2013/8/8 Page 1MTR Corporation 1 June 2009 Page 1MTR Corporation
Presented byAndrew LeeManager – Land Surveying9 Aug 2013
BIM in Current MTR Railway Projects
Harry WuManager – CADD
SDI Conference 2013
2013/8/8 Page 2MTR Corporation
BIM in Current MTR Railway ProjectsCONTENT
• BIM in MTR
• Current Application
• Kwun
Tong Line Extension (KTE)
• Express Rail Link (XRL)
• Shatin
to Central Link (SCL)
• Outlook
2013/8/8 Page 3MTR Corporation
BIM for MTR
• Model Detail
• Architectural Components
• Structural Components
• Building Services Components
• Mechanical -
air duct, fan unit…..
• Electrical -
lighting, cable trunk……
• Plumbing -
pipes, drain……….
• Fire Protection –
sprinkler, hose reel….
• MTR Systems Components
• Station / Trackside Furniture
• Signage
• CCTV …………
2013/8/8 Page 5MTR Corporation
Design Construction Operation & Maintenance
Consultant / Contractor / MTR MTR BIM Team
Building Life
Cycle
BIM Originator
BIM in MTR
BIM
Application
1. Design coordination
2. Clash analysis
3. Visualization
1. Design & works collaboration
2. Clash analysis
3. Construction Sequence
4. Visualization
5. Planning of Temporary Works
1. Inspection Registry System
2. BIM database
3. Visualization
Application of BIM in MTR
KTE, SCL KTE, XRL, SCL IRS
2013/8/8 Page 11MTR Corporation
Kwun Tong Line Extension (KTE)Entrance at
Fat Kwong
Street
Entrance at
Chung Hau
Street
Footbridge
across Chatham
Road
2013/8/8 Page 12MTR Corporation
Potential Application in Civil Works
Kwun Tong Line Extension (KTE)
1.
Integration of BIM and Survey DTM for Monitoring Excavation Progress
2013/8/8 Page 13MTR Corporation
Kwun Tong Line Extension (KTE)
1. Integration of BIM and Survey DTM for Monitoring Excavation Progress
Sep 2011 July 2012
Jan 2013 Jun 2013
0.7 M m3
2013/8/8 Page 14MTR Corporation
Kwun Tong Line Extension (KTE)
1.
Integration of BIM and Survey DTM for Monitoring Excavation Progress
Ho Man Tin Station Structural Model
2013/8/8 Page 15MTR Corporation
Kwun Tong Line Extension (KTE)
1.
Integration of BIM and Survey DTM for Monitoring Excavation Progress
Initial Survey DTM dated 14 May 2012
2013/8/8 Page 16MTR Corporation
Kwun Tong Line Extension (KTE)
1. Integration of BIM and Survey DTM for Monitoring Excavation Progress
Interim Survey DTM dated 22 Feb 2013
2013/8/8 Page 17MTR Corporation
Kwun Tong Line Extension (KTE)
1. Integration of BIM and Survey DTM for Monitoring Excavation Progress
SCL Section
KTE Section
2013/8/8 Page 18MTR Corporation
Kwun Tong Line Extension (KTE)
1. Integration Station at Ho Man Tin
SCL
KTE
2013/8/8 Page 22MTR Corporation
Express Rail Link (XRL)
•
4D Analysis of Excavation Sequence
•
Temporary Works Planning and Method Statement
•
Clash / Mismatch Detection
•
Design and Construction Review
2013/8/8 Page 28MTR Corporation
Express Rail Link (XRL)
2.
Planning of Temporary Works and Method Statement
2013/8/8 Page 31MTR Corporation
Express Rail Link (XRL)
Discrepancies between structural framing and structural details
2013/8/8 Page 34MTR Corporation 08/08/2013MTR Corporation
屯門Tuen
Mun
烏溪沙Wu Kai Sha
羅湖Lo Wu
大圍Tai Wai
金鐘Admiralty
紅磡Hung Hom
落馬洲Lok Ma Chau
東西走廊East West Corridor
•
馬鞍山線 Ma On Shan Line
•
西鐵線 West Rail Line
•
沙中線 (大圍至紅磡段)
SCL (Tai Wai to Hung Hom Section)
南北走廊North South Corridor
•
東鐵線 East Rail
Line
•
沙中線 (紅磡至金鐘段) SCL (Hung Hom to Admiralty Section)
SCL 走線 Alignment
2013/8/8 Page 35MTR Corporation
大圍 Tai Wai
顯徑 Hin Keng
鑽石山 Diamond Hill
啓德 Kai Tak
土瓜灣 To Kwa
Wan
馬頭圍 Ma Tau Wai
大圍至紅磡段
11 KmTai Wai to Hung Hom Section
會展 Exhibition金鐘 Admiralty
紅磡至金鐘段
6KmHung Hom to Admiralty Section
轉線站 Interchange Stations
SCL 走線 Alignment
何文田 Ho Man Tin
紅磡 Hung Hom
2013/8/8 Page 36MTR Corporation
效益 Benefits
Save Travelling Time
Relieve road traffic condition and pressure on the existing railway lines
Provide convenient access to the old districts and Ka Tak area
Reduce noise and roadside air pollution
2013/8/8 Page 37MTR Corporation
Shatin to Central Link (SCL)
1.
Underground Services -
Contract 1113
2.
Point Cloud Scanning for BIM Model Verification –
Contract 1111
2013/8/8 Page 38MTR Corporation
Shatin
to Central Link (SCL)
1.
Underground Services –
Contract 1113 (Reprovisioning
of New Territories
South Animal Management Centre and Shatin
Plant Quarantine Station)
NT South Animal Management Centre
Shatin
Plant Quarantine Station
2013/8/8 Page 39MTR Corporation
Shatin
to Central Link (SCL)
1.
Underground Services –
Integrated BIM Models
NT South Animal Management Centre
Shatin
Plant Quarantine Station
2013/8/8 Page 40MTR Corporation
Shatin
to Central Link (SCL)
1.
Underground Services –
Two Main Buildings
NT South Animal Management Centre
Shatin
Plant Quarantine Station
2013/8/8 Page 41MTR Corporation
Shatin
to Central Link (SCL)
1.
Underground Services –
Two Main Buildings (Structural Framing)
NT South Animal Management Centre
Shatin
Plant Quarantine Station
2013/8/8 Page 42MTR Corporation
Shatin
to Central Link (SCL)
1.
Underground Services –
MEP Networks
NT South Animal Management Centre
Shatin
Plant Quarantine Station
2013/8/8 Page 43MTR Corporation
Shatin
to Central Link (SCL)
2.
Point Cloud Scanning for BIM Model Verification -
Contract 1111 (Hung
Hom North Approach Tunnels
)
2013/8/8 Page 44MTR Corporation
Shatin
to Central Link (SCL)
2.
Point Cloud Scanning for BIM Model Verification -
Contract 1111 (Hung
Hom North Approach Tunnels
)
Overhead Truss lower than actual about 480mm
2013/8/8 Page 47MTR Corporation
Outlook
BIM Practice
Project Base for new works / new Infrastructure
Existing Infrastructure