BIO -CEL - Microdyn-Nadir Dis 4 Dis 3 Co 4 Me 3 Me 4 Sp 8 He 4 He 8 He 6 Pa 3 He 8 He ... xagon Bolt...
Transcript of BIO -CEL - Microdyn-Nadir Dis 4 Dis 3 Co 4 Me 3 Me 4 Sp 8 He 4 He 8 He 6 Pa 3 He 8 He ... xagon Bolt...
BIOBC40SUBM
ASS Versio
O-C00F-C
MERGED
SEMBLY
on M_BC4
CEL®
100-UD MEMB
Y INST
400_V1_0
®
P150BRANE
TRUCT
00e
MODUL
ION
LE
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Table o
1. Ru
1.1.
1.2.
1.3.
2. Ov
2.1.
3. Pre
3.1.
3.2.
3.3.
4. Fix
4.1.
4.2.
4.3.
4.4.
5. Clo
6. Ins
6.1.
6.2.
7. Ins
7.1.
7.2.
8. Mo
8.1.
8.2.
9. Ins
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
of content
les for Hand
Contact wit
Wet memb
Membrane
verview .........
List of Mate
eparations ....
Preparation
Special con
Preparation
xing cassette
Proper tran
Placing cas
Connecting
Securing th
osing the per
stallation of th
Securing th
Adding the
stallation perm
Attaching t
Attaching o
odule transpo
Lifting mod
Using a for
stallation of e
Recht vor, ng anzu-
cifications
M
I
R
D
ts
ling and Sto
th membrane
branes ..........
s sticking tog
....................
erials ...........
....................
n of the base
nsiderations
n of the coun
s into modul
nsportation o
ssettes into b
g the cassett
he cassettes
rmeate chan
he support b
he support ba
distance ke
meate pipe ..
he permeate
of permeate p
ortation ........
dules with a c
rklift to transp
extension fee
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
rage .............
es ................
....................
gether ..........
....................
....................
....................
e frame ........
when handli
nterpart ........
e base frame
of cassettes ..
base frame ..
es ................
to the base
nel ...............
ars ...............
ars ...............
epers ...........
....................
e fitting .........
pipe .............
....................
crane ...........
port modules
et ..................
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
....................
....................
....................
....................
....................
....................
....................
....................
ing the base
....................
e .................
....................
....................
....................
frame ..........
....................
....................
....................
....................
....................
....................
....................
....................
....................
s ..................
....................
Telefon:
Telefax:
E-Mail:
Internet:
...................
...................
...................
...................
...................
...................
...................
...................
frame .........
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
962-6001
962-9237
yn-nadir.de
yn-nadir.de
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
Page 2
............ 4
............ 4
............ 4
............ 4
............ 5
............ 5
............ 7
............ 7
............ 7
............ 8
.......... 10
.......... 10
.......... 11
.......... 12
.......... 14
.......... 15
.......... 18
.......... 18
.......... 18
.......... 20
.......... 20
.......... 20
.......... 21
.......... 21
.......... 21
.......... 23
2 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Table o
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 1
Figure 2
Figure 2
Figure 2
Figure 2
Figure 2
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
of Figures
: Overvie
: Front vi
: (Left) Th
: Counter
: Insert th
: The liftin
: Determi
: Place th
: Distanc
0: Inserting
1: All four
2: Hexago
3: Securinthe mod
4: Arrangesecure t
5: Locknut
6: Screw c
7: (Left) Mthrough
8: (Left) Ex(10) glu
9: Spacing
0: Permea
1: Installat
2: Proper a
3: The fork
4: Installat
Recht vor, ng anzu-
cifications
M
I
R
D
s
ew of an fully
ew of the BC
he counterpa
rpart (7) with
he O-ring (24
ng apparatus
ination of cas
he four casse
e keeper tha
g the tie rods
cassettes fa
onal bolts (17
g the cassetdule ............
ement of comthe permeate
t (20) fixed o
cap is placed
Metal Ring (13 the hole in t
xcess gap beed to the up
g of black an
ate fitting (8)
tion of the pe
attachment l
klift must tran
tion of BIO-C
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
assembled
C 400 base fr
art (7) (Right
h three thread
4) in the coun
s properly co
ssette orient
ettes on the g
at must be pla
s and counte
stened by th
7) used to tig
ttes to the ba....................
