BIEN PHAP THI CONG BE THAN TRU (TM)
-
Upload
buivantien -
Category
Documents
-
view
23 -
download
9
description
Transcript of BIEN PHAP THI CONG BE THAN TRU (TM)
-
Part 1/ Phn 1: Check larsen sheet/ Kim ton vng vy cc vn thp
I. Input data:
1. Geological Data:
Active dact
Passive dpass
1 Top 0,00
3Soil layer in riverside 1A
19,00 15,25 15,1 7,79 3,95 - 2,63 2,63
4Soil layer in riverside 2A
18,7 19,40 12,10 - 8,07 8,07
2. Characterized geometry of steel sheet pile
Section area (m2)
Unit weight (kg/m)
Momen of intertia Jx
(cm4)
Momen of intertia
Jx(cm4/m)
Resist bending moment
Wx(cm3)
Resist bending moment
Wx(cm3/m)
1 Larxen IV - 74,00 4.670,00 38.600,00 362,00 2.270,00
Symbol Value (m) Notes
C1 +2,50
C2 +3,00
C3 -9,00
3. Construction load
3.1. Load of crane
- Use crane with capacity 50 Ton:
Self weight Q: 40,47T
The area of Steelplate 6x2x1 on the movement of cranes: 12,00m2
Load strip of crane qc: 3,37T/m2
3.2. Loads of people and small construction equipment
Standard 22TCN200-1989:
png = 0,200T/m2
3.3. Total of construction load
p =qc*1m+ png= 3,573T/m2
= 35,73kN/m2
II. Calculation results.
Result analysis of Geo5 - sheeting design:
Construction Stage disadvantage: Install of steel sheet piling and pump sand.
Length of steel sheet pile L =
Maximum of momen: Mmax =
Maximum of shear: Qmax =
Steel sheet pile
Elevations construction table
CENTRAL MEKONG DELTA CONNECTIVITY PROJECT
No. NameThe top
levelThin
Unit weight g (kN/m3)
Cohesion of soil c (kPa)
Angle of internal
friction j
TT Item Type
Deformation modulus E
(Mpa)
Friction angle
PACKAGE: CW2C (KM18+200-KM23+450)
CHAPTER 1: CALCULATION OF SUPPORTING FRAME/ TNH TON KHUNG TNG THI CNG TR
Description
Elevation of design
Top of the steel sheet pile
Bottom of the steel sheet pile
50,64kN/m
12,00m
18,22kN.m/m
-
III. Check:
Check for steel sheet pile:
Check for strength:
with:
Maximum of momen: Mmax =
Resist bending moment : Wx =
Allowable stresses: [] =
Maximum of stresses :
Check
182200 kg.cm/m
2270 cm3/m
1900 kg/cm2
Mmax/Wx= 80,26 kg/cm2
ok
max
W ox
MR
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------
Xt trn 1m chiu di vnh ai khung chng ta c ti trng tc dng ln khung chng l ti trng di uc gi tr.
q = V1/1m = 142.29/1 142,29 (kg/cm)
S dng chng trnh tnh ton Midas 2006 phin bn 7.0.1 tnh ton gi tr ni lc trong cc thanhkhung chng ta c.
Part 2/ Phn 2: Check capicity of supporting frame/ Kim tra kh nng chu lc ca h khung chng.
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------
M
hnh
khu
ng c
hng
ch
u p
lc
ca
ti t
rng
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------
Biu
m
men
do
ti t
rng
gy
ra.
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------
Biu
lc
ct d
o t
i tr
ng g
y ra
. Bi
u
l
c d
c do
ti t
rng
gy
ra.
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------
Biu
lc
ct d
o t
i tr
ng g
y ra
.
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------
+ Kim tra kh nng chu lc ca thanh khung chng T1: H400x400x13x21mmS dng phn mm Midas 2006 phin bn 7.0.1 tnh ton ta c gi tr ni lc trong thanh T1:Gi tr momen ln nht: Mmax = 2591937,1 (kg.cm)= 25,92 (T.m)
Gi tr lc dc trc ln nht: Nmax = 48471,9 (kg)= 48,47 (T)
Gi tr lc ct ln nht: Qmax = 40180,4 (kg)= 40,18 (T)
Kim tra kh nng chu un.
max = 1.000,00 (kg/cm2) < Ru = 1900 (kg/cm2)
t
Trong : Ru: Cng ca thp khi chu un.F: Din tch tit din ca thanh T1
Wx : M un khng un ca tit din thanh T1Kim tra kh nng chu ct.
= 835,35 (kg/cm2) < Rc = 1300 (kg/cm2)
Trong : Sc =1800cm3: M men tnh ca 1/2 tit din thanh T1I=6660cm4: M men qun tnh ca tit din thanh T1b = 1.3cm: B dy bn bng tit din thanh T1
Rc =1300 kg/cm2: Cng ca thp khi chu ct+ Kim tra kh nng chu lc ca thanh khung chng T2: H300x300x10x15mm
S dng phn mm Midas 2006 phin bn 7.0.1 tnh ton ta c gi tr ni lc trong thanh T2:Gi tr momen ln nht: Mmax = 1276686,1 (kg.cm)= 12,77 (T.m)
Gi tr lc dc trc ln nht: Nmax = 48481,7 (kg)= 48,48 (T)
Gi tr lc ct ln nht: Qmax = 21963,1 (kg)= 21,96 (T)
Kim tra kh nng chu un.
max = 1.343,43 (kg/cm2) < Ru = 1900 (kg/cm2)
t
Trong : Ru: Cng ca thp khi chu un.F: Din tch tit din ca thanh T2
Wx : M un khng un ca tit din thanh T2Kim tra kh nng chu ct.
= 788,41 (kg/cm2) < Rc = 1300 (kg/cm2)
Trong : Sc =732.3cm3: M men tnh ca 1/2 tit din thanh T2I=20400cm4: M men qun tnh ca tit din thanh T2
b = 1.0cm: B dy bn bng tit din thanh T2
Rc =1300 kg/cm2: Cng ca thp khi chu ct+ Kim tra kh nng chu lc ca thanh khung chng T3: H300x300x10x15mm
S dng phn mm Midas 2006 phin bn 7.0.1 tnh ton ta c gi tr ni lc trong thanh T3:Gi tr momen ln nht: Mmax = 317556,6 (kg.cm)= 3,18 (T.m)
Gi tr lc dc trc ln nht: Nmax = 26625,6 (kg)= 26,63 (T)
Gi tr lc ct ln nht: Qmax = 2478,8 (kg)= 2,48 (T)
Kim tra kh nng chu un.
xW
M
F
N maxmaxmax
b
c
I
SQ
d
.
