Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An...

22
14.08.2013 1 Jyväskylä Summerschool 2013 Biogas – An Industrial perspective Jyväskylä Summerschool 2013 Budget offer Detail Offer Contra ct- plant Purchasing equipment First Contact with Custom er Basic / Detail engineering Construction Works (Civil works) Equipment installation Cold Commissioni ng Hot Commissioni ng Succes sful perfor mance test Mech anical Compl etion After Sales Service The stages of a typical Biogas project

Transcript of Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An...

Page 1: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

1

Jyväskylä Summerschool 2013

Biogas – An Industrial perspective

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

The stages of a typical Biogas project

Page 2: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

2

Jyväskylä Summerschool 2013

First contact with customer

- Potential customer announces interest- Inquiry via telephone or e-Mail- Contact on trade fare

- First contact to sales department- Fill in special biogas project questionnaire to gather required information for

plant design• Feedstock types and quantities• Feedstock properties• Available construction area• Desired type of energy conversion (CHP, Biomethane upgrading, ...)• Digestate utilization• ...

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Budget offer

Page 3: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

3

Jyväskylä Summerschool 2013

Budget offer

Budged offer is based on:• Data from tender or questionnaire and first meeting with customer

The budget offer consists of• A preliminary process concept• A preliminary mass and energy balance• An example layout• A standard project schedule• A cost estimation

=>Basis for a further discussion and vendor pre selection

If required an authority engineering contract is set up for gathering the permits

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Detail offer (fixed price offer)

Page 4: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

4

Jyväskylä Summerschool 2013

Detail offer (fixed price offer)

The detail offer is based on:• Detailed information from the customer and the permitting documents

The detail offer consists of• A final process concept• A final mass and energy balance• An final layout• A specific project schedule• Defined main equipment• Scope of supply definition• Basic economic calculation• A fixed price

• Desired result of detail offer is a signed contract for building the plant

Jyväskylä Summerschool 2013

Process flow diagram

Page 5: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

5

Jyväskylä Summerschool 2013

Layout

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Contract signed

Page 6: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

6

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

´First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Basic / Detail engineering

Jyväskylä Summerschool 2013

Basic engineering

- Specification of all equipment (datasheets)

- Drawing of PID (piping and instrumentation diagram)

- Preparation of tender documents

- Purchase of equipment with long delivery time (e.g. CHP)

- Inquiry of planning documents (dimension sheets, plans, electrical data, ...)

