Professor Bimal Kumar and Graham Hayne
GCU BIM Partnership
School of Engineering and Built Environment
Glasgow Caledonian University
BIM Strategy for NHSScotland
![Page 2: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/2.jpg)
Agenda
• Introduction to BIM
• GCU BIM Partnership with HFS
• HFS BIM Strategy
• HFS BIM Strategy Training Programme
![Page 3: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/3.jpg)
Some myths about BIM..
• BIM is a piece of software
• BIM will save my firm 20%+ if I use a BIM software
• A client is asking me to use BIM on their project – let’s buy some Revit (BIM software) licenses!
• We have been doing BIM for at least 30 years ever since CAD came out!
• BIM is CAD by another name!
![Page 4: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/4.jpg)
Information Management in the Construction Industry
• Industry seen as non-collaborative
• Latham/Egan urge collaborative working.
• IT systems will support collaboration
• Adoption of IT tools has been slow
• Clients are imposing pressure on contractors to improve
quality and performance
![Page 5: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/5.jpg)
Traditional Routes of Communication and
Knowledge Transfer
Client
Adviser
Planning
Building Control
Fire
Accountants Insurance
Banks
Engineers
Consultants
Quantity surveyors
Architects
Material suppliers
Main contractor
Sub – contractors
Client side
Financiers
Contracting side
Regulators
Professionals
![Page 6: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/6.jpg)
Knowledge Gap
24%
42%
22%
12%
Where knowledge currently resides
Where knowledge needs to reside
42%
![Page 7: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/7.jpg)
property
developer regulatory
bodies
general
contractor
architect
engineers
consultants
material producers material
supplier
specialist
contractor
EDMS
Structured Communication via an Intermediary
![Page 8: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/8.jpg)
Project Management
• Project Management is the planning, organising, monitoring and control of all aspects of a project and the motivation of all involved to achieve the project objectives safely and within agreed time, cost and performance criteria.
• Project management is largely an information processing enterprise.
![Page 9: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/9.jpg)
So………..The desired scenario in the Construction Industry is ……..
All stakeholders share and exchange information in a pre-agreed standard format which is enabled by appropriate technologies, processes and standard protocols.
![Page 10: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/10.jpg)
BIM Definition (BIM Handbook, Eastman et al.)
BIM is a modelling technology and associated set of processes to produce, communicate and analyse building models. These building models are characterised by:
Building Components that are represented with intelligent digital representations that ‘know’ what they are and can be associated with computable graphic and data attributes and parametric rules.
Components that include data that describe how they behave, as needed for analyses and work processes, e.g. takeoff, specification and energy analysis.
![Page 11: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/11.jpg)
BIM Definition contd....
Consistent and non-redundant data such that changes to component data are represented in all views of the component.
Coordinated data such that all views of a model are represented in a coordinated way.
Paul Morrell believes that BIM is about ‘the intelligent use of digital data to design, construct, manage and use a built facility’
Royal Institute of Chartered Surveyors (RICS) describe the fundamentals of BIM as ‘... a common single and co-ordinated source of structured information...’
National BIM Standards-United States definition: "A BIM is a digital representation of physical and functional characteristics of a facility. As such it serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its lifecycle from inception onward."
![Page 12: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/12.jpg)
So, what’s the difference between CAD (Computer-aided Draughting) and BIM (Building Information Modelling)?
CAD – ‘dumb’ drawing, a collections of various geometric shapes and components that make up a drawing of a building
BIM – an ‘all-encompassing’ container of information about all aspects of a building, i.e. A BIM model should contain information about design, construction, operation, schedules, costs etc. etc. for a building. Therefore, it can be used to extract information and reason with it for all imaginable aspects of a building!
BIM is a digital representation of the physical and functional characteristics of a facility
![Page 13: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/13.jpg)
Screen shot of BIM modelling software
![Page 14: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/14.jpg)
![Page 15: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/15.jpg)
![Page 16: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/16.jpg)
Processes
Standards and
Protocols
Tools
![Page 17: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/17.jpg)
Information Delivery Lifecycle
![Page 18: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/18.jpg)
UK Drivers
UK Government’s Construction Procurement Strategy published in June 2011 mandates the use of Level 2BIM on all public-sector projects from 2016.
More than 15 years ago, Michael Latham’s report (Constructing the Team) underlined the importance of Collaboration and the use of IT in facilitating that.
Subsequent to Latham, John Egan’s report (Rethinking Construction) again emphasised the importance of this and its role in improving the industry’s efficiency.
![Page 19: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/19.jpg)
Scottish Government Position
8.6.13 Recommendation:
The use of Building Information Modeling (BIM) should
be introduced in central government with a view to
encouraging its adoption across the entire public sector.
The objective should be that, where appropriate,
construction projects across the public sector in
Scotland adopt a BIM level 2 approach by April 2017.
