particular calendar year, the employee may take vacation during the following calendar year. Vacation may not be taken until accrued.

B. MAXIMUM ANNUAL VACATION ACCRUAL

In the event an employee does not take all of the vacation to which he/she is entitled in a calendar year, he/she shall be permitted to accumulate the unused portion, provided that at no time shall he/she accrue more than 2½ times his/her annual vacation entitlement. Therefore, if and when accumulated vacation is in excess of that herein provided for, no further accumulation will be earned until the balance falls below the maximum. However, an employee may exceed the 2½ times maximum accrual not more than 12-months prior to his/her effective retirement date. Permission to accrue vacation in excess of 2½ times the annual entitlement may also be amended by the General Manager at any time.

Page 145: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

16

When a legal holiday occurs during an employee's vacation, the holiday shall not be charged as vacation.

Upon the resignation or retirement of an employee, the employee shall, at his/her option, either be granted time off or be paid a lump sum for all authorized accrued vacation.

C. HOLIDAYS

Employees in the Plant Operating Unit are required to work on holidays. When an employee is authorized to work on a holiday, he/she shall receive his regular pay plus one and one-half (1-1/2) times his/her regular hourly rate of pay times the hours worked on the holiday. For timesheet purposes, the hours for the entire shift will be entered for the day on which the shift ends. Example:

a. Operator works from Sunday 18:00 to Monday 06:00, with Monday being a District holiday; the entire shift of 12 hours is entitled to holiday premium pay as described above;

b. Operator works from Monday 18:00 to Tuesday 06:00, with Monday being a District holiday; the entire shift of 12 hours is considered a non-holiday shift and no holiday premium applies.

If a District holiday falls on the operator’s scheduled day off, the operator will receive 8 hours floating holiday credit in his/her leave bank. If a District holiday falls on the operator’s scheduled work day, and the operator:

Works his scheduled: He/she will receive: 8 hours 8 hours base pay, and either

8 hours premium holiday pay (at 1.5xbase pay) or 12 hours compensatory time off

10 hours 10 hours base pay, and either 10 hours premium holiday pay (at 1.5xbase pay)

or 15 hours compensatory time off 12 hours 12 hours base pay, and either

12 hours premium holiday pay (at 1.5xbase pay) or 18 hours compensatory time off

Takes time off from his schedule of: He/she will receive: 8 hours 8 hours holiday pay at base rate 10 hours 8 hours holiday pay at base rate, and

2 hours pay at base rate by using 2 hours accrued time off

12 hours 8 hours holiday pay at base rate, and 4 hours pay at base rate by using 4 hours of

accrued time off

Page 146: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

17

The prescribed holidays are:

New Year's Day January 1 Martin Luther King, Jr. Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Day after Thanksgiving Day Fourth Friday in November Christmas Day December 25

When a holiday falls on a Sunday, the following Monday shall be observed. When a holiday falls on a Saturday, the previous Friday shall be observed.

In addition to the aforementioned holidays, each employee shall have seven floating holidays (56 hours) per calendar year, credited to the employee’s account on the first pay period of each calendar year. A new employee, or an employee who leaves the service of the District, will receive floating holidays during the employee’s year of employment on a pro rata basis (e.g., six (6) months of employment entitles the employee to 3½ holidays (28 hours)). The employee may carry over a maximum of four floating holidays (32 hours) to the next calendar year.

To be eligible for vacation, floating holiday, or compensatory time-off, the employee shall submit a written request to their supervisor as soon as possible prior to the scheduling of said leave, but no less than 14 days prior to the beginning of the time off. Further, leave will be granted only when there is an acceptable staffing level and without the payment of overtime to another employee.

Tardiness: Employees late for work will be required to use vacation, floating holiday, or comp time off, at a minimum of 15-minute increments, to the next highest 15-minute period. Excessive tardiness will be subject to disciplinary action.

D. SICK LEAVE Every employee shall be entitled to receive eight (8) hours of sick leave with pay for each full calendar month of regular employment in which the employee was in a pay status 160 straight-time hours or more. Sick leave may be used during probation, and employees shall earn sick leave credit from their first day of employment. Per Labor Code Sections 233-234 and 246.5, employees shall be allowed unrestricted use of up to 48 hours accrued sick leave per calendar year.

Sick leave may be taken for:

1. An employee’s illness or injury. Satisfactory proof of the necessity for sick leave usage shall

be furnished by the employee for each occurrence after the employee has used a total of 48 hours of sick leave during the current calendar year, in the form of a licensed health care practitioner’s certificate, certifying that the employee was examined and was found to be unable to perform his/her regular duties. The General Manager, or his/her designee, may, at his/her sole discretion and at District expense, require an additional examination from a doctor selected by the District, which evaluates the employee’s ability to perform his/her regular duties.

2. An employee’s dental, eye or other physical or medical examination or treatment by a

licensed practitioner. Leaves for this purpose are limited to four (4) hours in any one (1)

Page 147: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

18

working day. Satisfactory proof of necessity for sick leave usage shall be furnished by the employee for each occurrence after the employee has used a total of 48 hours of sick leave during the current calendar year.

3. Providing necessary care for an ill or injured spouse, registered domestic partner, parent,

step-parent, child or stepchild of the employee. Satisfactory proof of necessity for sick leave usage shall be furnished by the employee for each occurrence after the employee has used a total of 48 hours of sick leave during the current calendar year.

4. Bereavement Leave. Leave for this purpose shall be governed by the following parameters: a. Death of a spouse, registered domestic partner, child or stepchild - Usage of up to 40 hours of

sick leave; or b. Death in the immediate family - Usage of up to 30 hours of sick leave. c. In the event of extenuating circumstances, the employee may request the use of up to 20

additional hours of sick leave from the General Manager. The hours of bereavement leave used shall not affect the employee’s eligibility for quarterly sick leave award.

