BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL...

73
FEBRUARY 2013 BMO CAPITAL MARKETS 22 ND ANNUAL GLOBAL METALS & MINING CONFERENCE

Transcript of BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL...

Page 1: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

FEBRUARY 2013

BMO CAPITAL MARKETS 22ND ANNUALGLOBAL METALS & MINING CONFERENCE

Page 2: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

CAUTIONARY STATEMENTS

1

CAUTIONARY NOTE REGARDING FORWARD LOOKING-STATEMENTSThe information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-lookinginformation” within the meaning of applicable Canadian securities legislation. Forward-looking statements, which are all statements other than statements of historical fact, include, but arenot limited to, statements with respect to the future price of silver and gold, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing andamount of estimated future production, costs of production, reserve determination, reserve conversion rates and statements as to any future dividends. Generally, these forward-lookingstatements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,“intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or“will be taken”, “occur” or “be achieved”. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level ofactivity, performance or achievements of Silver Wheaton to be materially different from those expressed or implied by such forward-looking statements, including but not limited to:fluctuations in the price of silver and gold; the absence of control over mining operations from which Silver Wheaton purchases silver or gold and risks related to these mining operationsincluding risks related to fluctuations in the price of the primary commodities mined at such operations, actual results of mining and exploration activities, economic and political risks of thejurisdictions in which the mining operations are located and changes in project parameters as plans continue to be refined; and differences in the interpretation or application of tax lawsand regulations; as well as those factors discussed in the section entitled “Description of the Business - Risk Factors” in Silver Wheaton's Annual Information Form available on SEDAR atwww.sedar.com and in Silver Wheaton's Form 40-F on file with the U.S. Securities and Exchange Commission in Washington, D.C. Forward-looking statements are based on assumptionsmanagement believes to be reasonable, including but not limited to: the continued operation of the mining operations from which Silver Wheaton purchases silver or gold, no materialadverse change in the market price of commodities, that the mining operations will operate and the mining projects will be completed in accordance with their public statements andachieve their stated production outcomes, and such other assumptions and factors as set out herein. Although Silver Wheaton has attempted to identify important factors that could causeactual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Therecan be no assurance that forward-looking statements will prove to be accurate. Accordingly, readers should not place undue reliance on forward-looking statements. Silver Wheaton doesnot undertake to update any forward-looking statements that are included or incorporated by reference herein, except in accordance with applicable securities laws.

CAUTIONARY LANGUAGE REGARDING RESERVES AND RESOURCESFor further information on Mineral Reserves and Mineral Resources and on Silver Wheaton more generally, readers should refer to Silver Wheaton’s Annual Information Form for the year ended December 31, 2011, and other continuous disclosure documents filed by Silver Wheaton since January 1, 2012, available on SEDAR at www.sedar.com. Silver Wheaton’s Mineral Reserves and Mineral Resources are subject to the qualifications and notes set forth therein. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Mineral Resources: The information contained herein uses the terms “Measured”, “Indicated” and “Inferred” Mineral Resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize them and expressly prohibits U.S. registered companies from including such terms in their filings with the SEC. “Inferred Mineral Resources” have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of Measured or Indicated Mineral Resources will ever be converted into Mineral Reserves or that any exploration potential will ever be converted to any category of Mineral Reserves or Mineral Resources. United States investors are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable. United States investors are urged to consider closely the disclosure in Silver Wheaton’s Form 40-F, a copy of which may be obtained from Silver Wheaton or from http://www.sec.gov/edgar.shtml.

Page 3: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

2

Our vision

To be the world’s premier silver focused streaming company.

To provide shareholders with high quality, long-term exposure to precious metals.

To offer mine owners an attractive alternative to debt or equity.

Page 4: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

Silver Wheaton makes an upfront payment in return for the right to purchase a fixed percentage of the future silver production from a mine

As the mine owner delivers silver to Silver Wheaton, an additional delivery payment* is made to them

3

WHAT IS SILVER STREAMING?

Partner Mining Company

Upfront payment (Cash and/or SLW shares)

SLW receives a % of life-of-mine silver production*Delivery payments are approximately US$4/oz with an inflationary adjustment of approximately 1% per annum after the third year of production

Delivery payment ($ per ounce of silver)

Page 5: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

A WIN-WIN MODEL WHY IT WORKS

4

Silver stream agreements create shareholder value for both the purchaser (Silver Wheaton) and the seller (mine owner)

Silver produced at base metal and gold mines is given a lower valuation by the market than if it had been produced by a silver company• Results in ‘value arbitrage’ opportunity

NP

V o

f Silv

er S

tream

(Il

lust

rativ

e)

Base Metal or Gold Producer

Silver Wheaton

Arbitrage opportunity exists to create value for both

Silver Wheaton’s and the Partner’s Shareholders

Value of Future Silver

Production

Value of Future Silver Stream

Page 6: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

WHO IS SILVER WHEATON?

5

Page 7: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

30%

6%

5%

5%5%

4%

2%

Fresnillo Fresnillo Float CapSilver Wheaton Pan AmericanHochschild First MajesticCoeur d'Alene HeclaSilver Standard

51%31%

18%

Silver Wheaton Franco-Nevada Royal Gold

6

INDUSTRY LEADERBY MARKET CAPITALIZATION

Metals Streaming and Royalty Companies

*As of February 12, 2013; **Fresnillo’s float cap is only $4.3bn of the total market cap of $18.6B as it is 77% owned by Peñoles according to ThomsonReuters, Dec 31, 2012

Worldwide Senior Silver Producers

($13.1B)

($4.8B)

($7.9B)

($13.1B)

43%

$4.3B**Float

Page 8: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

53%

12%

11%

8%

6%

5%4%

1%

Silver Wheaton Pan AmericanCoeur d'Alene HeclaFirst Majestic FresnilloSilver Standard Hochschild

66%

22%

12%

Silver Wheaton Royal Gold Franco Nevada

INDUSTRY LEADERBY LIQUIDITY

7

Metals Streaming and Royalty Companies

Worldwide Senior Silver Producers

*Liquidity calculated as total value in US dollars of shares traded in 2012 on primary and key secondary market; Source:ThomsonReuters as of December 31, 2012

66%(~$200M / day)

53%(~$200M / day)

Page 9: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

Silver Wheaton

Fresnillo Pan American

Silver

Silver Standard

Resources

Bear Creek Mining

Polymetal Coeur d'Alene Mining

Levon Resources

Hecla Mining

Tahoe

Inferred

Measured & Indicated

Reserves

MORE SILVER RESERVES AND RESOURCESTHAN ANY OTHER SILVER COMPANY IN THE WORLD

8

*Source: Company Reports, Metals Economics Group data for Polymetal, Silver Standard Resources and Fresnillo

Silv

er R

eser

ves

and

Res

ourc

es (M

ozs)

Silver Wheaton has more than twice the silver reserves of any other silver company in the world

Page 10: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

41.00

25.80 25.50

18.75

13.60

9.50

0

5

10

15

20

25

30

35

40

45

Fresnillo Silver Wheaton Pan AmericanSilver

CoeurD'Alene

Hochschild Hecla

WORLD’S SECOND LARGEST SILVER PRODUCER

9

*Based on Company Reports Jan 2013, Hecla full year 2011 including Lucky Friday production (no 2013 guidance available)

Silv

er (M

ozs)

Silver Wheaton is the world’s 2nd largest silver producer

2013 Silver Production Guidance*

**Silver Wheaton’s 2013 silver equivalent production guidance is 33.5 Moz, including 145 koz of gold

**

Page 11: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

HIGH-QUALITY ASSET BASEDIVERSIFIED PORTFOLIO

10

Political risk further lowered with addition of Canadian and Brazilian mines

Operating Mines (19) Development Projects (4)

Page 12: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

2013 Proforma Forecast Production

by Cost Quartile*

2017 Proforma Forecast Production

by Cost Quartile*

11

HIGH-QUALITY ASSET BASELOW-COST PRODUCTION

*From company Q3 reports and Wood Mackenzie estimates of January 2013 byproduct cost curves for gold, zinc, copper, nickel and silver mines; both Vales’s Salobo & Sudbury operations are first cost quartile

Lowest cost quartile production increases to over 90% of SLW’s total over the next 5 years

83%

5%

12%

First Second Third Fourth

91%

1%8%

Page 13: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

12

HIGH-QUALITY ASSET BASELONG-LIFE MINES

*Source: Company Reports, based on mine life from 2012, Sudbury mines adjusted to 15 yr mine life in 2017 in respect of 20 year term; **long life is 10+ yrs

Mine life:

Mine life:

2013 Proforma Forecast Production By Mine Life*

2017 Proforma Forecast Production By Mine Life*

>80% of long-term attributable production comes from long-life mines**

46%

30%

7%

17%

31%

28%

12%

29%

20+yrs 15-20yrs 10-15yrs <10yrs

Page 14: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

13

THE VALE DEAL ADDING ‘THE RIGHT’ GOLD OUNCES

Announced in February, 2013 Salobo and Sudbury mines Accretive on all metrics Upfront payment of $1.9B* Provides immediate cash flow Significantly increases gold exposure

• Gold increases to 24% of overall production over the next 5 years

Enhances long term growth Increases portfolio diversification

Vale’s Salobo Mine (Brazil)

Vale’s Coleman Mine in Sudbury (Canada)*In addition to the upfront payment, 10 million Silver Wheaton warrants with a strike price of US$65 and a term of 10 years were also issued to Vale as part of the transaction.