- Verification with permitting and contract requirements

Page 7: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

7

Jyväskylä Summerschool 2013

PID – Piping and instrumentation diagram

Jyväskylä Summerschool 2013

Data sheet

Page 8: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

8

Jyväskylä Summerschool 2013

Detail engineering

- Detailed electrical planning- Wiring diagrams- Instruments

- Detailed piping planning- 3D planning- Isometric drawings- Part lists

- development of a description for the process control system- PLC description

Jyväskylä Summerschool 2013

Piping - Planing

Navis Works 3D ModelMateriallist

Date: 23.02.2010 Mat_List: Process + FAT Preparation

DN Pipe Number Insu

latio

n

Thic

knes

s of

In

sula

tion

Material Norm QU

AN

TITY

pc

s./ m

Pip

e cl

ass

blind plug R 1/2" 15 R10299-15-OIL3-132-WI_30 WI 30 1,4539 EN 10241 1 132border G 15x21,3x2 15 R10299-15-OIL3-132-WI_30 WI 30 1,4539 EN 1092-1/33 1 132elbow welded 90-3-21,3x2 15 R10299-15-OIL3-132-WI_30 WI 30 1,4539 EN 10253-4 1 132gasket DN15 15 R10299-15-OIL3-132-WI_30 WI 30 C 8200 DIN 2690 1 132loose flange F 15x21,3 15 R10299-15-OIL3-132-WI_30 WI 30 carb. steel hot galv. EN 1092-1/02 1 132pipe welded 21,3x2 15 R10299-15-OIL3-132-WI_30 WI 30 1,4539 EN 10220 1,29 132welding nipple R 1/2" 15 R10299-15-OIL3-132-WI_30 WI 30 1,4539 EN 10241 1 132blind plug R 1/2" 15 R10499-15-OIL3-132-WI_30 WI 30 1,4539 EN 10241 1 132border G 15x21,3x2 15 R10499-15-OIL3-132-WI_30 WI 30 1,4539 EN 1092-1/33 1 132elbow welded 90-3-21,3x2 15 R10499-15-OIL3-132-WI_30 WI 30 1,4539 EN 10253-4 1 132gasket DN15 15 R10499-15-OIL3-132-WI_30 WI 30 C 8200 DIN 2690 1 132loose flange F 15x21,3 15 R10499-15-OIL3-132-WI_30 WI 30 carb. steel hot galv. EN 1092-1/02 1 132pipe welded 21,3x2 15 R10499-15-OIL3-132-WI_30 WI 30 1,4539 EN 10220 1,29 132welding nipple R 1/2" 15 R10499-15-OIL3-132-WI_30 WI 30 1,4539 EN 10241 1 132blind plug R 1" 25 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10241 1 111border G 25x33,7x2 25 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 1092-1/33 1 111border G 50x60,3x2 50 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 1092-1/33 4 111border G 65x76,1x2 65 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 1092-1/33 5 111elbow welded 90-3-33,7x2 25 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10253-4 4 111elbow welded 90-3-60,3x2 50 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10253-4 3 111elbow welded 90-3-76,1x2 65 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10253-4 1 111gasket DN25 25 R106400-65-OIL1-111-WI_40_FA WI 40 C 8200 DIN 2690 1 111gasket DN50 50 R106400-65-OIL1-111-WI_40_FA WI 40 C 8200 DIN 2690 4 111gasket DN65 65 R106400-65-OIL1-111-WI_40_FA WI 40 C 8200 DIN 2690 5 111loose flange F 25x33,7 25 R106400-65-OIL1-111-WI_40_FA WI 40 carb. steel hot galv. EN 1092-1/02 1 111loose flange F 50x60,3 50 R106400-65-OIL1-111-WI_40_FA WI 40 carb. steel hot galv. EN 1092-1/02 4 111loose flange F 65x76,1 65 R106400-65-OIL1-111-WI_40_FA WI 40 carb. steel hot galv. EN 1092-1/02 5 111pipe welded 219,1x3 200 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10220 4 111pipe welded 26,9x2 20 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10220 0,11 111pipe welded 33,7x2 25 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10220 7,44 111pipe welded 60,3x2 50 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10220 3,2 111pipe welded 76,1x2 65 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10220 5,09 111reducing part welded E-114,3x2,6-76,1x2,3 100 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 DIN 2616-1 2 111reducing part welded E-219,1x3,2-114,3x2,9 200 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 DIN 2616-1 2 111reducing part welded K-76,1x2,3-60,3x2 65 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 DIN 2616-2 2 111socket Rp 1/2" PS-BDI-072 15 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 PS-BDI-072 1 111welding nipple R 1" 25 R106400-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10241 1 111blind plug R 1" 25 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10241 1 122blind plug R 1/2" 15 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10241 1 122border G 20x26,9x2 20 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 1092-1/33 2 122border G 25x33,7x2 25 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 1092-1/33 2 122border G 65x76,1x2 65 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 1092-1/33 6 122elbow welded 90-3-26,9x2 20 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10253-4 3 122elbow welded 90-3-33,7x2 25 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10253-4 2 122elbow welded 90-3-76,1x2 65 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10253-4 3 122gasket DN20 20 R106400-65-OIL1-122-WI_40_FA WI 40 C 8200 DIN 2690 2 122gasket DN25 25 R106400-65-OIL1-122-WI_40_FA WI 40 C 8200 DIN 2690 2 122gasket DN65 65 R106400-65-OIL1-122-WI_40_FA WI 40 C 8200 DIN 2690 5 122loose flange F 20x26,9 20 R106400-65-OIL1-122-WI_40_FA WI 40 carb. steel hot galv. EN 1092-1/02 2 122loose flange F 25x33,7 25 R106400-65-OIL1-122-WI_40_FA WI 40 carb. steel hot galv. EN 1092-1/02 2 122loose flange F 65x76,1 65 R106400-65-OIL1-122-WI_40_FA WI 40 carb. steel hot galv. EN 1092-1/02 6 122pipe welded 21,3x2 15 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10220 0,1 122pipe welded 26,9x2 20 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10220 1,06 122pipe welded 33,7x2 25 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10220 2,42 122pipe welded 76,1x2 65 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10220 8,48 122welding nipple R 1" 25 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10241 1 122welding nipple R 1/2" 15 R106400-65-OIL1-122-WI_40_FA WI 40 1,4571 EN 10241 1 122blind plug R 1" 25 R107200-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10241 2 111blind plug R 1/2" 15 R107200-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 10241 1 111border G 20x26,9x2 20 R107200-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 1092-1/33 2 111border G 25x33,7x2 25 R107200-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 1092-1/33 2 111border G 40x48,3x2 40 R107200-65-OIL1-111-WI_40_FA WI 40 1,4301 EN 1092-1/33 4 111

