BACHELOR OF TECHNOLOGY INMECHANICAL ENGINEERING
(COMPUTER INTEGRATEDMANUFACTURING)
Term-End Examination
|une, 2A0g
BME-035 : INDUSTRIAL ENGINEERING &OPERATION RESEARCH
Time : 3 hours Maximum Marks : 70
Note : QuestionNo.L is contpulsoty. Attempt any six questions
front the remnining question. lJse of cnlcttlntor is
permitted.
1,. Select the most suitable answer : 10xL=L0
(u) A graphical device used to determine the
break-even point and profit potential under
varying conditions of output and cost is
known as :
(i) Gantt chart
(ii) Flow chart
(iii) Break even chart
(i") PERT chart
(") none of the above
BME-035 P.T.O.
(b) Basic tool in work studY is :
(i) Graph paper
(ii) process chart
(iii) Stop watch
(i") Analytical mind
(") Planning chart
\A/hat does symbol'tl i*ply it work study :
(i) Operation
(ii) Inspection
(iit) Transport
(i") Permanent storage
(") None of the above
ABC analysis deals with :
(i) Analysis of process chart
(ii) Flow of material
(iit) Ordering schedule of job
(i") Controlling inventorY
(") All of the above
One Time Measurement Unit (TMU) in
method time measurement systems equals :
(i) 0.0001 minute
(ii) 0.0006 minute
(iii) 0.006 minute
(in) 0.001 minute
(") 0.06 minute
(.)
BME-035
(d)
(e)
(f) String diagram is used when :
(i) team of workers is working at a place
(ii) material handing is to be done
(iii) idle time is to be reduced
(iv) all of the above
(") none of the above
Micro motion study is :
(i) enlarged view of motion study
(ii) analysis of one stage of motion study
(ii| minute and detailed motion study
(i t) sub-division of an operation into
therbligs and their analysis
(") motion study of small components
upto micro-seconds.
The allowed time for a job equals standard
time plus :
(0 policy allowance
(ii) interference allowance
(iii) process allowance
(i") learning allowance
(") unforseen allowance
Percent idle time for men or machines is
found by :
(i) work sampling
(ii) time study
(iit) method study
(irr) motion study
(") ABC analysis
(g)
, t(h)
(i)
BME-035 P.T.O.
0) Time study is :
the apprhisal in terms of time, of the
value of work involving human effort
machining setting
(iii) time taken by workers to do a job
(i") method of fixing time for workers
(") method of determining the personnel
requirements
A company is making tow products A and B.
Plant of the company can operate 48 hours per
week. Production of product A will require
2 howsfunit and production of product B will
require 3 hours/unit. Each unit of product A will
contribute Rs. 40 to profits while product B will
contribute Rs. 80 per unit to profits. The marketing
department, af ter extensive research, has
determined that a maximum of 15 uni ts of
product A and 10 units of product B can be sold
each week. Formulate a linear programming
model to determine the optimal production mix
of both products that will maximrze profits. Solve
the above problem using the graphic method. L0
(i)
(ii)
2.
BME-035
3. A cement factory manager is considering the bestway to transport cement from his threemanufacfuring units P, Q, and R to depots A, B,C, D and E. The weekly production and demandsalong with transportation costs per ton are givenbelow ' 10
Supplyin Tons
603540
22 20 1B
\zVhat should be the distribution programme ?
A certain work order has five jobs which have tobe assigned'to five mechanics. The estimated time(in hours) that each mechanic requires to complete
the job is given in the following table : L0
l \ _I MECHAMCv h I z I s I + J s
P
aR
Demand
in Tons3045
4 .
M1
M,
M3
M,
Ms
7 5 9
9 1 2 7
8 5 4
7 3 6
4 6 7
8 1 1
1 1 1 0
6 9
9 5
5 11,
Assuming that each mechanic can be assigned toonly one job, determine the minimum time forcompleting the work order.
423
1.aJ
5
aJ
22
424
4
J
4
BME-035 P.T.O.
5 . A job consists of three work elements and all are
performed by the same operator. An analyst
conducted work sampling to determine the
standard time for the job. The duration of the
study is two shifts each with 400 minutes of
effective time. The details of observations are
summarized in the following table. The total
number of acceptable units produced during the
study period is 150 units. Determine the standard
time by assuming allowance of 10%. 1 0
Work element
number
Frequency of Performance
performance rating
12
3
708050
80%LzA%1,L0%
A manufacfuring company keeps stock of a special
product. Previous experience indicates the daily
demand as given below :
Simulate the demand for the next 10 days. Also
find the daily average demand for the product
on the basis of simulated data. Use the Random
Numbers 82, 96, 18, 96, 20, 84, 56, lL, 52, 03.
10
Daily
demand5 10 15 20 25 30
Probability 0.01 0.20 0.15 0.50 o.L20.02
BME-035
7. Solve the following pay off matrix to determine
the optimal strategies and the value of game.
B
I s 1 lA r IL 3 4 r
Write short notes on any tuto of the following :
(u) Data Envelopment Analysis
(b) Design for Environment
(") Factors affecting product design
(d) Human needs considerations for work
organization.
- o O o -
10
8 . 1 0
:i
l .I
BME.O35