Biomimicry Group - Final Presentation
description
Transcript of Biomimicry Group - Final Presentation
-
EDDIE MA 583573SOPHIE FARMER 390862RHIAN AP REES 361874JUNHAN FOONG 395563
TEAMTUTORSALISONPAULTUTORIALTHU 12-3 pm FINAL PRESENTATION
BIOMIMICRYADS 3 | Architecture Design Studio Air Semester 2 2012[ ]
-
INTRODUCTIONAND RECAP
-
ARGUMENTAn art piece which integrates, reacts with, and adapts to its environment.
-
GROWTHWYNDHAM =
-
DEVELOPMENT OF MODULE
-
DEVELOPING FORM &PLACEMENT
-
TO WY
NDHAM
TO G
EELO
NGPR
INCE
S HI
GHW
AY
PRINCE
S FREE
WAY
0 50 100 200m
THE SITE
-
IDENTIFY SITE BOUNDARIES
-
IDENTIFY SITE BOUNDARIESDIVIDE BOUNDS EQUALLY AND CONNECT TO CORRESPONDING POINT ON OPPOSITE SIDE
-
IDENTIFY SITE BOUNDARIESDIVIDE BOUNDS EQUALLY AND CONNECT TO CORRESPONDING POINT ON OPPOSITE SIDE
DIVIDE LINES EQUALLY AND SPECIFY AS POINTS
-
IDENTIFY SITE BOUNDARIESDIVIDE BOUNDS EQUALLY AND CONNECT TO CORRESPONDING POINT ON OPPOSITE SIDE
DIVIDE LINES EQUALLY AND SPECIFY AS POINTS
IDENTIFY SUN PATH SPECIFIC TO PATH
-
IDENTIFY SITE BOUNDARIESDIVIDE BOUNDS EQUALLY AND CONNECT TO CORRESPONDING POINT ON OPPOSITE SIDE
DIVIDE LINES EQUALLY AND SPECIFY AS POINTS
DIVIDE SUN PATH EQUALLY INTO SAME NUMBER OF SEGMENTS AS LINES
IDENTIFY SUN PATH SPECIFIC TO PATH
-
IDENTIFY SITE BOUNDARIESDIVIDE BOUNDS EQUALLY AND CONNECT TO CORRESPONDING POINT ON OPPOSITE SIDE
DIVIDE LINES EQUALLY AND SPECIFY AS POINTS
MOVE POINTS TOWARDS POINTS ON SUNPATHDIVIDE SUN PATH EQUALLY INTO SAME NUMBER OF SEGMENTS AS LINES
IDENTIFY SUN PATH SPECIFIC TO PATH
-
IDENTIFY SITE BOUNDARIESDIVIDE BOUNDS EQUALLY AND CONNECT TO CORRESPONDING POINT ON OPPOSITE SIDE
DIVIDE LINES EQUALLY AND SPECIFY AS POINTS
MOVE POINTS TOWARDS POINTS ON SUNPATH
RESULT
DIVIDE SUN PATH EQUALLY INTO SAME NUMBER OF SEGMENTS AS LINES
MATHEMATICAL MANIPULATION OF DISPLACEMENT OF EACH POINT TO EMULATE PHOTOTROPISM
IDENTIFY SUN PATH SPECIFIC TO PATH
-
TO WY
NDHAM
TO G
EELO
NGPR
INCE
S HI
GHW
AY
PRINCE
S FREE
WAY
0 50 100 200m
PLACEMENT ON SITE
-
PROBLEM SOLVING &CONSTRUCTION
-
IS IT STRUCTURAL?ISSUE:
-
IS IT STRUCTURAL?ISSUE:
MAIN PROBLEM AREA
-
SANTIAGOCALATRAVAVARIOUS PROJECTS[ ]
Samuel Beckett BridgeMargaret Hunt Hill Bridge
Zubizuri FootbridgePuente del Alamillo
-
BLOOMINSTALLATIONDORIS SUNG[ ]
-
LOTUSDOMESTUDIO ROOSEGAARDE[ ]
