CAPITAL DEVELOPMENT BOARD
WEBEX MEETING DUE TO
Jim Underwood, Executive Director
BOARD MEMBERS:
Eileen Rhodes, Chair
Glyn Ramage
Martesha Brown
David Arenas
Pam McDonough
Beverly Potts
JB Pritzker, Governor
BOARD BOOK
AUGUST 11, 2020
11:00 a.m.
Eileen Rhodes, Chair
COVID-19 EMERGENCY
Illinois.WebEx.com
Meeting (access code) 133 815 4263
Password: mTh3ebFAk74
CAPITAL DEVELOPMENT BOARD
August 11, 2020, 11:00a.m.
WebEx
The meeting of the Capital Development Board is being held by WebEx due to the COVID 19
crisis. CALL: 312-535-8110 ACCESS CODE: 133-815-4263 PASSWORD: mTh3ebFAk74 CALL TO ORDER
1. Roll Call of Members2. Confirmation of a Quorum
PRELIMINARY ITEMS 3. Adoption of Agenda4. Approval of the July 14, 2020 Minutes.......................................................................................1-4 5. Approval of the July 14, 2020 Executive Minutes6. Introduction of Guest’s
BOARD ACTION 7. Architect/Engineer Selection Recommendations from PSB 261...............................................5-7 8. Architect/Engineer Selection Recommendations from PSB 262.............................................8-10 9. Architect/Engineer Selection Recommendations from PSB 264...........................................11-12 10. Architect/Engineer Selection Recommendations from PSB 265...........................................13-17 11. Design Build...........................................................................................................................18-19
INFORMATIONAL ITEMS12. Emergency Selection..............................................................................................................20-21 13. Best Interest of the State Selection.......................................................................................22-38 14. Change Order of Board Authorized Proceed Order....................................................................39 15. COVID19 Emergency Project Proceed Order/Change Order Report...........................................40 16. Emergency Project Proceed Order/Change Order Report..........................................................41 17. Quarterly Remobilization Project Report....................................................................................42 18. FEB Board Report19. Public Comment
EXECUTIVE SESSION 15. Pending Litigation (5 ILCS 120/2(c)(11))
Staff Contacts: Sally Finney 217.782.8726 and Heather Bova 217.782.8729
CAPITAL DEVELOPMENT BOARD AGENDA ITEM
SUBJECT: Meeting Minutes for July 14, 2020
The meeting of the Capital Development Board was held by WebEx due to the COVID-19 crisis.
The Following board members were present via WebEx: Eileen Rhodes, Chair Pam McDonough David Arenas Beverly Potts Martesha Brown Glyn Ramage Others Present in Springfield: Amy Romano, CDB Heather Bova, CDB Sally Finney, CDB Ron Wright, CDB Others present thru WebEx: Jim Underwood, CDB Paula Sorensen, CDB Mike Wilson, CDB Carey Mayer, CDB Kathryn Martin, CDB Paul Kmett, CDB Heidi Hildebrand, CDB Lesa Branham, CDB Paula Sorensen, CDB Heidi Hildebrand, CDB Brent Lance, CDB Tim Patrick, CDB Jesse Martinez, CDB Jen Boen, CDB Karla Springer, CDB Lauren Noll, CDB Andres Padua, CDB Sarah Erwin, CPO Andrea Bauer, CDB Scott Steffg, White & Co. Amber Evans, CDB Tamakia Edwards, CDB Kate Muller, Muller & Muller Dina Tsiolis Dapak Shah Ramu Ramachandran The meeting was called to order at 11:03a.m. Sally Finney took roll call. For the record, Chair Eileen Rhodes and members David Arenas, Pam McDonough, Martesha Brown, Beverly Potts and Glyn Ramage were all present via WebEx. Glyn Ramage moved, and Pam McDonough seconded a motion for the adoption of the agenda. Chair Rhodes called for a vote, and the motion was approved unanimously.
001
Pam McDonough moved, and Glyn Ramage seconded a motion to approve the minutes of the June 11, 2020 meeting. Chair Rhodes called for a vote, and the motion was approved unanimously. Beverly Potts moved, and Glyn Ramage seconded a motion to approve the minutes of the Executive Session of the June 11, 2020 meeting. Chair Rhodes called for a vote, and the motion was approved unanimously. Brent Lance presented the following A/E selection recommendations from PSB 263:
1. 120-175-143 Department of Corrections Menard Correctional Center, Randolph County Replace the General Store and the Kitchen/Dining Complex
1. Shive-Hattery, Inc. 2. BHDG Architects, Inc. 3. Knight E/A, Inc.
Appropriation: $24,682,000 Project Cost: $24,682,000
2. 250-000-022 Department of Central Management Services Statewide Program Renovate Building
