Blank Boq - Finishing(II)-Hiland Park

download Blank Boq - Finishing(II)-Hiland Park

of 13

Transcript of Blank Boq - Finishing(II)-Hiland Park

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    1/13

    RATE AMOUNT

    IT.NO DESCRIPTION UNIT QTY (Rs.) (Rs.)

    A FLOORING WORK

    1 Fixing of ceramic tiles (300mm x 300mm ) in floor over a

    cement mortar (1:4) bed of 20mm thickness including

    pointing with pigments of matching colour and cleaning

    all complete. Sqm ####### 322

    2 Fixing of glazed tiles (300mm x 200mm) or (200mm x

    150mm) in dado over 15mm thick (1:3) cement mortar

    including pointing with pigments of matching colour and

    cleaning all complete. Sqm #######

    3Fixing of ceramic tiles in skirting (150mm high) over

    12mm thick cement mortar (1:4) including pointing with

    pigments of matching colour aqnd cleaning all complete. RM 5037.00

    4 Fixing of marbles in floor over a cement mortar (1:4) bed

    of 20mm thickness and filling the joints with pigments ofmatching colour including ordinary polishing and

    cleaning all complete. Sqm 8332.00

    ALTFixing of marbles in floor with white cement slurry over a

    cement mortar (1:4) bed of 20mm thickness and filling

    the joints with pigments of matching colour including

    ordinary polishing and cleaning all complete. Sqm

    5 i) x ng o mar e n s rt ng mm g ) over a cement

    mortar of 12mm thickness (1:4) including pointing with

    pigments of matching colour including ordinary polishing

    and cleaning all complete. RM 7516.00

    ALT i) Fixing of marble in skirting (75mm high) in white cement

    slurry over a cement mortar of 12mm thickness (1:4)

    including pointing with pigments of matching colour

    including ordinary polishing and cleaning all complete. RM

    ii) Fixing of ceramic tiles in skirting (75mm high) over a

    cement mortar of 12mm thickness (1:4) including

    pointing with pigments of matching colour and cleaning

    all complete. RM #######

    6 Supplying and fixing of vitrified tiles (size 400mm x400mm ) in corridor floor over a bed of cement sand

    mortar (1:4) of thickness 20mm including pointing and

    cleaning all complete. SQM 3427.00

    ALT x ng o v tr e t es s ze mm x mm ) n

    corridor floor over a bed of cement sand mortar (1:4) of

    thickness 20mm including pointing and cleaning all

    complete. SQM

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    2/13

    RATE AMOUNT

    IT.NO DESCRIPTION UNIT QTY (Rs.) (Rs.)

    7 Supplying and fixing of vitrified tiles in corridor skirting

    (75mm high) over a cement sand mortar of 20mm

    thickness (1:4) including pointing and cleaning all

    complete. RM 3799.00

    ALT Fixing of vitrified tiles in corridor skirting (75mm high)

    over a cement sand mortar of 20mm thickness (1:4)

    including pointing and cleaning all complete. RM

    8 Supplying and fixing of glazed tiles (size 200mm x

    200mm or 150mm x 150mm) in corridor dado over a

    cement mortar (1:3) of 12mm thickness including

    pointing and cleaning all complete. Sqm 876.00

    9 Fixing of granite in kitchen counter over a cement mortar

    (1:4) bed of 20mm thickness and filling the joints with

    pigments of matching colour including ordinary polishing

    and cleaning all complete. Sqm 550.00

    10 Fixing of granite in facia of kitchen counters (75mm

    high) over a cement mortar of 12mm thickness (1:4)

    including pointing with pigments of matching colour

    including ordinary polishing and cleaning all complete. RM 900.00

    11 Supplying & fixing of wall pannelling with 9mm thick

    ply over hard wood framework and finished with

    sunmica. SQM 1320.00

    Total for Flooring Work

    B DOOR WORK

    1 Fixing of main door (panelled) made of 2nd class Teak

    wood having single leaf including polishing but

    excluding cost of accessories at all levels. No 426.00

    2 Fixing of internal flush doors of different sizes including

    two coats of synthetic enamel paint (ICI/Berger/Asian

    Paint make) over a coat of primer but excluding cost of

    accessories at all levels. No 2556.00

    3 Fixing of balcony doors fully glazed of different sizes

    including two coats of synthetic enamel paint

    (ICI/Berger/Asian Paint make) over a coat of primer butexcluding glazing & cost of accessories at all levels.

