BUILDING INFORMATION MODELING (BIM) WAS INTRODUCED NEARLY TWELVE YEARS AGO TO DISTINGUISH THE INFORMATION RICH ARCHITECTURAL 3D MODELING FROM THE TRADITIONAL 2D DRAWING. BIM IS A BUILDING DESIGN METHODOLOGY CHARACTERIZED BY THE CREATION AND USE OF COORDINATED, INTERNALLY CONSISTENT COMPUTABLE INFORMATION ABOUT A BUILDING PROJECT IN DESIGN AND CONSTRUCTION.
• RELIABLE DIGITAL REPRESENTATION
• HIGH-QUALITY CONSTRUCTION DOCUMENT PRODUCTION
• CONSTRUCTION PLANNING
• PERFORMANCE PREDICTIONS
• COST ESTIMATES
WHAT IS BIM
ESSENTIAL PARAMETER IN BIM
“X”AXIS “Y”AXIS
“Z”AXIS
BIM PLATFORM USES THE THIRD DIMENSION (ALONG “Z” AXIS) WHICH
ENHANCES OUR VISUALISATION IN 3D AND EASES THE COORDINATION EFFORT
IN AUTOCAD TWODIMENSION ALONG “X” AXIS AND “Z” AXIS ARE USED
CLIENT
DESIGNBASIC INPUT
SCHEME/HAND SKETCH
PRESENTATION
3D MODEL
QUANTITY
CLASH ANALYSIS
SECTIONS & PLANS
GFC DRAWING
WALLS WITH THICKNESS AND HEIGHT, FIRE RATING IF REQUIRED ROOM DIMENSION WITH FUNCTIONAL NAMES CEILING TYPE, LEVEL VERTICAL CIRCULATION (STAIR,LIFT AND ESCALATOR) LOCATION EXTERIOR FAÇADE MATERIAL ACCESS OPENINGS IN WALL FOR DOORS,WINDOWS, LOUVER,
ROLLING SHUTTER WINDOW AND DOOR SCHEDULE SERVICE ROOMS(MECHANICAL, FIRE & PHE PUMP ROOM ) AND
SERVICE FLOORS WELL DEFINED AS PER MEP SERVICES REQUIREMENT
ARCITECTURAL INTENT FOR SERVICES AT CEILING LEVEL FOR AREAS WITHOUT FALSE CEILING
TYPE OF FIXTURES, FURNITURES PLANTER BODY,WATER BODIES (SPECIAL FEATURES) IF ANY ANY ADDITIONAL AESTHATIC REQUIREMENTS (BULK HEAD,
SKYLIGHT, COLUMN CLADDING, RAILING ETC) ROOF TYPE LEVELS, PARAPET HEIGHT FINISHING MATRIX
ARCHITECTURAL INPUT
ARCHITECTURAL LAYOUT FLOOR THICK NESS & TOC. FOUNADTION DETAIL(ISOLATED, COMBINED, WALL FOOTING) COLUMN TYPE AND SIZE BEAM DESIGN INFORMATION(EXTRACTED FROM ANALYSIS
SOFTWARE)- STEPS INVOLVED:
• INNITIALLY BEAM SIZES TO BE PROVIDED• BEAM SHOULD BE PLACED AS PER ARCHITECTURAL
LAYOUT• SEND AGAIN TO DESGNER FOR FINAL ANALYSIS FOR
CHANGES IF ANY FINALLY MODEL HAS TO BE COMPLETED INCLUDING RAMP &
STAIR.
STRUCTURAL INPUT
ARCHITECTURE & STRUCTURAL LAYOUT RCP LAYOUT
EQUIPMENT CAPACITY AND LOCATION
SHAFT LOCATION
SCHEME AND ZONING INFORMATION
VENDOR’S G.A. DRAWING
HVAC DESIGN INPUT
ARCHITECTURE LAYOUT SHOWING PLUMBING FIXTURE LOCATION.DEPTH OF SUNKEN IN WET AREAS.PIPE MATERIAL AS PER SPEC.PIPE DIAMETER . PIPE TYPES (WASTE, SOIL, RAIN WATER,IRRIGATION, WATER SUPPLY) PIPE SLOPE. SUPPORT SPACING WHEREVER APPLICABLE.FLOOR SCREED.RAIN WATER PIPE LOCATION & HARVESTING TANK..PIPING ARRANGEMENT INSIDE THE SHAFT.LOCATION OF VALVES AND OTHER ACCESSORIES.LOCATION OF HOT WATER EQUIPMENTS.EXTERNAL ROUTING OF SANITARY, STORM & WATER SUPPLY INPUT INCLUDING GULLY TRAP, MANHOLE & RAIN WATER CHAMBER.LAYOUT AND DETAILS OF WTP, STP, ETC.,
PHE DESIGN INPUT
ARCHITECTURE & STRUCTURAL LAYOUT
RCP LAYOUT
LIGHTING LAYOUT-NUMBER OF FIXTURES, TYPE AND ARRANGEMENT
POWER LAYOUT-TYPE, QUANTITY AND ARRANGEMENT
CABLE TRAY/BUS DUCT – SIZE AND ARRANGEMENT
SUBSTATION LAYOUT – EQUIPMENT, DIMENSIONS, ARRANGEMENT AND STATUOTORY CLEARANCE
SCHEMATIC AND CABLE SCHEDULE.
