Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit, Licenses and Access Pass 1.00 l.s. Bonds and Insurances 1.00 l.s. Temporary Facilities 1.00 l.s. Safety and Security Services 1.00 l.s. Material Testing 1.00 l.s. Verification Site Survey 1.00 l.s. As-built plans, shop drawings 1.00 l.s. Housekeeping & garbage disposal 1.00 l.s. B IMPROVEMENT OF PASSENGER TERMINAL BUILDING I Removal and disposal of existing 3,203.00 m 2 damaged floor tiles Installation of 600mm x 600mm 3,203.00 m 2 Homogeneous tiles Sub-Total I II Application of Multi Component polyurethane based, liquid applied waterproofing system. Roof Deck Slab (including conc. Gutter and SS gutter) 4,000.00 m 2 Application of Single Component Water Dispersed Vinyl Acetate-Ethylene Copolymer Waterproofing Treatment(2 coats) Parapet wall 754.00 m 2 Exterior Wall of Pre-Departure Building 500.00 m 2 Removal and disposal of existing water 4,000.00 m 2 proofing membrane Repair of damaged portion of roof slab, Installation of Cants 1.00 l.s. Sub-Total II III REPAINTING OF INTERIOR/EXTERIOR WALL Exterior Wall, Parapet, Ceilling and columns. 1,455.00 m 2 Interior Wall: Re-painting of Mgr's Office, Administration Office & Clinic 330.00 m 2 Interior Ceiling: Re-painting of all existing ceiling and A/C diffusers 3,400.00 m 2 Exterior Concrete Wall: Repainting of Old Porte Cochere 540.00 m 2 Exterior Steel: Re-painting of Covered Walk Structures 3,950.00 m 2 Sub-Total III IV FURNISHING OF V.I.P. ROOM @ ARRIVAL AREA Sofa Sets including Side Tables and Lamp Shades 3.00 set Vertical Blinds 106.00 m 2 Interior Wall Decors 1.00 lot TOTAL A REPLACEMENT OF DAMAGED FLOOR TILES WATERPROOFING Description Quantity Unit Unit Cost GENERAL REQUIREMENTS BILL OF QUANTITIES

Transcript of BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac...

Page 1: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Item Amount

No. (PhP)

A

Mobilization / Demobilization 1.00 l.s.

Permit, Licenses and Access Pass 1.00 l.s.

Bonds and Insurances 1.00 l.s.

Temporary Facilities 1.00 l.s.

Safety and Security Services 1.00 l.s.

Material Testing 1.00 l.s.

Verification Site Survey 1.00 l.s.

As-built plans, shop drawings 1.00 l.s.

Housekeeping & garbage disposal 1.00 l.s.

B IMPROVEMENT OF PASSENGER TERMINAL BUILDING

I

Removal and disposal of existing 3,203.00 m2

damaged floor tiles

Installation of 600mm x 600mm 3,203.00 m2

Homogeneous tiles

Sub-Total I

II

Application of Multi Component polyurethane based, liquid

applied waterproofing system.

Roof Deck Slab (including conc. Gutter and SS gutter) 4,000.00 m2

Application of Single Component Water Dispersed Vinyl

Acetate-Ethylene Copolymer Waterproofing Treatment(2 coats)

Parapet wall 754.00 m2

Exterior Wall of Pre-Departure Building 500.00 m2

Removal and disposal of existing water 4,000.00 m2

proofing membrane

Repair of damaged portion of roof slab, Installation of Cants 1.00 l.s.

Sub-Total II

III REPAINTING OF INTERIOR/EXTERIOR WALL

Exterior Wall, Parapet, Ceilling and columns. 1,455.00 m2

Interior Wall: Re-painting of Mgr's Office, Administration Office & Clinic 330.00 m2

Interior Ceiling: Re-painting of all existing ceiling and A/C diffusers 3,400.00 m2

Exterior Concrete Wall: Repainting of Old Porte Cochere 540.00 m2

Exterior Steel: Re-painting of Covered Walk Structures 3,950.00 m2

Sub-Total III

IV FURNISHING OF V.I.P. ROOM @ ARRIVAL AREA

Sofa Sets including Side Tables and Lamp Shades 3.00 set

Vertical Blinds 106.00 m2

Interior Wall Decors 1.00 lot

TOTAL A

REPLACEMENT OF DAMAGED FLOOR TILES

WATERPROOFING

Description Quantity Unit Unit Cost

GENERAL REQUIREMENTS

BILL OF QUANTITIES

Page 2: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Carpet Rugs provision 3.00 set

Sub-Total IV

V RENOVATION OF ARRIVAL GANGWAY FOR DOMESTIC PASSENGER

Remove existing damaged Drywall and Install new Drywall 280.00 m2

Replace Existing 2-Leaf Entrance Glass Door 1.00 set

Replace Existing 1-Leaf Glass Door 1.00 set

New Acoustic Ceiling 170.00 m2

Painting of New Wall 485.00 m2

Repair Floor and apply Rubberized Paint 170.00 m2

Supply & Installation of 2HP Inverter Window Type AIRCON Units 4.00 sets

*Including Power Supply and Outlets

Sub-Total V

VI REPAIR WORKS @ ARRIVAL INTERNATIONAL

Remove existing and install new Gypsum Ceiling 241.00 m2

Painting of New Ceiling 721.00 m2

Replace Existing Glass Door into 2-leaf Fire Exit Door 1.00 set

Replace Existing Automatic Sliding Door @ Arrival Lobby 1.00 set

* Automated 2-leaf Sliding Door, with 12mm thk. Tempered

Glass with complete accessories.

Sub-Total VI

VII IMPROVEMENT OF MANAGER'S OFFICE & CLINIC

INTERIOR WALL (12mm thk. Tempered Glass with sticker on Powder coated frame)10.00 m2

Provision of Vertical Blinds 16.00 m2

Provision of Counter with Sink 1.00 set

Sub-Total VII

VIII IMPROVEMENT OF FAÇADE @ INTERNATIONAL PRE-DEPARTURE

Replace Damaged ACP Claddings at all Exterior 82.00 m2

Sub-Total VIII

IX VARIOUS EXTERNAL WORKS

Stamped Concrete 105.00 m2

100mm thk. Reinforced Concrete Slab at AHU Area 225.00 m2

Provision of Concrete Security Fence with Combat Wire 285.00 lm

along PTB Entrance/Exit Gate (2.4m H from NGL)

Landscaping in front of International Pre-Departure Area 160.00 m2

75mm dia. Stainless Railings (1.20 mtrs High) 140.00 l.m.