    No 852.00

    4 Fixing of glass in balcony doors including putty at all

    levels but excluding cost of wooden bead. Sqm 1951.00

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    3/13

    RATE AMOUNT

    IT.NO DESCRIPTION UNIT QTY (Rs.) (Rs.)

    5 Fixing of fire door at corridor including painting but

    excluding cost of accessories at all levels (size 1m x

    2.05m ) No 142.00

    6 Fixing of electrical panel room door with louver (Teak

    wood) including two coats of synthetic enamel paint

    (ICI/Berger/Asian Paint ) over a coat of primer but

    excluding cost of accessories at all levels. No 142.00

    7 Supplying and fixing of Teak wood moulding (size

    50mm x 12.5mm ) including polishing at all levels. RM 3833.00

    8 Supplying and fixing of Badam wood moulding (size

    50mm x 12.5mm ) including two coats of synthetic

    enamel paint. RM #######

    Total for Wood Work

    C MISCELLANEOUS WORKS

    1 Supplying & Fixing of glass blocks (190mm x 190mm x

    80mm ) in electrical rooms including filling the joints

    with silicon sealant. Nos 852.00

    2 Fixing of steel louvers ( 075m x 0.6m ) No 852.00

    4 Supplying & applying of waterproof cement paint of

    approved brand to give an even shade with a coat of

    primer Sqm #######

    5 Fixing of door sills (Marble / Granite / Jaisalmir Stone)

    in floor with cement mortar of Size 65mm wide &

    20mm thick. Rm

    6 Supplying and Fixing of Wooden Skirting 75mm high &

    12mm thick with adhesive at all levels complete. Rm

    7 Providing two coats of White Wash with lime at all levels

    complete. Sqm

    8 Fixing of Kotah Stone in stair case over a cement mortar

    (1:4) bed of 20mm thickness including pointing with

    pigments of matching colour complete. Sqm

    9 Fixing of broken tiles in deck level over a cement mortar

    (1:4) bed of 20mm thickness including pointing with

    pigments of matching colour complete. Sqm

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    4/13

    RATE AMOUNT

    IT.NO DESCRIPTION UNIT QTY (Rs.) (Rs.)

    10Fixing of Jaisalmir Stone coping on stair case railing over

    a cement mortar (1:4) bed of 20mm thickness including

    pointing with pigments of matching colour complete. Sqm

    11 Supplying & Fixing of CI grating in drains. Kg

    12 Supplying & Fixing of 150mm dia CI grating. Nos

    13 Providing and laying IPS flooring in stair case, deck,

    ramp including finishing all complete.

    a) 25 mm thick Sqm

    b) 40 mm thick Sqm

    c) 50 mm thick Sqm

    14 Providing and fixing 0.75m x 0.6m ply (12mm thickness)

    for AC cutout covering including painting all complete.Nos

    15 Providing and filling with brick bats outside toilet in 'B'

    type flat at all levels complete. Sqm

    16 Providing and fixing 50mm x50mm x6mm support angle

    below kitchen counter at all levels. Kg

    17Fixing of door frame in concrete surface. With fasteners Nos

    18 Mixing water prrofing compound (Cico No.1) in 12mm

    thick plaster (1:4) inside flats. (Plastering shall be paid in

    BOQ iitem no. 19 of finishing work) Sqm

    19 Providing neat cement punning 150 mm high on sides of

    stair case at all levels complete. Sqm

    20 Water Proofing Treatment to Roof Garden:

    a) i) Cleaning the roof surface by means of wire brush

    ii) Application of "Bitcote"- Heavy Bodied Bitumen

    Coating on the roof surface) ay ng o rmours e - tact c o ypropy ene

    Waterproofing Membrane Reinforced with non-woven

    polyester by Thermofusing adopting ' Torch-on'

    appliction method, on the entire surface treated with

    'Bitcote' (Surface area shall be measured) Sqm

    b) Providing & laying 50mm thick(Av)screed concrete

    (1:2:4) of required thickness with chicken wire mesh over

    ' Armourshield' Sqm

    21 Fixing of counter top basin without accessories No

    Total for Miscellaneous Work

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    5/13

    RATE AMOUNT

    IT.NO DESCRIPTION UNIT QTY (Rs.) (Rs.)