- Review of Scottish Public Sector
Procurement in Construction, October 2013
![Page 20: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/20.jpg)
Northern Ireland Government’s Position
All public sector projects above the EU threshold (Euros 4.35m) will be Level 2 BIM-enabled from 2017.
![Page 21: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/21.jpg)
![Page 22: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/22.jpg)
Construction 2025 Targets (Construction
2025, 2013)
![Page 23: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/23.jpg)
![Page 24: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/24.jpg)
![Page 25: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/25.jpg)
BIM Technology Maturity Levels
![Page 26: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/26.jpg)
Level 2 BIM
CDE
BIM Model
1
BIM Model
2
BIM Model
3
BIM Model
4
![Page 27: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/27.jpg)
Information Delivery Lifecycle
![Page 28: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/28.jpg)
![Page 29: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/29.jpg)
Level 2 Key Issues
•Key to the strategy is the need to deliver Level 2 BIM capabilities with combined model, drawing and COBie data deliveries to the client at key points throughout the delivery and handover process.
•To achieve this, clear contractual and delivery guidance is being made available to the supply chain. The PAS 1192:2 and 3 form the first parts of this guidance. On successful completion of the Early Adopter programmes the documents and processes will be refined and converted into full British Standards.
![Page 30: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/30.jpg)
Level 2 BIM
Central idea:
Everyone uses the same Data Formats and Timings on data delivery
Data Format:
COBie - Construction Operations Building Information Exchange
![Page 31: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/31.jpg)
COBie
What is COBie?
•COBie stands for Construction Operations Building Information Exchange.
•COBie (Construction Operation Building information exchange) is a data schema for holding and transmitting information around handover to support the client’s ownership and operation of a facility.
•Technical Specifications for COBie is the Industry Foundation Class (IFC) Facility Management Handover Model View Definition
![Page 32: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/32.jpg)
BIM Protocol. A universal addendum to appointment documents and construction contracts that puts in place additional rights and
obligations associated with Building Information Models – includes guidance note and model contract amendment.
Employers Information Requirements. A template setting out the information needed to define information and other client
requirements for a project delivered using Building Information Models – includes guidance and pre-qualification documentation
for consultants and contractors.
Scope of Services for Information Management. A scope of services for Information Management activities that is designed to be
appended to an existing appointment – e.g. Design Team Leader.
PAS 1192:2. Building Information Modelling – Production information requirements for capital projects. The standard for
information exchange to meet BIM maturity level 2 – includes the BIM Implementation Plan and details of the Common Data
Environment. The PAS is published by the British Standards Institution.
PAS 1192-3:2014 - Specification for information management for the operational phase of assets using building
information modelling
BS 1192-4:2014 Part 4 - Collaborative production of information - Fulfilling employer’s information
exchange requirements using COBie – Code of practice
PAS 1192-4:2014 Part 5 – BIM and Cyber Security – Under Development
Digital Plan of Work – Under Development
So many BIM documents released
![Page 33: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/33.jpg)
The partnership was established in Autumn 2014 to assist client bodies, contractors and designers to implement BIM. Key contacts for the Partnerships are:
• Professor David Philp. Head of BIM Implementation, Cabinet Office.
• Professor Chimay Anumba. Department Head of Architectural Engineering. The Pennsylvania State University.
• Professor Bimal Kumar. Professor of IT in Design and Construction in the School of Built and Natural Environment at Glasgow Caledonian University
GCU BIM Implementation Partnership
![Page 34: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/34.jpg)
Purpose of the partnership is to:
• Develop skills and knowledge of the BIM processes by sharing experiences.
• Develop implementation strategies bespoke for each organisation but drawing on the experiences of others as well.
GCU BIM Implementation Partnership
![Page 35: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/35.jpg)
• At this point, the partnership comprises of two major national contractors and Health Facilities Scotland.
• Each organisation has different aims and objectives but similarities exist between the different organisations in terms of their BIM-related aspirations.
GCU BIM Implementation Partnership
![Page 36: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/36.jpg)
Activities undertaken to date:
• Carried out capability audits for the contractors.
• Key objectives of the audit were to:
• Establish the current level of knowledge and expertise within
the organisations.
• Establish robustness of the strategic plan for implementing
BIM.
GCU BIM Implementation Partnership
![Page 37: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/37.jpg)
Areas identified for improvement were:
• Development of an implementation strategy
• Development of bespoke training strategies
• Criteria for trial project selection
• Communication strategies
BIM Implementation Partnership
![Page 38: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/38.jpg)
Specific objectives for HFS are:
• Establishing an overall BIM strategy.
• Assessing how HFS can use BIM processes in its asset management strategies.
• Retrospective creation of asset models.
• Establishment of asset data bases.
• Linking BIM non-graphical data to CAFM systems.
GCU BIM Implementation Partnership
![Page 39: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/39.jpg)
Identified projects for HFS so far:
• Carry out a BIM audit of the Lanarkshire Beatson Hospital.