New Covered Walk @ Well wishers staying area

EARTH WORKS

Cutting and breaking of existing concrete slab (Baggage build up) 153.60 lm

Excavation 30.72 m3

Backfilling 13.82 m3

GRAVEL BED; 75mm thk. Gravel bed, G-1 3.07 m3

CONCRETE WORKS (Foundation and Pedestals, Lintel and Tie Beams)

REBARS 1,228.61 kgs

FORMS 99.84 m2

CONCRETE 11.33 m3

Steel Frames: Columns, Rafters Purlins and Plates 420.00 m2

Page 3: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Roofing: Ga. 24 Pre-painted Rib type Curved Roof 420.00 m2

Steel Framed Covered Crossing: Columns, Truss Purlins and Plates

EARTH WORKS

Cutting and breaking of existing concrete slab (Baggage build up) 16.00 lm

Excavation 12.00 m3

Backfilling 5.40 m3

GRAVEL BED; 75mm thk. Gravel bed, G-1 0.80 m3

CONCRETE WORKS (Foundation and Pedestals)

REBARS 446.72 kgs

FORMS 15.20 m2

CONCRETE 4.30 m3

Steel Frames: Columns, Truss, Purlins and Plates 112.50 m2

Roofing: Ga. 24 Pre-painted Rib type Roof 112.50 m2

ACP Cladding 55.00 m2

Stainless Gutter 55.00 l.m.

Pedestrian Lane markings 142.20 m2

Catch Basin with DS 4.00 set

Parking Booth Shelter

EARTH WORKS

Cutting and breaking of existing concrete slab (Baggage build up) 14.80 lm

Excavation 3.78 m3

Backfilling 1.70 m3

GRAVEL BED; 75mm thk. Gravel bed, G-1 0.35 m3

CONCRETE WORKS (Foundation and Pedestals)

REBARS 237.07 kgs

FORMS 9.12 m2

CONCRETE 1.79 m3

Steel Frames: Columns, Truss, Purlins and Plates 37.22 m2

Roofing: Ga. 24 Pre-painted Rib type Roof 37.22 m2

Parking Booth 2.00 set

Sub-Total IX

X DOMESTIC PASSENGER PRE-DEPARTURE BUILDING

a PASSAGEWAY / CONNECTING GANGWAY

EARTH WORKS

Cutting and breaking of existing concrete slab (Baggage build up) 108.00 lm

Hauling and disposal of debris 2.20 m3

Earthfill 16.00 m3

Excavation 19.00 m3

Backfilling 10.00 m3

GRAVEL BED; 75mm thk. Gravel bed, G-1 8.00 m3

CONCRETE WORKS

REBARS 951.00 kgs

FORMS 22.00 m2

CONCRETE 15.00 m3

MASONRY WORKS

125mm thk. CHB LAYING 44.00 m2

16mm thk. Plain Cement Plastering 44.00 m2

STEEL FRAMING (columns,girt, rafters and purlins) 2,280.00 kgs

G.I. PIPE RAILINGS (75mmΦ, S40 pipe, paint finished) 28.00 lm

THERMAL & MOISTURE

ROOFING & SIDINGS 213.00 m2

Gauge 24 pre-painted rib-type long span roof, gutter & flashings (incl. down spouts)

Page 4: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

FINISHING WORKS

FLOOR; 600mm X 600mm carpet tiles 72.00 m2

INTERIOR WALL (6mm thk. Hardiflex board on metal studs) 151.00 m2

CEILING (4.5mm thk. Ficem ceiling board on metal furring). 72.00 m2

DOORS & WINDOWS

SGD-1; 2000mm x 2,100mm H x 12mm Thick Frameless tempered 1.00 set

glass door with complete accessories.

FRSD-2; 900mm x 2100mm Fire resistant steel door and jamb. 1.00 set

w/ complete accessories and panic device.

PAINTING WORKS

WALL; Interior wall; double coat with semi-gloss latex paint 151.00 m2

CEILING; double coat with flat-gloss latex paint 72.00 m2

ELECTRICAL WORKS

LIGHTING & POWER LINES

Fluorescent Lighting Fixture, Recessed Mounted Type, 14 sets

12"x48" with Aluminum Relector/Louver, 2 x 16 Watts LED

Fluorescent Tube, 220V, 60Hz (UL listed - with 5 years warranty)

1/2" dia. IMC/EMT pipes 71 pcs

1/2" dia. IMC/EMT pipes connector/coupling 71 pcs

Wire, # 12 or 3.5 mm2 THHN 545 mtrs

Wire, # 10 or 5.5 mm2 THHN 273 mtrs

Utility Box 2" x 4" 25 pcs

1/2" dia. Utility Box Connector 40 pcs

Octagonal Junction Box, deeptype with cover 10 pcs

Single Switch/2-gang 2 set

Duplex Convenience Outlet - Universal 5 sets

ACU Outlet 3 sets

Electrical tape, 3/4in width, black pvc plastic 12 rolls

Miscellaneous & Consumables Materials 1 lot

MECHANICAL WORKS

Supply & Installation of 2HP Inverter Window Type AIRCON Units 1.00 units

Sub total a

b COVERED CONCOURSE

EARTH WORKS

Cutting and breaking of existing concrete slab (Baggage build up) 64.00 lm

Earthfill 393.00 m3

Excavation 16.00 m3

Backfilling 7.00 m3

GRAVEL BED; 75mm thk. Gravel bed, G-1 20.00 m3

CONCRETE WORKS

REBARS 1,075.00 kgs

FORMS 40.00 m2

CONCRETE 26.20 m3

MASONRY WORKS

125mm thk. CHB LAYING 71.00 m2

FINISHING WORKS

Floor : Stamped Concrete 226.00 m2

Steel Frames: Columns, Rafters Purlins and Plates 262.00 m2

Roofing: Ga. 24 Pre-painted Rib Type Roof 262.00 m2

Stainless Gutter 53.00 lm

ELECTRICAL WORKS

Page 5: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

LIGHTING & POWER LINES

Fluorescent Lighting Fixture, Recessed Mounted Type, 7 sets

12"x48" with Aluminum Relector/Louver, 2 x 16 Watts LED

Fluorescent Tube, 220V, 60Hz (UL listed - with 5 years warranty)

1/2" dia. IMC/EMT pipes 35 pcs

1/2" dia. IMC/EMT pipes connector/coupling 35 pcs

Wire, # 12 or 3.5 mm2 THHN 270 mtrs

Wire, # 10 or 5.5 mm2 THHN 136 mtrs

Utility Box 2" x 4" 12 pcs

1/2" dia. Utility Box Connector 20 pcs

Octagonal Junction Box, deeptype with cover 5 pcs

Single Switch/2-gang 1 set

Duplex Convenience Outlet - Universal 3 sets

ACU Outlet 0 sets

Electrical tape, 3/4in width, black pvc plastic 6 rolls

Miscellaneous & Consumables Materials 1 lot

Sub total b

c INTERIOR IMPROVEMENT WORKS

Repair Existing 2-Leaf Glass Doors 8.00 set

Ceiling : Provide ACP Perforated Ceiling Panels 1,200.00 m2

Interior Double Wall :

