Block Upgrades Next Steps & AN- Conf /12
description
Transcript of Block Upgrades Next Steps & AN- Conf /12
![Page 1: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/1.jpg)
International Civil Aviation Organization
Block Upgrades Next Steps & AN-Conf/12
Alexander KorsakovAir Navigation Commissioner
International Civil Aviation Organization
![Page 2: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/2.jpg)
2Preparatory Workshop for AN-Conf/12
A System of Systems
![Page 3: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/3.jpg)
Preparatory Workshop for AN-Conf/12 3
Synchronizing the System of Systems
RASGS
REGIONAL EFFORTS –
PIRGS, RASGS, Priorities? Requests?
ICAO ASSEMBLY &
BUDGET
STAKEHOLDERS
DATED/ NON-EXISTENT GLOBAL
REPORTS AND PLANS PIRGS
REGIONAL EFFORTS –
PIRGS, RASGS, Priorities? Requests?
ICAO ASSEMBLY &
BUDGET
STAKEHOLDERS
DATED/ NON-EXISTENT GLOBAL
REPORTS AND PLANS
![Page 4: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/4.jpg)
4Preparatory Workshop for AN-Conf/12
ICAO’s Strategic Approach
![Page 5: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/5.jpg)
5
ICAO’s Strategic Approach
Preparatory Workshop for AN-Conf/12
![Page 6: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/6.jpg)
6Preparatory Workshop for AN-Conf/12
Integrated Planning through Block Upgrades
![Page 7: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/7.jpg)
Preparatory Workshop for AN-Conf/12 7
Increased Runway Throughput ThroughOptimized Wake Turbulence Separation
Summary Improved throughput on departure and arrival runways through optimized wake turbulence separation minima, revised aircraft wake turbulence categories and procedures.
Main performance impact as per Doc 9854
KPA-02 – Capacity, KPA-06 – Flexibility.
Operating environment/Phases of flight
Arrival and departure
Applicability considerations Least complex – Implementation of revised wake turbulence categories is mainly procedural. No changes to automation systems are needed.
Global concept component(s) as per Doc 9854
CM – conflict management
Global plan initiatives GPI-13: Aerodrome designGPI 14: Runway operations
Main dependencies NilGlobal readiness checklist Status (ready now or estimated date)
Standards readiness 2013Avionics availability N/AGround systems availability N/AProcedures available 2013Operations approvals 2013
![Page 8: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/8.jpg)
8Preparatory Workshop for AN-Conf/12
Benefiting from All the Modules
• There is added value in using all modules– States should view modules in B0 & B1 as critical:• Formalizing a minimum track
– They will allow for benefits down the road in B2 & B3
![Page 9: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/9.jpg)
9Preparatory Workshop for AN-Conf/12
The Cost of Not Implementing
• Focusing on what it will cost if modules are not implemented:– Increased risk of serious incidents and accidents– Negative impact on operations– Environmental repercussions– etc.
