    Rajdhani engineering college Jaipur

    DEPARTMENT OF CIVIL ENGINEERING

    A summer trainingpresentation

    On

    Bitumen Roads ConstructionAt completed PWD Beawar

    2 June to 17 July

    2014

    Submitted to:-

    Mr..J.V.NATANI

    Head Dept. of CE

    Submitted by:-

    PRABHU SINGH

    4thYear

    Roll.No.11ERLCE054

  • 8/10/2019 Bitumines Road Ppt (1)

    2/16

    CONTENT

    1.Introduction

    2.Materials

    3.Types of pavements

    4.Tools and equipments5.Quality control

    6.Layers of bitumen macadam

    7.Stages of bitumen road construction

    1.) Soil sub grade preparation2.) Sub base preparation

    3.)Base course preparation

    4.)Surface course preparation

    Result

  • 8/10/2019 Bitumines Road Ppt (1)

    3/16

    1.INTRODUCTIONROAD:-

    Aroadis a route, or way on land between

    twoplaces which has beenpavedorotherwise improved to allow travel by

    some conveyance, including a horse, cart,

    ormotor vehicle.

  • 8/10/2019 Bitumines Road Ppt (1)

    4/16

    2.Materials

    1.Binder2.Coarse Aggregates

    3. Fine Aggregates4.Primer

  • 8/10/2019 Bitumines Road Ppt (1)

    5/16

    3.Types of pavements1. Flexible pavement:-

    These are asphalt pavements (sometimes called bituminous

    pavements), which may or may not incorporate underlying

    layers of stabilized or unsterilized granular materials on a

    prepared sub-grade. These types of pavements are called"flexible" since the total pavement structure bends (or

    flexes) to accommodate traffic loads.

    2. Rigid pavement :-These are Portland Cement concrete (PCC) pavements,

    which may or may not incorporate underlying layers of

    stabilized or un stabilized granular materials.

  • 8/10/2019 Bitumines Road Ppt (1)

    6/16

    4.TOOLS AND EQUIPMENTS

    JCB-excavatorCentral Hot Mix PlantVibrator Roller

    Vibratory Soil CompactorMechanical GraderAsphalt (bitumen ) tankerBroom

  • 8/10/2019 Bitumines Road Ppt (1)

    7/16

    5.Quality Control

    1. Test on sub grade soil.CBR test

    2.Test on bitumenPenetration testViscosity test

    Ductility test

    Softening test

    Flash and fire point testingLoss on heating test

    Solubility test

  • 8/10/2019 Bitumines Road Ppt (1)

    8/16

    6.LAYERS OF BITUMEN

    MACADAM

    1.Sub grade soil

    2.Sub base3. Base course

    4. Surface course

  • 8/10/2019 Bitumines Road Ppt (1)

    9/16

    7.Stages of bitumen road

    construction1.) Soil sub grade preparationClearing and excavation

    Leveling

    Compaction

  • 8/10/2019 Bitumines Road Ppt (1)

    10/16

    2.) Sub base preparation

    Spreading of Coarse aggregateCompaction of macadam

  • 8/10/2019 Bitumines Road Ppt (1)

    11/16

  • 8/10/2019 Bitumines Road Ppt (1)

    12/16

    Spreading of bitumen mix

  • 8/10/2019 Bitumines Road Ppt (1)

    13/16

  • 8/10/2019 Bitumines Road Ppt (1)

    14/16

    RESULT

  • 8/10/2019 Bitumines Road Ppt (1)

    15/16

  • 8/10/2019 Bitumines Road Ppt (1)

    16/16

    Thank You