-3 mtrs. High from FFL:6mm thk. Hardiflex Boards on Metal Studs 375.00 m3

-Aluminum Composite Panels 300.00 m3

Removal of existing Carpet Floor 1,200.00 m2

Floor : 600mm x 600mm Homogeneous tiles 1,200.00 m2

Provision of Water Supply lines for Concessionaire 4.00 units

FIDS Monitor w/ Controller 4.00 set

Sub total c

d OPEN TRENCH WITH STEEL GRATINGS

Excavation 30.38 m3

GRAVEL BED; 75mm thk. Gravel bed, G-1 2.53 m3

REBARS 687.15 kgs

FORMS 153.00 m2

CONCRETE 10.58 m3

Steel Gratings and Nosing painted primer and Top Coat 45.00 lm

Sub total d

Sub-Total X

XI IMPROVEMENT OF COMFORT ROOMS

a Removal & Replacement Works:

Removal of Existing Floor Tiles for toilets 486.00 m2

Removal of Existing Wall Tiles for Toilets 974.40 m2

Install New 600mm x 600mm Non Skid Homogenous Tiles 486.00 m2

New 300mm x 600mm Wall Tiles for Toilets 974.40 m2

New 700 x 2100mm Wooden Flush Doors for CR 17.00 set

e Toilet Fixtures:

Water Closet with complete fittings and accessories 55.00 set

Counter Lavatory with complete fittings and accessories 48.00 set

Wall Hang Lavatory with complete fittings and accessories 8.00 set

Bidet washers with complete fittings and accessories 55.00 set

Urinals 17.00 set

Sub-Total XI

TOTAL B

Page 6: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

C IMPROVEMENT OF BUILDING EXTERIORS

I

Re-painting of Exterior Concrete Wall 567.00 m2

Re-painting of Exterior Steel: Stairs and Covered Shed 150.00 m2

Parapet wall 175.00 m2

*Application of Single Component Water Dispersed Vinyl

Acetate-Ethylene Copolymer Waterproofing Treatment(2 coats)

Install Steel Frame Design around Penthouse 50.00 lm.

Remove existing damage Roof at Penthouse 16.00 m2

Install New Roofing Sheets at Penthouse 16.00 m2

*Ga. 24 Pre-painted Rib Type Roofing Sheets

Sub-Total I

II

Re-painting of Exterior: Roofing & Metal Sidings 910.00 m2

Steel Framed Stock Area:

Structural Steel Framing (Painted Finish) 152.00 m2

Install New Ga. 24 Pre-painted Rib type Roofing Sheets 152.00 m2

Rebars : 10mm dia. X 6m RSB 700.00 kgs

Forms 3.60 sq.m.

Concrete 15.00 cu.m.

Sub-Total II

III MOTORPOOL OFFICE

Re-painting of Exterior Wall: Concrete 178.00 m2

Re-painting of Exterior: Steel Frames and Metal Roofs 285.00 m2

Re-painting of Wooden Doors 6.30 m2

Steel Framed Parking:

Structural Steel Framing (Painted Finish) 64.00 m2

Install New Ga. 24 Pre-painted Rib type Roofing Sheets 64.00 m2

Rebars : 10mm dia. X 6m RSB 300.00 kgs

Forms 2.30 m2

Concrete 6.40 cu.m.

Sub-Total III

IV MOTORPOOL SHOP

Re-painting of Interior/Exterior Wall: Concrete 197.00 m2

Re-painting of Interior/Exterior: Steel Frames and Metal Sidings 680.00 m2

Sub-Total IV

V CARPENTRY BUILDING

Exterior:

Re-painting of Existing Exterior Wall: Concrete 450.00 m2

Re-painting of Existing Interior Wall: Concrete 360.00 m2

Re-painting of Existing Ceiling 390.00 m2

Re-painting of Existing Metal Roofings 1,000.00 m2

Remove existing Fascia Bd and replace with 12mm thk Hardie Senepa 114.00 lm.

Install New Ga. 24 Spandrel Ceiling Eaves 125.00 m2

Replace Existing 2-Leaf Wooden Door at the Entrance w/ Metal 1.00 set

Work Shop Area:

ANNEX BUILDING

TRACON - WAREHOUSE

Page 7: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Remove Old and Damage Roofing Sheets 490.00 m2

Structural Steel Framing (Painted Finish) 200.00 m2

Install New Ga. 24 Pre-painted Rib type Roofing Sheets 260.00 m2

Steel Framed Parking:

Structural Steel Framing (Painted Finish) 220.00 m2

Install New Ga. 24 Pre-painted Rib type Roofing Sheets 220.00 m2

Rebars : 10mm dia. X 6m RSB 1,040.00 kgs

Forms 4.60 m2

Concrete 22.00 cu.m.

Carpentry Office:

Remove existing and install new Drywall 126.00 m2

Painting of New Wall 126.00 m2

Remove existing and install new Gypsum Ceiling 70.00 m2

Painting of New Ceiling 70.00 m2

Replace Existing 1-Leaf Panel Door at the Entrance 1.00 set

Provision of Counter with Sink 1.00 set

New Comfort Room:

Remove existing Drywall and Install new CHB Wall 17.00 m2

Plastering 17.00 m2

Painting of New Wall 17.00 m2

1-Leaf Wooden Flush Door incl. accessories and Hardwares 1.00 set

Removal of Existing Floor Tiles 5.40 m2

Floor : 300mm x 300mm Ceramic Floor tiles 5.40 m2

Wall : 300mm x 300mm Ceramic Floor tiles 27.00 m2

Plumbing works incl. Fixtures

Sanitary 1.00 lot

Water Lines 1.00 lot

Toilet Fixtures 1.00 lot

Electrical Works

Fluorescent Lighting Fixture, Recessed Mounted Type, 7.00 sets

12"x48" with Aluminum Relector/Louver, 2 x 16 Watts LED

Fluorescent Tube, 220V, 60Hz (UL listed - with 5 years warranty)

1/2" dia. IMC/EMT pipes 32.00 pcs

1/2" dia. IMC/EMT pipes connector/coupling 32.00 pcs

Wire, # 12 or 3.5 mm2 THHN 260.00 mtrs

Wire, # 10 or 5.5 mm2 THHN 130.00 mtrs

Utility Box 2" x 4" 12.00 pcs

1/2" dia. Utility Box Connector 20.00 pcs

Octagonal Junction Box, deeptype with cover 5.00 pcs

Single Switch/2-gang 1.00 set

Duplex Convenience Outlet - Universal 3.00 sets

ACU Outlet 2.00 sets

Electrical tape, 3/4in width, black pvc plastic 5.00 rolls

Miscellaneous & Consumables Materials 1.00 lot

Sub-Total V

VI AIR ASIA BUILDING

Re-painting of Exterior Wall: Concrete 490.00 m2

Re-painting of Exterior: Metal Sidings 710.00 m2

Decorative Wall

Excavation 13.20 cu.m.

Backfill 6.00 cu.m.

Rebars 125.00 kgs

Forms 13.80 m2

Concrete 4.00 cu.m.