1. Moreno Architects Ltd. 2. Stantec Architecture, Inc. 3. CSA Partners, Ltd.
Appropriation: $3,000,000 Project Cost: $3,000,000
3. 250-000-023 Department of Central Management Statewide Program Renovate Building
1. John Shafer & Associates, Inc. 2. Johnson Lasky Kindelin Architects, Inc. 3. Muller & Muller, Ltd.
Appropriation: $1,000,000 Project Cost: $1,000,000
4. 546-035-007 Department of Military Affairs Marion Readiness Center, Williamson County Construct an Addition to the Readiness Center
1. Knight E/A, Inc. 2. Prairie Engineers, P.C. 3. Woolpert Architects, LLC.
Appropriation: $150,000 Project Cost: $6,000,000
002
Pam McDonough moved, and Beverly Potts seconded a motion to approve the previous recommendations for selection of A/E. Chair Rhodes called for a vote, and the motion was approved unanimously. Brent Lance presented the following A/E selection recommendation from PSB 264:
546-325-084 Department of Military Affairs Camp Lincoln, Sangamon County Replace Roofing System
1. Steckel-Parker Architects, In., 2. Kenyon & Associates Architects, Inc. 3. John Shafer & Associates, Inc.
Appropriation: $1,311,000 Project Cost: $1,311,000
David Arenas moved, and Beverly Potts seconded a motion to approve the previous
5. 651-000-174 Capital Development Board Facility Condition Assessment Services Statewide
1. HDR Architecture, Inc 2. OWP/P Cannon Design, Inc 3. A. Epstein and Sons International, Inc.
Appropriation: $2,500,000 Project Cost: $7,500,000
6. 351-000-175 Capital Development Board – Northern Construction Management Services Statewide
1. STV Construction, Inc. 2. Cotter Consulting, Inc. 3. McKissack & McKissack Midwest, Inc.
Appropriation: to be determined Project Cost: To be determined
7. 651-000-176 Capital Development Board-Central/Southern Construction Management Service Statewide
1. Cotter Consulting, Inc 2. The Concord Consulting Group of Illinois
Appropriation: to be determined Project Cost: to be determined
003
recommendation for selection of A/E. Chair Rhodes called for a vote, and the motion was approved unanimously.
Brent Lance gave an update on the Best Interest of the State Selection/Informational Item and Small contract Selection.
Ron Wright gave an update on COVID-19 Emergency Project Proceed Order/Change Orders, Change Order for Board Authorized Proceed Order’s and Single Bid Award.
David Arenas moved, and Pam McDonough seconded a motion to move to Executive Session for the purpose of discussing a personnel matter. Chair Rhodes called for a vote, and the motion was approved unanimously.
Executive Session was convened. One agenda item was discussed.
Regular session was reconvened at 12:33p.m. After Executive Session, Ms. Romano of General Counsel, recommended that the Executive Director’s Compensation as reviewed in Executive Session be adopted. Beverly Potts moved, and David Arenas seconded a motion to approve the Executive Director’s Salary adjustment. Chair Rhodes called for a vote, and the motion was approved unanimously. Beverly Potts moved, and David Arenas seconded a motion to adjourn. Chair Rhodes called for a vote, and the motion was approved unanimously. The meeting was adjourned at 12:37p.m.
004
Agenda ItemState of IllinoisCapital Development Board
SUBJECT: Staff Recommendations for Board Selection of Architect/Engineers
Project Number Firm/Job Description Estimated TotalProject Cost
250-000-020 Construct Central Computing FacilityDepartment of Central Management ServicesStatewide Program, Statewide
RECOMMENDED FIRMS IN ALPHA ORDER:
Batir Architecture, Ltd.Exp U.S. Services Inc.HDR Architecture, Inc.
$80,500,000
814-010-088 Renovate/Construct Nursing Lab, Including a Simulated HospitalChicago State UniversityChicago State University - Cook County, Cook
RECOMMENDED FIRMS IN ALPHA ORDER:
Holabird & Root, LLCStantec Architecture, Inc.Tilton, Kelly + Bell, L.L.C.
$25,800,000
005
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 250-000-020
PROJECT DESCRIPTION: Construct Central Computing Facility
PROJECT LOCATION: Department of Central Management ServicesStatewide Program
APPROPRIATION AMOUNT: $8,050,000ESTIMATED TOTAL PROJECT COST: $80,500,000
PROJECT SCOPE OF WORK:
The scope of work includes preparing program statement/scope development package followed by the bridging documentsfor the Design-Build project.
Elements of the project will include the construction of a Tier III Central Computer Facility to be located in the Springfieldarea. A minimum of LEED Silver Certification will be required.
Design Considerations:
Evaluate transition of existing building and data equipment for potential reuse at the new facility. Evaluate availableproperty, including state-owned property and propose a site. Give consideration to the application of renewable energysources, including but not limited to, the use of solar energy.
