BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

48
April 2014 Lego to Minecraft: from 3D CAD to BIM 0

description

BIM Show Live 2014 - Lego to Minecraft: from 3D CAD to BIM, by Sarah Rock from RPC

Transcript of BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Page 1: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

April 2014Lego to Minecraft: from 3D CAD to BIM 0

Page 2: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Lego to Minecraft: from 3D CAD to BIM

April 2014

Sarah [email protected]@rpc.co.uk

Page 3: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

2 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 4: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

3 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 5: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Introduction

Page 6: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

5 April 2014Lego to Minecraft: from 3D CAD to BIM

Background

Page 7: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Protocol

BIM Contractual Diagram

6 April 2014Lego to Minecraft: from 3D CAD to BIM

Employer

Information Manager

EIRs BEP

AppointmentsContract

Page 8: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

7 April 2014Lego to Minecraft: from 3D CAD to BIM

BIM Information Manager

New role

Can be existing member of project team but objectivity is vital

Assists with putting EIRs and BEP together, setting up and implementing the BIM protocol

Co-ordinates and manages the BIM process

Maintains data archive

CIC scope of services

Page 9: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

8 April 2014Lego to Minecraft: from 3D CAD to BIM

Employer’s Information Requirements

Software platforms

Data exchange format

Co-ordinates

Level of detail (general)

Level of detail (components)

Training

Standards

Stakeholder roles and responsibilities

Planning the work and data segregation

Security

Coordination and clash detection process

Collaboration process

Model review meetings

Health and safety and construction and design management

System performance constraints

Compliance plan

Delivery strategy for assets information

Timing of data drops

Clients strategic purpose

Defined BIM/project deliverables

BIM-specific competence assessment

Technical Management Commercial

Page 10: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

9 April 2014Lego to Minecraft: from 3D CAD to BIM

Employer’s Information Requirements

Technical

Software platform

Data exchange format

Level of detail

Page 11: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

10 April 2014Lego to Minecraft: from 3D CAD to BIM

Employer’s Information Requirements

Management

Standards

Roles and responsibilities

Clash detection

Collaboration process

Page 12: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

11 April 2014Lego to Minecraft: from 3D CAD to BIM

Employer’s Information Requirements

Commercial

Data drops

BIM-specific competence assessment

Page 13: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

BIM Execution Plan

Enables Employer to determine if requirements within EIRs are achievable

Supplier submits to Employer detailing supply chain’s capabilities and responsibilities

Information Manager to assist

To detail which models are to be created, why and by whom

12 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 14: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

BIM Protocol

13 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 15: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

14 April 2014Lego to Minecraft: from 3D CAD to BIM

CIC BIM Protocol

To be appended to contracts and appointments

Establishes priority of contract documents

Clause 6 – IP

Appendices – vital information

Page 16: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

BIM Protocol

Data exchange

Freezing points

Management of common data environment

Data security

File naming

Software to be used

Use of models

15 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 17: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Contractual Options for BIM projects

Page 18: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Contract Options

17 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 19: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

JCT Suite

Public Sector Supplement amended definition of Contract Document to include ‘any agreed BIM Protocol’

BIM working group considering further amendments where necessary

Constructing Excellence form of contract can be used for collaborative working

18 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 20: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

NEC3

Published ‘How to use BIM with NEC3 contracts’ supplement

Places obligation on the parties ‘to act in a spirit of mutual trust and co-operation’

Partnership option X12 must be selected for partnering

19 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 21: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

PPC2000

Used for Cookham Wood Prison BIM project with no contract amendments required

BIM Protocol available for use

Allows team members to contract as a team and allows others to join team through a ‘Joining Agreement’

Team works as a partnership with Core Group overseeing project

20 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 22: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

CIOB Complex Projects Contract

Designed for use on complex projects, multiple main contractors, multiple completion dates and construction period of more than one year

Requires that ‘the parties shall work together in the manner set out under the Contract and shall co-operate in a spirit of mutual trust and fairness’

Requires the parties to share information

Allows choice of BIM Protocol but has a default option

First standard form contract to cater for BIM specifically

21 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 23: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Contract Options

Existing contracts can be used with minimal amendment

Details of requirements to be in Protocol and schedule of services not the contract itself

BIM-compatible amendments can be incorporated into all contracts

22 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 24: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Procurement Routes for BIM projects

Page 25: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Procurement for BIM

Early contractor involvement

Front loaded

Collaborative working

Sharing of information in design environment

To consider digital data

24 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 26: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Traditional

Designed by Employer and executed by Contractor

Employer appoints QS, CA and Design team

Lead designer co-ordinates design team

When design substantially complete Contractor is appointed

25 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 27: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Design and Build

Single point responsibility

Less control over design or cost of variations

Contractor appointed when design has passed the outline/scheme stage and then takes over the reigns

Contractor responsible for completing the design and ensuring compliance with Employer’s Requirements

26 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 28: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Management Contracting

Main Contractor selected by quality of management of construction process

The Management Contractor stands in a contractual line between the Employer and the Works Contractors – but provisions give relief from line responsibility to the Employer for certain aspects of performance.