.maxmax
xW
M
F
N maxmaxmax
b
c
I
SQ
d
.
.maxmax
xW
M
F
N maxmaxmax
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------
max = 455,75 (kg/cm2) < Ru = 1900 (kg/cm2)
t
Trong : Ru: Cng ca thp khi chu un.F: Din tch tit din ca thanh T3
Wx : M un khng un ca tit din thanh T3Kim tra kh nng chu ct.
= 88,98 (kg/cm2) < Rc = 1300 (kg/cm2)
Trong : Sc =732.3cm3: M men tnh ca 1/2 tit din thanh T3I=20400cm4: M men qun tnh ca tit din thanh T3
b = 1.0cm: B dy bn bng tit din thanh T3
Rc =1300 kg/cm2: Cng ca thp khi chu ct+ Kim tra kh nng chu lc ca thanh khung chng T4: H300x300x10x15mm
S dng phn mm Midas 2006 phin bn 7.0.1 tnh ton ta c gi tr ni lc trong thanh T4:Gi tr momen ln nht: Mmax = 25759,2 (kg.cm)= 0,26 (T.m)
Gi tr lc dc trc ln nht: Nmax = 49229,6 (kg)= 49,23 (T)
Gi tr lc ct ln nht: Qmax = 182,1 (kg)= 0,18 (T)
Kim tra kh nng chu un.
max = 429,87 (kg/cm2) < Ru = 1900 (kg/cm2)
t
Trong : Ru: Cng ca thp khi chu un.F: Din tch tit din ca thanh T4
Wx : M un khng un ca tit din thanh T4Kt lun:Vng vy cc vn thp Larsen IV, L = 12m v h khung chng m bo iu kin n nh v kh nng chu lc
xW
M
F
N maxmaxmax
b
c
I
SQ
d
.
.maxmax
xW
M
F
N maxmaxmax
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
CHAPTER II. CALCULATE FORMWORK/ TNH TON VN KHUN
Item: Pier P9 -:- P14
I. Tnh ton vn khun thi cng b tr1. B tr chung vn khun, Cu to vn khun.
CENTRAL MEKONG DELTA CONNECTIVITY PROJECT
PACKAGE: CW2C (KM18+200-KM23+450)
mt ct a-aSection a-a
mt bng b tr vn khun b trb
b
a aDisposition of pier cap formwork
mt ct a-aSection a-a
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
2. Ti trng tnh tonp lc ngang tc dng ln b mt vn khun c xc nh theo cng thc.
Pmax = n(p+q) = 3.426,84 (kg/m2)= 0,34 (kg/cm2)Trong :n = 1.3 : H s xung kch.
p : p lc do b tng tI trong qu trnh gy ra.Theo bng 6 mc 2.14 trong 22TCN 200-89: Vi tc b tng 0.5m/h v chiu cao ca lp
b tng gy p lc H>1m ta c p lc bn ln nht tiu chun hn hp bt. p = gbt (0.27 V + 0.78) k1k2 = ######## (Kg/m2)= 0,22 (kg/cm2)
Cu to tm vn khun T1
mt ct B-bSection b-b
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
Trong :g bt : Dung trng ca hn hp b tng g bt = 2300 (kg/m3)
V: Tc b tng theo phng thng ng V = 0,5 (m/h)k1: H s k n nh hng st ca b tng
Vi b tng c st 8-10cm ta c: k1 = 1,25k2: H s k n nh hng ca nhit b tng
Vi b tng c nhit t 20 -320 k2 = 0,85q : Ti trng do rung lc khi x hn hp b tng ti
Theo bng 7 mc 2.14 trong 22TCN 200-89 : Vi b tng c bng phng php bngbm ta c: q = 400 (kg/m2)= 0,04 (kg/cm2)
3. Tnh ton b mt vn khunMt vn khun c tnh ton theo s bn ngm 4 cnh.
3.1 Kim tra sc chu ti.Ta c m men ti v tr trung tm ca sn cnh axb , tnh theo bn k 4 cnh.
Mtt = a Ptd a2 = 71,02 (kg.cm)Trong :
a: H s ph thuc vo t l gia 2 cnh a v b c ly theo bng 2-14.Vi a:b = 2:1 ta c a 0,0829
Ptd: Ti trng tc dng ln b mt tm vn khun Ptd = 0,34 (kg/cm2)a: Cnh di ca sn tnh ton. a = 50 cm
Xc nh ng sut trn mt bn tn.
max = Mtt / W = 106,53 (kg/cm2)
Trong : max : ng sut ln nht trn mt bn tn.
W: Sc khng un ca tit din mt vn khun.
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
W = b.d2 / 6 = 0,67 (cm3)Vi b: chiu di cnh ngn ca sn tnh ton. b = 25cm
d: b dy ca tm tn lt mt vn khun. d 0,4cmTa c:
max =106.53 (kg/cm2) Ru = 1900 (kg/cm2)
Vy b mt tm vn khun kh nng chu lc.3.2. Kim tra vng ca b mt tm vn khun. vng ca tm vn khun c xc nh theo cng thc sau.
Trong :f : vng ca b mt tm vn khun
Ptd: TI trng tc dng ln b mt vn khun. Ptd = 0,34 (kg/cm2)a Chiu di cnh sn tnh ton. a = 50 (cm)
E: m un n hi ca thp lm vn khun. E= 2100000 (kg/cm2)d: Chiu dy b mt tm vn khun. d = 0,4 (cm)b: H s tnh ton vng ca bn k 4 cnh. Tra bng 2-14 ta c vi bn c
a:b = 2:1 ta c b 0,0277Nh vy ta c:
f = 0,03 (cm) < [f] = l/400 = 0,0625 (cm) Vy b mt tm vn khun m bo iu kin vng.4.Tnh ton sn ngSn ng vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn ngang.
