Billings Integrated Water Plan Chartering Workshop
May 27, 2010
![Page 2: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/2.jpg)
Key Questions• What is Integrated Water Planning?• Why are we doing Integrated Water
Planning?• How is it different from conventional
planning?• What are the benefits and outcomes
of the Process?• Where are we in the process?• How can you participate?
This is not just another planning document. This represents the
beginning of a fundamental transition of how we manage our water resources in the
Billings area.
![Page 3: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/3.jpg)
What is Integrated Water Planning?
• An approach that balances competing water uses and considers cost effectiveness, environmental, and social values.
Many communities in the South and West have done Integrated Water Planning to balance competing water resource needs.
![Page 4: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/4.jpg)
Why are we doing Integrated Water Planning?
Because it’s all connected…
![Page 5: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/5.jpg)
The City’s wastewater pipe network drains to a central treatment facility that discharges to the Yellowstone River.
![Page 6: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/6.jpg)
Wastewater Challenge
• New river discharge restrictions will require costly improvements
The area of growth is away from the central plant site
![Page 7: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/7.jpg)
Wastewater Management Approaches
Conventional• Total Maximum Daily Load
(TMDL)– Lower Effluent Limits
• NPDES Discharge Permit Renewal
• Capitalize Advanced Treatment Technology– Add Nutrient Removal
• Potential Issues– Expense– Requirements Beyond Limits of
Technology
Integrated Water Plan• Effluent Management
– Reclaimed Water Reuse• Urban Irrigation• Industrial• Other
– Aquifer Recharge– Wetlands Restoration
• Water Quality Offsets and Trading
• Would still require other capital improvements (distribution and/or treatment)
![Page 8: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/8.jpg)
Options to Meet Restrictive TMDLs
Water Reclamation
Facility
Urban Irrigation•Parks, Schools, Fairgrounds
Industrial Reuse•Paper Mill, Rock Crushing, Concrete
Wetlands Restoration•Creation, Restoration, Enhancement
Groundwater Recharge• Surface PercolationO
ptio
ns
Other•Agricultural Land, Poplar Farms
![Page 9: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/9.jpg)
Urban Irrigation
Washington State Capitol Grounds(Olympia, Washington)
Sunken Garden(Olympia, Washington)
![Page 10: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/10.jpg)
Industrial Reuse
Recycled water from the West Basin Recycling Facility in El Segundo; CA is provided to industrial customers
for non-potable uses.
![Page 11: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/11.jpg)
Groundwater Recharge
Riparian Preserve (Gilbert Arizona)
LOTT Hawks Prairie (Lacey, Washington)
![Page 12: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/12.jpg)
Sidestream Nutrient Recovery
• Phosphorus Removal Applications– Anaerobic Digestion– Dewatering
• Struvite (MAP) Reactor– Recycles Nutrients as Fertilizer– Reduces Solids Stream Recycle
Impact– Reduces Chemical Use– Potential Greenhouse Gas
Credit • ~6 to 8 tons CO2 Equivalent per
Ton of Struvite
Clean Water Services of Washington County, OR Durham Plant
Ostara’s Green Crystal Green®
Fertilizer Product
![Page 13: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/13.jpg)
Wetlands Restoration
Oregon Nurseryman’s Garden(Silverton, Oregon)
![Page 14: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/14.jpg)
Other Uses
Reclaimed Water Fire HydrantsTop: (Portland, Oregon)Bottom: (Maui, Hawaii)
Cochrane Park(Yelm, Washington)
Source: Department of Ecology
![Page 15: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/15.jpg)
The City’s central WTP distributes water through its pipe and reservoir network.
![Page 16: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/16.jpg)
Water
Peak day summertime demands drive drinking water treatment capacity decisions.
Irrigation Demand
![Page 17: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/17.jpg)
Drinking Water• Current approach recommends a new West End
WTP at an approximate cost of $60-90M• Summertime irrigation demands drive the need for
that facility• Water rights are in limbo• Best use of resource for all uses (cooling water,
irrigation, etc.) ?
The City’s central WTP is nearing its capacity.
![Page 18: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/18.jpg)
Drinking Water Management Approaches
Conventional• Driver
– New Plant Capacity Needed– Water Rights– SDWA Compliance– Limitations of Existing Distribution
Infrastructure• New West End Plant• Off Stream Storage• Potential Issues
– Expense– Additional Staff
Integrated Water Plan• Alternatives to Treated Water
for Irrigation– Irrigation Canal– Reuse Water
• Use Aquifer for Storage• Conservation• Off Stream Storage• Will require construction of
capital facilities
![Page 19: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/19.jpg)
Irrigation out of canals could save peak treatment capacity
0
1
2
3
4
5
6
7
8
All Parcels within LOA Boundary
Irrigation Potential by Water Demand (MGD)
Adjacent to Irrigation SupplyWithin 500' of Irrigation Supply
Would require additional distribution piping
![Page 20: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/20.jpg)
The City’s stormwater pipe network discharges to the Yellowstone River in several locations.
![Page 21: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/21.jpg)
Stormwater• New water quality benchmarks for stormwater
discharges are in place• Monitoring today indicates some water quality
improvements will be needed• The Current Master Plan includes >$40M in high
priority improvements to address flooding issues
Future developments will include provisions to limit runoff to prevent future flooding problems.