Page 8: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

5" CHB 138.00 m2

Plastering 220.00 m2

Ornaments/Landscapes 1.00 lot

Sub-Total VI

VII TRANSIENT BUILDING

Re-painting of Exterior Wall: Concrete 347.00 m2

Re-painting of Exterior: Metal Sidings 1,170.00 m2

Sub-Total VII

VIII CONTROL TOWER

Re-painting of Exterior Wall: Concrete 800.00 m2

Re-painting of LOGO 2.00 nos

Re-painting of Exterior: Steel Frames/Railings 33.00 m2

Remove existing 0.60 x 0.60 Steel Casement Windows to replace 9.00 sets

Install new 0.60 x 0.60 Awning type Window 9.00 sets

with 6mm thk. Temp. Glass on Alum. Powder coated Frame

Remove existing and install new aluminum 1.60 x 0.80 Window to replace 4.00 sets

Install new 1.60 x 0.80 Sliding Window 4.00 sets

with 6mm thk Temp. Glass on Alum. Powder coated Frame

Remove existing to install new IGU 55.00 m2

Install new IGU - Insulating Glass Unit 55.00 m2

Replace Existing 2-Leaf Door at the Entrance 1.00 set

Sub-Total VIII

IX SECURITY BUILDING

Re-painting of Exterior Wall: Concrete 770.00 m2

Remove existing and install new Drywall Partition 260.00 m2

Painting of New Wall 260.00 m2

Install New Gypsum Ceiling 320.00 m2

Painting of Gypsum Ceiling 320.00 m2

Replace Existing 2-Leaf Door at the Entrance 2.00 set

Replace Existing 1-Leaf Door at the Entrance 1.00 set

Sub-Total IX

X SECURITY LOUNGE

Exterior:

Re-painting of Existing Exterior Wall: Concrete 520.00 m2

Re-painting of Existing Interior Wall: Concrete 425.00 m2

Install New Gypsum Ceiling 450.31 m2

Painting of Gypsum Ceiling 450.31 m2

Replace Existing 2-Leaf Wooden Door at the Entrance w/ Metal 2.00 set

1-Leaf Wooden Flush Door incl. accessories and Hardwares 8.00 set

Remove existing and install new Drywall 128.80 m2

Painting of New Wall 257.60 m2

Replace Existing 1-Leaf Panel Door at the Entrance 4.00 set

Provision of Counter with Sink 2.00 set

Installation of 600mm x 600mm 204.40 m2

Homogeneous tiles

New Comfort Room:

Plastering 140.58 m2

Page 9: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Painting of New Wall 281.16 m2

Removal of Existing Floor Tiles 111.93 m2

Floor : 300mm x 300mm Ceramic Floor tiles 111.93 m2

Wall : 300mm x 300mm Ceramic Floor tiles 173.77 m2

Plumbing works incl. Fixtures

Sanitary 1.00 lot

Water Lines 1.00 lot

Toilet Fixtures 1.00 lot

Electrical Works

Fluorescent Lighting Fixture, Recessed Mounted Type, 7.00 sets

12"x48" with Aluminum Relector/Louver, 2 x 16 Watts LED

Fluorescent Tube, 220V, 60Hz (UL listed - with 5 years warranty)

1/2" dia. IMC/EMT pipes 95.00 pcs

1/2" dia. IMC/EMT pipes connector/coupling 95.00 pcs

Wire, # 12 or 3.5 mm2 THHN 1,000.00 mtrs

Wire, # 10 or 5.5 mm2 THHN 500.00 mtrs

Utility Box 2" x 4" 35.00 pcs

1/2" dia. Utility Box Connector 60.00 pcs

Octagonal Junction Box, deeptype with cover 20.00 pcs

Single Switch/2-gang 4.00 set

Duplex Convenience Outlet - Universal 9.00 sets

ACU Outlet 6.00 sets

Electrical tape, 3/4in width, black pvc plastic 20.00 rolls

Miscellaneous & Consumables Materials 1.00 lot

MECHANICAL WORKS

Supply & Installation of 2HP Inverter Window Type AIRCON Units 6.00 units

Sub-Total X

D RENOVATION OF CIAC GATES

I RENOVATION OF MAIN ENTRANCE GATE (GATE-1)

1.0 Road Widening

1.1 Removal & Relocation Works 1.00 lot

a. Demolish and Dispose off debris of existing

concrete curb, sidewalk, Concrete Fences and Wing walls.

b. Remove & re-locate affected trees,directional signages

& street lights.

c. Remove & turn-over to CIAC Property affected

Steel security fences, Gates and Signages.

1.2 Roadway Construction 1,260.00 m2

a. Road excavation 229.32 cu.m.

b. Sub-grade Preparation 764.40 m2

c. Sub-base coarse 114.66 cu.m.

d. Base coarse 114.66 cu.m.

e. Bituminous Prime coat, MC-70 764.40 m2

f. Bituminous Hot-mixed Asphalt (HMA) 197.60 M.T.

g. Curbs and Gutter 268.13 l.m.

h. Side walk 335.16 m2

i. Landscaping 1,038.45 m2

j. Stamped concrete 335.16 m2

k. Asphalt Overlay 753.75 M.T.

TOTAL C

Sub-Total 1.1

Page 10: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

m. Thermo paint for Pedestrian lanes and center lines 714.56 l.m.

1.3 Extension of existing Storm Drainage & Construct New

Concrete Wing Wall

a. Construct new R.C.P. and Concrete Wing Wall

1. Excavation 26.25 cu.m.

2. Formworks 31.50 m2

3. Concrete 4.20 cu.m.

4. Re-bars 239.40 kgs.

5. 600mm dia. Reinforced concrete pipe 15.75 pcs.

2.0 Improvement Works of Guard House

2.1 Finishing Works of Guard House

a. Painting works

1. Masonry (interior ) 52.50 m2

2. Ceiling 11.55 m2

b. Tile works 11.55 m2

c. Cladding works (Alum. Composite Panel)

1. Fascia 16.80 m2

2. Accent Facade Design 43.05 m2

3. Exterior Eaves Design 7.35 m2

4. Exterior Wall Design 47.25 m2

d. Ceiling works (16mm thk moisture resistant & 11.55 m2

fire-rated gypsum on metal framing)

e. Granite countertop 3.28 m2

f. Doors & Windows

1. W-1 (0.80 x 0.60) Sliding Glass on Powder Coated Frame 1.00 sets

2. W-2 (2.250 x 1.0) Awning Type 1.00 sets

3. D-1 (0.90 x 2.10) Glass Door on Powder Coated Frame with Fix Glass on both sides 2.00 sets

4. D-2 (0.60 x 2.10) Wooden Panel 1.00 sets

g. Landscaping 15.75 m2

2.2 Installation of Lightings & Power System:

Electrical Installation, Materials

and Consumables

Conduit

100mmØ RSC Pipe 20.00 pcs

25mmØ RSC Pipe 25.00 pcs

20mmØ EMT Pipe 308.00 pcs

20mmØ PVC Pipe 165.00 pcs

200mm² THHN Wire 46.14 lm

125mm² THHN Wire 128.46 lm

22mm² THHN Wire 15.38 lm

14mm² THHN Wire 74.27 lm

8.0mm² THHN Wire 265.62 lm

3.5mm² THHN Wire 3,779.22 lm

5.5mm² THHN Wire 426.67 lm

Main Feeder & Sub Feeder

Wires & Cables

Sub-Total 1.2

Sub-Total 1.3

Total 1.0

Sub-Total 2.1

Page 11: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Lighting Fixtures

LED streetlight fixture 120W, 85-277V, 60Hz, CCT: 3500 K 12.00 sets

Warm White, modular design or upgradeable/replaceable

LED modules (with 5 yrs warranty)