mpression spe channel ....
nto the tie ro
d over the tie
3) on the barthe bar ........
etween suppper portion o
d white dista
attached to t
ermeate pipe
ocation and
nsport the m
CEL® extensio
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
BC 400 mod
rame (2) .....
t) The pipe co
ded tie rods
nterpart (7) .
onnected to t
tation by blac
ground with
aced betwee
erpart (7) into
he tie rods ...
hten the cas
ase frame (2)....................
pring (12) ove....................
od along with
rod to comp
r against the ....................
port bars (9) of the hole in
ance keepers
the cassette
e (5) ............
lifting techni
odules from
on feet .......
Telefon:
Telefax:
E-Mail:
Internet:
dule ............
...................
oupling (6) ..
...................
...................
the holes on
ck sealing ..
spacing .....
en each cass
o the cassett
...................
ssettes to the
) using hexag...................
er the metal t...................
h the big was
pletely shut p
cassette (Ce...................
and cassettethe cassette
s (10 & 11) fo
wall using th
...................
que for mod
the wider sid
...................
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
....................
....................
....................
....................
....................
the thin side
....................
....................
sette ...........
es ..............
....................
e base frame
gonal bolts (....................
tube (14) and....................
sher (23) and
permeate cha
enter) Splint-....................
e (Right) Blace .................
or each supp
he parker scr
....................
ule transport
de ................
....................
962-6001
962-9237
yn-nadir.de
yn-nadir.de
...................
...................
...................
...................
...................
e of the casse
...................
...................
...................
...................
...................
e (2) from the
16) from the...................
d tie rod to p...................
d spring (12)
annel ..........
-pin (15) sec...................
ck distance k...................
port bar (9) .
rews (19) ...
...................
tation with a
...................
...................
Page 3
............ 6
............ 7
............ 8
............ 9
............ 9
ettes . 10
.......... 11
.......... 11
.......... 12
.......... 13
.......... 13
e back 14
sides of .......... 14
properly .......... 16
.......... 17
.......... 17
cured .......... 18
keeper .......... 19
.......... 19
.......... 20
.......... 20
crane 21
.......... 22
.......... 23
3 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
1. Rul
1.1. Co
In ge
All m
Make
1.2. We
The m
Once
age t
Durin
1.3. Me
The m
To av
irradi
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
es for Han
ontact with
neral no con
embranes ar
e sure that no
et membra
membranes a
e the glycerin
he membran
ng de-installa
embranes
membranes
void the heat
ation.
Recht vor, ng anzu-
cifications
M
I
R
D
ndling and
h membra
ntact with the
re 100% qua
othing can da
anes
are stabilized
n solution is r
ne must not d
ation of the m
sticking t
must not be
ting-up of the
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
d Storage
anes
e membranes
ality tested an
amage the m
d with a glyc
removed or t
dry out again
modules the m
together
stored at tem
e PVC compo
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
s is allowed.
nd ready for
membrane du
cerin solution
the membran
n.
membrane m
mperatures b
ounds the m
Telefon:
Telefax:
E-Mail:
Internet:
operation.
uring assemb
for delivery.
nes become
must remain f
below 5°C an
modules shou
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
bling and ins
wet resulting
full of water a
nd above 40°
uld not be sto
962-6001
962-9237
yn-nadir.de
yn-nadir.de
stallation.
g from impro
at all times.
°C.
ored directly
Page 4
per stor-
in solar
4 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
2. Ove
2.1. LisTable 1 s
ual part
bly instru
tion befo
Part Nu
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Table 1:
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
erview
st of Matershows a com
is assigned a
uction. It is im
ore assembly
umber Qu
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
: Mate
Recht vor, ng anzu-
cifications
M
I
R
D
rials mprehensive
a number wh
mportant to e
y begins.