4.1 Kim tra sc chu ti.TI trng tc dng ln sn tng cng ng
qtd = Pmax .b = 8,57 (kg/cm)qtctd = qtd/n = 6,59 (kg/cm)
Trong :b = 25cm: Khong cch gia cc sn tng cng ng.
n = 1.3: H s tI trngMo men ln nht tc dng ln sn tng cng ng.
Mmax = qtd . L2 / 10 = 2.141,78 (Kg.cm)
ng sut ln nht trong sn ng. max = Mtt / W = 437,10 (kg/cm2)
Trong : max : ng sut ln nht trong sn ng.
W: Sc khng un ca tit din sn ng.
W = d.h2 / 6 = 4,90 (cm3)Vi d: b dy ca sn ng d 0,6cm
h: Chiu cao ca sn ng h 7,0cmTa c:
max =437.1 (kg/cm2) Ru = 1900 (kg/cm2)
3
4
.
..
db
E
apf td
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
Vy sn ng vn khun kh nng chu lc.4.2. Kim tra vng ca sn ng.
vng sn ng c xc inh theo 22TCN200-89
0,0089 (cm) 5.16 -Chng V- 22TCN200-89
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 17,15 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f] = Ltt/400 = 1,25 (mm) = 0,125 (cm)
fmax = 0,0089 (cm) < [f] = 0,125 (cm)
Sn ng m bo iu kin vng.5.Tnh ton sn ngangSn ngang vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn ng.
5.1 Kim tra sc chu ti.TI trng tc dng ln sn tng cng ngang
qtd = Pmax .a = 17,13 (kg/cm)qtctd = qtd/n = 13,18 (kg/cm)
Trong :a =50cm: Khong cch gia cc sn tng cng ngang.
n = 1.3: H s tI trngMo men ln nht tc dng ln sn tng cng ngang.
Mmax = qtd . L2 / 10 = 1.070,89 (Kg.cm)
ng sut ln nht trong sn ngang. max = Mtt / W = 218,55 (kg/cm2)
Trong : max : ng sut ln nht trong sn ngang.
W: Sc khng un ca tit din sn ngang.
W = d.h2 / 6 = 4,90 (cm3)Vi d: b dy ca sn ngang d 0,6cm
h: Chiu cao ca sn ngang h 7,0cm
Ta c: max =218.55 (kg/cm
2) Ru = 1900 (kg/cm2) Vy sn ngang vn khun kh nng chu lc.5.2. Kim tra vng ca sn ngang.
vng sn ngang c xc inh theo 22TCN200-89
0,0011 (cm) 5.16 -Chng V- 22TCN200-89
Trong :
x
tttc
JE
Lqf
..128
. 41max
x
tttc
JE
Lqf
..128
. 41max
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 17,15 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f] = Ltt/400 = 0,625 (mm) = 0,0625 (cm)
fmax = 0,0011 (cm) < [f] = 0,0625 (cm)
Sn ngang m bo iu kin vng.II. Tnh ton vn khun thi cng thn tr.1. B tr chung vn khun, cu to vn khun thi cng thn tr.
Pier cap
Formwork DB2
Formwork DB2
Formwork DB2
Formwork DB2
Formwork DB2
For
mw
or
k D
B1Fo
rm
wo
rk
DB1
For
mw
or
k D
B1Fo
rm
wo
rk
DB1
For
mw
or
k D
B1
For
mw
or
k D
B1Fo
rm
wo
rk
DB1
For
mw
or
k D
B1Fo
rm
wo
rk
DB1
For
mw
or
k D
B1
Formwork t1
Formwork t1
Formwork t1
Formwork t1
Formwork t1
Formwork t1
Formwork t1
Formwork t1
Formwork t1
Formwork t1
Pier cap
Form
wo
rk D
B1Fo
rmw
ork
DB1
Form
wo
rk D
B1Fo
rmw
ork
DB1
Form
wo
rk D
B1
mt bng b tr vn khun thn trLAYOUT OF FORMWORK OF COLUMN
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
2. Ti trng tnh tonp lc ngang tc dng ln b mt vn khun c xc nh theo cng thc.
Pmax = n(p+q) = 4.070,16 (kg/m2)= 0,41 (kg/cm2)Trong :n = 1.3 : H s xung kch.
p : p lc do b tng tI trong qu trnh gy ra.Theo bng 6 mc 2.14 trong 22TCN 200-89: Vi tc b tng 0.5m/h v chiu cao ca lp
b tng gy p lc H>1m ta c p lc bn ln nht tiu chun hn hp bt. p = gbt (0.27 V + 0.78) k1k2 = ######## (Kg/m2)= 0,27 (kg/cm2)
Trong :
cu to vn khun DB1
0506
cu to vn khun DB1T l: 1/15a
a
b b
01
01
02 04 02
03
03
05 06
mt ct a-aT l: 1/15
cu to vn khun DB2T l: 1/20
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
g bt : Dung trng ca hn hp b tng g bt = 2300 (kg/m3)V: Tc b tng theo phng thng ng V = 1,25 (m/h)k1: H s k n nh hng st ca b tng
Vi b tng c st 8-10cm ta c: k1 = 1,25k2: H s k n nh hng ca nhit b tng
Vi b tng c nhit t 20 -320 k2 = 0,85q : Ti trng do rung lc khi x hn hp b tng ti
Theo bng 7 mc 2.14 trong 22TCN 200-89 : Vi b tng c bng phng php bngbm ta c: q = 400 (kg/m2)= 0,04 (kg/cm2)3. Tnh ton tm vn khun B13.1. Tnh ton mt vn khun.Mt vn khun c tnh ton theo s bn ngm 4 cnh.
3.1.1 Kim tra sc chu ti.Ta c m men ti v tr trung tm ca sn cnh axb , tnh theo bn k 4 cnh.
Mtt = a Ptd a2 = 60,53 (kg.cm)Trong :
a: H s ph thuc vo t l gia 2 cnh a v b c ly theo bng 2-14.Vi a:b = 1.716 ta c a 0,0808
Ptd: Ti trng tc dng ln b mt tm vn khun Ptd = 0,41 (kg/cm2)a: Cnh di ca sn tnh ton. a = 42,9 cm
Xc nh ng sut trn mt bn tn.
max = Mtt / W = 58,10 (kg/cm2)
Trong : max : ng sut ln nht trn mt bn tn.