Site Development
The bridging documents will include, but are not limited to:
- Project Intent- Preliminary Site Plan- Program Elements- Conceptual Designs- Required Infrastructure Expansion or Modification- Preliminary Specifications to Establish Basis of Design
The A/E will develop a comprehensive bridging document, including all of the mentioned elements, in addition to all other miscellaneous criteria as required to provide clearly defined design guidance as a precursor for the follow-on Design-Build contract. The bridging documents will be developed in accordance with CDB's Guidelines for Bridging Documents(available for download on the CDB Reference Library) as appropriate to the project's specific scope of work.
The successful firm will need to demonstrate their experience and expertise with similar building type and use.
The A/E will need to determine if any components of this project are eligible for a utility company or other energygrant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate.
A combined MBE/WBE goal of 18 percent is applicable to the A/E team.
A VBE goal of 3 percent is applicable to the A/E team.
PROFESSIONAL SERVICES BULLETIN VOLUME: 261
006
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 814-010-088
PROJECT DESCRIPTION: Renovate/Construct Nursing Lab, Including a Simulated Hospital
PROJECT LOCATION: Chicago State UniversityChicago State University - Cook County
APPROPRIATION AMOUNT: $2,500,000ESTIMATED TOTAL PROJECT COST: $25,800,000
PROJECT SCOPE OF WORK:The Chicago State University is an 18-building facility established in 1867. The Douglas Hall (T0004) is a 195,000 square foot, 5-story building established in 1972.
The scope of work provides for the renovation of Douglas Hall, including creating a health professions nurse simulation lab/hospital with associated classrooms and offices. The work includes, but is not limited to, tuckpointing the exterior, renovating lecture halls, passageways, classrooms, upgrading infrastructure, restrooms, HVAC, electrical, plumbing and abatement of hazardous materials. The project also includes IT upgrades. The A/E should prioritize the various aspects of the project in order to maximize the use of available funds.
The A/E will need to determine if any components of this project are eligible for a utility company or other energygrant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate.
A combined MBE/WBE goal of 20 percent is applicable to the A/E team.
A VBE goal of 3 percent is applicable to the A/E team.
PROFESSIONAL SERVICES BULLETIN VOLUME: 261
007
Agenda ItemState of IllinoisCapital Development Board
SUBJECT: Staff Recommendations for Board Selection of Architect/Engineers
Project Number Firm/Job Description Estimated TotalProject Cost
815-010-082 $118,836,500
825-030-075
Construct New Science BuildingEastern Illinois UniversityEastern Illinois University - Charleston, Coles
RECOMMENDED FIRMS IN ALPHA ORDER:
Moody Nolan, Inc.RATIO Architects, Inc.SmithGroup, Inc.
Construct a Health Sciences BuildingSouthern Illinois UniversitySouthern Illinois University - Edwardsville, Madison
RECOMMENDED FIRMS IN ALPHA ORDER:
Hellmuth, Obata & Kassabaum, Inc.Kahler Slater, Inc.Moody Nolan, Inc.
$105,370,000
008
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 815-010-082
PROJECT DESCRIPTION: Construct New Science Building
PROJECT LOCATION: Eastern Illinois UniversityEastern Illinois University - Charleston
APPROPRIATION AMOUNT: $11,883,650ESTIMATED TOTAL PROJECT COST: $118,836,500
PROJECT SCOPE OF WORK:Eastern Illinois University in Charleston is a 79-building facility established in 1898.
The scope of work provides for construction of an approximately 171,000 square foot science building to house Biological Sciences and Chemistry and Biochemistry departments and include teaching and research laboratories, general classroom space, greenhouse and exterior plant biology facilities. The proposed new facility will contain building equipment and systems to provide adequate ventilation, fume control, plumbing, hazardous waste control, lighting and sound control. The building will also centralize animal care facilities currently housed in other campus buildings. Design consideration shall be given in developing optimal energy performance for the project, including photovoltaic arrays, geothermal, and green roofs. A minimum of LEED Silver Certification will be required. This project will have a separate Construction Manager engaged to assist with management of the project.
The A/E will need to determine if any components of this project are eligible for a utility company or other energygrant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate.
A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal.
A VBE goal of 3 percent is applicable to the A/E team.
PROFESSIONAL SERVICES BULLETIN VOLUME: 262
009
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 825-030-075
PROJECT DESCRIPTION: Construct a Health Sciences Building
PROJECT LOCATION: Southern Illinois UniversitySouthern Illinois University - Edwardsville
APPROPRIATION AMOUNT: $10,537,000ESTIMATED TOTAL PROJECT COST: $105,370,000
PROJECT SCOPE OF WORK:The Southern Illinois University in Edwardsville is a 129-building facility established in 1960.
The scope of work includes preparing program statement/scope development package followed by the bridging documentsfor the Design-Build project. Minimum of LEED Silver Certification will be required and additional energy efficiencies will beconsidered.
Elements of the project will include construction of a health sciences building, connections to two existing buildings andrenovation to the existing buildings.