Unused sick leave can be accrued to an unlimited extent.

The District takes note of the State and Federal laws regarding Family Medical Leaves.

For the purposes of this policy, any reference to “doctor” shall include any licensed health care practitioner providing services to the employee.

For the purposes hereof, “immediate family” is intended to include only the following family members: parents, siblings, grandparents, grandchildren, mother-in-law, or father-in-law of the employee, and “working day” shall be any day on which the employee is assigned to work.

E. WORKERS’ COMPENSATION

In industrial injury cases, Workers’ Compensation benefits and sick benefit allowances shall be paid separately, but in the event Workers’ Compensation payments cover all or part of the period during which sick benefit allowances are paid, the sum of the two (2) shall not exceed the sick benefit payable for said period, and the unused portion of accumulated sick leave will continue to be credited to the employee. Integration of sick leave benefits with Workers’ Compensation payments is to be automatic. The Employer may not waive integration, and any employee entitled to Workers’ Compensation payments must apply therefore (in order that the principle of integration may be applied) before sick benefits are payable. The District will compensate the employee in full during the initial three (3) day waiting period for an industrial injury, and such compensation will not be charged to the employee’s sick leave. Benefits will continue to be paid by the District only until the employee exhausts his/her sick leave, except as provided by the Family Medical Leave Act.

F. LIMITED-DUTY POLICY

The District reserves the right to assign employees modified work assignments for injuries or illnesses or job related injuries/illnesses after receipt of adequate medical information regarding the employee’s physical limitations. It is mandatory for employees with extended injuries/ illnesses, or job related injuries/illnesses, who have been released by their own treating physician and/or the District’s doctor, to perform assigned work within the parameters set by the medical provider.

Page 148: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

19

1) Limited-duty assignments will be considered for job-connected injuries/illnesses on a priority

basis. 2) Only if there is sufficient work will employees using extended sick leave for non-job-related

injuries/illnesses be considered for limited duty (per their physical limitations).

Prior to returning to full duty, the employee will be required to obtain an unconditional release from his/her or the District’s doctor.

G. MILITARY LEAVE

Military leave shall be granted in accordance with the provisions of State law. All employees entitled to military leave shall give the District an opportunity within the limits of military regulations to determine when such leave shall be taken. Military employees shall assign to the District all military compensation received by the employee, which was earned while on paid military leave from the District.

H. JURY LEAVE

Every employee who is called or required to serve as a trial juror, or as a witness in a civil or criminal action to which he/she is not a party, shall inform his/her supervisor, Department Head or the General Manager as soon as the employee has been notified. While on jury duty (or serving as a witness), he/she shall be entitled to be absent from his/her duties with the District during the period requiring the employee to necessarily be present at the courthouse as a result of such call. Under such circumstances, the employee shall be paid his/her full salary, and the payment received by him/her for services, including travel and meal allowance for jury duty or court witness duty, will be retained by the employee.

I. LEAVE OF ABSENCE WITHOUT PAY

Upon the written request of an employee, the General Manager may approve, at his/her sole discretion, in writing, a leave of absence without pay for a period not to exceed six (6) months. Such leave may, by mutual agreement between the employee and the General Manager, be extended up to an additional six (6) months.

IV. HOURS OF WORK, REST PERIODS A. HOURS OF WORK

All full-time employees in the Plant Operating Unit will be required to work a forty (40) hour work week within a seven (7) day work period, with a designated paid meal period of no less than 30 minutes, commencing midnight Sunday. A regular workweek is defined as Monday 00:00 through Sunday 24:00. Absent any extraordinary circumstances, an employee will not be required to work more than 16 hours in a row. The District has the right to make reasonable changes in employee’s work hours after meeting with the Local 39 Representative(s). However, in extenuating circumstances, and on a defined short-term temporary basis only, an employee may request, in writing, that his/her hours and/or days of work be adjusted to accommodate an employee’s need for special time off. The Department Head may, in his/her sole discretion, grant such a request based on the recommendation of a supervisor which asserts that such a request is not in conflict with the needs of the District. If an employee’s request is approved, the modified work hours or workdays shall not be subject to overtime pay. It shall also be the supervisor’s privilege to discontinue this adjusted

Page 149: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

20

work schedule for any employee if it is determined to be incompatible with the conduct of District business. The District reserves the right to discontinue the availability of this provision in its sole discretion at any time.

B. REST PERIODS

There shall be two paid 15-minute rest periods per shift, each approximately midway in each half of the shift, according to work requirements. Work shall not cease prior to the 15-minute rest period. When rest periods cannot reasonably be taken because of work requirements, employees requested by their supervisor to work an entire half shift without a rest period as provided by this subsection shall be credited with one half (½) hour of straight time in the employee’s “Comp Time Earned” leave bank.

C. CLEANUP TIME

Each employee shall be given up to 10 minutes per day, prior to end of any assigned shift, during which to clean up, provided that the relief operator is available to replace the employee who wishes to clean up. Cleanup shall be scheduled according to work requirements. Work shall not cease prior to the 10-minute clean-up period. The employee may leave the premises when cleanup is completed, and the relief operator is on the premises. Example: Operator A is to be relieved from shift by Operator B. Operator A is allowed to cease work and clean up 10 minutes prior to the end of the shift only when Operator B is on the premises and ready to replace Operator A.

V. SAFETY A. UNIFORMS, SHOES, PRESCRIPTION SAFETY GLASSES

Employees shall be provided with uniforms consisting of shirt or laboratory smock, trousers or coveralls at no cost. Protective clothing such as rubber or leather gloves, rain gear and eye shields shall be provided where required. The employee shall, as a condition of employment, wear safety shoes.