![Page 10: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/10.jpg)
10Preparatory Workshop for AN-Conf/12
Reporting Against the Global Plan…
• Performance Monitoring– of individual modules– Air Navigation Report Form
• Annual Global Air Navigation Report• Compare progress across regions• Adjust ICAO work programme
![Page 11: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/11.jpg)
11Preparatory Workshop for AN-Conf/12
…through the Use of GIS Tools
![Page 12: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/12.jpg)
12Preparatory Workshop for AN-Conf/12
Tracking Implementation in States & Regions
http://gis.icao.int
![Page 13: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/13.jpg)
13Preparatory Workshop for AN-Conf/12
Aligning the Conference & the Global Air Navigation Plan
CHAPTERS AN-CONF/12 WORKING PAPERS
Global Air Navigation Policy1
Standardization: Aviation System Block Upgrades2
Continuing Strategic Planning3
Implementing Globally Interoperable ATM4
Aviation System Reporting & Performance Adjustments5
• WP3 – Revised Global Air Navigation Plan (GANP) – framework for global planning
• WP5 – High-level Conference on Aviation Security (HLCAS)
• WP13 – Civil/military coordination/cooperation and flexible use of airspace
• WP25 – Minimum Path
![Page 14: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/14.jpg)
14Preparatory Workshop for AN-Conf/12
Aligning the Conference & the Global Air Navigation Plan
CHAPTERS AN-CONF/12 WORKING PAPERS
Global Air Navigation Policy1
Standardization: Aviation System Block Upgrades2
Continuing Strategic Planning3
Implementing Globally Interoperable ATM4
Aviation System Reporting & Performance Adjustments5
Aviation System Block UpgradeModules on: • WP4 – Airport Capacity• WP7 – SWIM • WP8 – FF-ICE• WP9 – Service improvement through
digital AIM and ATM information• WP10 – Network Operations• WP11 – Airborne Separation• WP12 – Airborne collision avoidance
systems and ground-based safety nets• WP14 – Integration of RPA into non-
segregated airspace• WP15 – Meteorological Information• WP17 – TBO• WP23 – Standardization – in support of
One Sky
![Page 15: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/15.jpg)
15Preparatory Workshop for AN-Conf/12
CHAPTERS AN-CONF/12 WORKING PAPERS
Aligning the Conference & the Global Air Navigation Plan
Global Air Navigation Policy1
Standardization: Aviation System Block Upgrades2
Continuing Strategic Planning3
Implementing Globally Interoperable ATM4
Aviation System Reporting & Performance Adjustments5
• WP6 – PBN for terminal and approach operations
• WP16 – PBN for en-route operations• WP18 – CCO & CDO• WP19 – Regional Performance
Framework – planning methodologies and tools
• WP20 – Human Performance• WP21 – GNSS implementation issues• WP22 – Rationalization of terrestrial
navigation aids
![Page 16: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/16.jpg)
16Preparatory Workshop for AN-Conf/12
CHAPTERS AN-CONF/12 WORKING PAPERS
Aligning the Conference & the Global Air Navigation Plan
Global Air Navigation Policy1
Standardization: Aviation System Block Upgrades2
Continuing Strategic Planning3
Implementing Globally Interoperable ATM4
Aviation System Reporting & Performance Adjustments5
• WP24 – Regional Performance Framework – alignment of areas of applicability of ANPs and regional SUPPs
![Page 17: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/17.jpg)
17Preparatory Workshop for AN-Conf/12
Desired Outcomes of AN-Conf/12
• Endorsement of:– Global Plan, as unified planning mechanism
• Agreement on:– Integrated work programme– Structure and management of “Expert Groups”
• Recommendations on ICAO technical work programme:– Endorsement for short term Block Upgrades– Agreement on Block 1
• Clear strategic direction for future infrastructure:– Endorsement for medium and long term Block Upgrades– Agreement on Blocks 2 & 3
![Page 18: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/18.jpg)
18Preparatory Workshop for AN-Conf/12
Further Addressing Technical Issues
• Aviation Data Link: Now and Tomorrow (2014)– Next steps for Data Link
• End-to-end System Demonstration of New ATM Concepts (2014)– Flight & Flow Information for a Collaborative Environment (FF-ICE)– Trajectory-based Operations– Human performance aspects
• Air Navigation Information Management Divisional Meeting (2015)– System Wide Information Management (SWIM)
![Page 19: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/19.jpg)
19Preparatory Workshop for AN-Conf/12
Further Addressing Policies
• Synergy between 12th Air Navigation Conference & 6th Air Transport Conference:– Policy on access and equity – Consideration of possible global mandates
• for key infrastructure needs such as datalink & SWIM
– Funding/financing of ground equipment & avionics for Block Upgrades
![Page 20: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/20.jpg)
20Preparatory Workshop for AN-Conf/12
Summary
• Follow-up to previous briefing:– Aviation System Block Upgrades
• Next steps in packaging tomorrow’s aviation system• ICAO’s strategic approach• Steps leading to 12th Air Navigation Conference• For more information: www.icao.int/anconf12
![Page 21: Block Upgrades Next Steps & AN- Conf /12](https://reader035.fdocuments.us/reader035/viewer/2022062813/568165cb550346895dd8d7cb/html5/thumbnails/21.jpg)
21Preparatory Workshop for AN-Conf/12