Page 15: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

14

THE VALE DEALTWO NEW HIGH-QUALITY PRECIOUS METAL STREAMS

Salobo Stream • 25% of total gold production for life of mine

Sudbury Stream • 70% of total gold production for 20 years

Consideration• Cash payment of US$1.9B paid on closing

• US$1.33B for Salobo, US$570M for Sudbury• 10 million SLW warrants with a 10 year term and strike price of $65

Production Payments• Salobo: $400/oz for gold, 1% inflationary adjustment starting 2016• Sudbury: $400/oz for gold, fixed for 20-year term

Key Terms

• Production accrues retroactively to January 1, 2013• Salobo gross up clause: If the 24Mtpa expansion is not completed by

the end of 2016, SLW is entitled to a temporary increase in the percentage of gold production based on the pro-rata achievement of the target production

• Additional payment to Vale if throughput is expanded to 28Mtpa or more within a specified time period and based on a set fee schedule

• Sudbury: Term is extended if mill shutdown for >60 cumulative days**Excludes any shutdown for scheduled maintenance or shutdowns for 20 consecutive days or less

Page 16: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

14.7%15.5%

21.1%

13.7% 13.7% 14.4%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

Production Initial10 Years

(at fullproduction***)

Production Initial20 Years

ReserveContained

Ounces

Reserve &ResourceContained

Ounces

Cash Flow Initial10 Years

(at fullproduction***)

Cash Flow Initial20 Years

THE VALE DEALACCRETIVE ON ALL KEY METRICS

15

*Production, Reserves, and Resources based on Ag Eq assuming 53.3:1 Ag:Au ratio; Cash flow based on silver and gold prices of $30 and $1,600, respectively; See appendix for full reserve and resource tables; **Enterprise value based on NYSE closing price on Feb. 4, 2013, of US$36, existing debt, outstanding obligations (Hudbay, Augusta, etc.), and cash on hand at the end of Q3, 2012; ***Full production is net of 3-year ramp-up at the Salobo mine and the Totten mine at Sudbury, both of which are expected to be complete by the end of 2015

Accretion to Silver Wheaton*

Vale upfront payment of $1.9B represents 12.9% of Silver Wheaton’s pro-forma Enterprise Value**

Page 17: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

16

THE VALE DEAL IMMEDIATE PRODUCTION AND GROWTH

Mine Salobo Subdury (6 mines + 1 project)

Location Brazil Canada

Status Operating / Expanding Operating / Expanding

Attributable Annual Production*:Ramp-up** Long-term AverageUpside to existing mine plans***

45koz Au (2013-2015)60koz Au (30 years)

70koz Au (2016-2025)

30koz Au (2013-2015)50koz Au (20 years)

50 koz Au (2008-2012)*****

P&P Gold Reserves**** 3.8Moz Au 0.75Moz Au

M&I Gold Resources**** 0.25Moz Au

Inferred Resource**** 0.13Mz Au 0.40Moz Au

Mine Life (yrs)**** >30 >25 years, term: 20 years

*Attributable production to Silver Wheaton based on the Company / Vale’s forecasts; ** Lower production in 2013-2015 due to Salobo ramp-up to 24 mtpa & ramp up at Sudbury’s Totten mine; ***Upside is based on existing mine plan and does not include expansion at Salobo above 24 mtpa; ****Please refer to the Reserve and Resource tables in the appendix of this presentation for full disclosure; *****70% of 71k oz Au produced 2008-2012, based on Vale’s 20-F filings with the US SEC.

Page 18: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

-$4.00

-$2.00

$0.00

$2.00

$4.00

$6.00

$8.00

$10.00

0% 20% 40% 60% 80% 100%-$1.50

-$0.50

$0.50

$1.50

$2.50

$3.50

$4.50

0% 20% 40% 60% 80% 100%

THE VALE DEALASSET QUALITY IS PARAMOUNT

Salobo and Sudbury are both in the lowest cost quartile

17

*Byproduct cash costs are based on Wood Mackenzie estimates for 2013

Salobo*

Sudbury*

2013 Copper Cost Curve* 2013 Nickel Cost Curve*

Page 19: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

18

HIGH QUALITY ASSET BASEWORLD-CLASS CORNERSTONE ASSETS

Mine Peñasquito Pascua-Lama

Operator

Location Mexico Chile/Argentina

Status Operating Prod start forecast H2-2014

Av. Annual Silver Production* 5.5 - 7Moz to SLW 9Moz to SLW (first 5 years)

P&P Silver Reserves ** 960Moz 676Moz

M&I Silver Resources** 266Moz 185Moz

By-product Cash Costs* <$0/oz Au <$0/oz Au (first 5 years)

Mine Life* 22+ 25+

*Source: Company Reports, Peñasquito production at design throughput capacity of 130k t/d is ~7Moz to SLW; however, given water shortages, throughput is forecast to average 110k t/d over the next 5 years and 2013 guidance from Goldcorp is for 5.5-5.8Moz to SLW. Production forecast Pascua-Lama life-of-mine (LOM ) average annual production of 20-25Moz Ag; **Peñasquito reserves and resources on a 100% basis and as at Dec. 31, 2011, Pascua-Lama reserves and resources on a 100% basis as at Dec. 31, 2011.

Cornerstone assets run by two of the world’s largest gold companies

Page 20: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

19

DIVERSIFICATION BY MINE19 PRODUCING MINES IN 2013

2013 Proforma ForecastProduction by Mine

2017 Proforma Forecast Production by Mine

*Silver Eq. production assuming Ag:Au ratio of 53.3:1; **Production includes Goldcorp’s four year commitment commencing in August 2010 to deliver to Silver Wheaton 1.5Moz of Ag per annum resulting from their sale of San Dimas to Primero; ***Comprised of the Veladero, Lagunas Norte and Pierina mines

Vale Vale

Diversified asset base with no single asset accounting for more than 25% of production

20%

17%

15%5%

5%

8%

6%

5%

5%

4%

10%San Dimas**

Peñasquito

777*

Salobo*

Sudbury*

Yauliyacu

Zinkgruvan

Barrick (Other)***

Cozamin

Minto (gold)*

Other*

23%

13%

12%

7%4%

8%

5%

5%

4%

4%

15%Pascua Lama

Peñasquito

San Dimas**

Salobo*

Sudbury*

Rosemont*

Yauliyacu

777*

Constancia

Zinkgruvan

Other*

Page 21: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

DIVERSIFICATION BY MINE TYPEPRODUCTION SPLIT BETWEEN BASE METALS AND GOLD

20

2013 ForecastProduction by Mine Type

2017 Forecast Production by Mine Type

Primary source production is well diversified between gold, copper, and zinc mines*Source: Company Reports

44%

31%

19%

4%

2%

Gold Copper Zinc Nickel Silver

50%

30%

14%

4%

2%

Page 22: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

FIVE YEAR PRODUCTION GROWTHADDING TO OUR INDUSTRY - LEADING GROWTH PROFILE

21

Silv

er E

quiv

alen

t Pro

duct

ion*

(M

oz)

Production is forecast for 53Moz Ag Eq. in 2017 with the addition of Salobo & Sudbury

*Assumes a Au/Ag ratio of 53.3:1; **Comprised of the Veladero, Lagunas Norte and Pierina mines; ***Production incudes Goldcorp’s four year commitment commencing in August 2010 to deliver to Silver Wheaton 1.5Moz of Ag per annum resulting from their sale of San Dimas to Primero

5 Year Forecast Production Growth >80%

25.3Moz~28Moz

~33.5Moz

~53Moz

0

10000

20000

30000

40000

50000

60000

2009A 2010A 2011A 2012E 2013E 2017E

SaloboSudbury777ConstanciaRosemontPascua LamaPeñasquitoSan Dimas***YauliyacuZinkgruvanBarrick (other)**Minto (gold)CozaminOther

Page 23: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

WHY INVEST IN SILVER WHEATON?