    TOTAL FOR FINISHING WORKS(B+C)

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    6/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    C FLOORING WORK

    1 Handling, lifting & fixing of ceramic tiles of specified

    size, approved shade and make forFlooring at all

    levels & heightsover a cement mortar (1:4) bed of

    20 mm thickness including cutting whereverrequired, making Hole of traps, pipes, comode &

    electric box, cladding, copla, V grove cutting &

    polishing, pointing with pigments of matching colour

    including cleaning, curing, tools complete in all

    respect as per drawing and specifications and as

    directed by the Project Manager (Including the cost

    of sand but excluding the cost of cement & tiles to

    be issued by CMGL).Sqm 27832 322 8961904

    2 Handling, lifting & fixing of ceramic tiles of specified

    size, approved shade and make forDado at all

    levels & heightsover a cement mortar (1:3) bed of15 mm thickness including cutting wherever

    required, making Hole of traps, pipes, comode &

    electric box, cladding, copla, V grove cutting &

    polishing, pointing with pigments of matching colour

    including cleaning, curing, tools complete in all

    respect as per drawing and specifications and as

    directed by the Project Manager (Including the cost

    of sand but excluding the cost of cement & tiles to

    be issued by CMGL).Sqm 14230 317 4510910

    3 Handling, lifting & fixing of ceramic tiles of specified

    size, approved shade and make forSkirting

    (100mm high) at all levels & heightsover a cement

    mortar (1:4) bed of 12 mm thickness including

    cutting wherever required, making Hole of traps,

    pipes, comode & electric box, cladding, copla, V

    grove cutting & polishing, pointing with pigments of

    matching colour including cleaning, curing, tools

    complete in all respect as per drawing and

    specifications and as directed by the Project

    Manager (Including the cost of sand but excluding

    the cost of cement & tiles to be issued by CMGL).RM 26290 60 1577400

    BOQ/Price schedule CMGL

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    7/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    4 Handling, lifting & laying/fixing Marble (of approved

    shade) tiles & slabs at all levels in Floor with white

    cement slurry over cement mortar base (CM 1:4) of

    20mm thick, finished to all shapes (curved or

    straight) and filling the joints with matching colour

    pigment including making Hole of traps, pipes,

    comode & electric box, cladding, copla, V grove,

    cutting, polishing, grinding and cleaning with acid as

    per drawings, specifications and directions of the

    Project Manager (Including the cost of sand, white

    cement, acid, pigment but excluding the cost of

    cement & marble).Sqm 8332 585 4874220

    5 Handling, lifting & laying/fixing Marble (of approved

    shade) tiles & slabs at all levels in Skirting (100mm

    high) with white cement slurry over cement

    mortar base (CM 1:4) of 12mm thick, finished to all

    shapes (curved or straight) and filling the joints with

    matching colour pigment including making Hole of

    traps, pipes, comode & electric box, cladding, copla,

    V grove, cutting, polishing, grinding and cleaning

    with acid as per drawings, specifications and

    directions of the Project Manager (Including the cost

    of sand, white cement, acid, pigment but excluding

    the cost of cement & marble).RM 8765 85 745025

    6 Handling, lifting & fixing of ceramic & vitrif ied tiles of

    specified size, approved shade and make for

    Skirting (150mm high) at all levels & heightsover a

    cement mortar (1:4) bed of 12 mm thickness

    including cutting wherever required, making Hole oftraps, pipes, comode & electric box, cladding, copla,