The District shall reimburse an employee, on a calendar year basis, $200 for safety shoes. The shoe allowance will be placed in a revolving account where no more than two years’ worth of shoe allowance can be maintained. There will be no limit to the number of pairs of safety shoes an employee purchases, as long as the revolving account always maintains a positive balance. Reimbursement is limited to the employee’s shoe account balance. The shoe allowance will be credited to the employee’s account on January 1st of each year, and the reimbursement will be processed through the District’s payroll system.

The District shall reimburse an employee up to $350 per calendar year for prescription safety glasses. Proof of purchase shall be required for reimbursement, as well as a doctor’s note indicating the need for the employee to purchase prescription safety glasses. No uniforms or protective wear shall be removed from the premises. Uniforms will be inventoried on an annual basis.

Page 150: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

21

B. SAFETY COMMITTEE Local 39 shall appoint one representative to the District Safety Committee, who will participate in Safety Committee meetings and inspections related to District safety conditions. The Local 39 safety representative shall suffer no loss in pay as a result of his/her safety activities.

No employee shall be expected, nor shall any employee be permitted, to perform work in an area or manner deemed to be unsafe according to the standards established by the Industrial Safety Commission of the State of California.

VI. DISCIPLINE, GRIEVANCE AND APPEAL PROCEDURE A. DISCHARGE AND DISCIPLINE

Right of Discharge and Discipline: The District shall have the right to discipline and/or discharge any employee for the following: fraud, misrepresentation of fact, or concealment in securing appointment; incompetence and/or inefficiency (i.e., failure to skillfully perform job functions); inexcusable neglect of duty; insubordination, including improper conduct towards a supervisor, or refusal to perform tasks assigned by a supervisor in the appropriate manner; dishonesty; possession, distribution, sale, use or being under the influence of alcoholic beverages or illegal drugs while on District property, while on duty, or while operating a vehicle on District business; unauthorized, unjustified, or excessive absence, repeated tardiness; disobedience of District safety rules, regulations, policies, practices, house rules and procedures, including the wearing of safety equipment as directed; any such action which indicates a lack of concern for self or others; misuse, destruction, or damage of property issued by the District, another employee, or a visitor; violation of District personnel policies and rules; any other failure of good behavior or acts during duty hours, which are incompatible with public service; failure to maintain a valid California driver’s license and a good driving record; theft or unauthorized removal or possession of property from the District, other employee(s), or someone else; actual or threatened physical violence toward another employee; possession or use of dangerous or unauthorized materials, such as explosives, firearms, or similar items, while on District property, while on duty, or while operating a District vehicle; harassment of another employee. Discharge or discipline of an employee shall not be in derogation of the Memorandum of Understanding, or for violating or ordering the violation of the Memorandum of Understanding.

A probationary employee’s employment may be terminated for any reason, which, in the sole opinion of the District, is just and sufficient, and such termination shall not be subject to any appeal provided, however, that there shall be no discrimination against any employee as provided in section VII. Should any employee discharged during the probationary period believe himself or herself to have been subjected to such discrimination, the employee shall have the right to appeal his or her discharge.

An employee’s request for Local 39 representation at all meetings and hearings related to his/her disciplinary action or discharge will be granted.

B. GRIEVANCE PROCEDURE

A grievance shall be defined as any dispute, which involves the interpretation or application of any provision of this Memorandum of Understanding.

Grievances as defined above shall be processed only in the following manner:

Page 151: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

22

Step 1: The employee and/or his/her representative shall present the grievance in writing to the immediate supervisor within 30 calendar days of when a reasonable person knew or should have known of the events on which the grievance is based.

Step 2: If the grievance is not resolved within five (5) working days of the presentation under Step 1 above, the grievance shall be submitted in writing to the Department Head. Such submittal to the Department Head shall be within five (5) working days of the action by the supervisor. The Department Head shall respond within five (5) working days.

Step 3: If the Department Head cannot resolve the grievance, the employee and/or his/her representative may, within five (5) working days of the action by the Department Head, arrange a meeting with the General Manager.

Step 4: The General Manager shall respond in writing within five (5) working days after the meeting. If the matter remains unresolved, it may be submitted by the Local 39 Representative(s), or in the case of a grievance filed by the District, to an impartial arbitrator selected by mutual agreement between the parties. If the parties cannot agree on an arbitrator, the arbitrator shall be selected from a list of names in odd numbers of no less than five (5) furnished by the American Arbitration Association by each party alternately striking one name until a single name remains. The Arbitration/Selection process must begin within 30 days following the General Manager’s written response.

The fees and expenses of the arbitrator and of a court reporter shall be shared equally by Local 39 and the District. Each party, however, shall bear the cost of its own presentation, including preparation and post hearing briefs, if any.

Decisions of arbitrators on matters properly before them shall be final and binding on the parties hereto.

No arbitrator shall entertain, hear, decide or make recommendations on any dispute involving a position over which a recognized employee organization has jurisdiction unless such dispute falls within the definition of a grievance as herein above set forth.

Proposals to add to or change this Memorandum of Understanding, or written agreements or addenda supplementary hereto, shall not be arbitrable, and no proposal to modify, amend or terminate this Memorandum of Understanding, nor any matter or subject arising out of or in connection with such proposal, may be referred for arbitration under this Section. The arbitrator shall not have the power to amend or modify this Memorandum of Understanding, or written agreements or addenda supplementary hereto, or to establish any new terms or conditions of employment.

Parties who may have direct knowledge of circumstances relating to the grievance may be present at the request of either party during any stage of the grievance procedure.

