HARBOUR QUAYS
New Zealand Sustainable Building Conference
Wellington
26 – 28 May 2010
Garry Pellett & Wendy Jones
11
Harbour Quays
Sustainable
Building
22
Presentation Outline
1. Where did the strategy come from
2. What we did – a sustainable building, fitted out
3. Challenges – an honest appraisal
33
Office Portfolio Strategy Aligns With Core BNZ Strategy
BNZ
VISION &
STRATEGIES
KEY DRIVERS
WORKPLACE
DESIGN
REAL ESTATE
STRATEGY
Driven by business
objectives
Acceptable residual
risk
Optimal financial
solution
Roadmap
MEASURES OF
SUCCESS
Property
Brand Image
Quality
Location
Property Costs
Lease vs Own
Technology
People
Culture and Performance
Flexibility
Integration
Risk Management
Increased Brand
awareness
1:15 occup. density
P&L targets met
Staff satisfaction
increased to 95%
80 Queen St market
value achieved
Occupy consolidated
A/B grade space only
Churn with negligible
cost
Reduced recruitment
costs
Increased productivity
Average floor plate
size 1,500+
Improved risk profile
New generation IT &
security systems
Professional and functional spaces
Regular floor plates 12-1500m2
Ave 15m2 per work setting
Consolidate by business styles
98-100% open plan, needs based
30-35% grp space
Supports collaborative and concentrated activ.
Central facilities
No barriers / open stairs
Flexible voice & data capability in all spaces
No ownership of window space
Community/informal spaces
Exit under performing premises
Consolidate number of sites
A or B grade space only
Podium not “top” floor
Group business units with affinity
Large floor plates & less floors
High quality building services
CBD or fringe only with good access & amenity ie. 80Queen
Brand key bldgs where appropr.
Flexi lease strategy
Technology enabled buildings
Deliver Solutions
High Performance
Trusted Relationships
Strong/ Sustainable TSR
Create and Leverage Assets
Leading Financial
Services Company -
OFFICE
PORTFOLIO
STRATEGY
OBJECTIVES
44
To Build or not to build
55
What does this mean…
Contact Centre,
NZ Post80 Boulcott St
Grand Arcade,
Willis St
BNZ Centre,
1 Willis St
Gen-i,
Featherston St
BNZ House,
50 Manners St
We
llin
gto
n
124 Vincent St 80 Queen St
125 Queen St PenroseAu
ckla
nd
ExistingExcludes Christchurch
Number of Buildings:
10
Total Area: 48,282
Number of Floors : 73
Ave Floor Plate: 661m2
80 Queen St New Ops Centre
Future
Number of Buildings: 4
Total Area: 36,400
Number of Floors : 21
Ave Floor Plate: 1,733m2
New Build
BNZ Centre
1 Willis Street
66
BNZ is part of a bigger, committed, Group
77
Voluntary commitments and
memberships through NAB
Bali, Poznan and Copenhagen Communiqués
Carbon Disclosure Project signature and member,
as well as respondent (listed in the Carbon
Disclosure Leadership Index for the Global 500
companies)
CDP Water Disclosure Project signatory
88
Regulatory requirements BNZ is linked
to
Energy Efficiency Opportunities Act 2006 (Cmth Aust)
National Greenhouse and Energy Reporting Act 2007 (Cmth Aust)
Environment Protection (Environment and Resource Efficiency Plans) Regulations 2007 (Victoria)
Water Management Action Plan (waterMAP) program (State Government initiative) for non-residential customers using more than 10 million litres of potable water/yr
CRC Energy Efficiency Scheme Order 2010 March 2010 (UK)
Carbon Trust Standard Accreditation (UK) – early action metric for the CRC
Green marketing requirements under the rules of the Australian Competition & Consumer Commission, NZ Consumer Commission and the UK
99
Monitoring & reporting
People manage what they measure
Environmental performance across the NAB Group is monitored by:
> BNZ Executive
> Group Climate Change & Environment Committee
> Group Risk Management Committee
> The Board
Reported publicly to stakeholders
1010
Carbon neutral – what do we mean?