uantity
4 Ca
1 Ba
2 Fla
1 Fla
1 Pe
1 Pip
1 Co
1 Fit
2 Su
8 Dis
4 Dis
3 Co
4 Me
3 Me
4 Sp
8 He
4 He
8 He
6 Pa
3 He
8 He
16 Wa
3 Wa
1 O-
erials list fo
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
list of mater
hich will be u
ensure that a
assette C100
ase Frame BC
at Sealing Ri
at Sealing Ri
ermeate Pipe
pe Coupling
ounterpart to
ting for Pipes
upport Bar
stance Keep
stance Keep
ompression S
etal Ring 84 x
etal Tube
plint-Pin 6.3 x
exagon Bolt M
exagon Bolt M
exagon Bolt M
arker Screw 7
exagon Nut M
exagon Nut M
asher 30 x 17
asher 28 x 9
Ring 235 x 5
r BC 400 as
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
rials needed
used to refer
all of the requ
0 + Distance
C400
ng 110 mm
ng 75 mm
e
Pipe Coupli
s
er (Black)
er (White)
Spring R=35
x 64 x 2 mm
x 90
M10 x 70 mm
M10 x 90 mm
M16 x 95 mm
7.8 x 25 mm
M8
M16
7 x 3 mm
x 3 mm
5 mm
ssembly (to
Telefon:
Telefax:
E-Mail:
Internet:
to assemble
to the part th
uired parts ar
Descriptio
Keeper
ng
N/mm
m
m
m
be filled in b
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
a BC 400 m
hroughout the
re present an
on
by productio
962-6001
962-9237
yn-nadir.de
yn-nadir.de
module. Each
e rest of the
nd in pristine
on)
Page 5
h individ-
assem-
e condi-
5 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Figure 1
by their a
Figure 1
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
shows a full
associated p
1: Ove
Recht vor, ng anzu-
cifications
M
I
R
D
ly assembled
part number.
rview of an
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
d BC 400 mo
fully assem
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
odule. The m
mbled BC 400
Telefon:
Telefax:
E-Mail:
Internet:
major compon
0 module
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
nents of the B
962-6001
962-9237
yn-nadir.de
yn-nadir.de
BC 400 are i
Page 6
identified
6 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
3. Pre
3.1. Pre
Place
acces
The f
be ins
Figure 2
3.2. Sp
The a
To pr
Befor
Do n
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
eparations
eparation
e the base fr
ssible.
front of the m
stalled. Figu
2: Fron
pecial cons
air diffusers a
rotect the diff
re the modul
ot use a knif
Recht vor, ng anzu-
cifications
M
I
R
D
s
of the bas
rame (2) into
module is the
re 2 shows t
nt view of th
sideration
are easily da
fusers do no
e is installed
fe to remove
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
se frame
o a position w
side where
he front view
he BC 400 ba
ns when h
amaged when
t remove the
d in a tank the
the bubble w
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
where both th
the air distrib
w of the modu
ase frame (2
andling th
n collisions w
e bubble wra
e bubble wra
wrap to avoid
Telefon:
Telefax:
E-Mail:
Internet:
he top and bo
butor is attac
ule.
2)
he base fra
with hard obj
p until the m
ap must be re
d diffuser da
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
ottom of the
ched and is w
ame
ects occur.
odule is com
emoved from
mage.
962-6001
962-9237
yn-nadir.de
yn-nadir.de
module are
where the pip
mpletely asse
m the bottom
Page 7
easily
pes will
embled.
.
7 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
3.3. Pre
The m
pipe c
Figur
Figure 3
The c
Figur
The t
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
eparation
module must
coupling (6)
re 3 shows th
3: (Left
counterpart
re 4.
tie rods also
Recht vor, ng anzu-
cifications
M
I
R
D
of the cou
t oriented pro
) facing the f
he counterp
t) The count
(7) and pipe
connect all f
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
unterpart
operly with th
front.
art (7) and p
terpart (7) (R
e coupling (6
four C100 Me
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
he counterp
pipe couplin
Right) The p
6) are conne
embrane Ca
Telefon:
Telefax:
E-Mail:
Internet:
part (7) facing
g (6) respec
pipe couplin
ected by thre
assettes and
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
g the back of
tively.
ng (6)
e threaded ti
d Distance K
962-6001
962-9237
yn-nadir.de
yn-nadir.de
f the module
ie rods as se
Keepers (1)
Page 8
e and the
een in
8 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Figure 4
Ensu
Figure 5
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
4: Cou
re that the O
5: Inse
Recht vor, ng anzu-
cifications
M
I
R
D
nterpart (7)
O-Ring (24) i
ert the O-ring
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
with three t
s correctly in
g (24) in the
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
threaded tie
nserted into t
e counterpar
Telefon:
Telefax:
E-Mail:
Internet:
e rods
the counterp
rt (7)
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
part (7) as se
962-6001
962-9237
yn-nadir.de
yn-nadir.de
een in Figure
Page 9
e 5.
