2013/8/8 Page 1 MTR Corporation 1 June 2009 Page 1 MTR Corporation Presented by Andrew Lee Manager – Land Surveying 9 Aug 2013 BIM in Current MTR Railway Projects Harry Wu Manager – CADD SDI Conference 2013

Transcript of BIM in Current MTR Railway Projects SDI Conference 2013 Conference 2013 - BIM in MTR... · MTR...

2013/8/8 Page 1MTR Corporation 1 June 2009 Page 1MTR Corporation

Presented byAndrew LeeManager – Land Surveying9 Aug 2013

BIM in Current MTR Railway Projects

Harry WuManager – CADD

SDI Conference 2013

2013/8/8 Page 2MTR Corporation

BIM in Current MTR Railway ProjectsCONTENT

• BIM in MTR

• Current Application

• Kwun

Tong Line Extension (KTE)

• Express Rail Link (XRL)

• Shatin

to Central Link (SCL)

• Outlook

2013/8/8 Page 3MTR Corporation

BIM for MTR

• Model Detail

• Architectural Components

• Structural Components

• Building Services Components

• Mechanical -

air duct, fan unit…..

• Electrical -

lighting, cable trunk……

• Plumbing -

pipes, drain……….

• Fire Protection –

sprinkler, hose reel….

• MTR Systems Components

• Station / Trackside Furniture

• Signage

• CCTV …………

2013/8/8 Page 4MTR Corporation

BIM for MTRTin Yat Light Rail Station

2013/8/8 Page 5MTR Corporation

Design Construction Operation & Maintenance

Consultant / Contractor / MTR MTR BIM Team

Building Life

Cycle

BIM Originator

BIM in MTR

BIM

Application

1. Design coordination

2. Clash analysis

3. Visualization

1. Design & works collaboration

2. Clash analysis

3. Construction Sequence

4. Visualization

5. Planning of Temporary Works

1. Inspection Registry System

2. BIM database

3. Visualization

Application of BIM in MTR

KTE, SCL KTE, XRL, SCL IRS

2013/8/8 Page 6MTR Corporation

Kwun Tong Line Extension (KTE)

2013/8/8 Page 7MTR Corporation

Kwun Tong Line Extension (KTE)

2013/8/8 Page 8MTR Corporation

Kwun Tong Line Extension (KTE)

2013/8/8 Page 9MTR Corporation

Kwun Tong Line Extension (KTE)

2013/8/8 Page 10MTR Corporation

Kwun Tong Line Extension (KTE)

2013/8/8 Page 11MTR Corporation

Kwun Tong Line Extension (KTE)Entrance at

Fat Kwong

Street

Entrance at

Chung Hau

Street

Footbridge

across Chatham

Road

2013/8/8 Page 12MTR Corporation

Potential Application in Civil Works

Kwun Tong Line Extension (KTE)

1.

Integration of BIM and Survey DTM for Monitoring Excavation Progress

2013/8/8 Page 13MTR Corporation

Kwun Tong Line Extension (KTE)

1. Integration of BIM and Survey DTM for Monitoring Excavation Progress

Sep 2011 July 2012

Jan 2013 Jun 2013

0.7 M m3

2013/8/8 Page 14MTR Corporation

Kwun Tong Line Extension (KTE)

1.

Integration of BIM and Survey DTM for Monitoring Excavation Progress

Ho Man Tin Station Structural Model

2013/8/8 Page 15MTR Corporation

Kwun Tong Line Extension (KTE)

1.

Integration of BIM and Survey DTM for Monitoring Excavation Progress

Initial Survey DTM dated 14 May 2012

2013/8/8 Page 16MTR Corporation

Kwun Tong Line Extension (KTE)

1. Integration of BIM and Survey DTM for Monitoring Excavation Progress

Interim Survey DTM dated 22 Feb 2013

2013/8/8 Page 17MTR Corporation

Kwun Tong Line Extension (KTE)

1. Integration of BIM and Survey DTM for Monitoring Excavation Progress

SCL Section

KTE Section

2013/8/8 Page 18MTR Corporation

Kwun Tong Line Extension (KTE)

1. Integration Station at Ho Man Tin

SCL

KTE

2013/8/8 Page 19MTR Corporation

Express Rail Link (XRL)

Shenzhen River

2013/8/8 Page 20MTR Corporation

Express Rail Link (XRL)

MTR Corporation

2013/8/8 Page 21MTR Corporation

Express Rail Link (XRL)

2010

2013

2013/8/8 Page 22MTR Corporation

Express Rail Link (XRL)

4D Analysis of Excavation Sequence

Temporary Works Planning and Method Statement

Clash / Mismatch Detection

Design and Construction Review

2013/8/8 Page 23MTR Corporation

Express Rail Link (XRL)

1.