Design considerations:
- Schools of pharmacy, nursing and related health sciences programs will be accommodated in the building.- Classroom's accommodations.- Teaching/research laboratories.- Nursing simulation laboratory.- Faculty offices/administrative spaces.- Student resources and study spaces.- Parking lot and site circulation design/improvements.
Program analysis and schematic design will include the following major elements:
- Identify and document requirements for compliance with applicable codes, regulations, standards and agencies havingoversight of design and construction.- Schematic design for programmed functions.
The bridging documents will include, but are not limited to:
- Project intent.- Preliminary site plan.- Program elements.- Conceptual designs.- Required infrastructure expansion or modification.- Preliminary specifications to establish basis of design.
The A/E will develop a comprehensive bridging document, including all of the mentioned elements, in addition to all other miscellaneous criteria as required to provide clearly defined design guidance as a precursor for the follow-on Design-Build contract. The bridging documents will be developed in accordance with the CDB's Guidelines for Bridging Documents(available for download on the CDB Reference Library as appropriate to the project's specific scope of work.
The A/E will need to identify if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for assisting with the grant application if the project qualifies for the rebate.
A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal.
A VBE goal of 3 percent is applicable to the A/E team.
PROFESSIONAL SERVICES BULLETIN VOLUME: 262
010
Agenda ItemState of IllinoisCapital Development Board
SUBJECT: Staff Recommendations for Board Selection of Architect/Engineers
Project Number Firm/Job Description Estimated TotalProject Cost
830-080-018 Construct a Library Learning Student Success Center University of IllinoisUniversity of Illinois - Springfield, Sangamon
RECOMMENDED FIRMS IN ALPHA ORDER:
Bailey Edward Design, Inc.Legat Architects, Inc.Woodhouse Tinucci Architects LLC
$35,000,000
011
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 830-080-018
PROJECT DESCRIPTION: Construct a Library Learning Student Success Center
PROJECT LOCATION: University of IllinoisUniversity of Illinois - Springfield
APPROPRIATION AMOUNT: $3,500,000ESTIMATED TOTAL PROJECT COST: $35,000,000
PROJECT SCOPE OF WORK:The University of Illinois, Springfield, was established in 1995.
Ranked as the #1 regional public university in Illinois, the University of Illinois at Springfield (UIS) occupies 740 acres with 87 facilities serving a student population of approximately 5,000 and over 950 employees. The scope of work provides for the construction of a multi-story Library Learning and Student Success Center (LLSSC) programmed at approximately 65,000 square feet with a goal to achieve LEED Platinum certification (minimum LEED Gold). Sited on the southeast corner of the main quadrangle, the LLSSC will serve as a nucleus for advanced and innovative teaching-learning and collaboration. The LLSSC will house library services and collections, Information Technology Services (ITS), client services, a help desk and the Center for Academic Success. The Center for Academic Success is composed of: The Learning Hub, Office of Advising Services, Information and Support, Experiential and Service-Learning Program, Testing Services, the Tutoring Center, Writing Lab, Math Lab, the Career Development Center and Testing Center. The multiple Experiential Teaching-Learning Labs will include a Communications Lab, Maker Space, an "Imaginaseum", technology rich multi-use classrooms, a flexible multi-use technology rich 200-seat classroom / conference space and supporting office space for faculty and staff. The LLSSC will have stand-alone heating and cooling and a backup power source to support 365 day/year operations. The heating/cooling system for the LLSSC will also need to support the adjacent Student Union building. Once established, the Student Union building will be disconnected from the campus chilled water plant. Adjacent parking and access to the LLSSC's loading dock is required on the east side of the site. Richard Wright Drive, William Maxwell Lane and the adjacent multi-modal and pedestrian pathways, will be modified to connect with exiting transportation infrastructure.
The scope of work will include some interior design and furniture selection for space planning purposes.
Documents produced during the conceptualization and schematic design phases will be used by the University for fund raising efforts.
An independent third-party commissioning agent will be selected and assigned to this project.
The A/E will need to determine if any components of this project are eligible for a utility company or other energygrant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate.
A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal.
A VBE goal of 3 percent is applicable to the A/E team.
PROFESSIONAL SERVICES BULLETIN VOLUME: 264
012
Agenda ItemState of IllinoisCapital Development Board
SUBJECT: Staff Recommendations for Board Selection of Architect/Engineers
Project Number Firm/Job Description Estimated TotalProject Cost
630-000-252 Various ImprovementsDepartment of TransportationStatewide Program, Statewide
RECOMMENDED FIRMS IN ALPHA ORDER:
ABNA Engineering, Inc.EDM IncorporatedRoss & Baruzzini, Inc.
$550,000
630-000-253 Various ImprovementsDepartment of TransportationStatewide Program, Statewide
RECOMMENDED FIRMS IN ALPHA ORDER:
Baysinger Architects, PLLCHarlan M. BohnsackWhite & Borgognoni Architects, P.C.