1
2
3
4
Measure (baseline/inventory)
Avoid/replace – switch fuel
Reduce energy consumption & travel
Offset unavoidable emissions
5 Verify & reportMonitor
Carbon neutral by September 2010 for our defined carbon inventory
1111
Harbour Quays
Sustainable Attributes – The Building and the Fitout
12
Quay Park, Auckland Harbour Quays, Wellington
80 Queen St, Auckland
BNZ Virtual Campus
13
BNZ Strategy link to design
Five key design
principles:
Openness and transparency
•Visible both from outside in
and inside out
Business enablement
•New technology, flexibility
and effectiveness with Kaizen
principles
Collaboration and community
•Virtual campus, shared
spaces, effective business
processes
Wellness
•Environment and facilities
for healthy living
Simplification
Revenue
Culture
14
Alignment to architecture
6 levels plus plant room:
Gross Area: 25,000 sqm
Office Area: 19,000 sqm
3 separate piers per floor:
Each floor plate: 3,600 to 4,300 sqm
Each Pier plate: 1,000 to 1,200 sqm
Two 13.5m atrium between each pier
Fully glazed walls on each east and west end with saw
toothed south-light roof for natural light
15
Alignment to architecture
Openness and transparency with floors directly open to
atria spaces across balustrades – no walls
Three sets of internal stairs allow access to 40-60% of
organisation within one flight of stairs
Stairs have glass end walls to align with openness
AGBC 4 star agreed with target of NZ Green Star 5 star
16
Management Systems
Correctly commissioned heating, ventilation, cooling
and lighting systems
Environmental management plan
Recycling of waste with multiple reporting
Comprehensive building management system
The light we see, the air we breathe
17
Indoor Environment Quality
100% improvement on standard ventilation rates
Floor to ceiling glass façade
Open plan layout and staff must work with view to outdoors
Living plant walls
Mix mode air
Zoned dimmable lights
Ergonomic furniture made from 90% recyclable material with
end of life cycle Product Stewardship
The light we see, the air we breathe
18
Energy
Deep natural light penetration
Movement sensor lights
Energy efficient appliances
Reuse of abundant energy, for example the lifts
The light we see, the air we breathe
19
Water
5, 500sqm roof will harvest rainwater to a 25,000L collection
tank, filtered for re-use in flushing systems
Hi-tech water metering
Waterless urinals
Low flow showers
Low volume and dual flush toilets
The light we see, the air we breathe
20
Materials
Sustainable timber used Victorian Ash and Bamboo
Environmentally friendly floor coverings including basalt,
recycled carpet, recycled rubber flooring
Low VOC adhesives and sealants
Environmental Choice paint and gib lining
Use of wool fabrics and acoustic absorbent panelling
PVC free blinds and window film
Eco-hush foam in atria roof, cantilever meeting room slab soffits,
balustrades
The light we see, the air we breathe
21
Transport
Close to city bus and train transport hub
Cycle facilities with drying racks
Showers with ironing facilities
Lockers
Car pooling
Motorcycle free parking
The light we see, the air we breathe
22
The light we see, the air we breathe
Land use and ecology
Enhanced environmental planting and landscaping with NZ
natives
“Swale” drain sustainable water management system
Close to harbour and green outdoors
Recycling of construction building waste
Emissions
Environmentally friendly refrigerants and insulation
Hi-tech monitoring systems including CO2 air quality
2323
Harbour Quays
Challenges & Opportunities
24
Challenges
1. The digital dependency
Fine tuning
Reporting language
2. Landlord Tenant interpretation of green leases
There are obligations on both parties
25
Challenges
3. Soft finishes – VOC’s
4. Cleaning
Day cleaners
Dishwashers
5. Water
Too little or too much
6. Waste
Collection and recording
Food scraps
2626
Opportunities
1. Baselining in a community – genuine interest
2. The supply vs demand equation
3. Territorial Authorities
4. The role of Central Government
272727
Satisfaction comparison of Image & Layout,
Pre versus Post Harbour Quays Move
Base: Pre-Relocation survey N=615, Post-
Relocation survey N=442
Im provem ents in Im age & Layout Rating (% rating as Excellent or Very Good)
20%
6%
11% 9%
5%
12%
83% 82% 82%79%
74%76%
0%
20%
40%
60%
80%
100%
Open space with good
lines of sight
Environm ental
sustainable design
A vibrant place to work A space that
encourages interaction
Interior decor of the
office
Encourage constructive
behaviours
Pre-Relocation Post-Relocation
28
Questions?
Waste Generation and Recycling
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Kg
Waste
/ F
TE
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
Recycli
ng
Rate
2009/ 10 waste
Recycling Rate
Current recycling rate
= 76%
Target recycling rate =
80%
Electricity Consumption / FTE
0.0
50.0
100.0
150.0
200.0
250.0
300.0
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
kW
h /
FT
E
1 Willis Street 2007/ 08
1 Willis Street 2008/ 09
Harbour Quays 2009/ 10
Harbour Quays average kWh/FTE = 177
1 Willis Street average kWh/FTE =
237
variance -25.6%