W: Sc khng un ca tit din mt vn khun.
W = b.d2 / 6 = 1,04 (cm3)Vi b: chiu di cnh ngn ca sn tnh ton. b = 25cm
d: b dy ca tm tn lt mt vn khun. d 0,5cmTa c:
max =64.84 (kg/cm2) Ru = 1900 (kg/cm2)
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
Vy b mt tm vn khun kh nng chu lc.3.1.2 Kim tra vng ca b mt tm vn khun. vng ca tm vn khun c xc nh theo cng thc sau.
Trong :f : vng ca b mt tm vn khun
Ptd: TI trng tc dng ln b mt vn khun. Ptd = 0,41 (kg/cm2)a Chiu di cnh sn tnh ton. a = 42,9 (cm)
E: m un n hi ca thp lm vn khun. E= 2100000 (kg/cm2)d: Chiu dy b mt tm vn khun. d = 0,5 (cm)b: H s tnh ton vng ca bn k 4 cnh. Tra bng 2-14 ta c vi bn c
a:b = 1.716 ta c b 0,026Nh vy ta c:
f = 0,02 (cm) < [f] = l/400 = 0,0625 (cm) Vy b mt tm vn khun m bo iu kin vng.3.2.Tnh ton sn ngSn ng vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn ngang.
3.2.1.Kim tra sc chu ti.TI trng tc dng ln sn tng cng ng
qtd = Pmax .b = 10,18 (kg/cm)qtctd = qtd/n = 7,83 (kg/cm)
Trong :b = 25cm: Khong cch gia cc sn tng cng ng.
n = 1.3: H s tI trngMo men ln nht tc dng ln sn tng cng ng.
Mmax = qtd . L2 / 10 = 1.872,69 (Kg.cm)
ng sut ln nht trong sn ng. max = Mtt / W = 187,27 (kg/cm2)
Trong : max : ng sut ln nht trong sn ng.
W: Sc khng un ca tit din sn ng.
W = d.h2 / 6 = 10,00 (cm3)Vi d: b dy ca sn ng d 0,6cm
h: Chiu cao ca sn ng h 10,0cmTa c:
max =208.98(kg/cm2) Ru = 1900 (kg/cm2)
Vy sn ng vn khun kh nng chu lc.3.2.2. Kim tra vng ca sn ng.
vng sn ng c xc inh theo 22TCN200-89
3
4
.
..
db
E
apf td
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
0,0020 (cm) 5.16 -Chng V- 22TCN200-89
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 50 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f] = Ltt/400 = 1,07 (mm) = 0,11 (cm)
fmax = 0,0020 (cm) < [f] = 0,11 (cm)
Sn ng m bo iu kin vng.3.3.Tnh ton sn ngangSn ngang vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn ng.
3.3.1 Kim tra sc chu ti.TI trng tc dng ln sn tng cng ngang
qtd = Pmax .a = 17,46 (kg/cm)qtctd = qtd/n = 13,43 (kg/cm)
Trong :a =42.9cm: Khong cch gia cc sn tng cng ngang.
n = 1.3: H s tI trngMo men ln nht tc dng ln sn tng cng ngang.
Mmax = qtd . L2 / 10 = 1.091,31 (Kg.cm)
ng sut ln nht trong sn ngang. max = Mtt / W = 109,13 (kg/cm2)
Trong : max : ng sut ln nht trong sn ngang.
W: Sc khng un ca tit din sn ngang.
W = d.h2 / 6 = 10,00 (cm3)Vi d: b dy ca sn ngang d 0,6cm
h: Chiu cao ca sn ngang h 10,0cmTa c:
max =121.78 (kg/cm2) Ru = 1900 (kg/cm2)
Vy sn ngang vn khun kh nng chu lc.3.3.2. Kim tra vng ca sn ngang.
vng sn ngang c xc inh theo 22TCN200-89
0,0004 (cm) 5.16 -Chng V- 22TCN200-89
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 50 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
x
tttc
JE
Lqf
..128
. 41max
x
tttc
JE
Lqf
..128
. 41max
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
[f] = Ltt/400 = 0,625 (mm) = 0,0625 (cm)
fmax = 0,0004 (cm) < [f] = 0,0625 (cm)
Sn ngang m bo iu kin vng.4. Tnh ton tm vn khun B24.1. Tnh ton mt vn khun.Mt vn khun c tnh ton theo s bn ngm 4 cnh.
4.1.1 Kim tra sc chu ti.Ta c m men ti v tr trung tm ca sn cnh axb , tnh theo bn k 4 cnh.
Mtt = a Ptd a2 = 68,18 (kg.cm)Trong :
a: H s ph thuc vo t l gia 2 cnh a v b c ly theo bng 2-14.Vi a:b = 1.27 ta c a 0,067
Ptd: Ti trng tc dng ln b mt tm vn khun Ptd = 0,41 kga: Cnh di ca sn tnh ton. a = 50 cm
Xc nh ng sut trn mt bn tn. max = Mtt / W = 41,42 (kg/cm2)
Trong : max : ng sut ln nht trn mt bn tn.
W: Sc khng un ca tit din mt vn khun.
W = b.d2 / 6 = 1,65 (cm3)Vi b: chiu di cnh ngn ca sn tnh ton. b = 40cm
d: b dy ca tm tn lt mt vn khun. d 0,5cmTa c:
max =41.12 (kg/cm2) Ru = 1900 (kg/cm2)
Vy b mt tm vn khun kh nng chu lc.4.1.2 Kim tra vng ca b mt tm vn khun. vng ca tm vn khun c xc nh theo cng thc sau.
3
4
.
..
db
E
apf td
3
4
.
..
db
E
apf td
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
Trong :f : vng ca b mt tm vn khun
Ptd: TI trng tc dng ln b mt vn khun. Ptd = 0,41 (kg/cm2)a Chiu di cnh sn tnh ton. a = 50 (cm)
E: m un n hi ca thp lm vn khun. E= 2100000 (kg/cm2)d: Chiu dy b mt tm vn khun. d = 0,5 (cm)b: H s tnh ton vng ca bn k 4 cnh. Tra bng 2-14 ta c vi bn c
a:b = 1.27 ta c b 0,02Nh vy ta c:
f = 0,08 (cm) < [f] = l/400 = 0,100 (cm) Vy b mt tm vn khun m bo iu kin vng.4.2.Tnh ton sn ngSn ng vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn ngang.