LED PAR/Spotlight Lighting Fixture, Ground Mounted Type, 9W 38.00 sets

Warm White, 90-305V, 60Hz, weather proof housing

(with 5 yrs warranty)

12” diameter LED Lowbay Lightings fixtures/luminaires 18W, 14.00 sets

90-305V, 60Hz, CCT: 5500 K daylight, aluminum reflector &

polycarbonate material (with 5 yrs warranty)

Weatherproof Lighting Fixture, Surface Mounted Type, 12" x 48", 28.00 sets

weather proof housing with 2 x 16 Watts Daylight LED Tube,

90-305V, 60Hz (with 5 yrs warranty)

6” diameter circular LED Panelight Fixture, Recessed Mounted 3.00 sets

Type, 9W Daylight, 90-305V, 60Hz, aluminum &

polycarbonate material (with 5 yrs warranty)

Outdoor/Weatherproof Signage LED Modules, with 3 LED's per 1,450.00 pcs

module, 1.2 W per module (0.4 W per chips), 12 Vdc,

IP67/Outdoor, Daylight, with strong double-sided adhesive

tape, Length: 2.7" to 3" per module (3 modules per foot)

(with 5 yrs warranty)

Driver for LED Modules, 12 Vdc, 100 W, IP67 (Outdoor), 18.00 pcs

50/60 Hz, Input voltage: 170Vac - 265Vac, Output voltage &

current: 12 Vdc / 8.33 A (with 5 yrs warranty)

Switches

One Gang Switch 2.00 pcs

Two Gang Switch 1.00 pcs

Three Gang Switch 3.00 pcs

Wiring Devices

Duplex Convinience Outlet (w/ grounding ) 6.00 sets

Weatherproof Duplex Convinience Outlet (w/ grounding ) 2.00 sets

Special Purpose, ACU Outlet 1.00 sets

Boxes

Utility Box 2" x 4" 90.00 pcs

Octagonal Junction Box, deeptype with cover 15.00 pcs

Panel Board

Main Panel Board (MPB) 1.00 assy

Main : 300AT, 250AF, 3P main center bolt on circuit breaker

Brs : 1 - 40AT, 50AF, 3P

1 - 250AT, 225AF, 3P

2 - 100AT, 100AF, 3P Spare

New Panel Board (NPB) for Lighting & Power 1.00 assy

Main : 250AT, 225AF, 3P main center bolt on circuit breaker

Brs : 8 - 20AT, 50AF, 3P

16- 20AT, 50AF, 2P

100mmØ or 4" dia.Service Entrance Cap 1.00 pc

Electrical tape, 3/4in width, black pvc plastic 50.00 rolls

Miscellaneous & Consumables Materials 1.00 lot

Sub-Total 2.2

Total 2.0

Page 12: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

3.0 CHB Fence, Steel Man Gate and Automated Sliding Gate

Automated Barriers and Bollards

3.1 CHB Fence, Shear Wall and Grills

a. Concrete Works (Foundation and Posts)

1. Excavation 68.40 cu.m.

2. Concrete 33.34 cum

3. Rebars 2,952.52 kgs

4. Forms 226.72 m2

b. Masonry Works -

1. CHB Masonry 140.83 m2

2. Plastering 180.26 m2

c. Steel Grills (2.75mW x 2.0mL) 36.00 sets

d. Stone Works 224.66 m2

3.2 Gates, Automated Sliding Gates, Barriers, Bollards and Walk Through Metal Detector

a. Steel Man Gate (750mmW x 2.05mH) 2.00 sets

b. Automated Sliding Gates (3.0mW x 2.1mH) 4.00 sets

c. Automated Barriers 4.00 sets

d. Automated Bollards 8.00 sets

e. Walk Through Metal Detector 1.00 set

4.0 Steel Framed Roof Shelter, Covered Walk & Waiting Shed

4.1 Waiting Shed

a. Concrete Works (Foundation and Pedestals, Lintel and Tie Beams)

1. Excavation 77.28 cu.m.

2. Concrete 23.04 cum

3. Rebars 2,470.46 kgs

4. Forms 98.68 m2

b. Masonry Works

1. CHB Masonry 119.70 m2

2. Plastering 203.70 m2

c. Finishes

1. Tileworks :400 x 400 Non Skid Tiles 34.19 m2

Toilet Floor :300 x 300 Non Skid Tiles

Toilet Wall :300 x 600 Polished Tiles

2. Ceiling works (16mm thk moisture resistant & 18.90 m2

fire-rated gypsum on metal framing)

3. Interior Paint 98.78 m2

4. Cladding works (Alum. Composite Panel) 106.05 m2

5. Toilet Fixtures : WC & Lav. 1.00 set

d. Plumbing

1. Water Lines 1.00 lot

2. Sanitary Lines 1.00 lot

4.2 Steel Framed Roof Shelter

a. Steel Strutures

1. Trusses, Purlins and Columns 231.08 m2

b. Thermal & Moisture Protection

1. Ga. 24 Pre-painted Rib type Curved Roof 231.08 m2

c. Finishes

1. 6" Wide Spandrel Ceiling 226.80 m2

2. Cladding works (Alum. Composite Panel) 111.86 m2

Sub-Total 3.1

Sub-Total 3.2

Total 3.0

Sub-Total 4.1

Page 13: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

d. Signages

1. CLARK INTERNATIONAL AIRPORT CORPORATION 1.00 lot

e. Plumbing

1. Storm Drain Pipes 90.30 lm

2. Catch Basin 19.00 pcs

4.3 Steel Framed Covered Walk

a. Concrete Works (Foundation and Pedestals, Lintel and Tie Beams)

1. Excavation 13.89 cu.m.

2. Concrete 5.84 cum

3. Rebars 700.47 kgs

4. Forms 56.70 m2

b. Steel Strutures

1. Trusses, Purlins and Columns, Painted Finish 247.02 m2

c. Thermal & Moisture Protection

1. Ga. 24 Pre-painted Rib type Curved Roof 247.02 m2

Sub-Total I

II NEW ENTRANCE / EXIT GATE AT C.O.B. (GATE-2)

1.0 New Road & Improvement of Existing Road

1.1 Removal & Relocation Works 1.00 lot

a. Demolish and Dispose off debris of existing

concrete curb, sidewalk.

b. Remove & re-locate affected trees,directional signages

& street lights.

c. Remove & turn-over to CIAC Property affected

Steel security fences, Gates and Signages.