22

Page 24: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

23

SIGNIFICANT MARKET SHAREINVESTMENT IN THE SILVER INDUSTRY

*Measured by average daily trading volume in US dollars, source is Bloomberg market data as of Dec 31, 2012, Data from US and Cdn exchanges except for Fresnillo and Hochschild which trade on LSE, **Includes iShares Silver Trust, ETF Securities’ Silver ETFs, ZKB Silver ETF and Sprott Silver Trust; ***Includes Coeur d’Alene, Hecla, Pan American Silver, Fresnillo and Hochschild

Percentage Allocation of Investment Dollars*

26%

62%

12%

= Silver Wheaton = Silver ETFs** = Senior Silver Producers***

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2004 2005 2006 2007 2008 2009 2010 2011 2012

Page 25: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

SILVER WHEATON VERSUS SILVER PRODUCERS

24

Silver Wheaton Silver Miners

Primary Silver Exposure Fixed operating* and capital costs

No exploration costs but exploration upside Highly diverse asset base

Sustainable dividend at all silver prices

*Ongoing delivery payments are fixed at approximately US$4/oz with an inflationary adjustment of approximately 1% per annum after the third year of production

Strong upside with downside protection

Page 26: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

85%

71% 70% 65%60%

40%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Silver Wheaton Pan AmericanSilver

Hochschild Coeur D'Alene Fresnillo Hecla

25

SILVER WHEATON VERSUS SILVER PRODUCERSPRIMARY SILVER EXPOSURE

*Source: Company Reports, first half ending Jun. 30, 2012; **Source: Company Reports; ***Based on 2012 forecast production, with gold production from Hudbay Minerals which began accruing as of Aug.1, 2012, annualized (SLW to receive 68,000 oz of gold per year from the 777 mine, through the end of 2016)

Silver revenue as a percentage of total revenue*Width of bars based on actual 2011 production**

25.4Moz

15Moz

21.9Moz

19.1Moz

41.9Moz

9.5Moz

100% of revenue derived from precious metals

***

Page 27: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

SILVER WHEATON VERSUS SILVER PRODUCERSFIXED OPERATING AND CAPITAL COSTS

26

*Refer to non-IRFS measures at the end of this presentation; **Operating costs are fixed at approximately US$4/oz with an inflationary adjustment of approximately 1% per annum after the third year of production; ***Source CPM Group, 2012 Silver Yearbook

Cash Operating Margins*Total Cash Cost/oz*

Fixed cash costs** provide shareholders with full benefit of increasing silver prices Expanding cash operating margins

$7.30 $7.31

$11.72$13.42

$14.97 $15.02

$20.75

$34.60

$30.90

$3.90 $3.90 $3.90 $3.91 $3.94 $3.97 $3.97 $3.99 $4.10$0

$5

$10

$15

$20

$25

$30

$35

$40

2004 2005 2006 2007 2008 2009 2010 2011 Q1-3 2012

Silv

er P

rice

(US

$/oz

)

Page 28: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

1719

7 8 6 4 2

44

7 5

1 33

0

5

10

15

20

25

SilverWheaton

SilverWheatonProforma

Fresnillo Pan AmericanSilver

Coeur D'Alene Hochschild Hecla

Num

ber o

f Ass

ets

Producing Assets Development Assets

SILVER WHEATON VERSUS SILVER PRODUCERSHIGHLY DIVERSE ASSET BASE

27

21

1413

7 75

Silver Wheaton offers superior asset diversification compared to other silver producers

*Source: Company disclosure, development assets include projects with defined resources

23

Page 29: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

SILVER WHEATON VERSUS SILVER ETF / BULLION

28

Silver Wheaton Silver ETF/Bullion

Primary Silver Exposure Leverage to Silver Price

Exploration and Expansion Acquisition Growth Potential

Dividend Yield

Silver Wheaton provides much more than silver exposure

Page 30: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

111%

215%

356%

0%

50%

100%

150%

200%

250%

300%

350%

400%

Silver Price* Silver Wheaton Share Price Cash Flow/Share**

SILVER WHEATON VERSUS SILVER ETF / BULLIONLEVERAGE TO SILVER PRICES

29

*Source: LBMA Silver Fixings; **Refer to non-IRFS measures at the end of this presentation

(09/30/2009 – 09/30/2012)Three year growth

$34.65/oz

$33.20/share

$1.78/share

$39.71/share

Page 31: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

SILVER WHEATON VERSUS SILVER ETF / BULLION EXPLORATION AND EXPANSION - GROWING RESERVES & RESOURCES

30

Silver Equivalent Reserves and Resources (in Moz)*

Silver Wheaton’s production has been more than replaced through successful exploration by our partners

69 (P&P)4(M&I)

173 (Inf)

1,774

275

222

*Reserves and resources are as of Dec. 31 for each year (see appendix for reserve and resource tables). Silver equivalent basis assuming a 53.3:1 Ag:Au ratio

275

Page 32: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

SILVER WHEATON VERSUS SILVER ETF / BULLION EXPANSION AND GROWTH THROUGH ACCRETIVE ACQUISITIONS

31

Total attributable Ag equivalent reserves and resources per share since inception*

Reserves Measured & Indicated Inferred

*Reserves and resources are as of Dec. 31 for each year (see appendix for reserve and resource tables); **Current reserves and resources include reserves and resources updated up until Jul. 31 plus reserves and resources of acquisitions since Dec. 31, 2011 including 777, Constancia, Salobo and Sudbury. Silver equivalent basis assuming a 53.3:1 Ag:Au ratio; ***From Dec. 31, 2004 to Dec. 31, 2011

0.0

1.0

2.0

3.0

4.0

5.0

6.0

2004 2005 2006 2007 2008 2009 2010 2011 Current**

Silv

er E

q. o

z/sh

are

Significant growth in reserves and resources per share since inception

Page 33: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

32

SILVER WHEATON VERSUS SILVER ETF / BULLION ACQUISITION GROWTH POTENTIAL - LARGE TARGET MARKET

Silver Wheaton vs. Global Silver Production

*Source: CPM Group silver production forecasts by source metal

Fore

cast

Glo

bal S

ilver

Pro

duct

ion

(Moz

)(S

ilver

Out

put b

y M

ine’

s S

ourc

e M

etal

)*

Silver Wheaton’s Potential Target

Market

4% 6%

Traditional Silver

Companies

Silver Wheaton’s Forecast Production (% of potential target market)

>70% of mined silver is produced as a by-product from base metal or gold mines = significant growth potential in the silver stream space

Primary Silver MinesGold MinesBase Metal Mines

0

100

200

300

400

500

600

700

800

900

1000

2011A 2012E 2013E 2014E 2015E 2016E SLW 2012

SLW 2016

Page 34: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

0

5

10

15

20

25

30

35

40

45

50

Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Jan-12 Jan-13

Silv

er P

rice

(US

$ / o

z.)

Spot Silver Price Analyst Consensus LT Silver Price

33

SILVER WHEATON VERSUS SILVER ETF / BULLION ACQUISITION GROWTH POTENTIAL - FAVORABLE ENVIRONMENT

Spot Silver Prices vs. Long-term Analyst Consensus

LuisminZinkgruvan

YauliyacuPeñasquito

Stratoni

Barrick

Keno Hill

Mineral ParkCampo Morado

Rosemont

Silverstone

Hudbay

Transactions have typically occurred when long-term analyst consensus silver prices are approximately 75% of spot silver prices

Vale

Page 35: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

$0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000

Paymentto Vale

Bridgenancing

SILVER WHEATON VERSUS SILVER ETF / BULLIONACQUISITION GROWTH POTENTIAL – CAPACITY FOR MORE DEALS

34

*Cash is at the end of Q3, 2012 and does not include cash generated in Q4, 2012 or YTD 2013; **Does not include 2 payments to Hudbay of $125M each to be made upon satisfaction of minimum capital expenditures at Constancia, net debt of $57M at the end of Q3, 2012, or additional payments of US$230M for the Rosemont transaction and US$32.4M for the Navidad transaction that are contingent upon receipt of key operating permits and a construction decision.