4.2.1.Kim tra sc chu ti.TI trng tc dng ln sn tng cng ng
qtd = Pmax .b = 20,35 (kg/cm)qtctd = qtd/n = 15,65 (kg/cm)
Trong :b = 33.5cm: Khong cch gia cc sn tng cng ng.
n = 1.3: H s tI trngMo men ln nht tc dng ln sn tng cng ng.
Mmax = qtd . L2 / 10 = 3.256,13 (Kg.cm)
ng sut ln nht trong sn ng. max = Mtt / W = 325,61 (kg/cm2)
Trong : max : ng sut ln nht trong sn ng.
W: Sc khng un ca tit din sn ng.
W = d.h2 / 6 = 10,00 (cm3)Vi d: b dy ca sn ng d 0,6cm
h: Chiu cao ca sn ng h 10,0cmTa c:
max =325.61(kg/cm2) Ru = 1900 (kg/cm2)
Vy sn ng vn khun kh nng chu lc.4.2.2. Kim tra vng ca sn ng.
vng sn ng c xc inh theo 22TCN200-89
0,0030 (cm) 5.16 -Chng V- 22TCN200-89
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 50 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f] = Ltt/400 = 1,00 (mm) = 0,10 (cm)
fmax = 0,0030 (cm) < [f] = 0,10 (cm)
x
tttc
JE
Lqf
..128
. 41max
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
Sn ng m bo iu kin vng.4.3.Tnh ton sn ngangSn ngang vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn ng.
4.3.1 Kim tra sc chu ti.TI trng tc dng ln sn tng cng ngang
qtd = Pmax .a = 16,28 (kg/cm)qtctd = qtd/n = 12,52 (kg/cm)
Trong :a =40cm: Khong cch gia cc sn tng cng ngang.
n = 1.3: H s tI trngMo men ln nht tc dng ln sn tng cng ngang.
Mmax = qtd . L2 / 10 = 4.070,16 (Kg.cm)
ng sut ln nht trong sn ngang. max = Mtt / W = 407,02 (kg/cm2)
Trong : max : ng sut ln nht trong sn ngang.
W: Sc khng un ca tit din sn ngang.
W = d.h2 / 6 = 10,00 (cm3)Vi d: b dy ca sn ngang d 0,6cm
h: Chiu cao ca sn ngang h 10,0cmTa c:
max =407.02 (kg/cm2) Ru = 1900 (kg/cm2)
Vy sn ngang vn khun kh nng chu lc.4.3.2. Kim tra vng ca sn ngang.
vng sn ngang c xc inh theo 22TCN200-89
0,0058 (cm) 5.16 -Chng V- 22TCN200-89
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 50 (cm4)
x
tttc
JE
Lqf
..128
. 41max
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
vng cho php: Mc 5.9 - Chng V - 22TCN200-89[f] = Ltt/400 = 1,25 (mm) = 0,1250 (cm)
fmax = 0,0058 (cm) < [f] = 0,1250 (cm)
Sn ngang m bo iu kin vng.
4.4.Tnh ton np vn khun.Ta c khong cch gia cc tng np VK l : h1 = 100 (cm)
4.4.1 Xt trng hp khng s dng thanh neo vn khun.S tc dng ln np vn khun khi khng s dng thanh neo.
Kim tra sc chu ti.TI trng tc dng ln thanh np vn khun
qtd = Pmax .h1 = 40,70 (kg/cm)qtctd = qtd/n = 31,31 (kg/cm)
Trong :h1 =100cm: Khong cch gia cc np vn khunn = 1.3: H s tI trng
Mo men ln nht tc dng ln thanh np vn khun.Mmax = qtd . L
2 / 8 = 623.242,92 (Kg.cm)ng sut ln nht trong np vn khun
max = Mtt / W = 4.477,32 (kg/cm2)Trong :
max : ng sut ln nht trong np vn khun.W: Sc khng un ca tit din np vn khun
W =Jx*2/h = 139,20 (cm3)
max =4477.32 (kg/cm2) > Ru = 1900 (kg/cm2)
Vy Np vn khun khng kh nng chu lc phI b tr thanh neo vn khun.4.4.2 Xt trng hp s dng thanh neo vn khun.
S tc dng ln np vn khun khi khng s dng thanh neo.
Kim tra sc chu ti.TI trng tc dng ln thanh np vn khun
qtd = Pmax .h1 = 40,70 (kg/cm)qtctd = qtd/n = 31,31 (kg/cm)
Trong :h1 =100cm: Khong cch gia cc sn np vn khun.n = 1.3: H s tI trng
Mo men ln nht tc dng ln thanh np vn khun.Mmax = qtd . L
2 /10 = ######### (Kg.cm)ng sut ln nht trong np vn khun.
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
max = Mtt / W = 292,40 (kg/cm2)Trong :
max : ng sut ln nht trong np vn khunW: Sc khng un ca tit din np vn khun
W =Jx*2/h = 139,20 (cm3)
max =292.40 (kg/cm2) < Ru = 1900 (kg/cm2)
Vy Np vn khun kh nng chu lc Kim tra vng np vn khun.
vng np vn khun c xc inh theo 22TCN200-89
0,0335 (cm) 5.16 -Chng V- 22TCN200-89
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 348 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f] = Ltt/400 = 2,5 (mm) = 0,2500 (cm)
fmax = 0,0335 (cm) < [f] = 0,2500 (cm)
Vy np vn khun m bo iu kin vng.
4.4.Tnh ton thanh neo vn khun.Ni lc trng thanh neo vn khun chnh l phn lc tc dng ln gi np vn khun.Kt qu tnh ton thanh np vn khun.
