Transcript of BIM Info- Osman
http://www.bimtaskgroup.org/bim-faqs/What is level 2 BIM
file based collaboration and library management.
BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them.
8. Okay but realistically how much more money could businesses make from implementing it?BIM, if successfully implemented, will help organisation strip the waste from their processes which in many cases could be in the bandwidth of 20-30%. This can be achieved by designing and building the asset virtually, once, twice….until it can be built once flawlessly on site.
Quote
Mark Twain offers some great advice “The secret to getting ahead is getting started. The secret to getting started is breaking your complex overwhelming tasks into small manageable tasks, and then starting on the first one.”
InvestmentYou cannot buy BIM out a box, and the truth is you may require to make a technology investment (Note: Government is not manda ting any specific software platforms) but BIM is very much more than technology it is a new way of working, you will need to invest mo re in doing than buying.
15. Okay so how much is BIM going to cost my business to implement?We are asked this question a lot, however we think that this should be reframed as either: what’s the cost to my business if we don’t do it? Or what is the typical return on investment (ROI) if you implement BIM?
The cost of BIM implementation is proportional to what outcomes you want to achieve from BIM. If treated as a business change programme the principal cost will be in staff time, BIM awareness and training etc. The inconvenient truth is that you are likely to need some new digital tools, however again the cost of this will depend on what you need to do with model; data creation or management. Most BIM design review tools are free! BIM authoring tools? Typically, depending upon complexity, will be around the same as (depending where you live in the UK) a pint and half of beer a day!
BIM MATURITY MODEL
BIM Info- OsmanSaturday, 8 November 2014 8:30 pm
Quick Notes Page 1
17. What is COBie?COBie is a data standard that was developed by the US Corps of Engineering to manage the data coming from BIM models into the client organisation, particularly for the handover of O&M information. We have extended this process (COBie UK 2012) to four data drops during the delivery stage of the project to manage cost and carbon. The data is exchanged using spreadsheets to keep the complexity of systems and training to a minimum.
18. Is COBie a building model?No, COBie is format for the publication of a subset of a building model. COBie’s focus is on delivering building information not geometric modelling. COBie formatted building information is not an entire building model. COBie is a subset of a building model referred to as a “model view” or “Data View”
Quick Notes Page 2
AUTODESK AMC Proposal
Stanford University’s Center for Integrated Facilities Engineering (CIFE) 2identified the following statistics based on a review of 32 major projects that had adopted BIM: Up to 40% elimination of unbudgeted change Up to 80% reduction in time taken to generate a cost estimate Cost estimation accuracy within 3% Up to 10% savings of the contract value through clash detections Up to 7% reduction in project time
“Autodesk Production Assurance” - part of “Enterprise Business Agreement
Autodesk Business Value Methodology
Activities of BIM Implementation project
a. BIM Maturity Assessment : 20 Days /60 Credits
i. BIM maturity matrixDeliverables :
1. Define ; As is
• Business value has been agreed. A roadmap and high-level plan are in place.
•
• Success metrics have been identified.
Define Phase
• Solution has been designed, developed, and tested.
• All data has been migrated. • Baseline metrics are available.• An adoption plan has been created.
Construct Phase
• All users are trained and the solution is in production with ongoing mentoring to ensure productive use.
• Metrics demonstrate business value.
Adopt Phase
Quick Notes Page 3
i. BIM maturity matrixii. Team BIM Maturity Report
iii. Map of current workflows.
a. BIM Standards & Process Map : 30 days/ 90 Credits
i. BIM Conclusion and Recommendations reportii. GAP analysis matrix
Deliverables
2. Define : To be
a. Project BIM Implementation Plan: 20 Days /60 Credits
i. Minutes of meetings and recommendationsii. Project Implementation outline
Deliverables
b. BIM Project Execution Plan : 30 days/ 90 Credits
Draft PEPi.ii. Outline BIM Uses protocols adapted to the project requirements
Deliverables
3. CONSTRUCT: Requirements Specification
a. BIM Standards and Process Map : 45 days/ 135 Credits
i. High-Level project specific recommendations report ii. High-Level project specific solution architecture
Deliverables
4. CONSTRUCT: Solution Design
1 template per discipline (ARCH, STR, ME,P) - 4 templates to bedeveloped by theproject team
a. Development of project specific file templates 10 days/ 30 Credits
5. CONSTRUCT: Solution Build
Project-focused custom trainings : 31 Days / 93 Creditsa.
6. ADOPT: Pre-Production Staging
a. Onsite over-the-shoulder mentoring and support 40 Days / 120 Credit
7. ADOPT: Production Deployment :
a. Project closeout 5 Days / 15 Credits
8. ADOPT: Solution Support
The Project Manager ensures smooth execution of the project, appropriate resourcing & staffing, steering & communicationof project status.