$750,000
630-076-004 Various ImprovementsDepartment of TransportationBishop Ford Maintenance Yard - Cook County, Cook
RECOMMENDED FIRMS IN ALPHA ORDER:
DLZ Illinois, Inc.Globetrotters Engineering CorporationWold Architects, Inc.
$3,600,000
830-080-019 Replace Roofing SystemUniversity of IllinoisUniversity of Illinois - Springfield, Sangamon
RECOMMENDED FIRMS IN ALPHA ORDER:
Allied Design Consultants, IncorporatedEvan Lloyd Associates, Inc.Kenyon & Associates Architects, Inc.
$1,000,000
013
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 630-000-252
PROJECT DESCRIPTION: Various Improvements
PROJECT LOCATION: Department of TransportationStatewide Program
APPROPRIATION AMOUNT: $110,000ESTIMATED TOTAL PROJECT COST: $550,000
PROJECT SCOPE OF WORK:
The Scott Airforce-I64 Storage Building (D0851) is a 900 square foot, one-story building established in 2001. The scope ofwork provides for alternative off-grid energy sources (solar/wind) for the site and to provide recommendations, an estimateand design for the chosen solution. The work may include, but is not limited to, architectural, mechanical, civil and electricalservices. The Illinois Department of Transportation will select the alternative energy solution after PASD submittal approval.
The Fairview Heights Maintenance Storage Facility Traffic and Maintenance Complex Building (D0864) is a 42,715 squarefoot, one-story building established in 1978. The scope of work provides for replacing the HVAC units. The work mayinclude, but is not limited to, architectural, structural, mechanical and electrical services.
The A/E will need to determine if any components of this project are eligible for a utility company or other energygrant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate.
There are no MBE/WBE/VBE goals applied to the A/E team, but participation is encouraged.
PROFESSIONAL SERVICES BULLETIN VOLUME: 265
014
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 630-000-253
PROJECT DESCRIPTION: Various Improvements
PROJECT LOCATION: Department of TransportationStatewide Program
APPROPRIATION AMOUNT: $150,000ESTIMATED TOTAL PROJECT COST: $750,000
PROJECT SCOPE OF WORK:
The Cairo Maintenance Storage Facility Truck East Building (D0924) is an approximately 4,032 square foot, one-storybuilding constructed in 1999. The scope of work provides for adding insulation and a heating system to the existingbuilding. This work may include, but is not limited to, architectural, structural, mechanical and electrical services.
The Cairo Maintenance Storage Facility Equipment Storage West Building (D0925) is an approximately 2,880 square foot,one-story building constructed in 1987. The scope of work provides for adding a concrete floor, removing the existing barnstyle door and adding overhead doors. This work may include but is not limited to, architectural, structural and electricalservices.
The West City Maintenance Yard Equipment Storage East Building (D0918) is an approximately 2,880 square foot, one-story building constructed in 1991. The West City Maintenance Yard Office / Garage / Equipment Storage Building (D0916)is an approximately 7,680 square foot, one-story building constructed in 1967. The scope of work provides for addinginsulation and heating systems to the existing buildings. This work may include, but is not limited to, architectural, structural,mechanical and electrical services.
The Mt. Vernon Maintenance Storage Facility Equipment Storage Building (D0782) is an approximately 4,000 square foot,one-story building constructed in 2012. The scope of work provides for adding an addition onto the building, approximately1,500 square feet. This work may include, but is not limited to architectural, structural and electrical services.
There are no MBE/WBE/VBE goals applied to the A/E team, but participation is encouraged.
PROFESSIONAL SERVICES BULLETIN VOLUME: 265
015
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 630-076-004
PROJECT DESCRIPTION: Various Improvements
PROJECT LOCATION: Department of TransportationBishop Ford Maintenance Yard - Cook County
APPROPRIATION AMOUNT: $720,000ESTIMATED TOTAL PROJECT COST: $3,600,000
PROJECT SCOPE OF WORK:The Bishop Ford Maintenance Yard Maintenance Storage E33 Building (D0012) is a 14,256 square foot, one-story buildingconstructed in 1958.
The scope of work provides for an evaluation of the feasibility to extend the heights of various bays and add extra bays tothe building. If feasible, the work would extend the height of bays 4 and 5 to approximately 20-feet and add extra bays tothe mechanics bay. The scope also includes installing a hydraulic lift for truck repairs, an oil/water separator system, a high-capacity exhaust system in the mechanic repair bays and repairing/replacing the septic system. The work may include, butis not limited to, upgrading to energy-efficient systems, mechanical, electrical and associated components, as needed.
The scope of work also provides for constructing a new salt storage building to replace the previous 5,723 square foot saltstorage building and the salt loader ramp. The work may also include, but is not limited to, ventilation, electrical andassociated components, as needed.
In the event that hazardous materials are encountered, they will be addressed outside of this contract.
The A/E will need to determine if any components of this project are eligible for a utility company or other energygrant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate.