    V grove cutting & polishing, pointing with pigments

    of matching colour including cleaning, curing, tools

    complete in all respect as per drawing and

    specifications and as directed by the Project

    Manager (Including the cost of sand but excluding

    the cost of cement & tiles to be issued by CMGL).RM 4500 60 270000

    .7 Handling, lifting & fixing of vitrif ied ti les of specified

    size, approved shade and make for corridor floor at

    all levels & heightsover a cement mortar (1:4) bed

    of 20 mm thickness including cutting whereverrequired, making Hole of traps, pipes, comode &

    electric box, cladding, copla, V grove cutting &

    polishing, pointing with pigments of matching colour

    including cleaning, curing, tools complete in all

    respect as per drawing and specifications and as

    directed by the Project Manager (Including the cost

    of sand but excluding the cost of cement & tiles to

    be issued by CMGL).SQM 3427 400 1370800

    BOQ/Price schedule CMGL

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    8/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    8 Handling, lifting & fixing of ceramic tiles of specified

    size, approved shade and make forCorridorDado

    opp. lift well at all levels & heightsover a cement

    mortar (1:3) bed of 15 mm thickness including

    cutting wherever required, making Hole of pipes,

    dedectors, electric box, cladding, copla, V grove

    cutting & polishing, pointing with pigments of

    matching colour including cleaning, curing, tools

    complete in all respect as per drawing and

    specifications and as directed by the Project

    Manager (Including the cost of sand but excluding

    the cost of cement & tiles to be issued by CMGL).Sqm 876 317 277692

    9 Handling, lifting and laying/f ixing pre-polished

    Granite (of approved shade) over RCC kitchen

    counter at all levels & heights, over cement mortar

    base (CM 1:4) of 20mm thick, finished to all shapes

    (curved or straight), making Hole of traps, pipes,electric box, cutting openings for Kitchen sink,

    Cladding, copla, V grove cutting & polishing and

    filling the paper joints with matching colour pigment

    as per drawings, specifications and directions of the

    Project Manager (Including the cost of sand but

    excluding the cost of granite and cement).Sqm 805 600 483000

    10 Handling, lifting and laying/fixing pre-polished

    Granite (of approved shade) skirting/facia at all

    levels & heights of kitchen counter, with a uniform

    layer of aralditeand POP on top of granite for

    holding till araldite dries, finished to all shapes(curved or straight) making Holes, Cladding, copla,

    V grove cutting & polishing and filling the paper

    joints with matching colour pigment as per

    drawings, specifications and directions of the

    Project Manager (Including the cost of araldite but

    excluding the cost of granite). RM 1778 400 711200

    11 Supplying, handling, lifting & fixing of wall

    pannelling at all levels & height all around the lif t

    openings in corridor of each floor with 6mm thick ply

    over hard wood framework and finished with

    sunmica including all consumables as per the

    approved sample to be made under the directionand satisfaction of CMGL. SQM 1320 1750 2310000

    Total for Flooring Work (C) 26092151

    D DOOR WORK

    BOQ/Price schedule CMGL

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    9/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    1 Handling, lifting and Fixing of main door (panelled)

    made of 2nd class Teak wood having single leaf at

    all levels including fixing all accessories like brass

    handle on both side, door stoper, buffer, hinges,

    godrej tribolt lock etc. including polishing complete,

    as per the direction of the Project Manager including

    supply of screws but excluding cost of accessories

    & door No 390 2000 780000

    2 Handling, lifting & Fixing of internal flush doors of

    different sizes at all levels including fixing all

    accessories like hinges, buffer, cylindrical locks,

    supply & application of two coats of synthetic

    enamel paint (ICI/Berger/Asian Paint make) over a

    coat of primer complete as per the direction of the

    Project Manager, including supply of screw but

    excluding cost of accessories & flush door. No 2556 950 2428200

    3 Handling, lifting & fixing of balcony doors fullyglazed (2 & 3 shutter) of different sizes at all levels

    including fixing all accessories like hinges, SS

    handle, tower bolt, buffer, supply & application of

    two coats of synthetic enamel paint

    (ICI/Berger/Asian Paint make) over a coat of primer

    complete as per the direction of the Project

    Manager, including supply of screws but excluding

    cost of glass, accessories & shutters. No 852 1270 1082040

    4 a Handling, lifting and Fixing of glass in balcony

    shutter glazed doors at all levels including applying

    putty but excluding cost of wooden bead. (overall

    area of door shutter shall be measured)Sqm 1951 110 214610

    b Supply of 5mm thick clear Modi float glass including

    wooden beading of good quality as same as that of

    the door wood quality and to the satisfaction of the

    Project Manager (overall area of door shutter shall

    be measured) Sq.m. 1951 350 682850

    5 Handling, lifting and Fixing of fire door (flush door)

    at all levels with accessories like hinges, lock, door

    closure, supply & application of two coats of

    synthetic enamel paint (ICI/Berger/Asian Paintmake) over a coat of primer complete, as per the

    direction of the Project Manager, including supply of

    screw but excluding cost of accessories & flush

    door. No 142 950 134900

    BOQ/Price schedule CMGL

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    10/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    6 Handling, lifting and Fixing of Electrical panel door