Autodesk follows the successful and proven PMI (Project Management Institute4) methodologyfor project and program management.
Process for BIM Implementation
Autodesk and Customer Project Managers (PMs) and lead Business Consultant(s) create a Project Management Plan (PMP)
1. Project Management Plan describes: The approach to quality control and assurance including testing and configurationmanagement. The process for acceptance of deliverables. The procedure for managing change requests. The plan for communications amongst stakeholders. The organizational structure including the roles and responsibilities of both Autodesk andCustomer. The process for identifying, quantifying and managing risks and issues.
2. Bi Weekly or Weekly Project3. Executive Project Steering Committee
Quick Notes Page 4
Autodesk Consulting has 400 members of staff, operating out of three geographic regions (EMEA, America and APAC),
Our service offerings include:Process Assessment: to understand customer challenges and recommend solutionsBIM Implementation: full support for BIM implementation on customer projects, including
re-engineering processes, defining standards and whitepapers and other enabling services;Collaboration and Data Management Services: Our proven methodology facilitates
strategic business alignment, helps improve workflows, and effectively integrates technologysolutions into complex business environments.
Solution Design and Roadmap: to develop solutions to address customer requirementsQuick-Starts: to help customers get started with Autodesk software rapidly and efficientlyCustom Training: tailoring training to meet specific customer needs and incorporating
workflowsHealth Check: review implementations and recommendations, to provide targeted on going
QA/QCCustomization and integration: using product APIs to develop custom functionality,
enhance interoperability and workflowsEnterprise Implementation: full design, build, test and deployment for enterprise solutions,
including Data Management, Enterprise GIS and PLM solutions.Solution Support: specific technical support for custom and enterprise solutions
KICK OFF MEETING / PM Activities
• Achieve a common understanding of the project goals & scope• Review the timeline and major milestones• Understand roles, responsibilities and pre-requisites
Agree on a frequency and format for communications •
Quick Notes Page 5
Quick Notes Page 6
List of BIM Standards
BS 1192:2007- Collaborative production of architectural, engineering and construction information
PAS 1192-2:2013 - Specification for information management for the capital/delivery phase of construction projects using building information modelling
PAS 1192-3- Specification for information management for the operational phase of assets using building information modelling
BS1192 part 4:2014 - Fulfilling employers information (EIR) exchange requirements using COBie – Code of practice is available as a free download.
Quick Notes Page 7
Other standardsOther British Standards and associated documents with some possible relationship to BIM include (note that this is not a complete list and is being added to constantly):
Standard
PAS 55-1:2008 Specification for the optimized management of physical assets
PAS 55-2:2008 Guidelines for the application of PAS 55-1
BS ISO 55000:2014 Asset management. Overview, principles and terminology
BS ISO 55001:2014 Asset management. Management systems. Requirements
BS ISO 55002:2014 Asset management. Management systems. Guidelines for the application of ISO 55001
BIP 2207 Building information management. A standard framework and guide to BS 1192
BS 6953:1998 (ISO 7078:1985) Glossary of terms for procedures for setting out, measurement and surveying in building construction (including guidance notes)
BS 7000-4:2013 Design management systems. Guide to managing design in construction
BS 8541-1:2012 Library objects for architecture, engineering and construction. Identification and classification. Code of practice
BS 8541-2:2011 Library objects for architecture, engineering and construction. Recommended 2D symbols of building elements for use in building information modelling
BS 8541-3:2012 Library objects for architecture, engineering and construction. Shape and measurement. Code of practice
BS 8541-4:2012 Defines properties and multiple levels of information including properties required for specification and selection and environmental, cost and social impacts
BS 8541-5:2014 IN DEVELOPMENT will cover assemblies - the sharing of sub-models representing combinations of components and spaces covering naming, classification and nesting
BS 8541-6:2014 IN DEVELOPMENT will cover product declarations - the sharing of data expected from product declarations, labelling and environmental tables. Aims to offer IFC and IFCXML and COBie representations incl waste data in standardised printed forms
BS ISO 12006-2:2001 Building construction. Organization of information about construction works. Framework for classification of information
BS ISO 12006-3:2001 Building construction. Organization of information about construction works. Framework for object-oriented information
BS ISO 22263:2008 Organization of information about construction works. Framework for management of project information
BS ISO 29481-1:2010 Building information modelling. Information delivery manual. Methodology and format
BS ISO 29481-2:2012 Building information models. Information delivery manual. Interaction framework
From <http://bimtalk.co.uk/standards>