Access to additional capital leaves us well-positioned to pursue additional accretive silver stream opportunities

End of Q3, 2012 Cash* $555M

Revolver$1.0B

Bridge Facility$1.5B

Payment to Vale$1.9B

Available Capacity>$1.0B**

Q4 2012 + YTD 2013

CF+

Page 36: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

35

*Operating cash costs are approx. US$4/oz (with an inflationary adjustment of approx. 1% per annum after the third year of production); **The declaration and payment of dividends remains at the discretion of the Board and will depend on the Company’s cash requirements, future prospects and other factors deemed relevant by the Board

SILVER WHEATON VERSUS SILVER ETF / BULLIONDIVIDEND YIELD - A UNIQUE AND SUSTAINABLE DIVIDEND POLICY

Unique Dividend Policy: Dividends linked to operating cash flows whereby 20% of previous quarter’s operating cash flows is distributed to shareholders

Benefits:• Direct Silver Price Exposure – Fixed cash cost* business model allows

shareholders to benefit from silver price increases

• Participation in Sector-Leading Production Growth – Greater than 65% organic attributable production growth forecast over the next 5 years

• Sustainable – Dividend can be provided in all silver price environments

• Flexible – Ensures Silver Wheaton has the cash flows required to deliver additional long-term production growth

Unique and sustainable dividend policy further differentiates Silver Wheaton from silver exchange traded funds

Page 37: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

SILVER WHEATON VERSUS SILVER ETF / BULLION

36

Silver Wheaton Silver ETF/Bullion

Primary Silver Exposure Leverage to Silver Price

Exploration and Expansion Upside Acquisition Growth Potential

Dividend Yield

Page 38: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

0.20%

0.50%

0.30%

0.49%

0.56%

0.45%

0.00%

0.10%

0.20%

0.30%

0.40%

0.50%

0.60%

Silver Wheaton iShares Silver Trust(SLV)

ETFS PhysicalSilver - New York

(SIVR)

ETFS PhysicalSilver - London

(PHAG)

Sprott PhysicalSilver Trust (PSLV)

Bullion Storage Fee(Industrial quantity)

37

SILVER WHEATON VERSUS SILVER ETF / BULLIONALL THE ADVANTAGES AND A LOWER COST

Administrative Costs

SLW administrative costs are lower than Silver ETFs and Silver Bullion storage fees 1) Presented as a % of Enterprise Value for SLW; as a % of NAV for SLV, SIVR and PSLV; as a % of Bullion held in custody for PHAG; 2) 2011 G&A of $25.2M / Enterprise Value of $12.8B per Thomson as of Dec-31-12; 3) As reported in Sept-30-12 10Q; 4) As reported in Oct-31-12 fact sheet; 5) As reported in Dec-31-11 Report to Unit Holders. Management fee of 0.45% + operating expense of 0.15% of NAV. 2011 operating expense of $1.67 million / NAV of $1.5B as of Sep-28-12; 6) Approx industry average as per ScotiaMocatta for $10M minimum storage amount.

23

3 4

5 6

1

Page 39: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

38

THE PROOF…IS IN THE PRICE PERFORMANCE

SLW

*Source: ThomsonOne, as of Feb 8, 2013

Silver

PAAS

HLSSRI

CDE

SLW’s share price has significantly outperformed the price of silver and the share price of its silver producing peers since the Company’s inception in October 2004

-200%

0%

200%

400%

600%

800%

1000%

1200%

1400%

Oct

-04

Jan-

05A

pr-0

5Ju

l-05

Oct

-05

Jan-

06A

pr-0

6Ju

l-06

Oct

-06

Jan-

07A

pr-0

7Ju

l-07

Oct

-07

Jan-

08A

pr-0

8Ju

l-08

Oct

-08

Jan-

09A

pr-0

9Ju

l-09

Oct

-09

Jan-

10A

pr-1

0Ju

l-10

Oct

-10

Jan-

11A

pr-1

1Ju

l-11

Oct

-11

Jan-

12A

pr-1

2Ju

l-12

Oct

-12

Jan-

13

Page 40: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

39

IF YOU LIKE SILVER….

SILVER WHEATON PROVIDES:

Cost certainty

Leverage to increasing silver prices

High quality asset base

Exceptional growth profile

Dividend yield

AND REMAINS STRATEGICALLY POSITIONED FOR FURTHER GROWTH.

Page 41: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

INVESTOR RELATIONSTel: 604-684-9648Toll Free: 1-800-380-8687Email: [email protected]

TRANSFER AGENTCIBC Mellon Trust Company Toll Free: 1-800-387-0825 Email: [email protected]

NYSE: SLW TSX: SLWwww.silverwheaton.com

40

Page 42: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

APPENDIX

41

Page 43: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

42

LIQUID STOCK CAPITAL STRUCTURE AS OF SEPT. 30, 2012

Shares Outstanding 354.2 million

Warrants Outstanding (in-the-money) 2.7 million

Options Outstanding (in-the-money) 2.5 million

Shares Fully Diluted 359.4 million

3 Month Average Daily Trading Volume:TSX: 1.0 million sharesNYSE: 3.2 million shares

Page 44: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

43

COMPANY HISTORYTIMELINE

2004 2005 2006 2007 2008 2009 2010 2011 2012

Date of Contract: 10/15/2004Current Owner: Primero MiningUpfront Payment: $190 million Term of Agreement: LOM Attr. Production: 100% Silver

San Dimas (Mexico)

Date of Contract: 12/8/2004Current Owner: Lundin MiningUpfront Payment: $78 millionTerm of Agreement: LOMAttr. Production: 100% Silver

Zinkgruvan (Sweden)

Date of Contract: 3/23/2006Current Owner: GlencoreUpfront Payment: $285 millionTerm of Agreement: 20 yearsAttr. Production: 100% Silver

Yauliyacu (Peru)

Date of Contract: 4/23/2007Current Owner: Eldorado GoldUpfront Payment: $58 millionTerm of Agreement: LOMAttr. Production: 100% Silver

Stratoni (Greece)

Date of Contract: 7/24/2007Current Owner: GoldcorpUpfront Payment: $485 millionTerm of Agreement: LOMAttr. Production: 25% Silver

Peñasquito (Mexico)

Date of Contract: 3/17/2008Current Owner: Mercator MineralsUpfront Payment: $42 millionTerm of Agreement: LOMAttr. Production: 100% Silver

Mineral Park (United States)

Date of Contract: 5/13/2008Current Owner: Nyrstar NVUpfront Payment: $79 millionTerm of Agreement: LOMAttr. Production: 75% Silver

Campo Morado (Mexico)

Date of Contract: 10/2/2008Current Owner: AlexcoUpfront Payment: $50 millionTerm of Agreement: LOMAttr. Production: 25% Silver

Keno Hill (Canada)

Date of Contract: 10/15/2004Current Owner: GoldcorpUpfront Payment: $4 millionTerm of Agreement: 25 yearsAttr. Production: 100% Silver

Los Filos (Mexico)

Date of Contract: 2/11/2010Current Owner: Augusta ResourcesUpfront Payment: $230 millionTerm of Agreement: LOMAttr. Production: 100% Silver

100% Gold

Rosemont (United States)

Date of Contract: 8/8/2012Current Owner: HudbayUpfront Payment: $295 millionTerm of Agreement: LOMAttr. Production: 100% Silver

Constancia (Peru)

Date of Contract: 8/8/2012Current Owner: HudbayUpfront Payment: $455 millionTerm of Agreement: LOMAttr. Production: 100% Silver

100% / 50% Gold *

777 (Canada)

Date of Transaction: 5/21/2009Interests Acquired: (mine / owner / location)Minto Capstone Mining CanadaCozamin Capstone Mining MexicoNeves-Corvo Lundin Mining PortugalAljustrel I’M SGPA Portugal

Silverstone Resources

Date of Contract: 9/8/2009Current Owner: BarrickUpfront Payment: $625 millionTerm of Agreement: LOMAttr. Production: 25% SilverAdditional Consideration: (mine / location)Lagunas Norte PeruPierina PeruVeladero Argentina

Pascua-Lama (Chile / Argentina)

10/22/2004: Silver Wheaton began trading on the TSX under the symbol SLW. In December, the Company’s name was changed from Chap Mercantile Inc. to Silver Wheaton Corp. and the outstanding shares were consolidated on a 5 for 1 basis.