C. NO STRIKE-NO LOCKOUT

During the term of this Memorandum of Understanding, Local 39 will not engage in any strike, slowdown, or other work stoppage arising out of any dispute relating to the terms and conditions hereof, except that its members shall not be required to cross bona fide picket lines sanctioned by the

Page 152: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

23

Central Labor Council, provided that after due notice, District employees and Local 39 members may cross picket lines to reach District facilities not involved in the primary dispute.

During the term of this Memorandum of Understanding, the District will not lock out any employee.

D. LAYOFFS/SEVERANCE PLAN

Within the classification subject to layoff, the order of layoff shall be in reverse seniority. 1. Under the Oro Loma Sanitary District Severance Plan, each eligible employee being terminated

from his/her employment, due to lack of work or funds by the District, would receive not less than twenty-one (21) calendar days’ notice. If such employee accepts other employment prior to termination, the terms of this severance package will not apply. Employee “bumping” rights are more specifically outlined in the District’s Personnel Rules.

2. Each eligible employee employed by the District on or after December 4, 2001, and terminated

by the District due to lack of work or funds by the District, would receive the sum of one (1) week’s salary for every year of service (prorated to the nearest month), but in no case less than three (3) weeks salary. Severance packages may, however, be enhanced to add an additional week per year for each of the first three years of service to Oro Loma, at the discretion of the District.

However, each eligible employee employed by the District prior to December 4, 2001, and terminated by the District due to lack of work or funds by the District would receive the sum of one (1) week’s salary for every year of service (prorated to the nearest month), but in no case less than six (6) weeks salary.

3. Eligible employees are defined as permanent, full-time employees. The severance package does

not apply to employees on probation, temporary or part-time employees. The severance package also would not be available to employees who have submitted resignation or retirement papers prior to receiving a notification of layoff or bumping rights.

4. In addition to the salary provisions, the employee would receive payment for 50 percent of

his/her sick leave accrued at the time of layoff. 5. Employees terminated through layoff will be eligible for State Unemployment Insurance, as well

as receiving the benefits of this severance package. Employees selecting to terminate their employment may not be eligible to collect Unemployment Insurance upon resignation from District employment. The State Employment Development Department will decide such cases on an individual basis, and the determination of eligibility will be made by that agency.

6. The District would pay the employee's COBRA benefits for a period not to exceed three (3)

months. 7. The District’s General Manager will have authority to approve final separation dates and may, in

his/her sole discretion, amend separation dates as needed to avoid undue hardship to District operations.

8. Those employees who are eligible for this severance plan will be notified by the Administrative

Services representative.

Page 153: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

24

9. An employee who has given satisfactory service, and who is laid off, shall be eligible for preferential re-employment in the same or other positions which require basically the same qualifications, and involve basically the same duties and responsibilities as the position from which the employee is laid off. This preferential re-employment list for employees hired after December 4, 2001 shall be in effect for a period of six (6) months, and twelve (12) months for those employees hired prior to December 4, 2001.

10. The Severance Plan outlined above is subject to discontinuance by the Board of Directors at any

time. VII. MISCELLANEOUS A. SEPARABILITY

Should any provision of this Memorandum of Understanding be declared illegal by a court of competent jurisdiction, that provision of the Memorandum of Understanding shall be null and void, but such nullification shall not affect any other provision of this Memorandum of Understanding, all of which other provisions shall remain in full force and effect. That portion declared illegal shall be renegotiated so as to conform, as nearly as possible, to the original intent of the parties.

B. NO DISCRIMINATION

There shall be no discrimination of any kind because of race, creed, color, national origin, sex, sexual orientation, disability, or Local 39 activities against any employee or applicant for employment by the District, or by anyone employed by the District; and to the extent prohibited by applicable State and Federal law, there shall be no discrimination because of age.

C. RETIREMENT SYSTEM

1. The retirement plan between the District and California Public Employees’ Retirement System (CalPERS) provides for the “2.5% @ age 55” retirement formula for all eligible employees hired prior to November 14, 2011. The final compensation for the purposes of determining the retirement allowance shall be based on the monthly average of the highest 12-month period, as calculated by CalPERS. These employees shall begin contributing to the California Public Employees’ Retirement System (CalPERS) a portion of the employee contribution rate established by law. The District shall deduct from the employee’s salary, each pay period, the employee contribution, and shall submit said amount to CalPERS as “tax-deferred member-paid contribution.” . The employee contribution shall be adjusted each year for the duration of this MOU, on the date of the annual CPI adjustment provided for in Section I.A., as follows:

a. Effective June 20, 2016 – employee contribution of 0.5% of base salary; b. Effective June 19, 2017 – employee contribution of 1.0% of base salary; c. Effective June 18, 2018 – employee contribution of 1.5% of base salary; d. Effective June 17, 2019 – employee contribution of 2.0% of base salary; e. Effective June 15, 2020 – employee contribution of 2.5% of base salary.

Employee contributions shall not exceed 8.0% at any time. The District shall continue to pay the difference between the CalPERS-mandated 8% employee contribution, which is part of the employee’s benefit package, and the percentage paid by the employee.

Page 154: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

25

District contributions made pursuant to this section shall be reported to CalPERS as “employee contributions made by the contracting agency.” The District will not treat these contributions as “compensation subject to income tax withholding” unless the Internal Revenue Service or Franchise Tax Board determines that such contributions are taxable income subject to withholding. In the event the contribution made to CalPERS by the District on behalf of the employee is ever found to be illegal, the District will meet and confer with the Local 39 Representative(s) regarding how the District’s employee CalPERS contribution is to be allocated.

Each employee is solely and personally responsible for any federal, state or local tax liability of the employee that may arise out of the implementation of this section or any penalty that may be imposed therefore.

