Big River
1
JUNE 2011 BIG RIVER Sun Mon Tue Wed Thu Fri Sat 1 2 Read through 3 4 5 6 Group songs 7 Group songs 8 9 Solos/duets 10 11 12 13 Solos/duets 14 Act I Blocking 15 16 Act I Blocking 17 18 19 20 Act II Blocking 21 Act II Blocking 22 23 Addt’l Blocking 24 25 26 27 Full run 28 All music 29 30 Run Act I Producon Stage Manager Sara Gonzalez (903) 253-2923 [email protected] Note: All rehearsals are from 7-9 PM unless otherwise noted. Dates, mes, and actors called are subject to change.
-
Upload
sara-gonzalez -
Category
Documents
-
view
216 -
download
2
description
June 2011 Calendar
Transcript of Big River
JUNE 2011
BIG RIVER
Sun Mon Tue Wed Thu Fri Sat
1 2 Read through
3
4
5 6 Group songs
7 Group songs
8 9 Solos/duets
10 11
12 13 Solos/duets
14 Act I Blocking
15 16 Act I Blocking
17 18
19 20 Act II Blocking
21 Act II Blocking
22 23 Addt’l Blocking
24 25
26 27 Full run
28 All music
29 30 Run Act I
Production Stage Manager Sara Gonzalez
(903) 253-2923 [email protected]
Note: All rehearsals are from 7-9 PM unless otherwise noted. Dates, times, and actors called are subject to change.