A combined MBE/WBE goal of 20 percent is applicable to the A/E team.
A VBE goal of 2 percent is applicable to the A/E team.
PROFESSIONAL SERVICES BULLETIN VOLUME: 265
016
A/E SELECTION COMMITTEE RECOMMENDATIONS8/11/2020
CDB PROJECT NO: 830-080-019
PROJECT DESCRIPTION: Replace Roofing System
PROJECT LOCATION: University of IllinoisUniversity of Illinois - Springfield
APPROPRIATION AMOUNT: $1,000,000ESTIMATED TOTAL PROJECT COST: $1,000,000
PROJECT SCOPE OF WORK:The University of Illinois, Springfield, was established in 1995. The Health Sciences Building (U2208) is a 57,716 squarefoot, 3 story building established in 1991.
The scope of work provides for the replacement of an approximately 18,700 square foot roofing system on the HealthScience Building. The work will include two lower roof sections with a 30-year, fully adhered roofing system. The work is toinclude enhanced insulation in accordance with IECC guidelines, flashing modifications, pre-finished metal edging and trim.The work should also include mechanical screening enhancements, curtainwall enhancements and brick/masonrytuckpointing as needed.
The A/E will be expected to provide resources to ensure an expedited design schedule.
A combined MBE/WBE goal of 15 percent is applicable to the A/E team.
There are no VBE goals applied to the A/E team, but participation is encouraged.
PROFESSIONAL SERVICES BULLETIN VOLUME: 265
017
Agenda ItemState of IllinoisCapital Development Board
SUBJECT: Board Concurrence/Design Build
Project Number Firm/Job Description Estimated TotalProject Cost
040-010-115 Construct New Nursing Home and Domiciliary Department of Veterans' AffairsQuincy Veterans' Home, Adams County
SHORTLISTED FIRMS IN ALPHA ORDER:
PARIC CorporationVeterans United Constructors (a Joint Venture)
$230,000,000
018
DESIGN-BUILD SELECTION COMMITTEE RECOMMENDATIONS 8/11/2020
040-010-115
Construct New Nursing Home and Domiciliary
Department of Veterans' AffairsQuincy Veterans' Home, Adams County$230,000,000$230,000,000
CDB PROJECT NO:
PROJECT DESCRIPTION: PROJECT
PROJECT LOCATION:
APPROPRIATION AMOUNT: ESTIMATED TOTAL PROJECT COST:
PROJECT SCOPE OF WORK:The Quincy Veterans' Home campus currently consists of approximately 37 buildings constructed between 1886 and 2002.
The project will include construction of a new nursing home and domiciliary on the campus of the Quincy Veterans' Home to accommodate up to 340 beds. Location and relationship of this new facility within the context of the campus complies with the recommendations of the overall Campus Master Plan. Project also include improvements and connection to existing campus infrastructure. LEED Silver certification will be required.
019
Informational ItemState of IllinoisCapital Development Board
SUBJECT: Emergency Selection / Informational Item
Project Number Firm/Job Description Estimated TotalProject Cost
120-255-027 Emergency Chiller ReplacementDepartment of CorrectionsShawnee Correctional Center - JohnsonCounty
SELECTED FIRM:
Asaturian, Eaton and Associates, P.C.
TBD
020
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
120-255-027
Emergency Chiller Replacement
Department of CorrectionsShawnee Correctional Center - Johnson County
To Be Determined
PROJECT SCOPE OF WORK:The Shawnee Correctional Center is a 24 building facility established in 1983.
The scope of work provides for an evaluation of the system, recommendations for temporary and permanentsolutions, including cost estimates and lead times and an expedited design of the replacement chiller and allancillary components. In addition, the scope also provides for a temporary chiller if needed, as a reimbursable itemunder the Architect/Engineer Professional Services Agreement, until the permanent chiller can be installed.
ARCHITECT/ENGINEER: Asaturian, Eaton and Associates, P.C. (1238) Carbondale, IL 62903
APPROVED BY THE EXECUTIVE DIRECTOR: 7/14/2020
021
Informational ItemState of IllinoisCapital Development Board
SUBJECT: Best Interest of the State Selection / Informational Item
Project Number Firm/Job Description Estimated TotalProject Cost
321-010-105 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesAlton Mental Health Center - MadisonCounty
SELECTED FIRM:
EDM Incorporated
TBD
321-015-103 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesChoate Mental Health and DevelopmentalCenter - Union County
SELECTED FIRM:
Eggemeyer Associates Architects Inc.
TBD
321-030-155 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesChicago-Read Mental Health Center -Cook County
SELECTED FIRM:
Affiliated Engineers, Inc.
TBD
321-035-066 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesMabley Developmental Center - LeeCounty
SELECTED FIRM:
Batir Architecture, Ltd.