Gi tr ni lc trong thanh neo D20 l : Nmax = ######### (kg)Gi tr ng sut trong thanh neo D20.
max = Nmax/ F = ####### # (kg/cm2)
x
tttc
JE
Lqf
..128
. 41max
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
max =1332.7 (kg/cm2) < Ru = 1900 (kg/cm2)
Vy thanh neo vn khun kh nng chu lc
5. Tng bin dng vn khun v np vn khun.
Bin dng ca vn khun sau khi kt thc qu trnh b tng phI tha mn iu kin sai s chophp i vi kt cu b tng thn tr.Ta c tng bin dng vn khun sau khi b tng.
f = f1 +f2 +f3 +f4Trong :
f1: Bin dng tn b mt vn khun f1 = 0,08 (cm)f2: Bin dng sn tng cng ngang f2= 0,0058 (cm)f3: Bin dng sn tng cng ng f3 = 0,0030 (cm)f4: Bin dng np vn khun. f4 = 0,0335 (cm)
Vy tng bin dng vn khun sau khi b tng l f = 0,12 (cm)Sai s cho php i vi b mt vn khun thn tr l [f] = 0,5 (cm)
f = 0.12 cm
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
2. TI trng tc dng.Cc loi tI trng tc dng ln vn khun y x m bao gm.
Loi tI trng k hiu Gi tr tiu chun n vH s
tI trngGi tr
tnh tonTnh tI ca lp b tng H = 173cm q1 0,43 (kg/cm2) 1,2 0,52 TI trng do chn ng khi b tng q2 0,04 (kg/cm2) 1,3 0,05 TI trng do tc dng ca m chn ng q3 0,02 (kg/cm2) 1,3 0,03 TI trng do ngi v dng c thi cng q4 0,025 (kg/cm2) 1,3 0,03 Trng lng bn thn vn khun. q5 0,006 (kg/cm2) 1,3 0,01
Trong :q1 = gbt.H Vi: gbt : Dung trng ca hn hp b tng
H: Chiu cao p lc ca hn hp b tng.q2,q3,q4 : Xc nh theo mc 2.11 Chng 2 trong 22 TCN 200-89.q5: Ly theo khi lng thit k ca 1 tm vn khun.
Tng gi tr tI trng tc dng ln b mt vn khun l.ptttd = S qi . ni = 0,64 (kg/cm2)ptctd = S qi = 0,52 (kg/cm2)
3. Tnh ton tn lt mt vn khun.Mt vn khun c tnh ton theo s bn ngm 4 cnh.
3.1 Kim tra sc chu ti.Ta c m men ti v tr trung tm ca sn cnh axb , tnh theo bn k 4 cnh.
Mtt = a Ptd a2 = 132,08 (kg.cm)Trong :
a: H s ph thuc vo t l gia 2 cnh a v b c ly theo bng 2-14.Vi a:b = 2:1 ta c a 0,0829
ptd: Ti trng tc dng ln b mt tm vn khun ptd = 0,64 (kg/cm2)a: Cnh di ca sn tnh ton. a = 50 cm
Xc nh ng sut trn mt bn tn.
max = Mtt / W = 198,12 (kg/cm2)
Trong : max : ng sut ln nht trn mt bn tn.
W: Sc khng un ca tit din mt vn khun.
Cu to tm vn khun T1
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
W = b.d2 / 6 = 0,67 (cm3)Vi b: chiu di cnh ngn ca sn tnh ton. b = 25cm
d: b dy ca tm tn lt mt vn khun. d 0,4cmTa c:
max =198.12 (kg/cm2) Ru = 1900 (kg/cm2)
Vy b mt tm vn khun kh nng chu lc.3.2. Kim tra vng ca b mt tm vn khun. vng ca tm vn khun c xc nh theo cng thc sau.
Trong :f : vng ca b mt tm vn khun
Ptd: TI trng tc dng ln b mt vn khun. Ptd = 0,64 (kg/cm2)a Chiu di cnh sn tnh ton. a = 50 (cm)
E: m un n hi ca thp lm vn khun. E= 2100000 (kg/cm2)d: Chiu dy b mt tm vn khun. d = 0,4 (cm)b: H s tnh ton vng ca bn k 4 cnh. Tra bng 2-14 ta c vi bn c
a:b = 2:1 ta c b 0,0277Nh vy ta c:
f = 0,05 (cm) < [f] = l/400 = 0,0625 (cm) Vy b mt tm vn khun m bo iu kin vng.4.Tnh ton sn dcSn dc vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn ngang.
4.1 Kim tra sc chu ti.TI trng tc dng ln sn tng cng dc
qtttd = ptt
td .b = 15,93 (kg/cm)qtctd = p
tctd .b = 13,09 (kg/cm)
Trong :b = 25cm: Khong cch gia cc sn tng cng dc.
Mo men ln nht tc dng ln sn tng cng dc.Mmax = qtd . L
2 /10 = 3.983,13 (Kg.cm)ng sut ln nht trong sn dc.
max = Mtt / W = 812,88 (kg/cm2)Trong :
max : ng sut ln nht trong sn dc.W: Sc khng un ca tit din sn dc.
W = d.h2 / 6 = 4,90 (cm3)Vi d: b dy ca sn dc d 0,6cm
h: Chiu cao ca sn dc h 7,0cmTa c:
max =812.88 (kg/cm2) Ru = 1900 (kg/cm2)
Vy sn dc vn khun kh nng chu lc.4.2. Kim tra vng ca sn dc.
vng sn dc c xc inh theo 22TCN200-89
0,0177 (cm) 5.16 -Chng V- 22TCN200-89
3
4
.
..
db
E
apf td
x
tttc
JE
Lqf
..128
. 41max
-
Cng ty CP u t v XDGT Phng Thnh--------------------------------------------------------------------------------------------------------------------------------------
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 17,15 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f] = Ltt/400 = 1,25 (mm) = 0,125 (cm)
fmax = 0,0177 (cm) < [f] = 0,125 (cm)
Sn dc m bo iu kin vng.5.Tnh ton sn ngangSn ngang vn khun c tnh ton theo s dm lin tc ta trn cc gi l cc sn dc.
5.1 Kim tra sc chu ti.TI trng tc dng ln sn tng cng ngang
qtttd = ptt
td .a = 31,87 (kg/cm)qtctd = p
tctd .a = 26,18 (kg/cm)
Trong :a =50cm: Khong cch gia cc sn tng cng ngang.