• Establish the level of BIM implemented on the project and the impacts it might have had in terms of quality, cost and time.
• Identify areas where further improvements can be made.
GCU BIM Implementation Partnership
![Page 40: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/40.jpg)
![Page 41: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/41.jpg)
HFS BIM Strategy
A comprehensive BIM Strategy has been developed for HFS. The key deliverables and components for this strategy are:
• Overall BIM strategy document
• BIM-based Project Delivery Process Maps
• Employer’s Information Requirements Guidance documents including EIR templates.
• HFS BIM protocols.
![Page 42: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/42.jpg)
HFS BIM Strategy – Process Maps
![Page 43: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/43.jpg)
HFS BIM Strategy
![Page 44: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/44.jpg)
HFS BIM Strategy Employers Information Requirements (EIR)
Sets out the clients requirements for the project with regards to the BIM processes:
• Deliverables and requirements
• Software versions
• Data formats for abstraction into CAFM programmes
• Security policies
• Codes and standards to be followed
![Page 45: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/45.jpg)
NHS Project stages Description Drop Purpose Level of Detail
Mid-Way through NHS
Stage 1
After Strategic Definition 1 Determine strategic case
and fit
0
Early in NHS Stage 2 Early in Outline
Business Case
(OBC)
2 Feasibility and analysis of
options
1
Late in NHS Stage 2 Late in Outline Business
Case (OBC)
3 Identification of proposed
solution
2
End of NHS
Stage 3
At end of Full Business
Case (FBC)
4 Design freeze and price
agreement
3
End of NHS Stage 4
At end of
implementation /
construction stage
and prior to handover
5 Practical completion –
populate O&M manual(s)
and Client’s CAFM
systems
6
HFS BIM Strategy Employers Information Requirements (EIR) Level of Detail (LOD)
![Page 46: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/46.jpg)
HFS BIM Strategy Employers Information Requirements (EIR) Deliverables at data drop 5
![Page 47: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/47.jpg)
HFS BIM Strategy BIM Protocol
• Legal document ensuring all project parties are contractually aligned in the BIM process.
• Sets out the requirements to appoint a BIM manager.
• Sets out obligations of project parties and the responsibility matrix.
![Page 48: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/48.jpg)
HFS BIM Strategy BIM Protocol
![Page 49: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/49.jpg)
HFS BIM Training Programme
• HFS are about to embark upon a training programme that builds on the HFS BIM Strategy.
• The BIM Strategy Project has produced several guidance documents and templates to facilitate BIM implementation in NHS Scotland projects. There is now a need for training key staff from all the participating Health Boards across the country so that the BIM strategy can be put into practice on future projects.
![Page 50: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/50.jpg)
HFS Training BIM Programme
• Course1. A half day course : Introduction to BIM
• Course2. A one day course: An Overview of the NHS Scotland BIM Strategy, EIR Templates, Protocol etc.
• Course 3. A one day course: Implementation of the NHS Scotland BIM strategy in projects.
![Page 51: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/51.jpg)
Course 1. Introduction to BIM: (½ day)
The first introductory course provides an overview of the key concepts behind BIM as a set of processes facilitated by technologies before briefly introducing Level 2 BIM concepts as the key driver behind the UK Government’s BIM strategy for 2016. This course also addresses the legal and commercial aspects as well as the strategic advantages of BIM adoption.
![Page 52: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/52.jpg)
Main Objectives - Course 1
1. To understand the concept of BIM, within the context of process and activity aided by technology and ‘data’ sets and how this relates to the construction industry. Includes the key interaction of process, technology and people in a BIM environment.
2. To understand the principles and structure of the BSI Level 2 processes at a strategic
3. To understand the principles of digital tools, key workflows and benefits
4. To understand the business case for BIM, taking into account investment and benefits, examining the major cost drivers and benefits of the digital information model(s).
![Page 53: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/53.jpg)
5. To understand the process of information management and exchanges
6. Understand commercial and legal aspects of BIM
![Page 54: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/54.jpg)
Main Objectives – Course 2
1. To understand the processes and standards that are applicable to the management of information about an asset throughout its lifespan as outlined in HFS BIM Strategy.
2. To understand the need for the right timing of information at each stage of the project lifecycle for the implementation of BIM and the responsibilities of each party at these stages.
3. To understand the key components of HFS BIM strategy.
![Page 55: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/55.jpg)
Main Objectives – Course 3
1. Understanding how to set up BIM on your project.
2. Understand how to assess capabilities of the project team relative to the desired BIM outcomes.
3. Quality management of the BIM process.
4. Understanding how a model and CDE should be set up.
5. 5 Procurement strategies for BIM.
![Page 56: BIM Strategy for NHSScotland](https://reader034.fdocuments.us/reader034/viewer/2022051522/589efb0c1a28abd94d8b9978/html5/thumbnails/56.jpg)
Questions & Discussion