Billet Tong - Elpi · 2018. 11. 20. · Type of hook (DIN 15401 or 15402) & number • Height below...

2
Billet Tong LOAD HANDLING Unlocking with a quarter-turn of the locking device Removable pads For hot or cold products Body of the liſter: S355 Arms of the liſter: S690QL By default: FEM A8M8 Informaon required : I. Crane : Capacity of crane in tons : …………T Hook number (DIN 15401/ 15402) : ….…… Liſting speed : ………………...M/min Distance between hook axes : ……………………...mm II. Load : Safe working load : …………………….. T Dimensions: billets L…………………… l………………… Length : Min……………………. Max……………….. Number of billets per liſting operaon : ………………………….. Product temperature :…………………..°C Material : ……………………... III. Opons : Storage stand www.elpifrance.com Tel : + 33 (0)9 81 97 95 43 Email : [email protected] Please contact us for further informaon

Transcript of Billet Tong - Elpi · 2018. 11. 20. · Type of hook (DIN 15401 or 15402) & number • Height below...

Page 1: Billet Tong - Elpi · 2018. 11. 20. · Type of hook (DIN 15401 or 15402) & number • Height below hook • Approach distances • Lifting and travel speeds • Bridge crane handling

Billet Tong

LOAD HANDLING

Unlocking with a quarter-turn of the locking device

Removable pads

For hot or cold products

Body of the lifter: S355

Arms of the lifter: S690QL

By default: FEM A8M8

Information required :

I. Crane :

Capacity of crane in tons : …………T

Hook number (DIN 15401/ 15402) : ….……

Lifting speed : ………………...M/min

Distance between hook axes : ……………………...mm

II. Load :

Safe working load : ……………………..T

Dimensions: billets L…………………… l…………………

Length : Min……………………. Max………………..

Number of billets per lifting operation : …………………………..

Product temperature :…………………..°C

Material : ……………………...

III. Options :

Storage stand

www.elpifrance.comTel : + 33 (0)9 81 97 95 43 Email : [email protected]

Please contact us for further information

Page 2: Billet Tong - Elpi · 2018. 11. 20. · Type of hook (DIN 15401 or 15402) & number • Height below hook • Approach distances • Lifting and travel speeds • Bridge crane handling

Client load lifting installation: Bridge crane, gantry crane, jib crane, crane, stacker • SWL at the hook • Number of hooks • Presence of beam under the hook • Type of hook (DIN 15401 or 15402) & number • Height below hook • Approach distances • Lifting and travel speeds • Bridge crane handling method: manual from cabin / remote controlled / automatic

Indoor or outdoor environment • Max. and min. temperatures in operating environment • Cross-section drawing of the workshop if possible •

Details of loads handled: Max. and min. weights • Max and min. dimensions (inner/outer Ø and length or LxWxH) • Max. and min. temperatures • Load surface properties (hardness, roughness, geometry) • Cleanliness: dry or oily • Grade •

Characteristics of equipment required: Number of cycles per hour / day / month / year • Average loads / % of total production • Max. loads / % of total production • Cycle time •

Equipment options:FEM (European Materials Handling Federation) classification • Power supply voltage • Motorised rotating head • Part detection sensor • Load detection sensor • Weighing function • Paint • Storage stand • Type of access to storage stand (steps or ladder) • Stand security features (with or without gate) • Power and operating cabinet on the stand for equipment testing • Equipment on automatic bridge crane • Centralised greasing •

Examples of details to communicate to us

LOADHANDLING

www.elpifrance.comPhone: + 33 (0)9 81 97 95 43

Email: [email protected]