TBD
022
Informational ItemState of IllinoisCapital Development Board
SUBJECT: Best Interest of the State Selection / Informational Item
Project Number Firm/Job Description Estimated TotalProject Cost
321-055-139 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesElgin Mental Health Center - Kane County
SELECTED FIRM:
Primera Engineers, Ltd.
TBD
321-060-052 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesFox Developmental Center - LivingstonCounty
SELECTED FIRM:
Farnsworth Group, Inc.
TBD
321-087-051 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesChester Mental Health Center - RandolphCounty
SELECTED FIRM:
Woolpert, Inc.
TBD
321-100-128 Renovate Dental Rooms for AirborneIsolationDepartment of Human ServicesShapiro Developmental Center - KankakeeCounty
SELECTED FIRM:
Knight E/A, Inc.
TBD
023
Informational ItemState of IllinoisCapital Development Board
SUBJECT: Best Interest of the State Selection / Informational Item
Project Number Firm/Job Description Estimated TotalProject Cost
321-110-070 TBD
321-135-080 TBD
321-190-053 TBD
321-210-006
Renovate Dental Rooms for Airborne IsolationDepartment of Human Services Ludeman Developmental Center - Cook County
SELECTED FIRM:
Knight E/A, Inc.
Renovate Dental Rooms for Airborne IsolationDepartment of Human ServicesMurray Developmental Center - Clinton County
SELECTED FIRM:
Woolpert, Inc.
Renovate Dental Rooms for Airborne IsolationDepartment of Human ServicesKiley Developmental Center - Lake County
SELECTED FIRM:
IMEG Corp.
Renovate Dental Rooms for Airborne IsolationDepartment of Human Services Rushville Treatment and Detention Facility - Schuyler County
SELECTED FIRM:
IMEG Corp.
TBD
024
Informational ItemState of IllinoisCapital Development Board
SUBJECT: Best Interest of the State Selection / Informational Item
Project Number Firm/Job Description Estimated TotalProject Cost
321-210-005 Replace Electronic Lock Controls, CCTV and Intercom SystemsDepartment of Human Services Rushville Treatment and Detention Facility - Schuyler County
SELECTED FIRM:
Dewberry Architects Inc.
$3,353,200
025
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-010-105
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesAlton Mental Health Center - Madison County
To Be Determined
PROJECT SCOPE OF WORK:The Forensic Service Building (BD081) is a 98,000 square foot, one-story building established in 1996.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: EDM Incorporated (27800) Collinsville, IL 62234
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
026
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-015-103
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesChoate Mental Health and Developmental Center - Union County
To Be Determined
PROJECT SCOPE OF WORK:The Red Bud Building (BG006) is a 44,465 square foot, 2-story building established in 1965.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Eggemeyer Associates Architects Inc. (26859) Herrin, IL 62948
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
027
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-030-155
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesChicago-Read Mental Health Center - Cook County
To Be Determined
PROJECT SCOPE OF WORK:The Administration Building (BK006) is a 31,296 square foot, 2-story building established in 1963.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Affiliated Engineers, Inc. (30090) Chicago, IL 60603
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
028
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-035-066
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesMabley Developmental Center - Lee County
To Be Determined
PROJECT SCOPE OF WORK:The Pearson Building (BC160) is a 15,737 square foot, one-story building established in 1986.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Batir Architecture, Ltd. (30897) St Charles, IL 60174
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
029
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-055-139
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesElgin Mental Health Center - Kane County
To Be Determined
PROJECT SCOPE OF WORK:The Forensic Treatment Center (BR121) is a 140,000 square foot,2-story building established in 1996.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Primera Engineers, Ltd. (33504) Lisle, IL 60532
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
030
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-060-052
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesFox Developmental Center - Livingston County
To Be Determined
PROJECT SCOPE OF WORK:The Hospital Building (BZ008) is a 36,877 square foot, 6-story building established in 1944.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Farnsworth Group, Inc. (28414) Bloomington, IL 61704
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
031
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-087-051
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesChester Mental Health Center - Randolph County
To Be Determined
PROJECT SCOPE OF WORK:The Admin and Medical Services Building (B5018) is a 23,845 square foot, one-story building established in 1975.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Woolpert, Inc. (29490) Fairview Heights, IL 62208
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
032
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-100-128
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesShapiro Developmental Center - Kankakee County
To Be Determined
PROJECT SCOPE OF WORK:The Medical/Surgical #603 Building (BX062) is a 57,569 square foot, 4-story building established in 1951.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Knight E/A, Inc. (29338) Chicago, IL 60601
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
033
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-110-070
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesLudeman Developmental Center - Cook County
To Be Determined
PROJECT SCOPE OF WORK:The Social Habitation Building (B3063) is a 8,350 square foot, one-story building established in 1972.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Knight E/A, Inc. (29338) Chicago, IL 60601
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
034
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-135-080
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesMurray Developmental Center - Clinton County
To Be Determined
PROJECT SCOPE OF WORK:The Admin/Hospital Building (BQ008) is a 48,873 square foot, 3-story building established in 1964.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: Woolpert, Inc. (29490) Fairview Heights, IL 62208
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
035
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-190-053
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesKiley Developmental Center - Lake County
To Be Determined
PROJECT SCOPE OF WORK:The Community Services A1 Building (BM051) is a 58,564 square foot, 3-story building established in 1974.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: IMEG Corp. (34312) Gurnee, IL 60031
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
036
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO:
PROJECT DESCRIPTION:
PROJECT LOCATION:
PROJECT AMOUNT:
321-210-006
Renovate Dental Rooms for Airborne Isolation
Department of Human ServicesRushville Treatment and Detention Facility - Schuyler County
To Be Determined
PROJECT SCOPE OF WORK:The Building A, Area C (C2302), is a 28,941 square foot, 2-story building established in 2002.
