BIM4FM Guillermo's & Manfred's · 2015-09-09 · 1 3 5 7 9 11 13 15 17 19 21 23 Room-Comfort...
Transcript of BIM4FM Guillermo's & Manfred's · 2015-09-09 · 1 3 5 7 9 11 13 15 17 19 21 23 Room-Comfort...
BIM4FM: an Interna-onal View Dr. Guillermo Aranda-‐Mena Associate Professor at the Royal Melbourne Institute of Technology, Australia Visiting Professor at the University of Applied Sciences and Arts Northwest Switzerland Regional Editor – Australasia -‐ for FACILITIES by Emerald
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
2 2
Melbourne
Dr. Guillermo Aranda-Mena. RMIT Melbourne. Innovation in the Built Environment Academy - LONDON - 2011
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
3
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
4
Think Big, start small,
act now!!
Strategic project
solutions:Latency
stanford VdC certificate program 2008: turner construction; pb; rmit; aera energy; slanvenberg; perkins eastman; rosendin electric; skanska...
4D
• PhD The University of Reading, UK
• RMIT Manager for the BIM National Guidelines, Australia
• Research Leader at the CRC Construction Innovation
• Professional Certificate by Stanford University, USA
BIM4FM: Informa-on based Design, Construc-on and Opera-on
Prof. Dr. Ing. Manfred Breit Institute for 4D-‐Technologies University of Applied Sciences Northwestern Switzerland Head of the Further Education Program « Digitales Bauen -‐ Digital AECO»
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
6
Use of Integrated Building Information
BIM: Building Information Model
IFC DWG
Live Cycle Costs LCC
Energy Simulation Building
-30-20-10
0102030405060708090
100
1 3 5 7 9 11 13 15 17 19 21 23
Room-Comfort Simulations
Virtual Reality
Coordination Visualization
Umweltanalysen LCA
HVAC MEP 3D CAD
Room Book
Belüftungssim. CFD
Lighting Design Visualization
Architect CAD Design
BUILDING SIMULATIONANNUAL ENERGY CONSUMPTION
Simulation 1
ANNUAL ENERGY CONSUMPTION AND COST
MONTHLY HEATING ENERGY MONTHLY COOLING ENERGY
Heating energy:
158.4 mk/MWh
(VAT not included 2%)
Electric energy:
270.0 mk/MWh
(VAT not included 2%)
Cooling electricity includes
the electricity consumption of
the compressors, condensers
and circulation pumps.
COP of cooling = 3
HEATING OF ROOM EQUIPMENTS COOLING OF ROOM EQUIPMENTS
HEATING OF SUPPLY AIR COOLING OF SUPPLY AIR
DOMESTIC WATER HEATING
GRANLUND SOFTWARE
RIUSKA
0
30
60
90
120
150
1 2 3 4 5 6 7 8 9 10 11 12
MWh
0
100
200
300
400
500
600
700
0
30000
60000
90000
120000
150000
MWh/a mk/a
0
30
60
90
120
150
1 2 3 4 5 6 7 8 9 10 11 12
MWh
0
30
60
90
120
150
1 2 3 4 5 6 7 8 9 10 11 12
MWh
Quantity Takeoff Costs
FM Building Portals
Self-Reporting Building
Source: Granlund
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
7
BIM supported Processes and Business Models
Source: Granlund
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
8
Self-Reporting Buildings – Link BIM with Business Model
Source: Granlund
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
9
Principles of BIM
Source: buildingSmart
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
10
Case Study: Sutter Medical Center Castro Valley
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
11
IPD BIM enabled collaboration
Process Metrics Target Costing
Design the «Big Room» Virtual Building Tools
«Big Room» Collaborative Planning Virtual Company
Design Assist
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
12
Comparision integrated and historic project delivery time lines
Source: Mossmann, Ballard, Pasquire
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
13
Collaborative Planning with BIM Case Study: Sutter Medical Center Castro Valley
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
14
Everything above 1.0 cm was modeled in 3D BIM Case Study: Sutter Medical Center Castro Valley
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
15
Federated Modelmanagement Case Study: Sutter Medical Center Castro Valley
Source: BIM Handbook
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
16
Construction based on the planned and coordinated BIM Case Study: Sutter Medical Center Castro Valley
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
17
Laser Scanning Check actual versus planned – Interaction BIM and Site Case Study: Sutter Medical Center Castro Valley
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
18
Transprarent Performance Metrics Case Study: Sutter Medical Center Castro Valley
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
19
Royal Children Hospital Melbourne
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
20
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
21 Dr Guillermo Aranda-Mena © 2011 64 64
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
22
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
23
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
24
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
25
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
26
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
27
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
28
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
29
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
30
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
31
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
32 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
33
Royal Children’s Hospital IMRIS, Melbourne www.ndy.com/projects
Project Review
Royal Children’s Hospital IMRIS, Melbourne
Market Sector: Health
Location:Melbourne, VIC
Office:Melbourne, VIC
Models:Designed in: Revit MEP 2010Developed in: Navisworks 2010
Services:� Mechanical
� Electrical
� Hydraulics
� Fire Protection
� Fire Engineering
� ESD
� Security
� Specialist Lighting
� Vertical Transportation
Description:In September 2007, NDY was appointed as part of the successful consortium to build the new Royal Children’s Hospital in Parkville. The consortium comprises Babcock and Brown as sponsors, Bovis Lend Lease as builder, Spotless Group as facilities manager and architects Billard Leece, Bates Smart and HKS (US).