9 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
4. Fixi
4.1. Pro
The C
A fork
Once
begin
Attac
Caref
perm
The c
Figure 6
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
ing casset
oper trans
C100 casset
klift can be u
e the cassette
n.
ch the lifting a
fully lift the c
eate channe
cellotape mu
6: The cass
Recht vor, ng anzu-
cifications
M
I
R
D
ttes into m
sportation
ttes (1) for e
used to caref
es are transp
apparatus to
cassette payi
el by cellotap
st be remove
lifting appasettes
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
module ba
n of casset
ach BC 400
ully transpor
ported to the
the circular
ng special at
pe.
ed prior to in
aratus prope
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
ase frame
ttes
module are
rt the wooden
e desired loca
holes on the
ttention to th
nstallation.
erly connect
Telefon:
Telefax:
E-Mail:
Internet:
transported
n crate to the
ation installat
e thin sides o
he distance k
ted to the ho
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
in a wooden
e desired ins
tion into the
f the first cas
keeper which
oles on the t
962-6001
962-9237
yn-nadir.de
yn-nadir.de
n crate.
stallation des
base frame
ssette.
h is attached
thin side of
Page 10
tination.
(2) can
to the
f the
0 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
4.2. Pla
Each
meat
A bla
has n
It doe
(2), b
Figure 7
Place
in Fig
Figure 8
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
acing cass
cassette ha
e channel.
ack sealing a
no sealing as
es not matter
but the direct
7: Dete
e all four cas
gure 8.
8: Plac
Recht vor, ng anzu-
cifications
M
I
R
D
settes into
as a delegate
ppears in the
s seen in Fig
r whether yo
ion of all cas
ermination o
settes on the
ce the four c
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
o base fra
ed front and b
e permeate c
ure 7.
u start placin
ssettes must
of cassette o
e ground with
cassettes on
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
ame
back side wh
channel on th
ng the casse
be consisten
orientation b
h enough sp
n the ground
Telefon:
Telefax:
E-Mail:
Internet:
hich can be d
he front side
ttes in the fro
nt with the di
by black sea
ace to reach
d with spaci
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
determined b
of the modu
ont or back o
rection of the
aling
h the permea
ing
962-6001
962-9237
yn-nadir.de
yn-nadir.de
by looking at
ule and the b
of the base f
e base fram
ate channel a
Page 11
the per-
ack side
frame
me (2).
as seen
of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
4.3. Co
Each
It is im
prope
Figure 9
To co
throu
modu
Conti
ers a
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
onnecting
cassette ha
mperative tha
er installation
9: Dista
onnect the m
gh the three
ule at the bac
inue pushing
s seen in Fig
Recht vor, ng anzu-
cifications
M
I
R
D
the casse
as a distance
at each dista
n.
ance keepe
modules start
holes in the
ck of the bas
g the tie rods
gure 10.
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
ettes
keeper as s
ance keeper
r that must
by pushing t
permeate ch
se frame).
through the
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
shown in Figu
be placed be
be placed b
the three tie
hannel and t
remaining c
Telefon:
Telefax:
E-Mail:
Internet:
ure 9.
etween its re
between eac
rods connec
the distance
cassettes and
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
espective mo
ch cassette
cted to the co
keeper of the
d their respec
962-6001
962-9237
yn-nadir.de
yn-nadir.de
odules to ens
ounterpart (
e first modul
ctive distanc
Page 12
sure a
(7)
e (the
ce keep-
2 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Figure 1
Once
tance
Add t
the fin
Figure 1
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
10: Inse
e the tie rods
e keepers ge
the final dista
nal cassette
11: All fo
Recht vor, ng anzu-
cifications
M
I
R
D
erting the tie
are success
ently push the
ance keeper
is secure as
our cassette
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
e rods and c
sfully through
e modules so
to the tie rod
s seen in Figu
es fastened
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
counterpart
h the first thre
o that there a
ds and insert
ure 11.
by the tie r
Telefon:
Telefax:
E-Mail:
Internet:
(7) into the
ee cassettes
are no gaps.
t the tie rods
rods
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
cassettes
s along with t
into the fina
962-6001
962-9237
yn-nadir.de
yn-nadir.de
their respect
al cassette en
Page 13
ive dis-
nsuring
3 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
4.4. Se
The c
age is
Once
part (
gaps
Use h
Figure 1
Once
(16) c
13.