Note: Upfront payment denoted in US$ millions; excludes closing costs and capitalized interest, where applicable*Silver Wheaton is entitled to acquire 100% of the life of mine gold production from Hudbay’s 777 mine until Hudbay’s Constancia project satisfies end of 2016, whichever islater. At that point, Silver Wheaton’s share of gold production from 777 will be reduced to 50% for the life of the mine

Date of Contract: 2/05/2013Current Owner: ValeUpfront Payment: $1.33 billionTerm of Agreement: LOMAttr. Production: 25% Gold

Salobo (Brazil)

Date of Contract: 2/05/2013Current Owner: ValeUpfront Payment: $570 millionTerm of Agreement: 20 yearsAttr. Production: 70% GoldAdditional Consideration:10 million SLW warrants w/$65 strike & 10yr term

Sudbury (Canada)

Page 45: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

44

SILVER STREAM AGREEMENTSPRODUCERS

Peñasquito San Dimas 777 Yauliyacu Salobo Sudbury

Company

Status Producing Producing Producing Producing Producing Producing

Contract Length

LOM LOM LOM 20 yrs LOM 20 yrs

Ag Prod. 25% 100%** 100%***up to 4.75 M

oz/yr25% of Au 70% of Au

Mine Life 22+ yrs 15+ yrs 9+ yrs 10+ yrs 30+ yrs 7+ yrs

Cash Costs $3.99/oz $4.09/oz $5.90/oz Ag$400/oz Au $4.02/oz $400/oz Au $400/oz Au

Annual Ag Production

7 Moz* 5+ Moz 820 koz Ag68 koz Au****

Up to 4.75 M oz 60 koz Au***** 50 koz*****

*Peñasquito production at design throughput capacity of 130k t/d is ~7Moz to SLW; **Silver Wheaton will receive 100% of first 3.5Moz Ag produced plus 50% of excess plus 1.5Moz of Ag from Goldcorp until Aug 2014 after which Silver Wheaton will receive 100% of first 6Moz Ag produced plus 50% of excess; ***Also includes 100% of gold production until later of 2016 or completion of Constancia, then drops to 50% of gold for the remainder of the mine life; ****Production rates for 2012-2016, LOM production is forecasted to be 870 koz Ag and 50koz Au; ***** 30yr Avg for Salobo; 20-year term Average for Sudbury

Page 46: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

Zinkgruvan Cozamin Minto StratoniCampo Morado

Neves-Corvo

Company

Status Producing Producing Producing Producing Producing Producing

Contract Length

LOM 10 yrs* LOM LOM LOM LOM

Ag Prod. 100% 100% 100%** 100% 75% 100%

Mine Life 10+ yrs 7+ yrs 10+ yrs 6+ yrs 10+ yrs 10+ yrs

Cash Costs $4.14/oz $4.08/oz $3.94/oz Ag$303/oz Au $3.98/oz $3.90/oz $3.98/oz

Annual Ag Production

2 Moz 1.5 Moz 0.2 Moz Ag20,000 oz Au 1+ Moz 1+ Moz 0.5 Moz

45

SILVER STREAM AGREEMENTSPRODUCERS

*Term of contract for Cozamin expires in 2017; **Includes gold production, If production exceeds 30,000 ounces of gold per year, Silver Wheaton is entitled to 100% of the gold produced up to these thresholds and 50% of the amount in excess of these thresholds

Page 47: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

46

Mineral Park Los Filos Keno Hill Aljustrel

Company

Status Producing Producing Producing Producing

Contract Length

LOM 25 yrs LOM LOM

Ag Prod. 100% 100% 25% 100%

Mine Life 23+ yrs 18+ yrs 4+ yrs 10+ yrs

Cash Costs $3.90/oz $4.13/oz $3.90/oz $3.94/oz

Annual Ag Production

0.5+ Moz 0.2-0.3 Moz 0.5+ Moz 0.1Moz

SILVER STREAM AGREEMENTSPRODUCERS (CONTINUED)

Page 48: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

47

SILVER STREAM AGREEMENTSPRODUCERS (CONTINUED)

Lagunas Norte

Pierina Veladero

Company

Status Producing Producing Producing

Contract Length

to 2014* to 2014* to 2014*

Ag Prod. 100% 100% 100%**

Mine Life 9+ yrs 4+ yrs 21+ yrs

Cash Costs $3.90/oz $3.90/oz $3.90/oz

Annual Ag Production

0.5 Moz 1+ Moz 1+ Moz

*100% Ag Prod. effective September 2009 until end of 2013; During 2014 and 2015, Silver Wheaton will be entitled to the silver production from the Lagunas Norte, Pierina and Veladero mines to the extent of any production shortfall at Pascua-Lama until Barrick satisfies a Completion Guarantee; **SLW’s attributable silver production is subject to a maximum of 8% of the silver contained in the ore mined at Veladero during the period

Page 49: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

48

Pascua-Lama Constancia Rosemont Navidad

Company

Status Development Development Development Development

Contract Length

LOM LOM LOM LOM

Ag Prod. 25% 100% 100%*** 12.5%*****

Mine Life 25+ yrs 16+ yrs 21+ yrs 15+ yrs

Cash Costs $3.90/oz $5.90/oz $3.90/oz Ag$450/oz Au US$4.00/oz

Annual Ag Production

9 M oz* 2.2 Moz** 2.4 Moz Ag15,000 oz Au**** 1.0-2.0 Moz

*9Moz for first 5 years and approx. 5.5 M oz over LOM; **Based on compnay estimates and Hudbay Minerals press release dated August 8, 2012; ***Also includes 100% of the future gold production; ****Based on a Jan 2009 Feasibility Report, Augusta forecasts that up to 15,000 ozs of gold may be produced annually; *****Silver Wheaton has converted a debenture to acquire an amount equal to 12.5% of the Loma de La Plata zone of the Navidad deposit

SILVER STREAM AGREEMENTSDEVELOPMENT ASSETS

Page 50: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

49

SILVER WHEATON’S EQUITY INVESTMENTS

Property of Interest

Corani Rock Creek Montanore Hackett River

Ownership 15% 17% 11% 7%

Stage Permitting Pre-FeasibilityAdvanced

ExplorationPre-Feasibility

Resource (Ag M oz)

P&P 270M&I 89Inf. 48

Inf. 229M&I 166Inf. 65

Ind. 200Inf. 64

Est. Annual Ag Production

+13 M oz/yr* 6 M oz/yr N/A 12 M oz/yr

Source: Company Reports; *For first 5yrs, 8M oz/yr LOM

Page 51: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

Company Type Projects Covered by ROFR

Producer Pascua-Lama

Producer Yauliyacu*

Producer 777 / Constancia**

Producer All Projects

Producer All Projects***

Producer All Projects

Producer Kutcho Project

AUX Canada Development La Bodega and Cal Vetas Projects (including 5km area of interest)

Development Hackett River, Del Norte and Red Lake

Development All Projects in Montana

Development Hermosa Silver Project

50

SIGNIFICANT GROWTH POTENTIALSILVER WHEATON’S RIGHT OF FIRST REFUSAL PORTFOLIO

*Also includes a right of first offer on any project owned by Glencore and its affiliates as of Mar 23, 2006 other than the Yauliyacu Mine; **Includes any future streaming agreement or royalty agreement related to the production of silver or gold from Constancia or 777; ***ROFR resulted from ELD acquisition of European Goldfields and affiliates

Page 52: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

51

THE SILVER STREAM STRUCTURESILVER CREDIT MODEL

Mine X

Smelter & Refinery

Production Report

Silver Credits Purchased From

Broker

Production Payment

Upfront Payment

Silver Production

1) SLW makes an upfront payment to the Vendor2) Mine X, affiliated with the Vendor, produces and sells its concentrates/dore3) Mine X production is a reference point for the amount of silver to be delivered4) The Vendor then purchases Silver credits in an amount equal to that

deliverable to SLW5) SLW then makes the necessary on-going per ounce production payment to

the Vendor6) SLW sells silver credits on spot market

Mining Co. or Affiliate (Vendor)

1

2

4

3

5

Silver Credits sold on spot

market

6

Page 53: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

52

PEÑASQUITO CASE STUDYSINCE ACQUISITION RESOURCES & PRODUCTION HAVE GROWN >65%

April 2007 Current* Growth

Silver Reserves/Resources

P&P Reserves (25%) 144 M oz 240 M oz +67%

M&I Resources (25%) 62 M oz 66 M oz +7%

LOM Silver Production Attributable to SLW (25%) 92 M oz 159 M oz +73%

Average Annual Silver Production Attributable to SLW (25%) 5.4 M oz 5.5-5.8 M oz** +30%

Anticipated Mine Life 17 yrs 22 yrs +29%

Underground Potential Not contemplated Yes +%??

*Reserves and Resources as of Dec 31, 2011, remaining data based on March 2009 Technical Report; **Peñasquito production at design throughput capacity of 130k t/d is ~7Moz to SLW; however, given water shortages, throughput is forecast to average 110k t/d over the next 5 years and 2013 guidance from Goldcorp is for 5.5-5.8Moz to SLW

Page 54: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

DEVELOPMENT STAGE ASSETS

Entitled to 100% of life of mine silver and gold production from Augusta Resource’s Rosemont Project

• Anticipated to be a very long-life, low-cost Cu-Mo-Ag-Au mine• Forecast to increase long-term annual production by approx.

