BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
PAN-EUROPEAN TRANSPORT CORRIDOR XSTEERING COMMITTEE MEETING
Belgrade, January 22, 2010
Status Report
for Austrian sections
of Corridor X
Roman KirnbauerFederal Ministry of Transport, Innovation and Technology
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Road sections
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
MOTORWAYS AND EXPRESSWAYS IN AUSTRIA
Tauern - Axis
Phyrn - Axis
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Salzburg
Stateborder AT / SLO
Tauerntunnel
Katschbergtunnel
Tunnelkette Werfen,
Ofenauertunnel, Hieflertunnel
Wolfsbergtunnel
Karawankentunnel
Tunnel Projects
(A10 Tauernautobahn)
Additionally, environmental measures (noise protection, etc.) are taken along the entire route within a long term programme (2004 – 2020).
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Rail sections
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Angertalbrücke (New Bridge)
Start of construction works: Sept. 2006Oct. 2008: Construction works suspended for legal reasons(newly required environmental impact assessment - „Umweltverträglichkeitsprüfung“).
Completion of works expected in 2010.Construction cost: 18,5 Mio. €
Section Type Status Construction
Cost
Kolbnitz –Mühldorf
Upgrade
(Doubletrack)
Completed 2006
49,7 Mio. €
Mühldorf – Pusarnitz
Upgrade
(Doubletrack)
Completed 2009
48,7 Mio. €
The 80 km long „Tauernbahn“ from Schwarzach-St.Veit to Spital-Millstättersee is
the transport backbone for cross alpine transit.
With the completion of the Kolbnitz-Pusarnitz section in 2009 a total of 85% (69 of 80 km)
of the „Tauernbahn“ is now in double track configuration.
Salzburg
State border AT / SLO
AngertalbrückeKolbnitz - Pusarnitz
Kolbnitz – Pusarnitz (Doubletrack configuration)
Start of construction works: 2002
Tauern-Axis
Rosenbach (Remodelling of Station, Removal of low speed sections)
Start of construction works: March 2009Completion of works expected for Dec. 2010.Construction cost: 11,9 Mio. €
Rosenbach (Station)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
„Tauernbahn“ - Construction works
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Phyrn – Axis
Graz Werndorf – Spielfeld (State border)
under construction
planning phase
completed
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
„Graz/Werndorf“ - Construction works and completed sections
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
THANK YOUFOR YOUR KIND ATTENTION!
Roman [email protected]