    (teak wood or marbau) at all levels with accessories

    like hinges, lock, buffer, supply & application of two

    coats of synthetic enamel paint (ICI/Berger/Asian

    Paint make) over a coat of primer complete, as per

    the direction of the Project Manager, including

    supply of screw but excluding cost of accessories &

    door. No 142 950 134900

    7 Supplying, handling lifting and fixing of Teak wood

    moulding (size 50mm x 12.5mm ) all around the

    door frames including polishing at all levels &

    heights as per the direction and satisfaction of the

    Project Manager. RM 3833 150 574950

    8Supplying, handling, lifting and fixing of Badam

    wood or equivalent approval moulding (size 50mm x

    12.5mm ) all around the door frames including two

    coats of synthetic enamel paint over a coat of primerat all levels and heights as per the direction &

    satisfaction of the Project Manager. RM 15331 100 1533100

    Total for Wood Work ( D) 7565550

    Note:

    E MISCELLANEOUS WORKS

    1 Supplying & Fixing of good quality glass blocks

    (190mm x 190mm x 80mm ) in electrical rooms with

    white cement mortar including sealing the joints with

    silicon sealant from outside as per the direction of

    the Project Manager (Glass Block sample to be

    approved by CMGL). Nos 852 180 153360

    2 Supplying & application of good quality exterior

    emulsion paint of approved shade & brand (2 or

    more coats) at all levels & height to give an even

    shade over a coat of primer including surface

    preparation, scafolding, jhulla, l ifting of materials

    etc. complete as per the direction & satisfaction of

    the Project Manager (A guarantee certificate of

    minimum 5 years is to be submitted at the end of

    completion of painting). Any price benefit derived

    out of joint negotiation with paint vendor shall be

    passed on to CMGL Sqm 78300 80 6264000

    The supply rate of all accessories/fixtures like hinges, Godrej trivolt lock, cylindrical lock, tower bolt,

    handles, buffer, door stopper etc. required for fixing of doors shall be jointly negotiated with vendor

    and over the vendor rate (all inclusive delivery at site), 15% extra will be paid to SPCL towards

    handling, wastage, overhead & profit.

    BOQ/Price schedule CMGL

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    11/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    3Supply & application of good quality internal paint of

    approved shade and brand (2 or more coats)at all

    levels and hieght to given an even shade over a

    coat of primer including surface preperation,

    scafolding, lifting of material etc. Complete as per

    the direction & satisfaction of the Project manager.

    Any price benefit derived out of joint negotiation withpaint vendor shall be passed on to CMGL

    a Staircase walls of tower including landing and part

    of Servant toilet Sqm. 10460 50 523000b Parapet walls of staircase Sqm. 14325 70 1002750c Basement wall and ceiling of tower Sqm. 7900 40 316000d Corridor walls of each floor Sqm. 6630 75 497250

    4 Supply & application of good quality Primer of

    approved brand at all levels and hieght inside flat to

    given an even & smooth finish including surface

    preperation, scafolding, lifting of material etc.

    Complete as per the direction & satisfaction of theProject manager. Any price benefit derived out of

    joint negotiation with paint vendor shall be passed

    on to CMGL Sqm. R.O. 28

    5 Handling, lifting & Fixing of door sills (Marble /

    Granite / Jaisalmir Stone) of varying width from

    65mm to 360mm as required in floor at all levels

    with cement mortar (1:4) of 20mm thick including

    cutting, polishing etc. complete as per the direction

    of the Project Manager, including the cost of sand,

    white cement pigment etc. but excluding the cost of

    cement & stone Rm 1500 50 75000

    6Supply & application of two coats of White Wash

    with lime at all levels in Electrical rooms including

    surface preperation, scafolding etc. complete as per

    the direction of the Project manager . Sqm 1615 16 25840

    7 Handling, lifting & Fixing of Kota Stone in stair case

    over a cement mortar (1:4) bed of 20mm thickness

    including pointing with pigments of matching colour

    etc. complete as per the direction of the Project

    Manager, excluding the cost of cement & kota stone

    supplied by CMGL. Sqm 102 450 45900

    8Handling, lifting & Fixing of broken tiles in deck level

    over a cement mortar (1:4) bed of 20mm thickness

    including pointing with pigments of matching colour,

    breaking of tiles etc. complete as per the direction of

    the Project Manager, excluding the cost of cement &

    tiles supplied by CMGL. Sqm 300 400 120000

    BOQ/Price schedule CMGL

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    12/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    9Handling, lifting & Fixing of Jaisalmir Stone coping