The Management Contractor cannot enforce and recover those aspects against the Works Contractors

Contractor engaged early to contribute construction expertise to the design

Increased risk for Employer

27 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 29: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Construction Management

Main Contractor selected by quality of management of construction process

Construction Manager appointed in effect as a consultant

Employer, on the advice of the Construction Manager, enters into Works contracts directly

Suitable for fast track projects or those with short lead time

Increased risk for Employer

No main contract

28 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 30: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Collaborative Procurement

Use partnering advisers

Careful assessment of project at outset needed to determine suitability

29 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 31: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Early Contractor Involvement

Preliminary design prepared by Employer’s designer

Tenderers submit delivery proposals but typically no design development at this stage

Two stage tendering used

Contractor works with the Employer to develop the design during Stage 1

Employer can terminate ECI contract at any stage during Stage 1 with a formal break point before committing to Stage 2

30 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 32: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Two Stage Tendering

Early contractor involvement

Front loaded

Collaborative working

Preferred contractor appointed early in process on basis of limited information

Initial tender obtained against outline scope/design/budget/programme

Second stage normally managed as negotiation between Employer and preferred Contractor

Preferred Contractor works with designers to develop design

31 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 33: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Two Stage Tendering

Allows Employer to begin work on site earlier

Contractor on board earlier so can advise on buildability and sequencing

Design developed during second stage – risk Contractor may inflate price substantially at this point

Relies on spirit of collaboration

32 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 34: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Procurement for BIM

Collaborative forms of contracts encouraged

Pre-selection of team should take account of commitment to and capability to implement BIM

Project team to ‘build the project twice’

Early contractor involvement

33 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 35: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Specific Clauses to look out for on BIM projects

Page 36: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Specific Clauses to look out for

Standards

Services

Fee structure

IP

IT

35 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 37: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Standards

Reasonable skill and care of BIM…….

Potential issue in disputes

RICS BIM Manager Certification – focus on practical BIM experience

BRE Global developing BIM certification schemes

BS11000, BS7000, PAS 1192-2, PAS 1192-3, BS1192-4

36 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 38: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Standards PAS 1192-2

‘Publically Available Specification’

CAPEX

Specification for information management for the capital/delivery phase of construction projects using building information modelling

‘Compliance with a PAS cannot confer immunity from legal obligations.’

February 2013

37 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 39: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Standards PAS 1192-3

OPEX

Specification for information management for the operational phase of assets using building information modelling

March 2014

‘Compliance with this PAS cannot confer immunity from legal obligations.’

Asset management

38 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 40: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Services

CIC Scope of Services for Information Manager

Additional duties to be defined in other professional appointments

Look at review, co-ordination and integration to clarify design responsibility

39 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 41: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Fee Structure

Front loaded work flow for design team

Fee structure to reflect this

40 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 42: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Intellectual Property

Little change at Level 2 BIM

Use permitted by licence for FM

Clear audit trails for amendments

Licence to use/alter manufacturer’s objects

41 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 43: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

IT

Cloud – software as a service (SAAS) allows multi-tenancy

Community cloud hosting

Responsibility for cloud provision and data security

ISO/IEC 27001 – Information Security Management

VHS – DVD – downloads - …………

How will we view BIM models in ten years time?

42 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 44: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

43 April 2014Lego to Minecraft: from 3D CAD to BIM

Facilities Management

Complete asset register negates requirement for full building asset survey

How to ensure model is ‘as built’

Assists going forwards with O&M

Visual 3D walkthroughs to locate faults

Laser scanning for pre-existing assets

Soft landings

PAS1192-3

Page 45: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

44 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 46: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

45 April 2014Lego to Minecraft: from 3D CAD to BIM

Page 47: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

Q&A

Page 48: BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM

April 2014Lego to Minecraft: from 3D CAD to BIM 47