2.9Moz of silver and up to 15,000 ozs of gold*• Once permits finalized, SLW to make upfront cash payments

of US$230 million plus ongoing production payment

Entitled to 12.5% of life of mine silver production from the Loma de La Plata zone of Pan American Silver’s Navidad project

• One of the largest undeveloped silver deposits in the world• Forecast to increase long-term silver production by up to

2Moz per annum**• Once permits finalized and construction commences, SLW to

make upfront cash payments of US$32.4 million plus ongoing production payment

53

*Based on Augusta Resource Corporation’s Jul. 24, 2012 disclosure; **Based on Pan American Silver’s Jan. 2011Preliminary Economic Assessment

Rosemont Project in Arizona

Navidad Project in Argentina

Two projects provide ~5Moz of long-term silver production

Page 55: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

4.00

4.00

4.00

3.00

3.00

3.00

3.00

3.00

3.00

2.97

2.71 2.62

2.39

2.25 2.

232.

222.

152.

092.

082.

032.

002.

001.

971.

861.

771.

671.

591.

501.

301.

001.

001.

001.

001.

001.

00

0.0

1.0

2.0

3.0

4.0

Nev

sun

Cen

terr

aTa

hoe

Ext

orre

Con

tinen

tal

Guy

ana

Can

aco

Bel

o S

unLy

dian

Eld

orad

oIM

ZK

inro

ssIA

MG

OLD

Gol

den

Min

eral

sP

anA

mer

ican

Ala

mos

New

Gol

dB

2Gol

dS

EM

AFO

Gol

dcor

pJa

guar

Min

ing

Prim

ero

Yam

ana

Bar

rick

New

mon

tS

ilver

Whe

aton

Fran

co-N

evad

aA

uRic

oA

gnic

oO

sisk

oS

an G

old

Lake

Sho

reD

etou

r Gol

dR

ubic

onE

xete

r

54

Silver Wheaton ranks very favorably on the political risk spectrum

NAV Weighted Political Risk Rankings*

*Source – July 9th edition of TD Gold and Precious Metals Weekly, Fraser Institute risk ratings to rank countries by quartile; **Silver Wheaton ranking does not include 777 and Constancia

FAVORABLE POLITICAL RISK PROFILETHE RIGHT JURISDICTIONS

Hig

her R

isk

Lower Risk

Page 56: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

Significant silver reserves and resources within non-silver dominant companies

SILVER IS OFTEN A NON-CORE ASSET

55

Silv

er R

eser

ves

and

Res

ourc

es (M

ozs)

Copyright Metals Economics Group - MineSearch - 2012

World’s 10 Largest Companies by Silver Reserves & Resources

0

500

1,000

1,500

2,000

2,500

3,000

Xstrata KGHM Polska

Goldcorp Silver Wheaton

Fresnillo Silver Standard

Barrick Pan American

Silver

BHP Billiton Allied Nevada

Inferred

Measured and Indicated

Reserves

Page 57: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

0

200

400

600

800

1,000

1,200

1,400

1,600

KG

HM

Pol

ska

Pen

asqu

itoP

ascu

a La

ma

Hyc

roft

Mt I

saN

avid

adLa

Pita

rrilla

Glo

gow

Geo

rge

Fish

erG

rasb

erg

Fres

nillo

Met

ates

Sau

cito

Can

ning

ton

Toro

moc

hoA

ntam

ina

Cor

dero

San

Cris

toba

lO

lym

pic

Dam

CU

MO

Esc

obal

Cor

ani

Mal

ku K

hota

KS

MN

eves

-Cor

voX

iasa

i Yin

dou

Roc

k C

reek

Duk

atG

arpe

nber

gZh

ezka

zgan

Hac

kett

Riv

erH

erm

osa

McA

rthur

Riv

erC

erro

de

Pas

coQ

ulon

gC

obre

Pan

ama

Mon

tano

reP

uebl

o V

iejo

Jiam

aE

l Bro

cal

Juan

icip

io

LARGEST 40 SILVER DEPOSITS IN THE WORLDPRODUCING MINES AND DEVELOPMENT PROJECTS

56

Source: Data from Metals Economics Group and includes producing mines and development stage projects with reserve and resource updates subsequent to Jan 1, 2007

Silver Wheaton Relationships (8)

Res

erve

s &

Res

ourc

es (M

oz)

Copyright Metals Economics Group - MineSearch - 2012

Stake in 2 of the top 3 (and 8 of the top 40) silver deposits in the world.

Page 58: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

ATTRIBUTABLE RESERVES AND RESOURCESTOTAL PROVEN & PROBABLE

57

Tonnage Grade Contained Tonnage Grade Contained Tonnage Grade Contained Process Recovery(7)

Mt g/t Moz Mt g/t Moz Mt g/t Moz %

SILVER

Peñasquito (25%)

Mill 156.6 28.9 145.5 129.3 20.2 83.8 285.9 24.9 229.3 53-65%

Heap Leach 8.3 14.4 3.9 23.0 9.4 6.9 31.4 10.7 10.8 24%

San Dimas(10) - - - 3.5 281.5 31.8 3.5 281.5 31.8 94%

Pascua-Lama (25%) 9.9 59.5 18.9 86.3 54.1 150.2 96.2 54.7 169.1 82%

Lagunas Norte(11) 3.3 3.2 0.3 37.6 3.2 3.9 40.9 3.2 4.2 22%

Pierina(11) 2.1 19.9 1.3 18.9 10.8 6.6 21.0 11.8 8.0 37%

Veladero(11) 3.7 13.4 1.6 61.3 13.4 26.5 65.0 13.4 28.1 6%

Yauliyacu(12) 1.0 99.6 3.3 2.7 105.9 9.1 3.7 104.2 12.4 85%

777 (13) 4.9 26.8 4.2 7.5 27.9 6.7 12.4 27.4 10.9 63%

Neves-Corvo

Copper 23.2 44.0 32.9 4.5 45.0 6.5 27.7 44.2 39.4 35%

Zinc 19.4 67.0 41.7 3.8 64.0 7.8 23.1 66.5 49.5 23%

Rosemont(14) 128.8 4.5 18.5 366.8 3.8 44.5 495.6 3.9 62.9 80%

Constancia 359.0 3.3 38.3 91.0 3.6 10.6 450.0 3.4 48.8 72%

Mineral Park(14) 293.9 2.7 25.7 74.5 2.9 7.0 368.4 2.8 32.6 49%

Zinkgruvan

Zinc 8.2 103.0 27.2 2.4 60.0 4.7 10.7 93.1 31.9 70%

Copper 2.8 32.0 2.8 0.1 29.0 0.1 2.8 31.9 2.9 78%

Aljustrel

Copper 2.2 19.2 1.3 8.4 15.3 4.1 10.6 16.1 5.5 30%

Campo Morado (75%) 0.7 166.7 3.8 0.1 123.4 0.3 0.8 162.6 4.1 55%

Stratoni 1.7 174.0 9.3 0.1 225.0 0.7 1.8 177.0 10.0 84%

Minto 5.5 5.4 1.0 5.9 4.6 0.9 11.4 5.0 1.8 80%

Cozamin(15)

Copper 0.9 63.0 1.7 4.9 50.7 8.0 5.8 52.5 9.8 74%

Los Filos 81.0 5.2 13.5 231.2 5.4 40.2 312.2 5.3 53.610 5%

TOTAL SILVER 396.5 460.8 857.4

GOLDSalobo (25%)(17) 142.1 0.45 2.06 135.9 0.40 1.75 278.0 0.43 3.80 66%

Sudbury (70%)(18) 34.8 0.29 0.33 26.5 0.49 0.42 61.3 0.38 0.75 81%

777 (13) 4.9 1.97 0.31 7.5 1.82 0.44 12.4 1.88 0.75 72%

Minto 5.5 0.69 0.12 5.9 0.51 0.10 11.4 0.60 0.22 74%

TOTAL GOLD 2.82 2.70 5.52

Proven & Probable Reserves Attributable to Silver Wheaton (1,2,3,8,16,19)

As of December 31, 2011 unless otherwise noted(6)

Proven Probable Proven & Probable

Page 59: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

ATTRIBUTABLE RESERVES AND RESOURCESTOTAL MEASURED & INDICATED

58

Tonnage Grade Contained Tonnage Grade Contained Tonnage Grade Contained

Mt g/t Moz Mt g/t Moz Mt g/t Moz

SILVER

Peñasquito (25%)