The aforesaid District contribution shall be considered solely for the purpose herein and shall not be considered for any other purpose, including but not limited to being considered as part of any employee’s salary for the purpose of computing straight-time earnings, compensation for assignment differentials, compensation for computing Workers’ Compensation benefits and the District’s contribution to CalPERS. The District reserves the right to take said contributions into account for the purpose of salary comparisons with other employers.

2. Eligible employees hired after November 14, 2011 and before January 1, 2013, shall be entitled to the CalPERS retirement benefits afforded by the “2% @ age 60” formula (Classic). The final compensation for the purposes of determining the retirement allowance shall be based on the monthly average of the highest 36-month period, as calculated by CalPERS. The District shall deduct from the employee’s salary, each pay period, an amount equal to the CalPERS employee contribution (7%), and shall submit said amount to CalPERS as “tax-deferred member-paid contribution.” The District will not treat these contributions as “compensation subject to income tax withholding” unless the Internal Revenue Service or Franchise Tax Board determines that such contributions are taxable income subject to withholding. In the event the contribution made to CalPERS by the District on behalf of the employee is ever found to be illegal, the District will meet and confer with the Local 39 Representative(s) regarding how the District’s employee CalPERS contribution is to be allocated.

Each employee is solely and personally responsible for any federal, state or local tax liability of the employee that may arise out of the implementation of this section or any penalty that may be imposed therefore.

The aforesaid employee contribution shall be considered part of an employee’s salary for the

purpose of computing straight-time earnings, compensation for assignment differentials, and compensation for computing Workers’ Compensation benefits. The District shall also take said contributions into account for the purpose of salary comparisons with other employers.

3. Eligible employees hired on or after January 1, 2013 shall be entitled to the CalPERS retirement

benefits afforded by the “2% @ age 62” formula as required by the Public Employees’ Pension Reform Act (PEPRA). The final compensation for the purposes of determining the retirement allowance shall be based on the monthly average of the highest 36-month period, as calculated by CalPERS. “New members” shall be subject to the contribution requirements in Section 7522.30(a) and (c) of the PEPRA. As such, “new members” shall pay at least 50% of the normal cost of their pension benefit and the District shall not pay any of the required contributions for “new members.” As of the date of adoption of the MOU, the new member employee contribution is 6.5%. The District shall deduct from the employee’s salary, each pay period, an amount equal to the CalPERS

Page 155: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

26

employee contribution (currently 6.5%), and shall submit said amount to CalPERS as “tax-deferred member-paid contribution.” The District will not treat these contributions as “compensation subject to income tax withholding” unless the Internal Revenue Service or Franchise Tax Board determines that such contributions are taxable income subject to withholding. In the event the contribution made to CalPERS by the District on behalf of the employee is ever found to be illegal, the District will meet and confer with the Local 39 Representative(s) regarding how the District’s employee CalPERS contribution is to be allocated.

Each employee is solely and personally responsible for any federal, state or local tax liability of the employee that may arise out of the implementation of this section or any penalty that may be imposed therefore.

The aforesaid employee contribution could be changed in the future by the CalPERS Board of

Administration. The employee contribution shall be considered part of an employee’s salary for the purpose of computing straight-time earnings, compensation for assignment differentials, and compensation for computing Workers’ Compensation benefits. The District shall also take said contributions into account for the purpose of salary comparisons with other employers.

D. PAST PRACTICES

This Memorandum of Understanding does not guarantee continuance of working conditions, benefits, and practices not specifically authorized by ordinance or by resolution of the Board of Directors.

E. JOB DESCRIPTIONS AND ANNOUNCEMENTS 1. Job Descriptions: Copies of the job descriptions for each classification within this unit shall be

posted on the bulletin boards in the area involved in the jobs described. Modifications and changes will be subject to consultation prior to adoption.

2. Job Announcements: All District job announcements shall be posted on the bulletin boards at

least ten (10) calendar days prior to the filing deadline. 3. Employees on a probationary period employment status shall not be eligible to participate in

District promotions or job classification changes. This restriction may be waived by the General Manager if, in his/her sole opinion, such waiver is warranted.

F. EMPLOYEE QUALIFICATION IMPROVEMENT PROGRAM

An employee who fails to meet the qualifications for a promotional position, or wishes to enhance job skills, may avail him or herself of the program described below to improve his or her qualifications.

For employees who wish to improve their knowledge and qualifications, the District will reimburse the employee up to $1,500 per calendar year for meetings and courses which are approved by the District, and after evidence of successful completion of the course work with a grade of “C” or above. All District paid books, equipment and/or reference materials become the property of the District.

The District shall post on all bulletin boards all job related educational and training opportunities it becomes aware of.

Page 156: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

27

Upon request, the District will provide an employee the minimum qualifications necessary to be eligible for a promotional opportunity. An employee who does not meet the minimum qualifications will be advised as to what qualification the employee has not met.

All reimbursements are subject to Internal Revenue Service regulations, and will be reported in accordance with appropriate IRS rules. Reimbursements will be made through the District’s payroll system, after submittal of a reimbursement request, with appropriate receipts attached, and approved by the employee’s supervisor/ Department Head. Reimbursements will be processed on regularly scheduled payroll processing dates.

G. STATE DISABILITY INSURANCE

The District shall maintain a contract with the State of California to provide for the State Disability Insurance Plan for employees covered by this Memorandum of Understanding. State Disability Insurance is a plan solely funded by employee contributions, and there shall be no contributions by the District toward State Disability Insurance.