Both
Nm) b
Figure 1
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
ecuring the
cassettes (1
s inflicted on
e all of the ca
(7) push the
.
hexagonal b
12: Hexaback
e hexagonal
can be used
sets of bolts
but must be
13: Secuside
Recht vor, ng anzu-
cifications
M
I
R
D
e cassette
) should be
n the cassett
assettes are
cassettes to
bolts (17) to
agonal boltsk
bolts (17) a
to secure th
s should not b
tight enough
uring the caes of the mo
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
es to the b
held togethe
tes (1) by sh
in the base f
ogether and t
secure the c
s (17) used t
are used to ti
e cassettes t
be too tight s
h that the cas
assettes to tdule
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
base frame
er by a suppo
ear stress.
frame (2) an
towards the f
cassettes to t
to tighten th
ghten the ca
to the base f
so as to avoid
ssettes are s
the base fra
Telefon:
Telefax:
E-Mail:
Internet:
e
ort belt to ens
nd connected
front of the b
the base fra
he cassettes
assettes from
frame (2) fro
d damage to
secure.
me (2) using
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
sure that no
d with the tie
base frame (
me (2) from
s to the bas
m behind the
om both side
o the cassette
g hexagona
962-6001
962-9237
yn-nadir.de
yn-nadir.de
unnecessary
rods and co
(2) to remove
the back (Fi
se frame (2)
hexagonal
es as seen in
es (no more
al bolts (16) f
Page 14
y dam-
ounter-
e any
gure 12).
from the
bolts
Figure
than 1
from the
4 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
5. Clo
Pleas
quate
The p
sion
The c
and m
There
the tie
The t
tion o
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
osing the p
se ensure tha
ely lubricated
permeate cha
springs (12
compressio
must be pre-t
e is also a m
e rods as sh
tensioned len
of the tie rod
Recht vor, ng anzu-
cifications
M
I
R
D
permeate c
at all nuts an
d with anti-se
annel is clos
2) to the tie ro
n springs (1
tensioned to
metal tube (1
own in Figur
ngth of the c
as well as th
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
channel
nd bolts asso
eize.
sed by attach
ods at the fro
12) are desig
a length of 6
4) that must
re 14.
ompression
he length of t
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
ociated with t
hing the pipe
ont of the cas
gned to exert
65 mm.
be inserted
n spring (12
the metal tu
Telefon:
Telefax:
E-Mail:
Internet:
the closing o
e coupling (6
ssettes.
t the force fo
into the com
) is given by
be (14).
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
f the permea
6) along with
r closing the
mpression sp
the length o
962-6001
962-9237
yn-nadir.de
yn-nadir.de
ate channel a
h the three co
e permeate c
pring (12) a
of the threade
Page 15
are ade-
ompres-
hannel
nd over
ed por-
5 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Figure 1
Once
rods t
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
14: Arraprop
e the compre
the pipe cou
Recht vor, ng anzu-
cifications
M
I
R
D
angement ofperly secure
ession sprin
upling (6) ca
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
f compressie the permea
ng (12) and m
an be attache
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
on spring (1ate channel
metal tube (
ed to the fron
Telefon:
Telefax:
E-Mail:
Internet:
12) over the
(14) are appr
nt.