![Page 22: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/22.jpg)
We are unique in having a large irrigation system running through the urban area.
![Page 23: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/23.jpg)
Irrigation• Established canal system throughout the service
area• Faces a declining customer base• Funding challenges• Infrastructure improvements are needed to maintain
old facilities
Irrigation will be a critical component to Integrated Water Planning.
![Page 24: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/24.jpg)
Stormwater Management Approaches
Conventional• Stormwater NPDES Discharge
Permits– 6 Minimum Control Measures– Best Management Practices
(BMPs)• Total Maximum Daily Load
(TMDL)– Wasteload Allocations
• Historically Quantity-based• Increasing Regulatory
Emphasis on Water Quality– Add Water Quality BMPs
Integrated Water Plan• Infiltration/Inflow
– Stormwater May Drive Peak Wastewater Flows
• Effluent Management– Links with Canals and Drainage
Systems• Water Quality Offsets and
Trading– Stormwater Reductions to Off-set
Wastewater Discharges
![Page 25: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/25.jpg)
Potential for TMDLs to Drive WasteloadAllocations for Regulated Stormwater
![Page 26: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/26.jpg)
Water Quality Best Management Practices
![Page 27: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/27.jpg)
Billings Floating Islands Pilot Project
• All-Natural System• Provides Nutrient Uptake• Small Footprint
![Page 28: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/28.jpg)
City of Helena Effluent Discharge to Helena Valley Irrigation District Canal
City of Helena WWTP
City of Helena Effluent Ditch
Helena Valley Canal
![Page 29: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/29.jpg)
Opportunities for Collaboration?
![Page 30: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/30.jpg)
West Basin Municipal Water District, El Segundo, CA• Five different qualities of “designer”
or custom-made recycled water 1. Tertiary Water2. Nitrified Water3. Softened Reverse Osmosis Water
Secondary treated wastewater pretreated by either lime clarification or microfiltration, followed by reverse osmosis (RO) and disinfection for ground-water recharge
4. Pure Reverse Osmosis Water5. Ultra-Pure Reverse Osmosis Water
• Injected into South Bay’s groundwater basin to prevent seawater intrusion
Advanced Oxidation Process (AOP) –Peroxide and UV
![Page 31: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/31.jpg)
Why are we doing Integrated Water Planning?• Wastewater-Restrictive limits for continued discharge
to the Yellowstone River• Drinking Water—
– Peak irrigation demands lead to new WTP– Water Rights– Best use of resource?
• Stormwater—New permit limits for discharge from MDEQ
• Irrigation—Declining customer base and increasing management costs
• May be opportunities to collaborate
![Page 32: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/32.jpg)
What are the benefits of an Integrated Water Plan?
• Allows time to make incremental changes• Long term cost effective service• Allows time to explore opportunities for more efficient
uses of water resources• Identify Opportunities
![Page 33: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/33.jpg)
What are the outcomes of the Integrated Water Plan?
• Clear definition of problems, goals and objectives• Establish Community Values• Define and evaluate alternative strategies
– Projects/Capital Facilities– Programs and Policies-Nonstructural Management
Measures• Implementation Plan
– Prioritized Actions– Defined Funding– Long Term Management Program
• Adopted plan will serve as a road map for the future
![Page 34: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/34.jpg)
How will we prepare the Integrated Water Plan?
• No preconceived notions about the outcome• No Cookie Cutter Approach• Facilitated Process• Broad stakeholder participation
– Build strong working relationships– Inclusive to build awareness and support
• Coordinate water management
![Page 35: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/35.jpg)
Where are we in the Integrated Water Planning Process?
Project Initiation
Chartering Workshop
Regulatory and
Benchmarking Work Group
Finance and Policy Work
Group
Alternative Analysis
Work Group and
Chartering Workshop
Group
Recommended Plan Work
Group
Chartering Workshop
Group
March NovemberOctoberAugustJuneMay December
![Page 36: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/36.jpg)
How will the Integrated Water Plan be coordinated?
City Council/StaffPublic Works Board
Technical Support PolicyChartering Group
Other InputWork Group
![Page 37: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/37.jpg)
Opportunities for consideration
• Discharge Effluent to a different location-groundwater, irrigation canal, wetland, etc.
• Move to Satellite treatment plants for water and wastewater
• Use Irrigation Canal for lawn irrigation• Use Reuse water for lawn irrigation• Store Finished Water Underground (ASR)• Change Development policies to minimize
stormwater runoff and improve runoff quality (Already required)
Other Ideas?
![Page 38: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/38.jpg)
Next Steps-Where are we going?
• Establish Work Group participation• Define additional projects, policies, technologies to
be considered• Screen and Prioritize Alternatives• Design of Implementation Plan• Produce the IWP by the end of the year
![Page 39: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/39.jpg)
How can you participate?
• Represent your group at work group sessions• Attend Chartering Group Workshops• Provide ideas• Comment on the website
![Page 40: Billings Integrated Water Plan Chartering Workshopflathead.mt.gov/wastewater_management/documents/may2010billin… · • Urban Irrigation • Industrial • Other – Aquifer Recharge](https://reader035.fdocuments.us/reader035/viewer/2022071015/5fcd85b4fcf7a345615b2b1e/html5/thumbnails/40.jpg)
Questions?