The scope of work provides for an assessment, recommendations and an estimate for the renovation needed forairborne isolation rooms. Design services may be required.
ARCHITECT/ENGINEER: IMEG Corp. (34313) Macomb, IL 61455
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
037
Informational ItemState of IllinoisCapital Development Board
CDB PROJECT NO: 321-210-005
PROJECT DESCRIPTION: Replace Electronic Lock Controls, CCTV and Intercom Systems
PROJECT LOCATION: Department of Human ServicesRushville Treatment and Detention Facility - Schuyler County
PROJECT AMOUNT: $3,353,200
PROJECT SCOPE OF WORK:The Rushville Treatment and Detention Facility Agency is a one-building facility established in 2014. The HousingBuilding "G" (DHS210-0001) is a 36,000 square foot, one-story building constructed in 2014.
The scope of work provides for replacing the electronic lock controls, intercom and CCTV systems throughout thebuilding.
ARCHITECT/ENGINEER: Dewberry Architects Inc. (31650) Peoria, IL 61602
APPROVED BY THE EXECUTIVE DIRECTOR: 7/6/2020
038
State of Illinois Capital Development Board Informational Item
CHANGE ORDER FOR BOARD AUTHORIZED PROCEED ORDER
Project Number
Project Description
Proceed Order or Change Order
Number
Total Amount
of Proceed Order
Board Date
Approved
Total Amount of Associated
Change Order(s) & Date
Executed
Percentage of Change
Order Work Completed
040-080-001 Ph. 2
Illinois Department of Veterans’ Affairs – Chicago Veterans’ Home – Construct 200 bed Veterans’ Facility – Chicago, IL, Cook County
P-18
E-36
$137,939.60
$50,000.00
TOTAL: $187,939.60
2/11/2020
2/11/2020
$113,821.15 7/28/20
$49,291.91 7/28/2020
TOTAL: $163,113.06
70%
90%
039
State of Illinois Capital Development Board Informational Item
COVID–19 EMERGENCY PROJECT PROCEED ORDER/CHANGE ORDER REPORT
Project Number
Project Description
Proceed Order, RFP
or Mod
Number
Total Amount of this
Proceed Order, RFP or Mod & Date Executed
Total Amount of Associated RFPs/Mods
& Date Executed
Percentage of RFP/Mod
Work Completed
120-000-062 Illinois Department of Corrections – Joliet In-Patient Treatment Center – Construct In-Patient Treatment Center – Joliet, IL, Will County
PO G-4R2 $600,000.00 7/10/2020
N/A 60%
120-000-062 Illinois Department of Corrections – Joliet In-Patient Treatment Center – Construct In-Patient Treatment Center – Joliet, IL, Will County
CO G-4A $111,744.00 N/A 100%
321-015-101 Department of Human Services – Choate Mental Health and Developmental Center – Emergency Renovation for Isolation Rooms – Anna, IL, Union County
PO G-2 $228,460.86 7/10/2020
N/A 89%
040
State of Illinois Capital Development Board Informational Item
EMERGENCY PROJECT PROCEED ORDER/CHANGE ORDER REPORT
Project Number
Project Description
Proceed Order, RFP
or Mod
Number
Total Amount of this Proceed
Order, RFP or Mod & Date Executed
Total Amount of Associated RFPs/Mods
& Date Executed
Percentage
of RFP/Mod
Work Completed
321-087-050
Illinois Department of Human Services – Chester Mental Health Center – Emergency Repair and Replacement of the Employee Duress System – Chester, IL, Randolph County
CO E-4
$150,000.00 7/28/2020
N/A
45%
041
State of Illinois Capital Development Board Informational Item
QUARTERLY REMOBILIZATION PROJECT REPORT
Project Number Project Description
Proceed Order, RFP,
or Mod Number
Total Amount of this Proceed Order, RFP or Mod & Date Executed
Total Amount of Associated
RFP/Mods and Date Executed
Percentage of RFP/Mod
Work Completed
817-010-055 Northeastern Illinois University – Construct and Education Building – Chicago, Cook County, IL
MOD 2 $1,317,860.00 7/10/2020
N/A
0%
042