1.2 Roadway Construction 1,099.00 m2

a. Road excavation 346.19 cu.m.

b. Sub-grade Preparation 1,153.95 m2

c. Sub-base coarse 173.09 cu.m.

d. Base coarse 173.09 cu.m.

e. Bituminous Prime coat, MC-70 1,153.95 m2

f. Bituminous Hot-mixed Asphalt (HMA) 298.30 M.T.

g. Curbs and Gutter 265.47 l.m.

h. Side walk 331.84 m2

i. Landscaping 474.60 m2

j. Stamped concrete 331.84 m2

k. Asphalt Overlay 386.78 M.T.

m. Thermo paint for Pedestrian lanes and center lines 318.22 l.m.

2.0 Construction of Guard House

2.1 Site Preparation

a. Cutting of existing pavement (saw cutting) 30.00 l.m.

b. Excavation 59.59 cu.m.

c. Backfill/Compaction 31.50 cu.m.

Total 4.0

Sub-Total 1.1

Sub-Total 1.2

Total 1.0

Sub-Total 4.2

Sub-Total 4.3

Page 14: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

d. Gravel bedding 2.10 cu.m.

2.2 Reinforcing Bars

a. Column Footing & Wall Footing 109.52 kgs.

b. Column , Pedestal & G. I. pipe Frames 471.66 kgs.

c. Beams & Canopy 206.12 kgs.

d. Slab on grade 105.74 kgs.

2.3 Concreting Works

a. Column Footing & Wall Footing 6.25 cu.m.

b. Column & Pedestal 3.25 cu.m.

c. Beams 1.58 cu.m.

d. Slab on grade 1.58 cu.m.

2.4 Formworks & Scaffolding 32.13 m2

2.5 Masonry Works

a. 5" CHB laying 66.31 m2

b. Plastering 54.57 m2

2.6 Concrete Roof Slab

1. Concrete 3.26 cum

2. Rebars 256.17 kgs

3. Forms & Scaffolds 25.83 m2

b. Water Proofing

1. Single Component, Solvent Free, 15.75 m2

Water Dispersed Vinyl Acetate-Ethylene

Copolymer Water Proofing Treatment

2.7 Finishing Works of Guard House

a. Painting works

1. Masonry (interior ) 52.50 m2

2. Ceiling 11.55 m2

3. Exterior Wall: 3 coats Latex Paint 52.29 m2

b. Tile works 26.84 m2

Toilet Floor :300 x 300 Non Skid Tiles

Toilet Wall :300 x 600 Polished Tiles

c. Wall Finishishes

1. Brick Finish Wall 50.40 m2

2. Plain Cement Finish 52.29 m2

3. Steel Bar Design 100.80 l.m.

d. Ceiling works (16mm thk moisture resistant & 11.55 m2

fire-rated gypsum on metal framing)

e. Granite countertop 3.28 m2

f. Doors & Windows

1. W-1 (0.80 x 0.60) Sliding Glass on Powder Coated Frame 4.00 sets

2. W-2 (2.250 x 1.0) Awning Type 1.00 sets

3. D-1 (0.90 x 2.10) Glass Door on Powder Coated Frame with Fix Glass on both sides 1.00 sets

4. D-2 (0.60 x 2.10) Wooden Panel 1.00 sets

g. Landscaping 15.75 m2

Sub-Total 2.2

Sub-Total 2.3

Sub-Total 2.4

Sub-Total 2.5

Sub-Total 2.6

Sub-Total 2.1

Page 15: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

e. Plumbing

1. Water Lines 1.00 lot

2. Sanitary Lines 1.00 lot

3. Toilet Fixtures : WC & Lav. 1.00 set

2.8 Installation of Lightings & Power System:

Electrical Installation, Materials

and Consumables

I

Conduit

60mmØ RSC Pipe 34.00 pcs

20mmØ PVC Pipe 16.00 pcs

20mmØ EMT Pipe 91.00 pcs

80mm² THHN Wire 200.00 lm

8.0mm² THHN Wire 100.00 lm

5.5mm² THHN Wire 51.39 lm

3.5mm² THHN Wire 4,503.25 lm

Lighting Fixtures

LED streetlight fixture 120W, 85-277V, 60Hz, CCT: 3500 K 12.00 sets

Warm White, modular design or upgradeable/replaceable

LED modules (with 5 yrs warranty)

35 ft. Single Arm Steel Post/Pole, with Base Plate, 12.00 sets

Anchor Bolt & Washer (Similar with the existing streetlights pole)

LED PAR/Spotlight Lighting Fixture, Ground Mounted Type, 9W 95.00 sets

Warm White, 90-305V, 60Hz, weather proof housing

(with 5 yrs warranty)

12” diameter LED Lowbay Lightings fixtures/luminaires 18W, 10.00 sets

90-305V, 60Hz, CCT: 5500 K daylight, aluminum reflector &

polycarbonate material (with 5 yrs warranty)

6” diameter circular LED Panelight Fixture, Recessed Mounted 2.00 sets

Type, 9W Daylight, 90-305V, 60Hz, aluminum &

polycarbonate material (with 5 yrs warranty)

3” diameter circular LED Panelight Fixture, Recessed Mounted 12.00 sets

Type, 6W Domelight, 90-305V, 60Hz, aluminum &

polycarbonate material (with 5 yrs warranty)

Fluorescent Lighting Fixtures, Recessed mounted 3.00 sets

with 2x8W LED tube, 90-305V, 60Hz, 1/8" Thick Polycarbonate

Diffuser (with 5 yrs warranty)

5W LED Square Type Outdoor Bollard Lights 36.00 sets

(with 5 yrs warranty)

Outdoor Wall/Post Mounted Lighting Fixture (White), 10.00 sets

Bulkhead-Oblong Type, 5.5W LED Bulb, 220 V, 60 Hz

(with 5 yrs warranty)

Outdoor/Weatherproof Signage LED Modules, with 3 LED's per 890.00 pcs

module, 1.2 W per module (0.4 W per chips), 12 Vdc,

IP67/Outdoor, Daylight, with strong double-sided adhesive

tape, Length: 2.7" to 3" per module (3 modules per foot)

(with 5 yrs warranty)

Main Feeder & Sub Feeder

Wires & Cables

Sub-Total 2.7

Page 16: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Driver for LED Modules, 12 Vdc, 100 W, IP67 (Outdoor), 12.00 pcs

50/60 Hz, Input voltage: 170Vac - 265Vac, Output voltage &

current: 12 Vdc / 8.33 A (with 5 yrs warranty)

Switches

One Gang Switch 1.00 pc

Two Gang Switch 5.00 pc

Three Gang Switch 1.00 pc

Wiring Devices

Duplex Convinience Outlet (w/ grounding ) 7.00 sets

Weatherproof Duplex Convinience Outlet (w/ grounding ) 4.00 sets

Boxes

Utility Box 2" x 4" 18.00 pcs

Octagonal Junction Box, deeptype with cover 190.00 pcs

Panel Board

Main Panel Board (MPB) 1.00 assy

Main : 200AT, 150AF, 3P main center bolt on circuit breaker

Brs : 16 - 20AT, 50AF, 2P

4 - 20AT, 50AF, 3P Spare

60mmØ Service Entrance Cap 1.00 pc

Electrical tape, 3/4in width, black pvc plastic 10.00 rolls

Miscellaneous & Consumables Materials 1.00 lot

3.0 CHB Fence, Steel Man Gate and Manually Operated

Sliding Gate and Automated Barriers & Bollards

3.1 CHB Fence, Wall and Grills

a. Concrete Works (Foundation and Posts)

