BIM process adoption for integrated design and constuction

50
BIM Process adoption for integrated design and construction 15 th September 2015

Transcript of BIM process adoption for integrated design and constuction

BIM Process adoption for integrated design and construction

15th September 2015

An Architect with 20 years of experience in Digital architecture, Design Systems Implementations, Automating the construction documents preparation using the up-to-date technology and tools.

Has shared in Design and Production Process development in several large scale A/E Consultants in GCC.

Key Speaker • Big 5 Show 2014 ( Dubai ) • BIG 5 Show 2014 ( Kuwait ) • BIM & Engineering Seminar 2013 ( Dubai ) • BIM Day By Autodesk 2012 ( Jeddah ) • BIM implementation and Design Process 2012 ( Jeddah, United

Architects of Philippines )

Events and Seminars • BIM Strategy and Implementation Conference Stanford Uni. Abu Dhabi 2010 • BIM and Process transformation Workshop Harvard Uni. Jeddah 2010

Waleed Eliwa

BIM Consultant

Biography

Experiences • Zuhair Fayez Partnership (Jeddah - Cairo), • Dimensions ( Dubai – Cairo ) • Saudi Diyar ( Jeddah – Cairo ) • NAGA Architects ( Dubai ) • Mazaya Consultants ( Dubai ) • EHAF Consulting Engineers

• Founder BIMRoad BIM Social Group Certifications • Revit Architectural Provisional 2011, to 2015 • CADD and ADT • Network Administration, • Programming Techniques • Data Base Concepts News Letter • Autodesk News Letter ( BIM Implementation

Successful Story ) 2012

Waleed Eliwa

BIM Consultant

Biography

BIM & Design Process • What is BIM Part 1

• Current Design Process • BIM Definition • Drafting And Modeling • BIM Members

• BIM implementation Part 2 • Key Words • Teams • What must and what must not • Selected Practicing Samples • Perfect Process workflow

• Expectations Part 3 • Project Samples

BIM & DESIGN PROCESS Applications and Implementation Workshop Presentation

19th November 2014

• What is BIM and What is not

• Drafting And Modeling • BIM Members

Design Process Key Words

• Design Stages • Schematic SD • Conceptual CD • Development DD

• Disciplines Scope • Architecture • Structure • MEP

• Data Exchange • Data Workflow

• Files Format • Files Relationship

What Is BIM

• Design Criteria • References • Codes • Quality Control • Coordination • Evaluation • Deliverables • Change Management • Time Management

Developing Design Process

• Drafting Capabilities • E-Coordination • Change Management

• Staff Capabilities • Software • Infrastructure

What Is BIM

• Business Needs • Level of required

enhancements • What is the benefits of

changing what I use to do ?

• Achievement against Risk

• Targets • Expectations

Current Design Process

• A/E Design Process • Data Exchange • Data Workflow

Schematic

Development

Construction Documents

VER Views HOR Views

Schedules 3D Views

Details

Separate 2D Drawings

• Design Language

What Is BIM

Schematic

Development

Construction Documents ~ 30% Lost ( Re-work, Data integration & Coordination )

Time

Lose information as you move from phase to phase.

• A/E Design Process • Data Exchange • Data Workflow

Pro

cess

Start

Current Design Process What Is BIM

Schematic

Development

Construction Documents

In the traditional process, you lose information as you move from phase to phase.

• A/E Design Process • Data Exchange • Data Workflow • Coordinated Drawings

• Shop Drawing • Fractions • Change Management • As Built Drawings • Cost Management • BOQ

Current Design Process What Is BIM

Schematic

Development

Construction Documents

In the traditional process, you lose information as you move from phase to phase.

• A/E Design Process • Data Exchange • Data Workflow • Separated Elements

• Lines to Draw objects • Editable Dimensions Value • Manual Cross References • No Drawing Integration • Drafting Schedules

Current Design Process What Is BIM

• Sub consultants • Shop Drawing • Change Management • As Built Drawings • Construction Cost Control

Arch Plans MEP Data St Data

On Site Coordination

Time Lost / RFIs

Lower Quality

Current Design Process What Is BIM

Model

• Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility.

• BIM is a shared

knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle

BIM Concept What Is BIM

Sheets

BOQ

2D

Arc

h D

ata

Str

uctu

re

Dat

a

MEP Data

• Emigration • From Draw to build • From 2D To 3D • From Element to Object • From Text To Label

• Parametric • Object Relations • Object Behavior • Information injection and

extraction • Information Integration

BIM Concept What Is BIM

It is Process Revolution Information Management New Design Thinking Construction Solutions

• BIM is a process that involves creating and using an intelligent 3D model to inform and communicate project decisions.

