AccuracyBIM Level 0

Meta-data

Interoperability

Level of Detail

Generalisation BIM Level 2 Geo Enabled

RISK

COSTCLASH

REWORK

BIM Level 1

Quantitatively Managed

Quantitatively Managed

Defined

Defined

Managed

DELAY

Page 3: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2

Accuracy - Andrew Evans

Geo Enabling BIM Level 2

Page 4: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Accuracy - Overview

Andrew EvansTopcon

Key Issues / considerations / challenges• Accuracy underpins traceability of BIM

process and decisions• Accuracy is understood by surveyors but it

needs to be communicated to People and Systems in BIM

Page 5: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Accuracy – Maturity

Effort needed to support BIM Level 2

Stage 1Initial

Stage 2Managed

Stage 3Defined

Stage 4Quantitatively

Managed

Stage 5Optimising

Processes unpredictable,

Poorly controlled and reactive

Processes unpredictable,

Poorly controlled and reactive

Processes characterised for projects and is often reactive

Processes characterised for projects and is often reactive

Processes characterised for the organisation and is proactive

Processes characterised for the organisation and is proactive

Processes measured

and controlled

Processes measured

and controlled

OptimisationOptimisation

UK BIM Here

Geo Enabled

Page 6: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Accuracy – Road Map

Required here Backlog

“BIM Maturity Model” , Mark Bew and Mervyn Richards ©

What are the

Challenges ?

Page 7: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Accuracy – Actions

Headline Action Opportunity Required Engagement

Carry out a controlled test Internal

Carry out a survey Internal

Collate existing forum/group activity Internal

Collate existing standards Internal

Create internal workgroup solution / proposal Internal

Join and influence existing forum/ group External

Produce case study Internal

Produce guidance Internal

Set challenge for software house External

Develop a detailed Road Map Internal

Yes

Yes

Yes

Yes

Yes

Yes

Page 8: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Accuracy – Action Who/What first ?

Priorities for call to action

1. Establish internal group to define best standard for consistent accuracy unit

2. Work with OGC to establish common approach to accuracy meta-data and attribution

Page 9: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2

Meta Data – Mark King

Geo Enabling BIM Level 2

Page 10: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Meta Data - Overview

Mark KingLeica

Key Issues / considerations / challenges• Lack of understanding and use of metadata

standards within the BIM industry

• Current metadata standards, such as Gemini v2.2, may not be suitable / enabled for use with survey and Survey4BIM

Page 11: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Meta Data – Maturity

Effort needed to support BIM Level 2

Stage 1Initial

Stage 2Managed

Stage 3Defined

Stage 4Quantitatively

Managed

Stage 5Optimising

Processes unpredictable,

Poorly controlled and reactive

Processes unpredictable,

Poorly controlled and reactive

Processes characterised for projects and is often reactive

Processes characterised for projects and is often reactive

Processes characterised for the organisation and is proactive

Processes characterised for the organisation and is proactive

Processes measured

and controlled

Processes measured

and controlled

OptimisationOptimisation

UK BIM Here

Geo Enabled

Page 12: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Meta Data – Road Map

Required here Backlog

“BIM Maturity Model” , Mark Bew and Mervyn Richards ©

What are the

Challenges ?

Page 13: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Meta Data – Actions

Headline Action Opportunity Required Engagement

Carry out a controlled test Internal

Carry out a survey Internal

Collate existing forum/group activity Internal

Collate existing standards Internal

Create internal workgroup solution / proposal Internal

Join and influence existing forum/ group External

Produce case study Internal

Produce guidance Internal

Set challenge for software house External

Develop a detailed Road Map Internal

Yes

Yes

Yes

Yes

Yes

Page 14: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Meta Data – Actions

Priorities for call to action

1. Assess the details, feasibility and suitability of Gemini as a common standard as well as gap analsysis to upgrade if appropriate

2. Become involved with the BSI IST36 Standards Committee which is about to begin an assessment of the Gemini standard for a planned release of v2.3 in early 2016

Page 15: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2

Interoperability – Mark Lawton

Geo Enabling BIM Level 2

Page 16: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Interoperability - Overview

Mark LawtonSkanska

Key Issues / considerations / challenges• Different file formats exchange capability

Degradation of data and inability to add data.

• Different coordinate system translationThe technology of the capture device as evolved faster than the knowledge of the user.

Page 17: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Interoperability – Maturity

Effort needed to support BIM Level 2

Stage 1Initial

Stage 2Managed

Stage 3Defined

Stage 4Quantitatively

Managed

Stage 5Optimising

Processes unpredictable,

Poorly controlled and reactive

Processes unpredictable,

Poorly controlled and reactive

Processes characterised for projects and is often reactive

Processes characterised for projects and is often reactive

Processes characterised for the organisation and is proactive

Processes characterised for the organisation and is proactive

Processes measured

and controlled

Processes measured

and controlled

OptimisationOptimisation

UK BIM Here

Geo Enabled

Page 18: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Interoperability – Road Map

Required here Backlog

“BIM Maturity Model” , Mark Bew and Mervyn Richards ©

What are the

Challenges ?

Page 19: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Interoperability – Actions

Headline Action Opportunity Required Engagement

Carry out a controlled test Internal

Carry out a survey Internal

Collate existing forum/group activity Internal

Collate existing standards Internal

Create internal workgroup solution / proposal Internal

Join and influence existing forum/ group External

Produce case study Internal

Produce guidance Internal

Set challenge for software house External

Develop a detailed Road Map Internal

Yes

Yes

Yes

Yes

Yes

Page 20: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Interoperability – Action Who/What first ?

