BIM from C oncept Design up to F acility M anagement success story New Giza – Neighborhoods NH04 NH07 and NH05

Transcript of BIM fromConcept Design up to Facility Management …...Navisworks, Dynamo, Revit API” Hashim...

  • BIMfrom Concept Design up to Facility

    Managementsuccess story

    New Giza – Neighborhoods NH04

    NH07 and NH05

  • Mohamed Hashim KhaterManager, BIM Management Department ECG

    Consultant ArchitectAIA International associate

    Autodesk Certified, Revit and AutoCADOver 22 years’ experience in Architecture/Engineering industry

    Over 12 years in BIM applications and practical experience “Revit, AutoCAD Architecture, MEP, Navisworks, Dynamo, Revit API”

    Hashim graduated from Cairo University, 1997. And joined Zuhair Fayez Partnership “ZFP” for 13 Years as an architect, then Team leader, and he created

    CAD and Revit Development Department for CAD and BIM automation, in 2009 he created the first BIM unit and established ZFP BIM system standards,

    Then he Joined genesis Engineering Consultants “GEC” as a technical Manager and utilized his Architecture and Engineering Technical skills in integration with BIM experience and developed advanced BIM System,

    In 2012 he joined ECG as a manager of Engineering software department, then he assigned as manager of BIM Management department, Now he is utilizing his experience in creating the most advanced BIM system

    using API’s, Dynamo, Cloud solution, VR, and AI.

  • Topics

    1. New Giza project description2. BIM uses and targets3. BIM process at Design stage4. BIM process at Construction stage5. BIM Challenges6. BIM at next stage “Facility Management”

  • 1. New Giza project description

    New Giza Site map Neighborhood 04

    11 types211 buildings

  • NH04-Project Stakeholders• Owner and Project management

    • Consultants “For Buildings”

    • Architecture Consultant

    • Structural and MEP Consultant

    • Construction and Facility Management

    • Construction Supervision

    • Planning

    • Suppliers “Elevators”

    UBTC

    SPRINT

    DEVICO

    MEDCOM

    TALENCO

    REDCON

    FICC

    UNIVERSAL

    MODERN INTERIORS

    Contractors

    UBTC

    SPRINT

    DEVICO

    MEDCOM

    TALENCO

    REDCON

    FICC

    UNIVERSAL

    MODERN INTERIORS

  • Rule of thumbThe BIM Model is the source of Information

  • BIM Model Effort vs. Time

    BIM

    Effo

    rt

    Time

    Cost of errors

    LOD 300

    LOD 100

    LOD 200

    LOD 350

    LOD 400

    LOD 500

  • 2. BIM uses and targets• Modelling all “3D” Elements with the required Information “LOD 300”• Design Reviews “ Revit, Navisworks, and Dynamo”• Resolving all Coordination issues at the Design models before construction• Producing the IFC Sheets• Accurate BOQ Automatic Generation “5D”• Shop Drawings Generation from the model “LOD 350”• Construction Simulation “4D”• Record Information Modelling for Facility Management “7D”

  • 3. BIM process at design stage• Paperless Process• No CAD files• Revit families with its parameters• Revit Templates including BOQ schedules• Auto Generation / Auto Formatting BOQ • Visual Validation “In-Line Review”• Interference Checks using Navisworks

  • ECG

    Rev

    it Sy

    stem

  • Revi

    t Tem

    plat

    es w

    ith p

    re-c

    onfig

    ured

    BO

    Q S

    ched

    ules

  • BOQ

    Exp

    orte

    r ECG

    Rev

    it Ad

    d-in

  • In-L

    ine

    Revi

    ew –

    Mod

    el V

    isual

    Val

    idat

    ion

  • 4. BIM at Construction stage• Preparing BIM Execution Plan “Prototype, and Adaptation”• Compare the IFC Model Against Shop Drawings Model “BIM 360”• Ensure extracting the PDF sheets from Revit Model “No 2D CAD Lines”• BOQ sheet from the Revit model including schedules• Coordination using Navisworks criteria• 4D Simulation for each building• Implementing the client Modifications at each type• Uploading the approved package for Site supervision Engineers

  • BIM

    from

    Con

    sulta

    nt P

    oint

    -of-V

    iew

  • BIM

    from

    Con

    trac

    tor P

    oint

    -of-V

    iew

  • BIM

    from

    QS

    Surv

    eyor

    Poi

    nt-o

    f-Vie

    w

  • BIM

    from

    Site

    eng

    inee

    r Poi

    nt-o

    f-Vie

    w

  • 5. BIM Challenges• Paperless process• No AutoCAD• No Common Data Environment “CDE”• Each unit has different survey points• Client modifications for each unit• Most Of Contractors have no BIM Experts• Steel Reinforcement on Revit needs high Workstation configuration • AIA-BIMForum LOD include high Detailing Level• LOD 400 – Fabrication is Excluded

  • Each type has its own level and infrastructure utilities

    Clients Modifications Implementation

  • BIM Violation Samples

    Client Modifications

    Changing in Substructure

    Using Detail lines instead of Model Elements

    Using AutoCAD for sheet representation and Revit for Modeling

  • SUCCESS WORKSHOP DRAWINGS SHEETS SUBMITTAL

  • 6. BIM at Next Stage “Facility Management”• Preparing Asset Information Requirements “AIR”

    • Parameters• Attachments “Warranty, Certificates, Operation Manuals, Technical Data,….”

    • Hiring FM Software• LOD 500 preparation• Preparing the validation Criteria of “Record Models approvals”• Apply modifications for each unit

  • 6. BIM at FM stage

    BIM

    at F

    M st

    age

  • Facility Management data

  • Conclusion and Recommendations

    •BIM + Management is the success key•Utilize BIM as much as you can•Start BIM - End BIM

  • Please scan this QR Code

    to watch or download this Presentation

    Mohamed Hashim Khater [email protected]

    01229781812

    mailto:[email protected]

    BIM� from Concept Design up to Facility Management �success storySlide Number 2Topics1.New Giza project description�NH04-Project StakeholdersRule of thumb�The BIM Model is the source of InformationBIM Model �Effort vs. Time2.BIM uses and targets3.BIM process at design stageECG Revit SystemRevit Templates with pre-configured BOQ SchedulesBOQ Exporter ECG Revit Add-inSlide Number 134.BIM at Construction stageBIM from Consultant Point-of-ViewBIM from Contractor Point-of-ViewBIM from QS Surveyor Point-of-ViewBIM from Site engineer Point-of-View5.BIM ChallengesEach type has its own level and infrastructure utilitiesBIM Violation SamplesSlide Number 226.BIM at Next Stage “Facility Management”6.BIM at FM stageSlide Number 25Conclusion and RecommendationsSlide Number 27