4D Analysis of Excavation Sequence

2013/8/8 Page 24MTR Corporation

Express Rail Link (XRL)

1.

4D Analysis of Excavation Sequence

2013/8/8 Page 25MTR Corporation

Express Rail Link (XRL)

1.

4D Analysis of Excavation Sequence

2013/8/8 Page 26MTR Corporation

Express Rail Link (XRL)

1.

4D Analysis of Excavation Sequence

2013/8/8 Page 27MTR Corporation

Express Rail Link (XRL)

1.

4D Analysis of Excavation Sequence

2013/8/8 Page 28MTR Corporation

Express Rail Link (XRL)

2.

Planning of Temporary Works and Method Statement

2013/8/8 Page 29MTR Corporation

Express Rail Link (XRL)

2.

Maintenance

2013/8/8 Page 30MTR Corporation

Express Rail Link (XRL)

2.

Maintenance

2013/8/8 Page 31MTR Corporation

Express Rail Link (XRL)

Discrepancies between structural framing and structural details

2013/8/8 Page 32MTR Corporation

Express Rail Link (XRL)

Clashing Analysis

2013/8/8 Page 33MTR Corporation

Express Rail Link (XRL)

SEM / CSD Coordination

2013/8/8 Page 34MTR Corporation 08/08/2013MTR Corporation

屯門Tuen

Mun

烏溪沙Wu Kai Sha

羅湖Lo Wu

大圍Tai Wai

金鐘Admiralty

紅磡Hung Hom

落馬洲Lok Ma Chau

東西走廊East West Corridor

馬鞍山線 Ma On Shan Line

西鐵線 West Rail Line

沙中線 (大圍至紅磡段)

SCL (Tai Wai to Hung Hom Section)

南北走廊North South Corridor

東鐵線 East Rail

Line

沙中線 (紅磡至金鐘段) SCL (Hung Hom to Admiralty Section)

SCL 走線 Alignment

2013/8/8 Page 35MTR Corporation

大圍 Tai Wai

顯徑 Hin Keng

鑽石山 Diamond Hill

啓德 Kai Tak

土瓜灣 To Kwa

Wan

馬頭圍 Ma Tau Wai

大圍至紅磡段

11 KmTai Wai to Hung Hom Section

會展 Exhibition金鐘 Admiralty

紅磡至金鐘段

6KmHung Hom to Admiralty Section

轉線站 Interchange Stations

SCL 走線 Alignment

何文田 Ho Man Tin

紅磡 Hung Hom

2013/8/8 Page 36MTR Corporation

效益 Benefits

Save Travelling Time

Relieve road traffic condition and pressure on the existing railway lines

Provide convenient access to the old districts and Ka Tak area

Reduce noise and roadside air pollution

2013/8/8 Page 37MTR Corporation

Shatin to Central Link (SCL)

1.

Underground Services -

Contract 1113

2.

Point Cloud Scanning for BIM Model Verification –

Contract 1111

2013/8/8 Page 38MTR Corporation

Shatin

to Central Link (SCL)

1.

Underground Services –

Contract 1113 (Reprovisioning

of New Territories

South Animal Management Centre and Shatin

Plant Quarantine Station)

NT South Animal Management Centre

Shatin

Plant Quarantine Station

2013/8/8 Page 39MTR Corporation

Shatin

to Central Link (SCL)

1.

Underground Services –

Integrated BIM Models

NT South Animal Management Centre

Shatin

Plant Quarantine Station

2013/8/8 Page 40MTR Corporation

Shatin

to Central Link (SCL)

1.

Underground Services –

Two Main Buildings

NT South Animal Management Centre

Shatin

Plant Quarantine Station

2013/8/8 Page 41MTR Corporation

Shatin

to Central Link (SCL)

1.

Underground Services –

Two Main Buildings (Structural Framing)

NT South Animal Management Centre

Shatin

Plant Quarantine Station

2013/8/8 Page 42MTR Corporation

Shatin

to Central Link (SCL)

1.

Underground Services –

MEP Networks

NT South Animal Management Centre

Shatin

Plant Quarantine Station

2013/8/8 Page 43MTR Corporation

Shatin

to Central Link (SCL)

2.

Point Cloud Scanning for BIM Model Verification -

Contract 1111 (Hung

Hom North Approach Tunnels

)

2013/8/8 Page 44MTR Corporation

Shatin

to Central Link (SCL)

2.

Point Cloud Scanning for BIM Model Verification -

Contract 1111 (Hung

Hom North Approach Tunnels

)

Overhead Truss lower than actual about 480mm

2013/8/8 Page 45MTR Corporation

Point Cloud Data

2013/8/8 Page 46MTR Corporation

Point Cloud Data

2013/8/8 Page 47MTR Corporation

Outlook

BIM Practice

Project Base for new works / new Infrastructure

Existing Infrastructure

2013/8/8 Page 48MTR Corporation

END