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
metal tube
ropriately pos
962-6001
962-9237
yn-nadir.de
yn-nadir.de
(14) and tie
sitioned on t
Page 16
e rod to
he tie
6 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
In ord
wash
Figure 1
Once
ened
Make
Once
pling
Figure 1
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
der to secure
her (22) and
15: Lock
e the couplin
to the end o
e sure that al
e the locknut
g (6) in order
16: Scre
Recht vor, ng anzu-
cifications
M
I
R
D
e the pipe co
locknut (23
knut (20) fix
ng (6) and as
of the threads
l three lockn
ts (20) are a
to complete
ew cap is pla
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
oupling (6) to
) must be pla
xed onto the
ssociated pa
s on the tie ro
nuts (20) (on
appropriately
ly seal the p
aced over th
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
o the tie rods
aced on eac
e tie rod alon
arts are attac
rods.
ne for each ti
tightened th
ermeate cha
he tie rod to
Telefon:
Telefax:
E-Mail:
Internet:
s and compr
h tie rod as s
ng with the
hed properly
ie rod) are tig
e screw cap
annel as seen
o completely
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
ression spri
shown in Fig
big washer
y the locknut
ghtened unifo
s must be at
n in Figure 1
y shut perm
962-6001
962-9237
yn-nadir.de
yn-nadir.de
ings (12) a b
ure 15.
(23) and sp
t (20) must b
formly.
ttached to th
6.
eate channe
Page 17
big
ring (12)
be tight-
e cou-
el
7 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
6. Inst
6.1. Se
First
front
The s
are ri
Push
Fix th
Figure 1
6.2. Ad
Once
be ad
Use P
holes
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
tallation o
ecuring the
push the sup
of the modu
support bar
ght next to c
the metal ri
he splint-pin
17: (Leftcure
dding the d
e the suppor
dded to comp
PVC glue to
s in the casse
Recht vor, ng anzu-
cifications
M
I
R
D
of the supp
e support
pport bars (
le.
(9) should b
cassettes.
ing (13) onto
n (15) into the
t) Metal Ringed through t
distance k
rt bars (9) ar
pletely seal t
fix the cresc
ettes Figure
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
port bars
bars
(9) through th
be pushed in
o the bar so t
e designated
g (13) on thethe hole in t
keepers
re inserted th
he excess g
ent shaped d
18 (Right).
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
he cassettes
so that the h
that it is rest
d hole by ben
e bar againshe bar
hrough the ca
aps as show
distance kee
Telefon:
Telefax:
E-Mail:
Internet:
s so that the l
holes in the b
ing against t
nding the end
st the casse
assettes dist
wn in Figure 1
eper (10 & 1
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
longer end o
bar meant fo
he cassette
ds Figure 17
ette (Right) S
tance keepe
18 (Left).
11) to the upp
962-6001
962-9237
yn-nadir.de
yn-nadir.de
of the bar is a
or the splint-
Figure 17 (L
7 (Center).
Splint-pin (1
ers (10 & 11
per section o
Page 18
at the
pins (15)
eft).
15) se-
) must
of the
8 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Figure 1
There
in the
The d
Figure 1
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
18: (Leftkeep
e are black d
eir respective
distribution o
19: Spac
Recht vor, ng anzu-
cifications
M
I
R
D
t) Excess gaper (10) glue
distance kee
e spots to en
of the distanc
cing of blac
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
ap between ed to the up
epers (10) a
sure proper
ce keepers (
ck and white
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
support bapper portion
and white dis
sealing.
(10 & 11) for
e distance ke
Telefon:
Telefax:
E-Mail:
Internet:
rs (9) and caof the hole
stance keep
r each bar is
eepers (10 &
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
assette (Rigin the casse
pers (11) whi
shown in Fig
& 11) for eac
962-6001
962-9237
yn-nadir.de
yn-nadir.de
ght) Black dette
ich must be
gure 19.
ch support
Page 19
istance
applied
bar (9)
9 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
7. Inst
7.1. Att
Attac
in Fig
The h
Figure 2
7.2. Att
The p
at the
Add o
Add t
Attac
wash
Figure 2
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
tallation p
taching th
ch the fitting
gure 20.
holes for the
20: Perm
taching of
permeate pi
e front of the
one flat seal
the other flat
ch the perme
hers (22) as
21: Insta
Recht vor, ng anzu-
cifications
M
I
R
D
permeate p
he permea
(8) for the p
parker scre
meate fitting
f permeate
pe (5) is atta
module.
ling ring (3)
t sealing rin
eate pipe (5)
shown in Fig
allation of th
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
pipe
ate fitting
ipes to the fr
ews (19) are
g (8) attache
e pipe
ached to the
between pip
g (3) on top
) to the flange
gure 21.
he permeate
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
ront of the ca
already pres
ed to the cas
flange portio
pe coupling a
of the perme
e by using th
e pipe (5)
Telefon:
Telefax:
E-Mail:
Internet:
assette using
sent in the ca
ssette wall u
on of the pip
and fitting as
eate pipe as
he hex flang
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
g the parker
assette wall.
using the pa
e coupling (
shown in Fig
shown in Fig
e bolts (18)
962-6001
962-9237
yn-nadir.de
yn-nadir.de
screws (19)
arker screws
(6) and the f
gure 21.
gure 21.