    on stair case railing over a cement mortar (1:4) bed

    of 20mm thickness including pointing with pigments

    of matching colour etc. complete as per the direction

    of the Project Manager, excluding the cost of

    cement & stone supplied by CMGL. Sqm 50 400 20000

    10 Supplying & Fixing of CI grating in drains as per the

    direction of Project manager and section/sample

    approved. Kg 200 50 10000

    11Providing and laying IPS flooring in stair case, deck,

    ramp including finishing, red oxide pigment etc.all

    complete as per the directionof the Project Manager. 0a) 25 mm thick Sqm 500 200 100000b) 40 mm thick Sqm 3020 250 755000c) 50 mm thick Sqm 3000 300 900000

    12 Providing and fixing wooden frame (section

    75mmX50mm) for approx. opening size of 700mm X

    800mm of AC cutout including supply & fixing of

    5mm thick float glass with silicon sealant from

    outside for water proofing etc. complete as per the

    direction of the Project Manager and sample

    approved. Nos 1120 1350 1512000

    13 Providing & fixing PHE duct covering with frame,

    shutter, moulding etc. complete (9mm ply & frame

    75mm X 50mm) as per the drawing and direction of

    the Project Manager in "B" type flat kitchen andDining area (size 850mm X 600mm approx.) and

    Duplex area as per site requirement Nos. 150 1000 150000

    14Providing and placing of brickbats 1:3:6 (1 cement :

    3coarse sand : 6brickbats) outside toilet in 'B' type

    flat at all levels after the completion and inspection

    of sanitary lines laid in the sunken slab and proper

    waterproofing & clearance of testing. The placement

    of the brickbats shall be as per specificaion

    indicated in the drawings . Any breakage of pipeline

    or damage to waterproofing during the entire

    operation of brickbat filling shall be to thecontractors account (Cement & bricks will be

    supplied by CMGL). Sqm 530 200 106000

    15 Providing and fixing 50mm x50mm x6mm support

    angle below kitchen counter at all levels as per the

    direction of the Project Manager. Kg 100 60 6000

    BOQ/Price schedule CMGL

  • 7/27/2019 Blank Boq - Finishing(II)-Hiland Park

    13/13

    M/s. SPCL

    Unit RATE AMOUNT

    No. DESCRIPTION UNIT QTY (Rs.) (Rs.)

    16Providing & Fixing of door frame in concrete surface

    with anchor fasteners (6 nos.) as per the direction of

    the Project Manager & sample approved. Nos 140 500 70000

    17 Supply & Mixing of water proofing compound (Cico

    No.1) in 12mm thick plaster (1:4) inside flats as per

    the product literature and direction of the Project

    Manager. (Plastering shall be paid in BOQ iitem no.

    19 of finishing work) Sqm R.O. 7

    18 Handling, lifting & Providing neat cement punning

    150 mm high on sides of stair case at all levels

    including curing etc.complete as per the direction of

    the Project Manager, excluding the cost of cement

    supplied by client. Sqm 250 27 6750

    19 Providing & fixing with all materials for shoring work

    comprising 5.0 metre long eucalptus ballah of

    200mm dia driven about half the length into theground by monkey at a very clossed spacing side by

    side and providing 2 nos. of eucalyptus runner of

    75mm dia including cost of all materials and one

    coat of coaltar painting to all ballahs and inlcuding

    hire and labour charges for necessary driving

    appliances and all tackles etc. complete as per

    direction of EIC RM 220 2614 575000

    Total for Miscellaneous Work (E) 13233850

    TOTAL FOR FINISHING WORKS(A+B+C+D+E) 102307664

    BOQ/Price schedule CMGL