In disability cases arising outside the course of the employee’s employment, State Disability Insurance benefits and sick benefit allowances shall be paid separately; but in the event State Disability Insurance payments cover all or part of the period during which sick benefit allowances are paid, the sum of the two (2) shall not exceed the sick benefit payable for said period, and the unused portion of accumulated sick leave will continue to be credited to the employee. Integration of sick leave benefits with State Disability Insurance payments is to be automatic. The Employer may not waive integration, and any employee entitled to State Disability Insurance payments must apply for such payments. Benefits will continue to be paid by the District only until the employee exhausts his/her sick leave.

H. DEFERRED COMPENSATION

The District will contribute 0.32% of the employee’s gross salary into each Local 39 member’s 457 Deferred Compensation Plan, of which the employee must match. In addition to this amount, the District will contribute $0.50 for each $1.00 voluntarily contributed by the employee to his/her 457 Deferred Compensation account, up to a maximum additional District contribution of $750 per calendar year, per employee. In years one and five of this Contract, said District contribution shall be prorated to compensate for the six-month calendar period.

I. TRAFFIC MANAGEMENT EXPOSURE PAY

Infrequently, Plant Operating Unit members are temporarily relieved from their normal duties as Plant Operators I or II, and required to perform or assist others in performing special duties. In some cases, these duties require said members to work within, direct and modify the flow of vehicle traffic. Said members shall be eligible for traffic management exposure pay when performing these duties. Said compensation shall be approved in advance by his/her supervisor and paid at a rate of $2.50 per hour for those hours in which the Local 39 member is performing the work as described herein.

J. OTHER

Meals, mileage, per diem and other taxable District payments shall be payable on the regular paycheck pursuant to Internal Revenue Service regulations, and to the extent applicable, will appear on the employee’s W-2 form.

Page 157: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

28

The District will pay for all District approved immunizations or flu shots of the employees, and an employee will be granted up to two (2) hours paid release time to be immunized.

K. MEET AND CONFER 1. Scope:

The District, through its representatives, shall meet and confer in good faith with representatives of Local 39 regarding matters within the scope of representation including wages, hours and other terms and conditions of employment within the bargaining unit.

2. Consultation in Good Faith:

All matters affecting employer-employee relations, including those that are not subject to meeting and conferring, are subject to consultation. The District, through its representatives, shall consult in good faith with representatives of Local 39 on employer-employee relations matters that affect them. Within 45 days from the date the Sanitary Board ratifies this MOU, a Labor-Management Committee shall be convened for the purpose of addressing the following issues: 1) reinstatement of the overtime call list for the Local 39 employees; 2) inviting all Local 39 employees to attend relevant operational meetings called by management; and 3) other issues that may come up from time to time.

3. Advance Notice: Except in cases of emergency as provided in this Section, the District shall give reasonable written notice to the Local 39 Representative(s) of any ordinance, rule, resolution or regulation directly relating to matters within the scope of representation, including matters subject to consultation, proposed to be adopted by the District, and shall give the Local 39 Representative(s) the opportunity to meet with the District.

VIII. DURATION

This Memorandum of Understanding shall cover the period June 20, 2016 through June 27, 2021, provided that, by mutual agreement, it shall continue to operate after June 27, 2021, and until a new Memorandum of Understanding shall have been entered into by the parties hereto.

IX. RECIPROCITY

In the event any other bargaining unit at Oro Loma negotiates, in the aggregate, benefits, wages and/or working conditions other than those provided above, a representative from Local 39 will be afforded the opportunity to meet and confer with the District to receive said adjustments for the Unit as well. Reciprocity shall apply to employment terms common across bargaining units (e.g. CPI adjustments, Health & Welfare benefits, leaves, retirement system, deferred compensation), and shall not apply to provisions specific to the work of each bargaining unit (e.g. shift differential, emergency response standby pay, hours of work, after-hours emergency response pay). This provision shall terminate when all represented District labor contracts have been accepted and adopted by the Board. However, the termination of this reciprocity clause shall not apply to future salary negotiations that may result solely from the minimum and maximum CPI salary indicators as outlined in Section I.A, paragraph two. In addition, and provided that all represented District labor

Page 158: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

29

contracts contain the same beginning and ending dates, this reciprocity clause contained herein shall be included in future Local 39 Memoranda of Understandings.

Dated: June 20, 2016 STATIONARY ENGINEERS LOCAL 39 ORO LOMA SANITARY DISTRICT ____________________________________ _________________________________ By: s/ Jerry Kalmar, Business Manager – Secretary By: Jason Warner, General Manager ____________________________________ _________________________________ By: s/ Tony DeMarco, President By: Andreea Simion, Administrative

Services Manager ____________________________________ By: s/ Steve Crouch, Director of Public Employees _________________________________ By: Austris Rungis, Chief Spokesperson ____________________________________ By: s/ Richard J. Putz, Business Representative ____________________________________ By: s/ Scott Beckman, Steward ____________________________________ By: s/ Chad McCarthy, Steward

Page 159: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

30

Exhibit A

Classifications in Stationary Engineers Local 39 Plant Operating Unit

Plant Operator I Plant Operator II

Monthly* Salary Schedule

Effective June 20, 2016

Range Classification A B C D E F G

POPI Plant Operator I 5556 5833 6125 6431 6753 7090 7445

POII Plant Operator II 6667 7000 7350 7718 8103 8509 8934

Note: The salaries include 7.30% market adjustment for Plant Operator II, 1.45% internal equity adjustment for Plant Operator I, and a 2.6% CPI increase for both, as described in Section I.A. of this MOU. * = Future salary adjustments will be processed annually in accordance with Section I.A of this MOU.

