Bioretention - Virginia Tech

17
Bioretention Photo Tutorial to Accompany Bioretention Design Specification

Transcript of Bioretention - Virginia Tech

Page 1: Bioretention - Virginia Tech

Bioretention

Photo Tutorial to Accompany Bioretention Design Specification

Page 2: Bioretention - Virginia Tech

Applications: Micro-ScaleImpervious Area Treated = 250 to 2,500 square feet

Residential Lots Commercial Rooftop

Page 3: Bioretention - Virginia Tech

Applications: Small-Scale

Parking Lot Edges Parking Lot Medians

Courtyards Right-of-way/Urban Bioretention

Page 4: Bioretention - Virginia Tech

Applications: Bioretention Basins

Bottom of ED Pond

Institutional

Page 5: Bioretention - Virginia Tech

Design, Construction, Maintenance Guidance

• Pretreatment • Geometry• Vegetation/Surface Cover• Construction• Maintenance

Page 6: Bioretention - Virginia Tech

Pretreatment (types)

Grass Filter Strip

Grass Channel

Stone Flow SpreaderStone/Rip Rap Apron

Forebay

Page 7: Bioretention - Virginia Tech

Results of Poor or No Pretreatment

Debris from Curb Cut Blocks Outlet Flow from Curb Cut Creates By-Pass Channel

Sediment clogs filter surface

Page 8: Bioretention - Virginia Tech

Geometry: Long Flow Path, Good Treatment

Grass inlet channel lengthens flow path

Long flow path from inlet to outlet

Page 9: Bioretention - Virginia Tech

Geometry: Short Flow Path, Less Treatment

Last curb cut

Outlet

These practices have a lack of storage and treatment due to:

•Curb inlets too close to outlets

•Outlet structure flush with filter surface

•Direct or almost direct conveyance from inlet to outlet

Page 10: Bioretention - Virginia Tech

Turf-treeTree-shrub-mulch

Perennial Garden Herbaceous-tree

Vegetation & Surface Cover (options)

Page 11: Bioretention - Virginia Tech

Other Types of Surface Cover

Stepping stones for pedestrian flowStone/cobble

Concrete cells -- herbaceous

Page 12: Bioretention - Virginia Tech

Vegetation: Poor Examples

Too much rock

Sparse, not enough herbaceous Plant substitutions lead to mortality, not enough herbaceous

Sparse, ground too soggy

Page 13: Bioretention - Virginia Tech

Typical Construction Sequence

Install secondary E&S, excavate from side

Install geotextile on SIDES ONLY (optional), add gravel to create stone storage layer up to design elevation

Install underdrain pipes and pack #57 stone around the pipes

Scar, rip, or till bottom to promote some infiltration

Page 14: Bioretention - Virginia Tech

Construction Sequence (cont.)

Install plant materials and water until established

Add soil media in 12” lifts from sides. Bring to design elevation and add more after settling

Install surface cover: mulch, stone, matting, etc.

Add 3” choker stone (#8 or #89) on top of underdrain stone instead of filter fabric

Page 15: Bioretention - Virginia Tech

Typical Construction Problems

Installed too early during construction

Stone too high at inlet – blocks flow Small grade changes divert flow from inlet

Improper soil mix

Page 16: Bioretention - Virginia Tech

Maintenance (representative)

Remove sediment and trash from pretreatment and filter bed

Water, add/replace plants, replace mulch, check invasives Rehabilitate clogged or slow draining media if necessary

Remove sediment from inlets, curb cuts, pavement edges

Page 17: Bioretention - Virginia Tech

Maintenance Issues (typical)

Sediment buildup at grass edge diverts flow

Too much mulch added – diverts flow from inlets Overgrown or taken over by invasives

Unhealthy or dead plants