, nuts (21) a
Page 20
) as seen
s (19)
itting (8)
and
0 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
8. Mod
8.1. Lif
A cra
The l
show
The m
Figure 2
8.2. Us
The f
The f
mm (
Both
slip o
Mane
It may
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
dule trans
fting modu
ane can be us
oad-carrying
wn in Figure 2
module must
22: Propa cra
sing a fork
forklift must l
fork length m
(1.64 ft).
sides of the
off and cause
euver the mo
y be necessa
Recht vor, ng anzu-
cifications
M
I
R
D
sportation
ules with a
sed to lift the
g cables shou
22.
t be complete
per attachmane
klift to tran
ift the modul
must be a min
module fram
e significant d
odules carefu
ary to secure
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
a crane
e completed
uld be positio
ely lifted off o
ent location
nsport mo
es from the w
nimum of 1,4
me must rest
damage.
ully since the
e the module
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
modules to a
oned onto th
of the ground
n and lifting
odules
wide side as
400 mm (4.6
on top of the
ere is special
e to avoid an
Telefon:
Telefax:
E-Mail:
Internet:
a desired loc
e steel bars
d and must n
technique f
s shown in Fi
ft) and the in
e forks to ens
risk associa
y shifting or
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
cation.
directly at th
never slide ac
for module t
gure 23.
nner width m
sure that the
ate with a hig
tilting.
962-6001
962-9237
yn-nadir.de
yn-nadir.de
he cassette w
cross the flo
transportati
ust be at lea
e module doe
gh balance po
Page 21
walls as
or.
ion with
ast 500
es not
oint.
of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
Figure 2
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
23: The
Recht vor, ng anzu-
cifications
M
I
R
D
forklift mus
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
st transport
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
the module
Telefon:
Telefax:
E-Mail:
Internet:
es from the w
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
wider side
962-6001
962-9237
yn-nadir.de
yn-nadir.de
Page 22
2 of 23
MAp
Ww
M_B
MICRODYN-NADIRAngaben ohne vorhassen.
We reserve the righwithout prior notific
BC400_Assembly Ins
9. Inst
BIO-C
fuser
Exten
Place
Ensu
with t
Fix th
tion o
Pleas
tank s
Figure 2
R behält sich das herige Ankündigu
ht to change speccation.
struction_V1_00e
tallation o
CEL® module
rs in the base
nsion feet are
e the extensi
re that the fe
the screws.
he extension
of the screws
se note that t
since they ar
24: Insta
Recht vor, ng anzu-
cifications
M
I
R
D
of extensio
es are requir
e frame (2) i
e available fr
on feet into t
eet are fully i
feet with the
s is not impor
the feet mus
re not design
allation of B
MICRODYN-N
ndustriepark K
Rheingaustraß
D-65203 Wies
on feet
red to have a
n order to en
rom MICROD
the feet of th
nserted into
e chipboard s
rtant.
t be removed
ned to carry t
BIO-CEL® ex
NADIR GmbH
Kalle-Albert
ße 190 – 196
sbaden
a certain dist
nsure proper
DYN-NADIR
e module wh
the base fra
screws as sh
d before the
the load of a
xtension fee
Telefon:
Telefax:
E-Mail:
Internet:
ance from th
r hydraulic flo
if needed.
hile the modu
ame (2) befo
hown in INSE
module is pu
a wet module
t
+49 (0) 611/9
+49 (0) 611/9
info@micrody
www.micrody
he bottom of
ow.
ule is in a ha
re permanen
ERT CITATIO
ut on the gro
.
962-6001
962-9237
yn-nadir.de
yn-nadir.de
the tank to t
anging positio
ntly securing
ON. The exa
ound outside
Page 23
he dif-
on.
them
act posi-
of the
3 of 23