Page 160: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

AGENDA ITEM NO: 15 AGENDA DATE: 10/18/16 Memorandum of Understanding Between Save The Bay and Oro Loma Sanitary District Regarding Partnership to Site a Native Plant Nursery on Oro Loma Sanitary District Property W ritten by: J. Warner

BACKGROUND: Following the successful planting of the Horizontal Levee Demonstration, Save The Bay inquired about the possibility of extending the existing nursery operation into the future. Our facility provides Save The Bay security and a sustainable irrigation water source. The partnership offers Oro Loma an enhanced treatment plant tour, increased exposure to local volunteer groups, and positive social media exposure from Save The Bay’s postings from the site. As proposed, Save The Bay will continue to have access to the existing nursery site, and is required to keep it in good condition. The District will have access to the site for public outreach activities. Save The Bay will design displays describing the nursery, how it was used to support the Horizontal Levee Project, and the role native plants play in improving the quality of the San Francisco Bay. Since its first introduction, the Board and Operations Committee have provided significant input to improve the MOU’s approach to site access, security, and safety. Staff worked with Save The Bay to incorporate the suggested improvements (see highlighted section in the attached). The improvements include limiting the group size, limiting the hours of access, specifically noting the District’s right to cancel a planned event, requiring the names and contact information for participants, and adding site rules to the planned signage. More recently, the Operations Committee asked that the agreement include a two-year duration, so staff could review the impacts of the agreement before extending it further. District legal counsel has read and approved the draft agreement presented for Board consideration and approval. RECOMMENDATION: The Board will be asked to authorize the General Manager to execute the

Memorandum of Understanding between Save The Bay and Oro Loma Sanitary District

ATTACHMENT: Memorandum of Understanding: Between Save The Bay and Oro Loma

Sanitary District Regarding Partnership to Site a Native Plant Nursery on Oro Loma Sanitary District Property

Page 161: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

1

MEMORANDUM OF UNDERSTANDING

Between Save The Bay and Oro Loma Sanitary District Regarding Use of and Access to Property at Oro Loma Sanitary District

This Memorandum of Understanding (“MOU”) is entered into by Save The Bay, a California non-profit organization, 1330 Broadway, Suite 1800, Oakland CA 94612 and Oro Loma Sanitary District (“OLSD”), 2655 Grant Avenue, San Lorenzo, CA 94580.

1. BACKGROUND Save The Bay established a temporary nursery facility on the premises of OLSD in collaboration with OLSD for the purpose of propagating approximately 70,000 plants for the Oro Loma Horizontal Levee project. Save The Bay provided the wooden structures for the nursery beds, the soil, and the plants. OLSD provided a gravel base layer for the nursery, irrigation piping and water, and ongoing support to ensure the project’s success. While most of the plants needed for the Horizontal Levee project have been provided, there are still a large number of remaining plants in the nursery beds that could serve as additional nursery stock for the Horizontal Levee project when needed, for other OLSD projects, and/or for other restoration projects throughout San Francisco Bay in the coming years. OLSD welcomes the opportunity to educate more members of the public about its activities. The beds will provide an interactive exhibit for OLSD plant tours and will also allow for identification of plant species in the Horizontal Levee project. OLSD and Save The Bay have developed a strong partnership and share a mutual interest in maintaining the water quality in the Bay and in restoring the habitat surrounding it. 2. PURPOSE This MOU establishes the terms and understanding between Save The Bay and OLSD for Save The Bay to continue to access the temporary nursery facility and to conduct nursery propagation activities on OLSD property, in exchange for the District’s ability to use the plants when necessary, and to use the facility as an educational exhibit during community plant tours. 3. SCOPE OF ACTIVITIES This MOU does not represent a commitment of funds between Oro Loma Sanitary District and Save The Bay. Save The Bay and OLSD mutually agree to the following activities as part of this MOU. a) Nursery Propagation and Maintenance Activities

Page 162: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

2

With the approval of this MOU by OLSD and in accordance with the conditions described herein, Save The Bay will continue to use the nursery facility to propagate plants. The nursery facility will not expand beyond its original footprint at any time without the express written permission of OLSD. Activities to support plant propagation include nursery bed maintenance, importing soil to maintain the bed elevations, weed removal, and irrigation. Any additional proposed activities must be approved in writing. Save The Bay will continue to have access to OLSD irrigation as part of this MOU; however Save The Bay will manage the maintenance of the piping within 50 feet of the nursery beds and will be responsible for maintaining the drip system and the sprinkler heads or other equipment within this area that is necessary for nursery operations. Save The Bay will maintain the nursery facility in good condition; this includes the wooden beds and irrigation structures and also includes maintaining a neat and tidy area around the beds. The area in and around the nursery beds must be kept clean and in good repair by Save The Bay staff. All minor repairs to the beds will be made within two weeks after necessary repairs are identified. In order to allay any concerns about mosquitos, Save The Bay will ensure that water will not remain standing for more than 24 hours. Any materials used by Save The Bay that need to be kept on site for nursery propagation and maintenance, and for volunteer programs will be stored in a mutually agreeable location. b) Volunteer Programs Save The Bay will continue to run occasional volunteer programs to help with plant propagation and nursery bed maintenance as well as occasional weed control at the Oro Loma site in the near future. All Save The Bay employees and volunteers and other participating individuals (including members of the press, regulatory personnel, and others interested in the work) agree to abide by any Site Guidelines of OLSD, which may be updated at any time upon notice by OLSD. Save The Bay staff and volunteers will provide a roster of attendees or sign in individually with the OLSD office before entering the property. The roster or sign-in information shall include the names of the participant and method of emergency contact while on site. Site access shall be limited to 7AM to 5PM. Save the Bay shall limit the number of attendees to 15 for efforts open to the public, and 20 for groups whose members are from a single organization. OLSD staff will be notified by email a minimum of 72 hours in advance of any group greater than 8 people and retains the right to cancel the event if needed to facilitate plant operations. c) Signs/Publicity Save The Bay will not itself post any permanent signage anywhere on OLSD property. However, Save The Bay will collaborate with OLSD to develop content for a permanent sign(s) to be located at the nursery facility. Save The Bay will provide content and graphic design for the permanent signage and OLSD will pay for the costs to construct and install any signage. In addition to educational content, the permanent signage shall also include a list of Site Guidelines.