Mill 34.1 13.1 14.4 128.2 12.4 51.1 162.3 12.6 65.5

Heap Leach 1.0 4.6 0.2 6.2 3.9 0.8 7.2 4.0 0.9

Pascua-Lama (25%) 5.3 24.5 4.2 55.9 23.4 42.1 61.2 23.5 46.3

Yauliyacu(12) 0.7 108.5 2.5 6.1 192.4 37.8 6.8 183.5 40.3

Neves-Corvo

Copper 15.4 53.0 26.2 3.4 51.2 5.6 18.8 52.7 31.8

Zinc 42.7 54.3 74.6 14.5 49.5 23.0 57.2 53.1 97.6

Rosemont(14) 7.2 3.9 0.9 103.0 2.7 8.8 110.2 2.7 9.7

Constancia 119.0 2.3 8.6 344.0 2.0 21.9 463.0 2.1 30.5

Mineral Park(14) 101.0 2.6 8.4 175.6 2.7 15.2 276.6 2.7 23.6

Zinkgruvan

Zinc 0.9 123.4 3.8 3.3 109.5 11.5 4.2 112.6 15.2

Copper 2.7 24.4 2.1 0.1 38.5 0.1 2.8 24.9 2.2

Aljustrel

Zinc 1.3 65.6 2.7 20.5 60.3 39.7 21.8 60.7 42.4

Copper - - - 0.1 11.7 0.04 0.1 11.7 0.04

Campo Morado (75%) 2.1 162.1 10.8 4.4 158.0 22.5 6.5 159.3 33.2

Loma de La Plata (12.5%) - - - 3.6 169.0 19.8 3.6 169.0 19.8

Minto 9.4 3.9 1.2 27.2 3.2 2.8 36.5 3.3 3.9

Keno Hill (25%)

Underground - - - 0.3 545.4 4.5 0.3 545.4 4.5

Elsa Tailings - - - 0.6 119.0 2.4 0.6 119.0 2.4

Los Filos 7.9 9.5 2.4 42.7 7.2 9.9 50.6 7.6 12.4

TOTAL SILVER 162.9 319.4 482.3

GOLDSudbury (70%)(16) - - - 23.3 0.33 0.25 23.3 0.33 0.25

Minto 9.4 0.44 0.13 27.2 0.28 0.24 36.5 0.32 0.38

TOTAL GOLD 0.13 0.49 0.62

Measured & Indicated

Measured & Indicated Resources Attributable to Silver Wheaton (1,2,3,4,5,9,16,19)

As of December 31, 2011 unless otherwise noted(6)

Measured Indicated

Page 60: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

ATTRIBUTABLE RESERVES AND RESOURCESFOOTNOTES

59

Notes:1. All Mineral Reserves and Mineral Resources have been calculated in accordance with the CIM Standards and NI 43-101, or the AusIMM JORC equivalent.

2. Mineral Reserves and Mineral Resources are reported above in millions of metric tonnes (“Mt”), grams per metric tonne (“g/t”) and millions of ounces (“Moz”).

3. Individual qualified persons (“QPs”), as defined by the NI 43-101, for the technical information contained in this document (including the Mineral Reserve and Mineral Resourceestimates) for the following operations are as follows:

a. Peñasquito – Maryse Belanger, P.Geo. (Vice President, Technical Services, Goldcorp Inc.).

b. San Dimas – Rodney Webster, MAusIMM, MAIG (Geology Manager, Principal Geologist), Herbert A. Smith, P.Eng (Mining Manager, Principal Mining Engineer) and J.Morton Shannon, P.Geo (Geology Manager, Principal Geologist) all of whom are employees of AMC Mining Consultants (Canada) Ltd.

c. Pascua-Lama – Dino Pilotto, P.Eng. (Principal Mining Consultant, SRK Consulting (Canada) Inc.); Bart A. Stryhas, Ph.D., CPG (Principal Resource Geologist, SRKConsulting (U.S.) Inc.).

d. 777 – Robert Carter, P.Eng. (Director, Technical Services, Hudbay Minerals Inc.).

e. Yauliyacu – Neil Burns, M.Sc., P.Geo. (Vice President, Technical Services); Samuel Mah, M.A.Sc., P.Eng. (Senior Director, Project Evaluations), both employees of theCompany (the “Company’s QPs”).

f. Salobo – A technical report is being prepared, and will be filed by the Company on Sedar (www.Sedar.com) within 45 days of this news release.All other operations anddevelopment projects: the Company’s QPs.

4. The Mineral Resources reported in the above tables are exclusive of Mineral Reserves. The Minto, Campo Morado, Neves-Corvo, Zinkgruvan and Aljustrel mines report MineralResources inclusive of Mineral Reserves. The Company’s QPs have made the exclusive Mineral Resource estimates for these mines based on average mine recoveries anddilution.

5. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.

6. Other than as detailed below, Mineral Reserves and Mineral Resources are reported as of December 31, 2011 based on information available to the Company as of the date of thisdocument, and therefore will not reflect updates, if any, after such date.

a. Resources and Reserves for Yauliyacu, Neves-Corvo and Zinkgruvan are reported as of June 30, 2011.

b. Resources for Rosemont are reported as of October 22, 2008 and Reserves as of March 17, 2009.

c. Resources for the Constancia and Pampacancha deposits are reported as of November 2, 2011 and April 2, 2012, respectively. Reserves for both Constancia andPampacancha deposits are reported as of August 7, 2012.

d. Resources for Mineral Park are reported as of December 29, 2006.

e. Resources and Reserves for Aljustrel’s Feitais and Moinho deposits are reported as of November 30, 2010, Resources for the Estaçao deposit are reported as ofDecember 31, 2007.

f. Resources for Campo Morado’s El Rey, Naranjo and Reforma deposits are reported as of October 13, 2005.

g. Resources and Reserves for Stratoni are reported as of August 10, 2010.

h. Resources for Keno Hill’s Lucky Queen and Onek deposits are reported as of June 30, 2011 and Elsa Tailings as of April 22, 2010.

i. Resources for Loma de La Plata are reported as of May 20, 2009.

Page 61: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

ATTRIBUTABLE RESERVES AND RESOURCESFOOTNOTES (CONTINUED)

60

Notes:7. Process recoveries are the average percentage of silver or gold in a saleable product (doré or concentrate) recovered from mined ore at the applicable site process plants as

reported by the operators.

8. Mineral Reserves are estimated using appropriate process recovery rates and commodity prices of $20.00 per ounce of silver, unless otherwise noted below:

a. Pascua-Lama, Lagunas Norte, Veladero, Pierina and 777 – $22.00 per ounce.

b. Constancia - $23.00 per ounce.

c. Yauliyacu - $30.00 per ounce.

d. Neves-Corvo – 1.4% Cu cut-off for the copper Reserve and 5.0% Zn cut-off for the all zinc Reserves except for Lombador which was reported above a cut-off of 6.0% Zn.

e. Rosemont –$10.00 per ounce.

f. Mineral Park – $7.50 per ounce.

g. Zinkgruvan – 3.7% Zn equivalent cut-off for the zinc Reserve and 1.8% Cu cut-off for the copper Reserve.

h. Aljustrel – 1.5% Cu cut-off for all copper Reserves, 4.5% Zn cut-off for all zinc Reserves.

i. Campo Morado - $30.00 per ounce.

j. Minto – $3.90 per ounce silver and $300 per ounce gold.

k. Salobo and Sudbury - $975 per ounce gold.

9. Mineral Resources are estimated using appropriate recovery rates and commodity prices of $24.00 per ounce of silver, unless otherwise noted below:

a. San Dimas - $25.00 per ounce.

b. Pascua-Lama, Lagunas Norte, Veladero and Pierina – $28.00 per ounce.

c. 777 and Constancia - $22.00 per ounce

d. Yauliyacu – $30.00 per ounce.

e. Neves-Corvo – 1.0% Cu cut-off for the copper Resource and 3.0% Zn cut-off for the zinc Resource.

f. Rosemont – 0.2% Cu cut-off.

g. Zinkgruvan – 3.1% Zn equivalent cut-off for the zinc Resource and 1.5% Cu cut-off for the copper Resource.

h. Mineral Park – $7.50 per ounce.

i. Aljustrel – 1.5% Cu cut-off for all copper Resources, 4.5% Zn cut-off for Feitais and Moinho zinc Resources and 4.0% for Estação zinc Resources.

j. Campo Morado – $30.00 per ounce for the G-9 zones and 5% Zn cut-off for the El Rey, Naranjo and Reforma deposits.

k. Loma de La Plata – $12.50 per ounce.

l. Minto – 0.5% Cu cut-off.

m. Keno Hill – $15.25 per ounce for the Southwest and 99 Zones, $14.50 per ounce for the East Zone, $17.00 per ounce for the Elsa Tailings and $18.50 per ounce for theLucky Queen and Onek deposits.

n. Salobo and Sudbury - $975 per ounce gold. of other metals at the time.

Page 62: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

ATTRIBUTABLE RESERVES AND RESOURCESFOOTNOTES (CONTINUED)

61

Notes:10. The San Dimas silver purchase agreement provides that from August 6, 2010 until August 5, 2014, Primero Mining Corp. (“Primero”) will deliver to the Company a per annum

amount equal to the first 3.5 million ounces of payable silver produced at San Dimas and 50% of any excess, plus the Company will receive an additional 1.5 million ounces of silverper annum to be delivered by Goldcorp. Beginning August 6, 2014, Primero will deliver to the Company a per annum amount equal to the first 6.0 million ounces of payable silverproduced at San Dimas and 50% of any excess, for the life of the mine.