1. Excavation 32.28 cu.m.

2. Concrete 35.83 cum

3. Rebars 3,075.98 kgs

4. Forms 218.57 m2

b. Masonry Works

1. CHB Masonry 159.65 m2

2. Plastering 185.61 m2

c. Steel Grills (2.75mW x 2.0mL, Painted Finish) 32.00 sets

d. Stone Works 210.67 m2

d. Brick Finish Wall 33.81 m2

3.2 Gates, and Automated Barriers & Bollards

d. Steel Man Gate (750mmW x 2.05mH) 2.00 sets

e. Manual Type Sliding Gates (3.0mW x 2.4mH) 2.00 sets

f. Automated Barriers 2.00 sets

g. Automated Bollards 4.00 sets

Sub-Total 3.1

Sub-Total 3.2

Total 3.0

Sub-Total 2.8

Total 2.0

Page 17: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

4.0 Reinforced Concrete Roof Shelter, Waiting Shed & Vertical Steel Tubes

4.1 Waiting Shed

a. Concrete Works (Foundation and Pedestals, Lintel and Tie Beams)

1. Excavation 112.56 cu.m.

2. Concrete 45.33 cum

3. Rebars 3,521.91 kgs

4. Forms 237.20 m2

b. Masonry Works

1. CHB Masonry 119.70 m2

2. Plastering 203.70 m2

c. Finishes

1. Tileworks :400 x 400 Non Skid Tiles 18.90 m2

2. Ceiling works (16mm thk moisture resistant & 18.90 m2

fire-rated gypsum on metal framing)

3. Interior Paint 98.78 m2

4. Exterior Wall: Plain Cement Finish 106.05 m2

5. Exterior Wall: 3 coats Latex Paint 106.05 m2

4.2 Reinforced Concrete Roof Shelter (Slab)

a. R.C. Slab

1. Concrete 25.31 cum

2. Rebars 3,334.82 kgs

3. Forms & Scaffolds 149.13 m2

b. Water Proofing

1. Single Component, Solvent Free, 141.04 m2

Water Dispersed Vinyl Acetate-Ethylene

Copolymer Water Proofing Treatment

c. Finishes

1. Plain Cement Finish (Rubbed Concrete) 149.13 m2

2. Exterior Wall: 3 coats Latex Paint 149.13 m2

d. Signages

1. CLARK INTERNATIONAL AIRPORT CORPORATION 1.00 lot

e. Plumbing

1. Storm Drain Pipes 103.85 lm

2. Catch Basin 20.00 pcs

4.3 Vertical Steel Tubes Painted with CIAC Colors

a. Concrete Works (Foundation and Pedestals)

1. Excavation 3.40 cu.m.

2. Concrete 1.23 cum

3. Rebars 101.44 kgs

4. Forms 8.10 m2

b. Steel Structures (Painted Finish)

1. 300 x 300 Steel Tubulars, Plates & Anchors 4.00 set

Sub-Total II

III IMPROVEMENT OF AIRSIDE GATES (GATES - 4, 5 & 8)

1.0 Road Improvement

1.1 Removal & Relocation Works 1.00 lot

a. Demolish and Dispose off debris of existing

concrete curb, sidewalk, Concrete Fences and Wing walls.

Total 4.0

Sub-Total 1.1

Sub-Total 4.1

Sub-Total 4.2

Sub-Total 4.3

Page 18: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

1.2 Roadway Construction

a. Asphalt Overlay 130.28 M.T.

b. Thermo paint for Pedestrian lanes and center lines 141.75 l.m.

c. Landscaping 37.80 m2

2.0 Construction of Guard House 4,5,8 (2.0 x 3.0)

2.1 Site Preparation

a. Cutting of existing pavement (saw cutting) 15.00 l.m.

b. Excavation 15.28 cu.m.

c. Backfill/Compaction 6.11 cu.m.

d. Gravel bedding 1.25 cu.m.

2.2 Reinforcing Bars

a. Column Footing & Wall Footing 255.69 kgs.

b. Column 456.39 kgs.

c. Beams & Canopy 243.19 kgs.

d. Slab on grade 128.07 kgs.

2.3 Concreting Works

a. Column Footing & Wall Footing 4.06 cu.m.

b. Column & Pedestal 3.02 cu.m.

c. Beams 1.89 cu.m.

d. Slab on grade 1.89 cu.m.

2.4 Formworks & Scaffolding 55.44 m2

2.5 Masonry Works

a. 5" CHB laying 120.71 m2

b. Plastering 203.62 m2

2.6 Thermal & Moisture Protection

1. Steel Roof Frame 600.64 kgs

2. Ga. 24 Pre-painted Rib type Roof 60.70 sq.m.

2.7 Finishing Works of Guard House

a. Painting works

1. Masonry (interior ) 203.62 sq.m.

2. Ceiling 18.90 sq.m.

3. Exterior Wall: 3 coats Latex Paint 203.62 sq.m.

b. Tile works: 300 x 300 Non Skid Tiles 18.90 sq.m.

c. Ceiling works (16mm thk moisture resistant & 18.90 sq.m.

fire-rated gypsum on metal framing)

f. Doors & Windows

1. W-1 (0.80 x 0.60) Sliding Glass on Powder Coated Frame 6.00 sets

Sub-Total 2.2

Sub-Total 2.3

Sub-Total 2.4

Sub-Total 2.5

Sub-Total 2.6

Sub-Total 2.7

Sub-Total 1.2

Total 1.0

Sub-Total 2.1

Page 19: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

2.8 Installation of Lightings & Power System:

Electrical Installation, Materials

and Consumables

I

Conduit

40mmØ RSC Pipe 34.00 pcs

20mmØ EMT Pipe 30.00 pcs

20mmØ PVC Pipe 25.00 pcs

30mm² THHN Wire 200.00 lm

5.5mm² THHN Wire 206.50 lm

3.5mm² THHN Wire 258.88 lm

Lighting Fixtures

6” diameter circular LED Panelight Fixture, Recessed Mounted 3.00 sets

Type, 9W Daylight, 90-305V, 60Hz, aluminum &

polycarbonate material (with 5 yrs warranty)

Outdoor/Weatherproof Signage LED Modules, with 3 LED's per 224.00 pcs

module, 1.2 W per module (0.4 W per chips), 12 Vdc,

IP67/Outdoor, Daylight, with strong double-sided adhesive

tape, Length: 2.7" to 3" per module (3 modules per foot)

(with 5 yrs warranty)

Driver for LED Modules, 12 Vdc, 100 W, IP67 (Outdoor), 3.00 pcs

50/60 Hz, Input voltage: 170Vac - 265Vac, Output voltage &

current: 12 Vdc / 8.33 A (with 5 yrs warranty)