Project: Material list for pipes and pipe parts

Page 9: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

9

Jyväskylä Summerschool 2013

Piping – Isometric drawing

Jyväskylä Summerschool 2013

Insulation

Page 10: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

10

Jyväskylä Summerschool 2013

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Purchasing of equipment

Page 11: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

11

Jyväskylä Summerschool 2013

Mechanical Data: Approved by BDI Operating Data: Approved by BDI

OFFER FROM FINAL CHOSEN SUPPLIER

Example purchase of agitator

Jyväskylä Summerschool 2013

Information to BDIMotor data sheet

Dimension sheet

APPROVED FOR CONSTRUCTION

APPROVED FOR CONSTRUCTION

Example purchase of agitator

Page 12: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

12

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Construction works (Civil Works)

Jyväskylä Summerschool 2013

Construction works (Civil Works)

- Clearing the site

- Earthwork

- Groundwork

- Piping ditches

- construction of foundations

- construction of process buildings

- construction of tanks (in case of concrete tanks building phase starts earlier)

Page 13: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

13

Jyväskylä Summerschool 2013

Construction works

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Equipment installation

Page 14: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

14

Jyväskylä Summerschool 2013

Equipment Installation

- Pipe work

- Equipment installation- Pumps- Tanks- Heat exchangers- Instruments- Agitators- ....

- Electrical installation- Wiring- Cabinets

Jyväskylä Summerschool 2013

Pipe installation

Page 15: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

15

Jyväskylä Summerschool 2013

Agitator installation

Jyväskylä Summerschool 2013

Intallation of gas holder

Page 16: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

16

Jyväskylä Summerschool 2013

Insulation works

Jyväskylä Summerschool 2013

CHP installation

Page 17: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

17

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Cold commissioning

Jyväskylä Summerschool 2013

Cold commissioning

Testing of mechanical and electrical functionality after electrical and mechanical completion (PID Check, pressure testing, leak tests, ...)

external- FAT-Test (Factory acceptance test) for PCS

On site- Installation of PCS- Signal check- Rotation direction check- Test of automatic valves- ....

Page 18: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

18

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Hot (biological) commissioning

Jyväskylä Summerschool 2013

Hot (biological) commissioning

Start up of biogas plant

- Filling with inoculum

- Heating up inoculum

- Start feeding substrate

- Displacement of explosive atmosphere from fermenter

- Commissioning of emergency flare

- Commissioning of gas treatment (e.g. external desulfurization)

- Commissioning of CHP or gas utilisation unit

- Increasing biological activity to design performance

Page 19: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

19

Jyväskylä Summerschool 2013

Filling and heating up inoculum

- Filling the digester with a sufficient

quantity of inoclulum

- Inoculum should be adapted to

process conditions and feedstock

- Heating up the inoculum (external

heat source is required)

- Quality check of inoculum

(impurities, chemical parameters, …)

Jyväskylä Summerschool 2013

Feeding plan

Page 20: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

20

Jyväskylä Summerschool 2013

Commisioning emergency flare

Jyväskylä Summerschool 2013

Budget offer Detail OfferContra

ct-plant

Purchasing equipment

´First Contact

with Custom

er

Basic / Detail

engineering

Construction Works (Civil

works)

Equipment installation

Cold Commissioni

ng

Hot Commissioni

ng

Successful

performance

test

Mechanical Completion

After Sales Service

Performance Test / Plant hand over

Page 21: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

21

Jyväskylä Summerschool 2013

Performance Test / Plant hand over

- Hand over conditions for the biogas plant are defined in the contract

- Usually the functionality and capacity of the plant has to proven by the plant

manufacturer in a performance test

- Parameters of performance test are defined in the contract

Jyväskylä Summerschool 2013

After Sales Support

- After hand over of the plant to the customer the warrenty period starts

- During this period the After Sales department takes care about guarantee items

- Furthermore the After Sales department provides services like:- Spare parts- Maintenance- Repair works (out of guarantee)- Hotline services

Page 22: Biogas – An Industrial perspective · 14.08.2013 1 JyväskyläSummerschool 2013 Biogas – An Industrial perspective JyväskyläSummerschool 2013 Budget offer Detail Offer Contra

14.08.2013

22

Jyväskylä Summerschool 2013

Reinhold Waltenberger / [email protected] International AG/ Parkring 18 / A-8074 Grambach / Austria