11. The Company’s attributable tonnage at Pierina was estimated by assuming 2011 production level for the remaining two years. The Company’s attributable tonnage at LagunasNorte and Veladero was estimated by assuming 2012 and 2013 processed tonnes based on Barrick’s life of mine (“LOM”) plans. Tonnes for all three operations were pro-ratedbetween Proven and Probable Mineral Reserves according to the ratio of Barrick’s December 31, 2011 Proven and Probable Mineral Reserves. Average reserve grades wereapplied to the Pierina estimates and the average LOM plan grades were applied to Lagunas Norte and Veladero. LOM plans and December 31, 2011 Mineral Reserves estimatesare as published by Barrick.

12. The Company’s Yauliyacu silver purchase agreement (March 2006) with Glencore International AG provides for the delivery of up to 4.75 million ounces of silver per year for 20years. In the event that silver sold and delivered to Silver Wheaton in any year totals less than 4.75 million ounces, the amount sold and delivered to Silver Wheaton in subsequentyears will be increased to make up for any cumulative shortfall, to the extent production permits. Depending upon production levels it is possible that the Company’s currentattributable tonnage may not be mined before the agreement expires.

13. The 777 purchase agreement provides that Hudbay Minerals Inc. will deliver 100% of the payable gold until completion of the Constancia project, after which the gold stream willreduce to 50%. The gold figures in this table represent 100% of 777 Resources and Reserves. In reliance upon Section 9.2 of NI 43-101, all technical information in this documentregarding 777 was sourced by the Company from the Annual Information Form of Hudbay Minerals Inc. filed by Hudbay on March 13, 2012.

14. The Mineral Park and Rosemont Resources and Reserves do not include the SX/EW leach material since this process does not recover silver.

15. The Company’s attributable tonnage at Cozamin was estimated by assuming Capstone Mining Corp’s (“Capstone”) 2012 production guidance of 1.1 million tonnes until the end ofthe Company’s Cozamin silver purchase agreement with Capstone. Tonnes were pro-rated between Proven and Probable Mineral Reserves according to the ratio of Capstone’sDecember 31, 2011 published Proven and Probable Mineral Reserves, applying average reserve grades.

16. The Company has filed a technical report for Yauliyacu, Peñasquito, San Dimas and Pascua-Lama, which are available on SEDAR at www.sedar.com. Please see footnote 13 forfurther information regarding 777.

17. A technical report for Salobo will be filed on Sedar within 45 days of this news release. Inferred Resources have been estimated by the Company and are contained within thecurrent Reserve pit shell.

18. The Company’s attributable Resources and Reserves for Sudbury have been constrained to the production expected for the 20 year term.

19. Silver and gold are produced as by-product metal at all operations with the exception of silver at the Keno Hill mine and Loma de La Plata project; therefore, the economic cut-offapplied to the reporting of silver and gold Resources and Reserves will be influenced by changes in the commodity prices of other metals at the time.

Page 63: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

Silver is a unique precious metal• Silver price has high correlation with gold price• Produced primarily as a by-product• Significant industrial applications

Silver is a store of value• Physical silver demand has risen significantly in the past several years

reflecting strong investor interest• ETF inventories remain at historically high levels

Silver is a versatile industrial metal• The best conductor of heat and electricity, the most reflective, malleable yet

strong• Used in a very wide range of products• New uses are being developed at a staggering pace• Relied upon in advancement of developed and emerging economies

62

WHY SILVER?

Page 64: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

63

Source: Thomson Reuters GFMS

SILVER DEMANDWHAT IS SILVER USED FOR?

2011 Actual2010 Actual

Page 65: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

64

INVESTMENT DEMAND

Silver ETF demand was more volatile in 2011 with a decline of approximately 26Moz**

• This decline was more than offset by continued strong silver bar demand

• Year-to-date ETF demand has been relatively flat

*GFMS estimates; **CPM Group; ***Mitsui

Coins and medals demandincreased by 19% in 2011 posting a new record of 118Moz*

Coins and Medals Demand (in Mozs)

Silver ETF Investment (in Mozs)***

0

50

100

150

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

USA Canada Other

Page 66: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

INDUSTRIAL DEMAND

65

Industrial demand estimated to have decreased 2.7% in 2011, due primarily to weaker year-over-year fourth quarter demand

Industrial demand is relatively inelastic to the price of silver (low proportion of input cost)

Source: GFMS

0

100

200

300

400

500

600

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Silv

er (m

illio

n ou

nces

)

Other

Brazing Alloys

Electrical

Page 67: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

The largest component of industrial demand is:• Electrical and Electronics• Brazing alloys and solders

Given silver’s unique characteristics of being the best conductor and the most reflective of all metals, and of possessing natural antimicrobial properties, several new industrial uses are forecast to increase future demand

66

DEMAND FROM INDUSTRIAL APPLICATIONS

Source: VM Group July 2011Silver Book

Page 68: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

2010 Actual

67

Source: Thomson Reuters GFMS

SILVER SUPPLY

2011 Actual

Page 69: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

68

Source: GFMS

SILVER SUPPLY – PRODUCTION GROWTH

World silver mine production was estimated to have increased 1% in 2011

0

100

200

300

400

500

600

700

800

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Silv

er P

rodu

ctio

n (M

ozs)

Latin America North America Asia Oceana CIS Europe Africa

Page 70: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

69

Source: GFMS

SILVER SUPPLY – SCRAP

Silver scrap supply was estimated to have risen by 28Moz or 12% in 2011

0

20

40

60

80

100

120

140

160

180

200

220

240

260

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Silv

er S

crap

(M

ozs)

Page 71: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

SILVER BULLION INVENTORIES*

70

*Source: CPM Group; **Other inventories include all reported inventories at exchanges, some industry-reported inventories, CPM Group’s estimates of bullion in bar form. It excludes coins and silver held as a form of savings in silverware and jewelry as well.

Total silver bullion inventories declined from 1988-2005 The introduction of silver ETFs in 2006 reversed this trend Government inventories have been declining since 1980 and are estimated at

less than 60Moz of silver

Silv

er (m

illion

s of

oun

ces)

Other silver inventories**

Government silver inventories

Silver inventories held in ETFs

0

500

1,000

1,500

2,000

2,500

3,000

70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 00 02 04 06 08 10

Page 72: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

0

20

40

60

80

100

120

1833 1843 1853 1863 1873 1883 1893 1903 1913 1923 1933 1943 1953 1963 1973 1983 1993 2003

71

GOLD/SILVER PRICE RATIO1833 - PRESENT

Gol

d/si

lver

ratio

Average Price Ratio = 37:1

Source: Average yearly gold and silver price sourced from www.kitco.com

The ratio of silver to gold in the earth’s crust is approximately 19:1

Page 73: BMO CAPITAL MARKETS 22 ANNUAL GLOBAL METALS & MINING CONFERENCE · 2017-05-15 · BMO CAPITAL MARKETS 22ND ANNUAL GLOBAL METALS & MINING ... Mining Levon Resources Hecla Mining Tahoe

NON-IFRS MEASURES

72

Silver Wheaton has included, throughout this presentation, certain non-IFRS performance measures, including (i) average cash costs of silver and gold on a per ounce basis; (ii) operating cash flows per share (basic and diluted) and; (iii) cash operating margin.

i. Average cash cost of silver and gold on a per ounce basis is calculated by dividing the cost of sales by the ounces sold. In the precious metals mining industry, this is a common performance measure but does not have any standardized meaning. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company’s performance and ability to generate cash flow.

ii. Cash operating margin is calculated by subtracting the average cash cost of silver and gold on a per ounce basis from the average realized selling price of silver and gold on a per ounce basis. The Company presents cash operating margin as it believes that certain investors use this information to evaluate the Company’s performance in comparison to other companies in the preciousmetals mining industry who present results on a similar basis.

iii. Operating cash flow per share (basic and diluted) is calculated by dividing cash generated by operating activities by the weighted average number of shares outstanding (basic and diluted). The Company presents operating cash flow per share as it believes that certain investors use this information to evaluate the Company’s performance in comparison to other companies in the preciousmetals mining industry who present results on a similar basis.

These non-IFRS measures do not have any standardized meaning prescribed by IFRS, and other companies may calculate these measures differently. The presentation of these non-IFRS measures is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For more detailed information, please refer to pages 19 to 21 of Silver Wheaton’s Q2 2012 Management Discussion and Analysis available on the Company’s websiteat www.silverwheaton.com and posted on SEDAR at www.sedar.com.