ELECTRICAL DESIGN INPUT
ARCHITECTURE , SHAFT LOCATION & STRUCTURAL LAYOUT
RCP LAYOUT.
CAR PARKING
PIPE MATERIAL & GRADE AS PER DBR AND BOQ
HYDRANT VALVE LOCATION AS PER RECOMMENDED INTERVAL
PIPE TYPES (SPRINKLER, HYDRANT)
COVERAGE OF SPRINKLER FOR CAR PARKING AND OFFICE AREA
FIRE DETECTION AND PUBLIC ADRESSABLE SYSTEMS
FIRE ALARM PANEL AND NUMBER OF LOOP.
FIRE RESERVOIR.
FIRE PUMP ROOM WITH PUMPING DETAILS AND CAPACITY.
FIRE DESIGN INPUT
CLASH REPORT IN NAVIS WORKS
CLASH REPORT DOCUMENTS
THE STEPS INVOLVED:
1. THE STRUCTURE FOUNDATION MODEL SHOULD BE FREEZED BEFORE START OF PHE MODEL
1. IN CASE OF ANY CLASH, CAN BE RESOLVED BY CHANGING THE PIPE ROUTE, LOWERING THE PIPE DEPTH TO BELOW FOUNDATION ELEMENT(HUME), SLEEVES CAN ALSO BE PROVIDED AFTER DISCUSSION WITH THE STRUCTURAL ENGINEER
TWO ELEMENTS ARE INVOLVED HERE :
STRUCTURE
PHE
STEPS INVOLVED:
THE RCP LAYOUT IS TO BE FREEZEDTHE LOCATION OF THE FOLLOWING TO BE FIXED
1.LIGHTING FIXTURE LOCATION BY ELECTRICAL
2.DIFFUSER/GRILL LAYOUT BY HVAC
3.FIRE ALARM/SPRINKLER LAYOUT BY FIRE.
ELEMENTS INVOLVED:-
ARCHITECTURE RCPHVAC DIFFUSERFIRE DETECTOR AND SPRINKLERELECTRICAL :LIGHTING FIXTURE
ELECTRICAL
ARCH-RCP
ELECTRICAL LIGHTING
LIGHTING + HVAC DIFFUSER/GRILL
DIFFUSER+LIGHTING+ SPRINKLER/FIRE ALARM
COORDINATED RCP TO ARCHITECT FOR REVIEW(ASTHETIC/LOOK AND FILL)
COMMENTED RCP FROM ARCHITECT
HVAC FIRE
PHE PUMP ROOM PHE, HVAC, ELECTRICAL, ELV
TOILET AREA PHE, HVAC, ELECTRICAL, ELV
FIRE PUMP ROOM FIRE, HVAC, ELECTRICAL, ELV
OFFICE/ODC/CORRIDOR HVAC, PHE, FIRE, ELECTRICAL, ELV
TERRACE AREA HVAC, FIRE, PHE, ELECTRICAL, ELV
ELECTRICAL ROOMSUB STATIONDG ROOMHUB ROOMBMS ROOMSWITCH ROOMUPS ROOMDATA CENTER
PLAT ROOM/CHILLER PLANT/AHU ROOM HVAC, ELV
ELECTRICAL, HVAC, PHE, ELV
DAY-0 STAGE-0A (MEP) DESIGN CAL CULATION AND REDINESS OF BASIC DRAWING INPUTS FOR THE ZONE BY THE ENGINEERS.
B (ARCH/STRUC) PREPARATION OF BASIC COORDINATED MODEL.
DAY-1 STAGE-1 APPROX SPACE PLANNING AND BASIC ROUTING FOR INDIVIDUAL MEP DISCIPLINE BY THE ENGINEERS ON THE ARCH. & STRUC. LAYOUT.
DAY-2STAGE-2 STRUCTURE & ARCHITECTURE MODEL REVIEW FOR ENABELING MEP DRAFTING PERSONS TO UDERSTAND THE
ZONE IN A 3D PLATFORM.
STAGE-3 INTER MEP DISCIPLINE COORDINATION MEETING TO FREEZ APPROX. PLAN AND ELEVATION.
DAY-3 STAGE-4 MEP DRAFTING AND MODEL DEVELOPMENT LAYOUT BASED ON INPUTS (STAGE-0 TO STAGE-3
DAY-3 & 4 STAGE-5A CHECKING OF DRAWING BY ENGINEERS FOR TECHNICAL ADEQUECY (NOT CLASH DETECTION)
B MODEL UPDATION BY ARCH. & STRUC. AS PER MEP MODEL.
DAY-6 STAGE-6 MODEL REVIEW IN NAVIS BY ALL DISCIPLINE (MEP, STRUC, ARCH)
DAY-7 & 8 STAGE-7 CLASH COORDINATION AND RESOLVE AS PER STAGE-6
DAY-9 STAGE-8 ANNOTATION & SHEET CREATION
DAY-10 STAGE-9 QC & CORRCTION & GFC
• WALL CUT OUT LOCATION TO ARCHITECTURE.• SLEEVE LOCATION FOR THE BEAM TO STRUC.• DOG HOUSE LOCATION AND HEIGHT TO STRUC. & ARCH.• LOUVERS SIZES & LOCATION TO ARCH.• SHARE WALL OPENING TO STRUC.• CORE CUT LOCATION & SIZE TO STRUC.
PHASE-I PHASE-II
PHASE-III
THANK YOU