The new hospital is being delivered as a PPP under the State Government’s Partnerships Victoria model and is expected to cost around $850 million. It is due to open in 2011.
It is one of the largest hospital projects undertaken in Australia. Some of the features include:
� Aiming to be Australia’s first 5 star Green Star hospital
� A 45% reduction in greenhouse gas through the use of energy efficient lighting, cooling and heating
� The inclusion of a 2.8MW gas fired co-generation plant and solar panels
� Chilled beams in the majority of non-patient areas
� Low or non volatile compounds in carpets, vinyls and paints
� Rainwater collection from 75% of new roof areas with storage tanks to collect 85% of run off
� Blackwater treatment plant for reuse of wastewater
� Zero net loss of parkland with the removal of the existing hospital.
NDY was instrumental in providing design input during the bid phase of the project, demonstrating our ability and commitment to assist the financier and builder during this crucial stage.
This is one of the biggest projects undertaken by the Melbourne office of NDY and has driven the use of some innovative BIM technologies.
Case Study 2: The Royal Children Hospital Melbourne The Facts: Drivers and enablers for a 1 billion AusDlls Hospital procured under Public Private Partnership with a 25+ years Government consetion period to private sector operations and FM.
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
34
FM role through the ProjectFM role through the ProjectFM role through the ProjectFM role through the Project
EOI PhaseRFT/Design
PhaseConstruction
PhaseHandover
PhaseOperational
Phase
Architects
Engineers
BuildersBuilders
SPV
Equity Provider
FM Team
ACTIVE
PASSIVE 50,7�8QYHUVLW\���*XLOOHUPR�$UDQGD�0HQD
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
35 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
36 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
37 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
38 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
39 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
40 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
41 Image courtesy: Australian Design Review
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
42
Impact of BIM and Process on Project Performance Case Study: SERA Architects 2012
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
43
Impact of BIM and Process on Project Performance Case Study: SERA Architects 2012
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
44
Impact of BIM and Process on Project Performance Case Study: SERA Architects 2012
Quelle: CIFE
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
48
MAS Digitales Bauen (dBAU) «Digital AECO» Information Based Design, Planning, Construction and Operation
Curriculum Strategic and Opera-ve Deployment of BIM Technologies q BIM Technologies, Poten-als and Challenges
q Change of Design-‐, Planning-‐ and Construc-on Processes
q Implementa-on in AECO Prac-ce Study Assignments focus on Industry Prac-ce Topics and Implementa-on Problems
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
45
• A module of the Master of Advanced Studies Curriculum «Digital AECO» «Informa-on Based Design, Planning, Construc-on and Opera-on»
• University of Applied Sciences Northwestern Switzerland in Coopera-on with the
Center für Integrated Facility Engineering der Stanford University, USA and der Zürcher Hochschule für Angewandte WissenschaPen Life Sciences + Facility Management
• The Programm in supported by buildingSMART Schweiz
CAS Course «BIM -‐ Poten-als and Strategies» Information Based Design, Planning, Construction and Operation
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
46
MAS Digitales Bauen (dBAU) «Digital AECO» Information Based Design, Planning, Construction and Operation
CAS dBAU 15 ECTS each 1. dBAU-‐1 Poten-al and Strategies Start September 2013 2. dBAU-‐2 Methods and Technologies Start March 2014 3. dBAU-‐3 Performance and Cost Management Start September 2014 4. Masterthesis Topic from Prac-ce Start January2015
Course 1 + 2 are mandatory, course 3 is arbitrary – further course will be developed with partner universi-es; • Simula-on / Engineering and Construc-on Planning • The Digital Construc-on Site • Opera-on and Facilies Management
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
47
MAS Digitales Bauen (dBAU) «Digital AECO» Information Based Design, Planning, Construction and Operation
BIMStudy Tour – Center for Integrated Facility Engineering, Stanford University -‐ BIM Leadership Seminar Visit GSA PBS Office of the Chief Architect, San Francisco BIM for Owners/Investors/Federal Administra-on – BIM-‐Incen-ve Visit to Johnson Control (Building Services Technologies) -‐ Facili-es Management Visit to DPR, Silicon Valley, IPD – Integrated Project Delivery New Process-‐, Management-‐ und Contract Models: Design to Value BIM Leadership Seminar, CIFE, Stanford University Analyses Industry Case Studies, Implementa-on Strategies, Current Research
A/Prof Dr Guillermo Aranda-Mena - RMIT Melbourne, Au. Prof. Dr. Manfred Breit – FHNW Switzerland,, CH © 2013
49 Breit
Business and Marketing Positioning for FM professionals procuring projects as “Expert Client” What is your take?
Thank you, A/Prof. Dr. Guillermo Aranda-Mena Prof. Dr. Manfred Breit