Mo men ln nht tc dng ln sn tng cng ngang.Mmax = qtd . L
2 / 10 = 1.991,56 (Kg.cm)ng sut ln nht trong sn ngang.
max = Mtt / W = 406,44 (kg/cm2)Trong :
max : ng sut ln nht trong sn ngang.W: Sc khng un ca tit din sn ngang.
W = d.h2 / 6 = 4,90 (cm3)Vi d: b dy ca sn ngang d 0,6cm
h: Chiu cao ca sn ngang h 7,0cmTa c:
max =406.44 (kg/cm2) Ru = 1900 (kg/cm2)
Vy sn ngang vn khun kh nng chu lc.5.2. Kim tra vng ca sn ngang.
vng sn ngang c xc inh theo 22TCN200-89
0,0022 (cm) 5.16 -Chng V- 22TCN200-89
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din thp Jx = 17,15 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f] = Ltt/400 = 0,625 (mm) = 0,0625 (cm)
fmax = 0,0022 (cm) < [f] = 0,0625 (cm)
Sn ngang m bo iu kin vng.
x
tttc
JE
Lqf
..128
. 41max
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
CHAPTER III. SUPPORTING BEAM OF FORMWORK OF HEADSTOCK
Item: Pier P9 -:- P14
I.D liu tnh ton.1. S b tr h dm vn khun y x m tr.
II. Tnh ton dm dc vn khun y x m tr.1. Dm dc ngoi : H300x300; L = 12m1.1. S tnh.Dm dc vn khun sn y c tnh nh dm lin tc c k trn gi l cc dm ngang.
1.2. TI trng tnh ton.
Loi tI trng k hiuGi tr tiu
chunn v H s tI trng
Gi tr tnh ton
Tnh tI ca lp b tng H = 80cm q1 0,20 (kg/cm2) 1,2 0,24 TI trng do chn ng khi b tng q2 0,04 (kg/cm2) 1,3 0,05 TI trng do tc dng ca m chn ng q3 0,02 (kg/cm2) 1,3 0,03 TI trng do ngi v dng c thi cng q4 0,025 (kg/cm2) 1,3 0,03 Trng lng bn thn vn khun. q5 0,006 (kg/cm2) 1,3 0,01
Trong :q1 = gbt.H Vi: gbt : Dung trng ca hn hp b tng
H: Chiu cao p lc ca hn hp b tng.q2,q3,q4 : Xc nh theo mc 2.11 Chng 2 trong 22 TCN 200-89.q5: Ly theo khi lng thit k ca 1 tm vn khun.
Phn m rng ca x m tr c bi 2 dm dc H300x300 ta coi nh ton b tI trng caphn m rng ca x m tr phn b u trn 2 dm dc H300x300 ny.Tng tI trng tc dng ln dm dc h vn khun y x m tr.
ptttd = S qi .a. ni = 15,23 (kg/cm)ptctd = S qi.a = 12,37 (kg/cm)
CENTRAL MEKONG DELTA CONNECTIVITY PROJECT
PACKAGE: CW2C (KM18+200-KM23+450)
Thn tr
Cu to x m tr
1/2 SECTION C-C 1/2 SECTION d-d
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
1.3. Kim tra kh nng chu lc.S dng phn mm Midas 2006 phin bn 7.0.1 tnh ton ta c
Biu m men do tI trng tc dng ln dm dc.Gi tr Momen ln nht.
Mmax = 746.492,2 (kg.cm)
Biu gi tr phn lc tc dng ln dm ngang.
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
Gi tr phn lc ln nht tc dng ln dm ngang.R1 = 12.686,30 (kg)R2 = 1.066,40 (kg)
M men ln nht tc dng ln dm dc vn khun y x m tr c xc nh nh sau.Mmax = 746.492,2 (kg.cm)
Gi tr ng sut ln nht xut hin trong dm dc. max = Mtt / W = 548,89 (kg/cm2)
Trong :W: Sc khng un ca tit din dm dc.
Vi thp hnh H300x300x10x15mm. W= 1360 cm3
Ta c: max =235.44 (kg/cm
2) Ru = 1900 (kg/cm2) Vy dm dc vn khun y x m tr m bo iu kin chu lc.4. Kim tra vng. vng ln nht ca dm dc vn khun y c xc nh theo 22TCN200-89.
0,27 (cm)
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din dm dc Jx = 20400 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f1] = Ltt/400 = 14 (mm) = 1,4 (cm) vng cho php phI m bo sai s cho php i vi kt cu b tng sau .[f2] 5 mm
vng cho php: [f] = min ([f1],[f2]) = 5mm = 0,5 (cm)fmax = 0,27 (cm) < [f] = 0,5 (cm)
Dm dc vn khun y x m tr m bo iu kin vng.2. Dm dc trong : H300x300; L = 4m1.1. S tnh.Dm dc vn khun sn y c tnh nh dm lin tc c k trn gi l cc dm ngang.
1.2. TI trng tnh ton.
Loi tI trng k hiuGi tr tiu
chunn v H s tI trng
Gi tr tnh ton
Tnh tI ca lp b tng H = 160cm q1 0,40 (kg/cm2) 1,2 0,48 TI trng do chn ng khi b tng q2 0,04 (kg/cm2) 1,3 0,05 TI trng do tc dng ca m chn ng q3 0,02 (kg/cm2) 1,3 0,03 TI trng do ngi v dng c thi cng q4 0,025 (kg/cm2) 1,3 0,03 Trng lng bn thn vn khun. q5 0,006 (kg/cm2) 1,3 0,01
x
tttctd
JE
Lpf
..128
. 4
max
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
Trong :q1 = gbt.H Vi: gbt : Dung trng ca hn hp b tng
H: Chiu cao p lc ca hn hp b tng.q2,q3,q4 : Xc nh theo mc 2.11 Chng 2 trong 22 TCN 200-89.q5: Ly theo khi lng thit k ca 1 tm vn khun.
Phn m rng ca x m tr c bi 2 dm dc H300x300 ta coi nh ton b tI trng caphn m rng ca x m tr phn b u trn 2 dm dc H300x300 ny.Tng tI trng tc dng ln dm dc h vn khun y x m tr.
ptttd = S qi .a. ni = 50,86 (kg/cm)ptctd = S qi.a = 41,74 (kg/cm)
1.3. Kim tra kh nng chu lc.S dng phn mm Midas 2006 phin bn 7.0.1 tnh ton ta c
Biu m men do tI trng tc dng ln dm dc.
