BIOMASS POWER PALNTS IN UK
1. Western WoodLocation: Wales
Operator: Eco2 LtdConfiguration: 1 X 13.8 MW
Operation: 2009Fuel: wood
Boiler supplier: AETT/G supplier: Mitsui
EPC: BWSCQuick facts: On 26 Apr 2006, a turnkey contract for the construction and delivery of this power station wassigned with a consortium consisting of Aalborg Energie Technik and BWSC. The site is in Margam, PortTalbot, and Western Wood is the first commercial-scale biomass power station in Wales. The installationhas the following main components: a wood chip handling system, an advanced grate and low-Nox boiler
system, a baghouse, the steam set, and an air-cooled condenser. Annual fuel burn is expected to be
160,000t of clean wood, much of it supplied by the Forestry Commission from managed woodland inSouth Wales.
2. Stevens Croft
Location: ScotlandOperator: E.ON UK Renewables Ltd
Configuration: 1 X 52 MW
Operation: 2007
Fuel: wood
Boiler supplier: Kvaerner
T/G supplier: SiemensEPC: Siemens, Aker Kvaerner, Mott Macdonald
Quick facts: This is the UK's largest stand-alone dedicated wood-fired power plant and one of the largest
such facilities built to date. The 130mn plant uses about 475,000t/yr of sustainable wood and 95,000t/yr
of short rotation coppice. Steven's Croft creates 40 direct jobs in the Lockerbie area and should create or
safeguard over 300 jobs in forestry and farming as well as encourage additional investment in sawmills.
Work commenced in Oct 2005 and the plant started generating electricity on 11 Nov 2007
3. lanfordLocation: England
Operator: Energy Power Resources Ltd
Configuration: 1 X 13.5 MWOperation: 1993
Fuel: MBM, biomass
Boiler supplier: Aalborg
T/G supplier: Allen, GEC-Alstom
EPC: Aalborg
Quickfacts: This was the world's second poultry litter fired power station. In May 2000, the plant was re-
commissioned to burn meat and bone-meal (MBM) as a result of UK efforts to combat mad-cow disease.
-
8/8/2019 Biomass Power Palnts in Uk
2/2
In Jan 2004, planning permission was extended to allow MBM from any source and any other biomass to
be burned. Annual fuel burn is about 89,000t.
4. BalcasLocation: Northern IrelandOperator: Balcas Timber Ltd
Configuration: 1 X 2.7 MW CHPOperation: 2005
Fuel: woodBoiler supplier: Vyncke
T/G supplier: M&M Turbinen, KaickQuick facts: This CHP plant uses surplus sawdust and woodchips to generate electricity and 10 MW of
heat. The electricity and heat produced will supply most site requirements saving 1mn/yr and surpluselectricity is delivered to National Grid.