-
KNEX CONSTRUCTION SYSTEMIMAGINE BUILD PLAY[ ]
-
BIMETAL PANEL STEELSURFACEWITH CORTEN FINISH
BIMETAL PANEL POLISHEDCOPPER SURFACE
CIRCULAR HOLLOW SECTIONSTEEL PIPE STRUCTURE
BOLT FIXED 6 WAY STEEL JOINT
BIMETAL PANELS RIVET FIXED TOSTEEL PANEL. STEEL PANELWELDED TO STRUCTURE
FLUORESCENT STRIP LIGHTEMBEDDED IN PIPE STRUCTURE
BIMETAL PANEL IN CLOSEDPOSITION
-
ARCHITECTURAL EXPERIENCE:
DRIVE THROUGH
-
THE MK II
-
REFERENCE LISTBloom Installation
http://api.ning.com/files/zwzEAHkhvSX0O0dnOShqXvsjUBJ6ubVW3yaeyEjNk7bGb3pxq5wvpht4ahsz-7rLwxvF6FPiZkMiHj4wQggv*vBhSDA*mS5z/bloom01.jpeghttp://1.bp.blogspot.com/-Xq3XSqkLTds/Tw-kLOY7xNI/AAAAAAAAApo/Gf3CP-cwHAA/s1600/Derek-Greene%2BNorthSide.JPG
VIDEOhttp://vimeo.com/35537546
Construction Sitehttps://news.slac.stanford.edu/sites/default/files/images/image/196412_mm0104-27.jpg
KNEXhttp://kavibuilt.files.wordpress.com/2010/10/k-nex.jpghttp://ebayimages.rswhost.com/301735/83470J.jpghttp://static.zoovy.com/img/orangeonions/W1136-H1044-Bffffff/1/13065_box_medium.jpg
Lotus Dome
http://plusmood.com/wp-content/uploads/2012/01/LOTUS-DOME_Daan-Roosegaarde-2.jpghttp://24.media.tumblr.com/tumblr_mbsjcoF2k31qh0usho2_1280.jpghttp://3.bp.blogspot.com/-Qrm4LRwekBM/UIgkEK9bRGI/AAAAAAAAdM4/pXhSlrpnRv8/s1600/dan+roosegaarde+lotuse+dome+4.jpg
VIDEOhttp://vimeo.com/51209332
SANTIAGO CALATRAVA
Margaret Hunt Hill Bridgehttp://medias.photodeck.com/02952b2a-3f46-11e1-a9ff-3f6fcd0917bb/ta_us_dallas_0071_xgaplus.jpg
Puente del Alamillohttp://smu.edu/newsinfo/releases/images/m0011l.jpg
Samuel Beckett Bridgehttp://www.calatrava.com/content/images/Dublin/Samuel-Beckett-Bridge_001.jpg
Zubizuri Footbridgehttp://pictomat.files.wordpress.com/2010/07/peruarki81.jpg
-
CAST MASS CONCRETE PAD FOOTING
STEEL PANEL BOLT FIXED TO FOOTING
CIRCULAR HOLLOW SECTION STEEL PIPE STRUCTURE.BOLT FIXED TO FOOTING
BIMETAL PANEL STEELSURFACEWITH CORTEN FINISH
BIMETAL PANEL POLISHEDCOPPER SURFACE
CIRCULAR HOLLOW SECTIONSTEEL PIPE STRUCTURE
BOLT FIXED 6 WAY STEEL JOINT
BIMETAL PANELS RIVET FIXED TOSTEEL PANEL. STEEL PANELWELDED TO STRUCTURE
FLUORESCENT STRIP LIGHTEMBEDDED IN PIPE STRUCTURE
BIMETAL PANEL IN CLOSEDPOSITION
THEMK II
TO WY
NDHAM
TO G
EELO
NGPR
INCE
S HI
GHW
AY
PRINCE
S FREE
WAY
0 50 100 200m
AA
B
B
SECTION AA SECTION BB
SITE PLAN