Priorities for call to action

1. Set a challenge to the software houses

2. Produce self driven case study with impact assessment (i.e. rail alignment) on the same challenge

BGleeson
Set challenge to technology alliance and OGC /Smartcities forums- get them to fund/support our input
BGleeson
develop use case with Open Forum - rather than internal action
Page 21: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2

Level of Detail – Martin Penney

Geo Enabling BIM Level 2

Page 22: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Level of Detail - Overview

Martin PenneyTechnics

Key Issues / considerations / challenges• Variance in Definitions

• Graphical representation of as-built data is not the same as design representation

Page 23: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Level of Detail – Maturity

Effort needed to support BIM Level 2

Stage 1Initial

Stage 2Managed

Stage 3Defined

Stage 4Quantitatively

Managed

Stage 5Optimising

Processes unpredictable,

Poorly controlled and reactive

Processes unpredictable,

Poorly controlled and reactive

Processes characterised for projects and is often reactive

Processes characterised for projects and is often reactive

Processes characterised for the organisation and is proactive

Processes characterised for the organisation and is proactive

Processes measured

and controlled

Processes measured

and controlled

OptimisationOptimisation

UK BIM Here

Geo Enabled

Page 24: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Level of Detail – Road Map

“BIM Maturity Model” , Mark Bew and Mervyn Richards ©

What are the

Challenges ?

Required here

Page 25: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Level of Detail – Actions

Headline Action Opportunity Required Engagement

Carry out a controlled test Internal

Carry out a survey Internal

Collate existing forum/group activity Internal

Collate existing standards Internal

Create internal workgroup solution / proposal Internal

Join and influence existing forum/ group External

Produce case study Internal

Produce guidance Internal

Set challenge for software house External

Develop a detailed Road Map Internal

Yes

Yes

Yes

Yes

Yes

Yes

Page 26: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Level of Detail – Action Who/What first ?

Priorities for call to action

1. Identify which Industry groups & forums lead this development & current standards

2. Setup a workgroup within the survey community to address the geospatial concerns impacted by variances of LoD definition

BGleeson
BS Task Group looking at Level of Detail and Level of Information - to find unifying standard Chris Preston - Asset Information Companies - looking at their needs - risk we could open the word Focus on generic -
Page 27: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2

Generalization – Simon Navin

Geo Enabling BIM Level 2

Page 28: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Generalisation - Overview

Simon NavinOrdnance Survey

Key Issues / considerations / challenges• The representation of 2D/3D data while

maintaining geometric integrity and recognisable context

• The capability of the user to recognise and interpret generalised data and utilise it accordingly

Page 29: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Generalisation – Maturity

Effort needed to support BIM Level 2

Stage 1Initial

Stage 2Managed

Stage 3Defined

Stage 4Quantitatively

Managed

Stage 5Optimising

Processes unpredictable,

Poorly controlled and reactive

Processes unpredictable,

Poorly controlled and reactive

Processes characterised for projects and is often reactive

Processes characterised for projects and is often reactive

Processes characterised for the organisation and is proactive

Processes characterised for the organisation and is proactive

Processes measured

and controlled

Processes measured

and controlled

OptimisationOptimisation

CAD Here

GIS Here

CGI Here

Page 30: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Generalisation – Road Map

“BIM Maturity Model” , Mark Bew and Mervyn Richards ©

Required here

What are the

Challenges ?

Page 31: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Generalisation – Actions

Headline Action Opportunity Required Engagement

Carry out a controlled test Internal

Carry out a survey Internal

Collate existing forum/group activity Internal

Collate existing standards Internal

Create internal workgroup solution / proposal Internal

Join and influence existing forum/ group External

Produce case study Internal

Produce guidance Internal

Set challenge for software house External

Develop a detailed Road Map Internal

Yes

Yes

Yes

Yes

Yes

Yes

Page 32: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Generalisation – Action Who/What first ?

Priorities for call to action

1. Collate available standards from Industry and Professional organisations and BIM software vendors on how they currently support generalisation

2. Identify and engage 3D specialists outside of the direct construction community who specialise in generalising data for visualisation, gaming etc……

3. Determine use cases and examples of outputs generalized for user benefit – and end user services – (interpretable, safe decisions, good service- branding of generalised services (which may be products but may be broader)

Page 33: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2

Next Steps – What do you think

Geo Enabling BIM Level 2

Page 34: Big5 Geospatial Challenges to Geo Enable BIM Level 2.

Big5 Geospatial Challenges to Geo Enable BIM Level 2Actions – Summary – What next / first

Headline Action Opportunity AccuracyInteropera

bilityMeta Data

Level of Detail

Generalisation

Resource Support

Carry out a controlled testYes Internal

Carry out surveyYes Yes Yes Internal

Collate existing forum/group activity

Yes Yes Yes Internal

Collate existing standardsYes Yes Yes Yes Yes Internal

Create Internal Workgroup Solution / Proposal

Yes Yes Yes Yes Internal

Join and Influence existing forum/ group

Yes Yes Yes Yes External

Produce case studyYes Internal

Produce GuidanceYes Yes Yes Internal

Set challenge for software house

Yes Yes External

Develop a detailed Road MapYes Internal