![Page 1: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/1.jpg)
BIODEEP MEETING(Venice, October 13-15 2003)
![Page 2: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/2.jpg)
Problems experienced during 2001 cruise
• Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID umbilical cable some deployments aborted
• Failure of MODUS thrusters detailed surveys made with extreme difficulty
• Failure to some components STAND-BY
• Insufficient quality of the video documentation system bad images taken
![Page 3: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/3.jpg)
Remedial actions
• New SCIPACK/SCISKID umbilical cables manufactured and tested
• 3 lengths now available: 10, 25 and 200 m
![Page 4: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/4.jpg)
Remedial actions
• All failed components repaired and/or replaced
•SCIPACK TV camera
•SCIPACK altimeter
![Page 5: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/5.jpg)
Thrusters
The electronics of all thrusters have been updated by the manufacturer Tecnadyne and became more reliable.The entire MODUS system has been tested before conducting the SN-1 observatory recovery in May 2003 successfully. Nevertheless 2 thrusters showed problems during the GNDT recovery, without harming the mission.
For BIODEEP cruise the configuration shall be:•2 thruster mounted on MODUS•2 thruster available as spare
For the BIODEEP mission we don’t see a risk, as a wide range of operation is not necessary.
![Page 6: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/6.jpg)
Comparison between ‘old’ and improved Video-System
Component 2001 cruise Improvements
Cameras Needed: 4 at MODUSavailable 4: 2x col, 2x b/w
Needed: 4 at MODUSavailable 6: - 3x b/w (incl. 1x Hi-Res),- 3x col (incl 1x Zoom)Control-Racks 1x Video (=2
Monitors), 1x Steering, 1x Sonar
2x Video (=4 Monitors), 1x Steering, 1x Sonar
Video-Line One VGA signal in-line for two Monitors
One VGA signal splitted for four Monitors=better quality images
Video-Recording Two Recorder for two Monitors
Four Recorder for four Monitors
![Page 7: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/7.jpg)
left: 2001 cruise equipment for MODUS steering and control units
right: new configuration with additional second 19” Video-System rack
Video documentation system
![Page 8: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/8.jpg)
New Zoom-Camera from DeepSea-Power&Light: Super SeaCam 6000, 12xZoom, autofocus
Comparison between ‘old’ and improved Video-System
![Page 9: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/9.jpg)
Configurations for 2003 cruise
200 m
• sw/brine interface• body brines + HP5l
survey10 m 15 m
![Page 10: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID.](https://reader035.fdocuments.us/reader035/viewer/2022070403/56649f295503460f94c42ac4/html5/thumbnails/10.jpg)
System upgrades
• more sensors transmissometer added to SCIPACK CTD. Integration of other sensors possible (CH4, pH, Eh, O2, etc.), depends on budget
• possibility to explore the second interface of Urania basin long cable provided
• sensors at two levels (e.g. at two ends of the Niskin bottles) for a more accurate sampling at the interface no sensor provided by CONISMA not implemented
• Additional TV camera on SCIPACK no budget for that in BIODEEP
• Integration of IMBC multicorer TUB and IMBC to coordinate