Date SL Particulars Bill
9.12.11 1 Plinth area 4005sqft @70/- 280350
30.4.12 2 Gnd Floor Slab Casting area 5326 sqft @ 60/- 319560
5.6.12 3 1st floor slabe casting level area 5032sqft @55/- 276760
21.7.12 4 2nd floor slabe casting level area 5032sqft @ 60/- 301920
10.8.12 5 gnd floor pcc casting work area 4005sqft @ 11/- 44055
20.10.12 6 4th floor slabe casting level 5326 sqft @ 67 356842
3.2.13 7 boundry wall despending work labour charge 1600
27.1.13 8
1st,2nd,3rd floor work monson 122@250, labour 200x 130 , brick
carring Rs. 7000 63000
3.2.13 9
1st ,2nd,3rd floor manson 127x250,200x142 labour rs 2000, sand
and brikcs carring rs 8000. 70000
10.2.13 10
Manson 250 x 149, 200 x 140, labour rs 2000 material carrying
rs5000 72000
17.2.13 11
4th floor brick work +plaster work manson 250x42, labour 200 x 36,
labour 2000, brick sand carring 4th floor rs 2000 21000
23.2.13 12
Manson 100x250 labour 114x200 labour rs 2000 material lifting rs
18000 67800
2.3.13 13Manson 75x250 labour 77x00 labour rs 2000 material lifting rs14000 50100
11.3.13 14
Manson 89x250 labour 96x200 labour contractor 2000 material
lifting rs 12000 55450
25.3.13 15 manson 73x250 labour 80 x 200 labour 2000 36250
16
17
26.6.13 18 gnd floor seling plaster work 5326 sqft @5/- 26000
4.8.13 19
Head room slabe custing work 228sqft @95 water tank bottom slab
casting work 140 sqft @95/- 34900
5.8.13 20
1st floor inside wall plaster work completed 5000*10, 2nd floor
inside wall plaster work 2500sqft x 10 62500
14.9.13 21
Electrical Works wiring of light point pp 180x11, fan point pp 180x7,
5amps plug point pp 80x4, 5amp plug point 5/15 amps plug point pp
100x5, circuit line 2x2.5mm wore +1x1 mm2 coper wire rm 20x150
light point front gate gnd fl pp 300x6 laying pvc pipe 6/10mm for
water pump rm 60x50, provindgin fixing fittingh and connectionof
pvc pipe rm 200x150 30000
5.8.13 22 Lift room works manson 14.5x370, labour 270x17.5 10000
11.9.13 23 Manson 21x370 labour 23x270 13900
13.9.13 24
2nd floor in side plaster75% complete less 25% @2500x10, 3rd floor
inside plaster 100% completion 5000x10 75000
12.9.13 25
All building work completed on @70000, extra work old kitchen wall
plaster work 3000, new kitchen wall partiton work wall sespending
work 10000, parapide wall work complition 540x45, two stair case
railig work 3500 biru bari hazira work manson + labour 400 + 300 105000
5.4.13 26 ???????????????????????????????????
16.6.13 27
Gnd Floor wall plaster and floor casting work labour 33x260 monson
48x350 25000
22.8.13 28 ???????????????????????????????????
-
8/12/2019 bisudetailsd
2/6
9.10.13 29
4th Floor inside plaster complete 10x5000sqft., parpet wall 1096sqft
x 38 91600
2.12.13 30
Bathroom down slab cleaning haking and plaster, netfinishgin work
40 nos. of bathroom work per number of bathroom @1000 x40 40000
20.11.13 31 Extra Outside works manson 370x30 Labour 13x 260 14000
11.11.13 32
Slab top RCC water tank rcc wall and top slab casting and outside
slope chata casting and finishing work. 85000
11.11.13 33
Lift RCC Wall and slab casting and lift masin room wall and top slab
casting and plaster finishing work , wall and slab casting work, top
lsable and wall work, total lift lift and masin finishing work
30000,50000,40000 120000
19.12.13 34
Building outside duct brick and plaster work 664sqft @25 duct area
groving dizine plaster 665x12 24500
19.12.13 35
Poddar site window chaja casting and plastering 288x60, poddar site
belcony chaja casting and plastering 40x50 19300
19.12.13 36
building outside chaja casting and plastering 95x60, poddar site
slabe top chaj casting and plaster finidhing 280x60, poddar siteslabe top inside chaja dizen beat plastering 229x17 26400
19.12.13 37
Headroom brik and plaster finishing work 162x50, headroom inside
chaja casting and plastering 120x60, headroom inside chaja dizine
beat plaster 120x17 17300
20.12.13 38
building outside plaster one side 50000, extra bill amt rs 87500,
water tank bill amt 85000 + 40000 + 14000 276500
8.1.14 39
backside plaster complition 50000, extra work back side lintle chaja
suttering casting and plastering work 168x60, back side slabe chaja
only plastering 73x12 60518
30.1.14 40
Building outside plaster 50000, north side slabe top chaja casting
and plaster 280x60 northside slabe top inside chaja dizen beat
plastering work 229sqftx17 70693
30.1.14 41
Northside window chaja casting and plastering 376x60, northside
building outside duct brick and plaster work 688x25 39700
30.1.14 42
Northside duct area groving sizine plastering 688x12, northside
building outside 340x5 9950
30.1.14 43
-
8/12/2019 bisudetailsd
3/6
-
8/12/2019 bisudetailsd
4/6
Adv. Discount Pay -1 Pay -2 Pay -3 Balance
100000 28000 152350
50000 31956 95000 142604
170000 27760 79000
190000 30220 15000 66700
4455 39600
160000 35842 161000
1600
15000 48000
70000
72000
10000 11000
25000 25000 17800
25000 20000 5100
10000 25000 10000 10450
14000 22250
0
0
2600 20000 3400 0
3500 31400
6200 52000 4300
30000 0 check sl24
10000 0 check sl24
13900 0 check sl24
25000 50000 0
105000 0
0
20000 5000
0
-
8/12/2019 bisudetailsd
5/6
9200 82400 0
40000
14000
85000
100000 20000
24500
19300
26400
17300
80000 184000 12500
5000 30000 25518
70693
39700
9950
0
0
0
0
0
00