Page 163: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

3

These shall include, but not be limited to ‘What to do in an Emergency’, a requirement to stay with a Save The Bay staff person, responsibility for safety, warnings about potential hazards in other areas of the site, and a requirement to wear a high visibility vest. Save The Bay staff will continue to provide temporary signage to remain at the individual plant beds to identify the plants for visitors and OLSD staff. Save The Bay will post temporary signs at the entrance to OLSD for volunteer events and these must be removed at the end of each program. Volunteer events held at the OLSD site will be publicized on Save The Bay’s volunteer website so that members of OLSD and Castro Valley Sanitary District communities can sign up for public programs if they are interested. 4. INSPECTION The nursery facility will be subject to inspection by OLSD staff at any time. 5. INDEMNIFICATION Save The Bay will protect, defend, indemnify and hold harmless OLSD, its elected and appointed officials, officers, employees and representatives, from any and all demands, claims, damage, loss or liability of any nature, including death or injury to persons or damage to property, caused by or arising out of Save The Bay’s activities or Save The Bay’s use of OLSD property, premises or facilities, unless injury or damage is cause by the sole negligence or the intentional and willful misconduct of OLSD, its officer, agents, or employees. Save The Bay staff will continue to ensure that each volunteer fills out a waiver before participating in any Save The Bay activity on OLSD property. 6. INSURANCE Save The Bay must procure and keep in force during the term of this MOU, at Save The Bay’s own cost and expense, the following policies of insurance with companies licensed to do business in the State of California, which are rated at least “A” or better by A.M. Best Company. Save The Bay will, within 15 days of executing this MOU and prior to the termination of any policy, supply OLSD with a certificate acceptable to OLSD showing that such insurance is in force.

a. General Liability and Bodily Injury Insurance. Save The Bay is to maintain a commercial general liability insurance policy in the amount of One Million Dollars ($1,000,000) per occurrence basis, combined limit for bodily injury and property damage and provide that OLSD, its officers, employees, and agents are named as additional insured under the policy.

Page 164: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

4

b. Automobile Liability. Automobile liability insurance must be maintained in the minimum amount required by the State of California.

c. Workers’ Compensation. Workers’ Compensation insurance as required by law and Employer’s Liability with limits of $500,000 per occurrence.

7. REPORTING Save The Bay will notify OLSD staff of any problems or issues with the nursery facility as soon as possible. Save The Bay will annually provide a brief report (written or oral presentation) to OLSD staff describing nursery activities for the year upon request. 8. DURATION This MOU may be modified at any time, in writing, by mutual consent of authorized officials from Save The Bay or OLSD. This MOU is effective upon signature by the authorized officials from Save The Bay and OLSD and will remain in effect until terminated by either party upon 90 days’ notice. In the event that Save The Bay defaults in any obligation of this MOU or defaults in the performance of any of the terms and conditions of this MOU, OLSD may, at its option, immediately terminate this MOU. Unless extended in writing, this MOU will terminate on December 31, 2018. 9. ASSIGNMENT Save The Bay will not assign or otherwise transfer any rights, duties, obligations or interest in this MOU to any persons or entities whatsoever without the prior written consent of OLSD and any attempt to assign or transfer without such prior written consent will be void. 10. NOTICES If either party desires or is required to give notice to the other, such notice must be given in writing, and must be personally delivered, sent via e-mail, or sent by prepaid U.S. certified or registered postage, return receipt requested, address to the recipients listed below. Either party may change its address by giving notice to the other. 11. GOVERNING LAW This MOU will be construed and interpreted in accordance with the laws of the State of California. 12. ENTIRE AGREEMENT

Page 165: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

5

This MOU contains all legal and logistical agreements and understanding of the parties pertaining to the subject matter contained herein and supersedes all prior agreements, representations and understandings of the parties. This MOU cannot be amended or modified except by written agreement of both parties. 13. CONTACT INFORMATION SAVE THE BAY Save The Bay

David Lewis, Executive Director 1330 Broadway, Suite 1800 Oakland, CA 94612 510.463.6802 [email protected]

ORO LOMA SANITARY DISTRICT Oro Loma Sanitary District

Jason Warner General Manager 2655 Grant Ave. San Lorenzo, CA 94580 510-276-4700 [email protected]

15. SEVERABILITY

If a court of competent jurisdiction finds or rules that any provision of this MOU is invalid, void, or unenforceable, the provisions of this MOU not so adjudged will remain in full force and effect.

16. NO IMPLIED WAIVER OF BREACH

The waiver of any breach of a specific provision of this MOU does not constitute a waiver of any other breach of that term or any other term of this MOU.

17. COUNTERPARTS This MOU may be executed in multiple counterparts, each of which will be an original and all of which together will constitute one agreement.

Page 166: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580

6

________________________ Date: David Lewis, Executive Director Save The Bay ________________________ Date: Jason Warner, General Manager Oro Loma Sanitary District

424.001 2634955.3

Page 167: BOARD MEETING AGENDA Tuesday, October 18, …...BOARD MEETING AGENDA Tuesday, October 18, 2016 3:00 p.m. Oro Loma Sanitary District Boardroom 2655 Grant Avenue San Lorenzo, CA 94580