Gi tr Momen ln nht.Mmax = 846.406,3 (kg.cm)
Biu gi tr phn lc tc dng ln dm ngang.
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
Gi tr phn lc ln nht tc dng ln dm ngang.R2 = 26.168,90 (kg)R1 = 13.375,20 (kg)
M men ln nht tc dng ln dm dc vn khun y x m tr c xc nh nh sau.Mmax = 846.406,3 (kg.cm)
Gi tr ng sut ln nht xut hin trong dm dc. max = Mtt / W = 622,36 (kg/cm2)
Trong :W: Sc khng un ca tit din dm dc.
Vi thp hnh H300x300x10x15mm. W= 1360 cm3
Ta c: max =116.22 (kg/cm
2) Ru = 1900 (kg/cm2) Vy dm dc vn khun y x m tr m bo iu kin chu lc.4. Kim tra vng. vng ln nht ca dm dc vn khun y c xc nh theo 22TCN200-89.
0,01 (cm)
Trong :E: M un n hi ca thp E = 2100000 (kg/cm2)Jx: M men qun tnh ca tit din dm dc Jx = 20400 (cm4)
vng cho php: Mc 5.9 - Chng V - 22TCN200-89
[f1] = Ltt/400 = 5 (mm) = 0,5 (cm) vng cho php phI m bo sai s cho php i vi kt cu b tng sau .[f2] 5 mm
vng cho php: [f] = min ([f1],[f2]) = 5mm = 0,5 (cm)fmax = 0,01 (cm) < [f] = 0,5 (cm)
Dm dc vn khun y x m tr m bo iu kin vng.III. Tnh ton dm ngang vn khun y x m tr1. Tnh ton dm ngang pha trong1.1. S tnhDm ngang c tnh ton nh dm gin n k trn 2 gi l gi trn cc ct
1.2. TI trng tc dng.TI trng tc dng ln dm ngang chnh l tI trng chuyn t dm dc xung.
R1 = 12.686,30 (kg)R2 = 13.375,20 (kg)
1.3. Kim tra kh nng chu lc.S dng phn mm Midas 2006 phin bn 7.0.1 ta c.
x
tttctd
JE
Lpf
..128
. 4
max
R1 R1 R2 R1 R1
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
Biu Momen do tI trng truyn t dm dc xungGi tr Momen ln nht do tI trng tc dng ln dm ngang.
Mmax = 1.028.851 kg.cm
Biu phn lc do tI trng truyn t dm dc xungGi tr phn lc tc dng ln gi
R = 17.545 kgGi tr ng sut ln nht trong dm ngang.
max = Mtt / W = 756,51 (kg/cm2)Trong :
W: Sc khng un ca tit din dm dc.Vi thp hnh H200x200x8x12mm. W= 1360 cm3
Ta c: max =756.51 (kg/cm
2) Ru = 1900 (kg/cm2) Vy dm ngang vn khun y x m tr m bo iu kin chu lc.2. Tnh ton dm ngang pha ngoi1.1. S tnhDm ngang c tnh ton nh dm gin n k trn 2 gi l gi trn cc ct
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
1.2. TI trng tc dng.TI trng tc dng ln dm ngang chnh l tI trng chuyn t dm dc xung.
R1 = 1.066,40 (kg)R2 = 26.168,90 (kg)
1.3. Kim tra kh nng chu lc.S dng phn mm Midas 2006 phin bn 7.0.1 ta c.
Biu Momen do tI trng truyn t dm dc xungGi tr Momen ln nht do tI trng tc dng ln dm ngang.
Mmax = 657.031 kg.cm
R1 R1 R2 R1 R1
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
Biu phn lc do tI trng truyn t dm dc xungGi tr phn lc tc dng ln gi
R = 8.932 kg
Gi tr ng sut ln nht trong dm ngang. max = Mtt / W = 483,11 (kg/cm2)
Trong :W: Sc khng un ca tit din dm dc.
Vi thp hnh H200x200x8x12mm. W= 1360 cm3
Ta c: max =483.11 (kg/cm
2) Ru = 1900 (kg/cm2) Vy dm ngang vn khun y x m tr m bo iu kin chu lc.IV. Tnh ton gi trn ct1.Chi tit gi dm ngang trn ct
2. Tnh ton sc khng ct ca ng hn gi .Sc khng tnh ton ca cc lin kt hn gc chu ct trn din tch hiu dng c tnh ton theo 22TCN 272 -05 mc 6.13.3.2.4b -1
Rr = 0.6je2 FexxTrong :
Rr : Sc khng tnh ton ca ng hn gcje2 : h s sc khng je2 = 0,8 (6.5.4.2 - 22TCN272-05)
Fexx : Cng ca kim loi hn vi que hn HV-J421 ta c Fexx = 420 (N/mm2)
Sc khng tnh ton ca ng hn.
Detail Bchi tit B
2 2section 2-2mt ct 2-2
-
Cng ty CP u t v XDGT Phng Thnh-------------------------------------------------------------------------------------------------------------------------------------------
Rr = 201,6 (N/mm2)3. Kim tra kh nng chu lc ca gi .S tnh ton lin kt gi .
Vi mi bn thp tin hnh hn 2 bn nn ta c tng chiu di hiu dng ng hn lin kt gi Lw = L - 2t = 568 mm
S dng ng hn c chiu cao hf = 8mm ta c.Tng din tch tit din ng hn gc l:
Aw = (Lw hf)/2 = 2272 mm2Kim tra kh nng chu lc ca ng hn.
77,22 (N/mm2)
Trong :N: Lc dc trong gi do tI trong gy ra truyn t dm ngang xung.N = Rmax = 17.545 (kg)Aw : Din tch hiu dng tit din ng hn gc.
Ta c:1-1 = 77.22 N/mm2 < Rr = 201,6 (N/mm2)
Vy gi dm ngang trn ct m bo kh nng chu lc trong qu trnh thi cng.
R R
fww hL
N
A
N11
11