Outdoor Wall/Post Mounted Lighting Fixture (White), 5.00 sets

Bulkhead-Oblong Type, 5.5W LED Bulb, 220 V, 60 Hz

(with 5 yrs warranty)

Switches

Three Gang Switch 1.00 pc

Wiring Devices

Duplex Convinience Outlet (w/ grounding ) 5.00 sets

Boxes

Utility Box 2" x 4" 6.00 pcs

Octagonal Junction Box, deeptype with cover 10.00 pcs

Panel Board

Main Panel Board (MPB) 1.00 assy

Main : 100AT, 100AF, 3P main center bolt on circuit breaker

Brs : 6 - 20AT, 50AF, 2P

4 - 20AT, 50AF, 3P

40mmØ Service Entrance Cap 1.00 pc

Electrical tape, 3/4in width, black pvc plastic 10.00 rolls

Miscellaneous & Consumables Materials 1.00 lot

Main Feeder & Sub Feeder

Wires & Cables

Sub-Total 2.8

Total 2.0

Page 20: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

3.0 Manually Operated Sliding Gate, Automated Barriers, Bollards and Walk Through Metal Detectors

3.1 Gates, Automated Barriers, Bollards and Walk Through Metal Detectors

a. Steel Man Gate (750mmW x 2.05mH) 2.00 sets

b. Manual Type Sliding Gates (4.0mW x 2.4mH) 6.00 sets

c. Automated Barriers 6.00 sets

d. Automated Bollards 12.00 sets

e. Walk Through Metal Detector 3.00 set

Sub-Total III

IV IMPROVEMENT OF LANDSIDE GATES (GATES - 6 & 13)

1.0 Road Improvement

1.1. Roadway Construction

a. Asphalt Overlay 217.14 M.T.

b. Thermo paint for Pedestrian lanes and center lines 252.00 l.m.

c. Landscaping 25.20 m2

2.0 Construction of Guard House 6&13 (2.0 x 3.0)

2.1 Site Preparation

a. Cutting of existing pavement (saw cutting) 12.00 l.m.

b. Excavation 10.19 cu.m.

c. Backfill/Compaction 4.07 cu.m.

d. Gravel bedding 0.84 cu.m.

2.2 Reinforcing Bars

a. Column Footing & Wall Footing 170.46 kgs.

b. Column 304.26 kgs.

c. Beams & Canopy 162.13 kgs.

d. Slab on grade 85.38 kgs.

2.3 Concreting Works

a. Column Footing & Wall Footing 2.71 cu.m.

b. Column & Pedestal 2.02 cu.m.

c. Beams 1.26 cu.m.

d. Slab on grade 1.26 cu.m.

2.4 Formworks & Scaffolding 36.96 m2

2.5 Masonry Works

a. 5" CHB laying 80.47 m2

b. Plastering 135.74 m2

2.6 Thermal & Moisture Protection

1. Steel Roof Frame 400.43 kgs

Sub-Total 2.3

Sub-Total 2.4

Sub-Total 2.5

Sub-Total 3.1

Total 3.0

Sub-Total 1.1

Total 1.0

Sub-Total 2.1

Sub-Total 2.2

Page 21: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

2. Ga. 24 Pre-painted Rib type Roof 40.46 m2

2.7 Finishing Works of Guard House

a. Painting works

1. Masonry (interior ) 135.74 m2

2. Ceiling 12.60 m2

3. Exterior Wall: 3 coats Latex Paint 135.74 m2

b. Tile works: 300 x 300 Non Skid Tiles 12.60 m2

c. Ceiling works (16mm thk moisture resistant & 12.60 m2

fire-rated gypsum on metal framing)

f. Doors & Windows

1. W-1 (0.80 x 0.60) Sliding Glass on Powder Coated Frame 4.00 sets

2.8 Installation of Lightings & Power System:

Electrical Installation, Materials

and Consumables

I

Conduit

25mmØ RSC Pipe 34.00 pcs

20mmØ EMT Pipe 42.00 pcs

14mm² THHN Wire 200.00 lm

5.5mm² THHN Wire 100.00 lm

3.5mm² THHN Wire 372.19 lm

Lighting Fixtures

6” diameter circular LED Panelight Fixture, Recessed Mounted 4.00 sets

Type, 9W Daylight, 90-305V, 60Hz, aluminum &

polycarbonate material (with 5 yrs warranty)

Outdoor/Weatherproof Signage LED Modules, with 3 LED's per 224.00 pcs

module, 1.2 W per module (0.4 W per chips), 12 Vdc,

IP67/Outdoor, Daylight, with strong double-sided adhesive

tape, Length: 2.7" to 3" per module (3 modules per foot)

(with 5 yrs warranty)

Driver for LED Modules, 12 Vdc, 100 W, IP67 (Outdoor), 3.00 pcs

50/60 Hz, Input voltage: 170Vac - 265Vac, Output voltage &

current: 12 Vdc / 8.33 A (with 5 yrs warranty)

Outdoor Wall/Post Mounted Lighting Fixture (White), 5.00 sets

Bulkhead-Oblong Type, 5.5W LED Bulb, 220 V, 60 Hz

(with 5 yrs warranty)

Switches

Three Gang Switch 1.00 pc

Wiring Devices

Duplex Convinience Outlet (w/ grounding ) 7.00 sets

Boxes

Utility Box 2" x 4" 8.00 pcs

Octagonal Junction Box, deeptype with cover 10.00 pcs

Wires & Cables

Sub-Total 2.6

Sub-Total 2.7

Main Feeder & Sub Feeder

Page 22: BILL OF QUANTITIES - Clark International Airportcrk.clarkairport.com/files/11/Landside Fac BOQ-Final.pdf · Item Amount No. (PhP) A Mobilization / Demobilization 1.00 l.s. Permit,

Panel Board

Main Panel Board (MPB) 1.00 assy

Main : 50AT, 50AF, 3P main center bolt on circuit breaker

Brs : 5 - 20AT, 50AF, 2P

1 - 20AT, 50AF, 2P Spare

25mmØ Service Entrance Cap 1.00 pc

Electrical tape, 3/4in width, black pvc plastic 10.00 rolls

Miscellaneous & Consumables Materials 1.00 lot

3.0 Manually Operated Sliding Gate

3.1 Gate

a. Manual Type Sliding Gates (5.0mW x 2.4mH) 4.00 sets

Sub-Total IV

E LANDSCAPING

I Landscaping in front of International Pre-Departure Area 160.00 m2

II Ornaments/Landscapes @ AIR ASIA BLDG. 133.33 m2

III Landscaping @ Gate 1, New Gate, Airside and Landside Gates 1576.05 m2

TOTAL BID AMOUNT : _____________________________________________________________________

BID AMOUNT IN WORDS: ___________________________________________________________________

_________________________________________________________________________________________

Name of Bidder's Authorized Representative: __________________________________________________

Position/Designation: ____________________________________________

Total 3.0

TOTAL D

GRAND TOTAL A+B+C+D+E

TOTAL PROJECT COST

Sub-Total 2.8

Total 2.0

Sub-Total 3.1