• Design, visualization & simulation

BIM Definition What Is BIM

BIM Is a Process

Design Flow Evaluation Management Serious Decision Team Investment

Time and Money Saving Quality and Accuracy

Tasks re-scheduling Information Parametric Objects

Objects Behaviors

Accumulative Knowledge

Learning Curve Level Of Details Deliverables

Data Exchange Design Validation Management Data Presentation

Reports Document Management Facility Management

Operation Fabrication As-Built Workshop

Re define and re think about • Design Process • Design, Information, Presentation & Deliverables • Design is a group of scheduled decision • Design is construction able solutions Give answer to : • What is the reason to do this by this way and when ? • Project Level of integrity You are moving : • From Text to Parameter • From Element to Object • Early Solutions On office before expensive on site

New Definitions before Shifting to BIM What Is BIM

BIM Members

BIM Process adoption for integrated design and construction

15th September 2015

Key Words Implementation

• BIM Levels

Key Words Implementation

• Process

• Project BIM Execution Plan • Project Phases Definitions • Conceptual Design • Design Developments • Construction Drawings • Check lists and QC

• Software matching with process

• Modeling Reference • Coordination • BOQ • National CAD Standard • LOD Definition

Tin

der

CD DD CD

File Format Information Deliverables

Key Words Implementation

• Deliverables

• 2D PDF Files • IFC Format • DWF Format • Revit Model ( as Contract ) • DWG Format

LOD 100 - Essentially the equivalent of conceptual design, the model would consist of overall building massing and the downstream users are authorized to perform whole building types of analysis (volume, building orientation, cost per square foot, etc.)

LOD 200 - Similar to schematic design or design development, the model would consist of "generalized systems or assemblies with approximate quantities, size, shape, location and orientation.

Key Words Implementation

• Deliverables

• 2D PDF Files • IFC Format • DWF Format • Revit Model ( as Contract ) • DWG Format

LOD 300 - Model elements are suitable for the generation of traditional construction documents and shop drawings. As such, analysis and simulation is authorized for detailed elements and systems.

LOD 500 - The final level of development represents the project as it has been constructed - the as-built conditions. The model is suitable for maintenance and operations of the facility.

Key Words Implementation

• Tools / Software

- Software price - Learning time - Data exchange - Meet business needs - Compatible with sub

consultants tools - Integrated with design

flow - Integrated with

infrastructure - Employees investments

to business income

- Training and workshops - Updating Standers

Key Words Implementation

• BIM XD

Key Words Implementation

• Tools / Software • Design Tools

• User interface • Drawing Generation • Complex Curved Surface

Modeling • Other Tools-Level Capabilities

• BIM Platform • Scalability • Library • Extensibility • Interoperability • Multiuser environment

• Revit Platform • Bentley Systems • ArchiCAD • Digital Projects • Vectorworks • Tekla • Dprofiler • Autocad Based applications

Key Words Implementation

• BIM Team • Team Work Skills • 3D imagination • Familiar with objects

properties, Parameters and data base initial concepts

• Coordinated Decisions • Design Decision Maker • Construction Knowledge • Research Ability • Modeling Skills

Core

Core Team

Support T

Pilot Project

1.St Project

Projects Team

Key Words Implementation

• Facts • BIM to enhance quality and

productivity and have more projects not to reduce staff number

• BIM for all who can fit with • Tasks and Duties will re

schedule • Team Re-Tasking • A complete 3D model is every

one task • Do it right from the first time • Any action will reflect all

project Team and objects • Coordination and BOQ are

every one Aim

Core

Core Team

Support T

Pilot Project

1.St Project

Projects Team

Key Words Implementation

• Standards • BIM Workflow • Standard Naming Conventions

• Material • Parameters • Families

• Architectural Guidelines • Structural Guidelines • Mechanical Guidelines • Electrical Guidelines • Tele-Communication Guidelines • Plumbing and Fire Fighting

Guidelines • Clash Detection Methodology

Key Words Implementation

• BIM Project Management • BIM Execution Plan

• Model Construction • Links and Model Data Exchange • File format • Sub consultants and Disciplines tools

• Project Contract and Deliverables • shall we submit models with the same

fees ? • Readability and Model Author

• Project pricing to BIM time saving

BIM Process adoption for integrated design and construction

15th September 2015

Governmental - KSA • Design Model, SD, DD, CD By Revit • Plans , Sections, Wall Sections, Elevations, Area Plans & Schedules • Drawing Details scale 1:400 to 1:1

Multi Disciplines Model

Site Area 47,000 m2 36,000 m2 office

Building 30,000 m2

underground parking Design SD to DD

3monthes

Governmental - KSA • Design Model, SD, DD, CD By Revit • Plans , Sections, Wall Sections, Elevations, Area Plans & Schedules • Drawing Details scale 1:200 to 1:1

…..

Governmental - KSA • Model Structure and Data Management

Central Model Jeddah

St Cloud MEP Cloud

Ar Cloud

Local Model

Local Model

Local Model

Local Model

Local Model

Ar

ID

St

Me

PG

El

Local Model

Central Model Manila

Coordination Model

ETABS Model

Governmental - KSA

Governmental - KSA

Commercial - KSA

Commercial - KSA

G+5+27 100% Tender

Residential - UAE

Residential BUA 36,800 m2

Commercial - UAE

Residential

5 Stars Hotel

Hotel

Time DD Stage = 200 Hr

Shopping Mall

Detailing

Detailing

Team Architectural

Interior Design AD Disabled Club

Interior Design AD Disabled Club / Cafeteria

Interior Design AD Disabled Club / GYM

BIM Process adoption for integrated design and construction

15th September 2015

[email protected]