Page 1 of 31
HAZARA UNIVERSITY, MANSEHRA
OFFICE OF THE PROCUREMENT OFFICER
Phone No. 0997-414178, Fax No. 0997-414111
www.hu.edu.pk, [email protected]
BIDDING DOCUMENTS FOR ACQUISITION & IMPLEMENTATION OF HAZARA
UNIVERSITY CAMPUS MANAGEMENT SYSTEM (HCMS)
Tender Reference: HU/PO/2020-21/06-11
Technical Bid will be opened on Tuesday, June 09, 2020 at 1400 hrs in the conference room of
Administrative Block of Hazara University, Mansehra. The Bids complete in all respect should
reach to the Procurement Office Hazara University, Mansehra on or before Tuesday, June 09,
2020 at 1300 hrs.
Name of the Company / Dealer: (Block Letter):
_____________________________________________________________________________
_____________________________________________________________________________
Address of the Company / Dealer: (Block Letter):
_____________________________________________________________________________
_________________________________________________________________________
SIGNATURE AND SEAL
Telephone No: Fax:
E. mail:
Tender Fee of Rs.2,000/- (Non-Refundable) vide Demand Draft / Pay order No: date
Page 2 of 31
1. ABOUT THE HAZARA UNIVERSITY, MANSEHRA
Hazara University, Mansehra is a public sector University. The University is providing affordable quality
education to groom future leadership attributed with strong national character and professional expertise
for various domains of national life.
The mission of Hazara University is to impart knowledge in the fields of emerging and social sciences as
well as liberal arts inculcating the universal values of truth, beauty and goodness among the younger
generations, on the one hand, and to provide a befitting research base for contributing original research to
the world research pool for the service of mankind, on the other. It further aims at imbuing the students
with higher and nobler ideals of Islam and socializing them into well-rounded persons ever ready to serve
their own nation, the Ummah and humanity at large.
2. OBJECTTIVE OF THE ASSIGNMENT
The objective of this assignment is to identify and select a Software Development firm or IT vendor with
proven experience of development and implemention of University Management System (UMS). The
PROPOSER will provide off-the-shelf solution which can be deployed and implemented in a shortest span
of time. The PROPOSER will perform an analysis of the Hazara University’s current environment,
business processes and organizational strategy prior to the deployment of the software.
The high-level objectives of UMS are as follows:
1. Off-the-shelf solution, with liacence and all rights and previlages, to satisfy data mamagement
requirments of the University and its scalabitity and expandibilty;
2. Deveoplment a software from starch as per data management requirements of the University. This
will involve all steps of software design from requriment gathrings, analysis design, coding to the
quality testing, successful implementation & operation and after sale maintenance and sacalitiy and
expendibitlity.
The PROPOSER will perform in depth complete analysis of the Hazara University’s current environment,
business processes and organizational strategy prior to the deployment/development of the software. The
PROPOSER will also provide;
a) All information about the proposed plateform for the software and its viabilitiy;
b) Source code availabilty and liacense to use it as per the Univesity needs;
c) Training manuals and methods to efficiently use, update and expand the software;
d) Complete information about the trained men power required for successful and smoothly operation
and maintenace the software
e) Any hardware or networking requirement of that software
Page 3 of 31
f) Complete and detailed Gantt Chart reflecting all activities and required time for completion of each;
g) Any other information not mentioned above (a to f), but required for software optimal design,
coding, implementation and maintenance.
The high-level objectives of UMS are as follows:
• It must be an Integrated software application system for process management;
• It must meets all standards requirements for coat effective implementation of the a student lifecycle
• It must be an effective and efficient solution to the requirements of the University;
• It must be a self-sustainable and cost-effective solution; It must be scalable and expandable and
caters data management needs of the University for the next 10 years atleast;
• Source code of the software must be provided to the University for future updation, expension and
scalabilty.
• The succeffull implementation of the system culminate in achieving paper less efficient, effective
and user friendly healthy working environment;
• Ensure state of the art service level and coordination among all functional hierarchical
compoments of the university; i.e departments, sections etc.;
• It must optimally reduce processing time by effective automation of workflow at all levels of
University functional Hierarchy.
• It must facilitate faculty, students, officers and staff to smoothly, efficiently and effetively
accomplish their respective data processing and report generation.
• It must have facilities for Integration with the banks to productively streamline all required
financial and accounting process, with FBR, KPRA, KPPRA, KPITB and Hazara University’s
websites;
Page 4 of 31
3. TERMS OF REFERENCE (TOR)
Hazara University intends to have University Management System (UMS) with desired Attributes/Modules
at Data Centre of its Main Campus. Users of Main Campus will access these centralized web-based services
through intranet platform, however; remote users of sub campuses will access these services through
Pakistan Education and Research Network (PERN) which is a high speed network of Higher Education
Commission (HEC) of Pakistan and is being used for inter-site connectivity and remote site users of sub
campuses will also access these services through internet as well”.
A.The main components and deliverables of the assignment are as follows:
1. A smoothly and efficiently operating user friendly state of the art Software System having all
desired Attributes/Modules and with all documentation & training required for implementation,
operation, maintance, scalability and expandibility of the system, to the entire satisfaction of the
Hazara University.
2. Parrallel satisfied operation of the system for a time period of 06 to 09 Months dully certified by
the Univesity;
3. Technicall support service for 03 Years without any additional maintance or operational cost.
B. In Scope Locations
Following is the list of in-scope locations:
i. Hazara University Garden Campus (Main)
ii. Battagram Campus
iii. Affiliated colleges
iv. Private candidates/Distance learning candidates
v. All Banks
vi. Federal Board of Revenue (FBR), KPPRA, KPRA, KPITB & HEC etc.
Page 5 of 31
4. ELIGIBILITY CRITERIA
Following particulars/documents make merit for assessment of eligible bidders;
S.NO
DESCRIPTION
REMARKS
1 Certificate of Company / Firm Registration/ Incorporation under the laws of
Pakistan
Mandatory
2
Government-owned enterprises in the Purchaser’s country may participate only if they are
legally and financially autonomous, if they operate under commercial law, and if they are
not a dependent agency of the Purchaser.
Mandatory
3
Valid Income Tax Registration (NTN). Must be on Active Tax Payer List of FBR.
Mandatory
4
Valid General Sales Tax Registration.
Mandatory
5
Valid Khyber Pakhtunkhwa Revenue Authority (KPRA) Registration Certificate.
Mandatory
6
Submission of undertaking on legal valid and attested stamp paper mentioning that the firm
is not blacklisted by any of Provincial or Federal Government Department, Agency,
Organization or autonomous body anywhere in Pakistan.
Mandatory
7
Time Line for completion of work on all modules is forty-five (45) days from the date of
issuance of work order. Minimum will be given preference.
Mandatory
8
Affidavit on stamp paper to the effect that 2% bid security (Without indicating the
amount) in shape of DD/Pay Oder in the name of Treasurer Hazara University
Mansehra in original available in Financial Bid.
Mandatory
9
The bidder should have strong understanding of UMS and extensive experience with
academic institutions of at least medium size university, preferably in public sectors.
Mandatory
10
The bidder should have completed at least 1 successful implementations of UMS software
preferably in universities of at least similar nature and size.
Mandatory
11
Proof that the PORPOSER is original owner of the software or authorized dealer (Annex–A)
(installation/commissioning/training undertaking by original equipment/software
manufacturer)
Mandatory
12
Client’s Reference(s) of similar work experience as mentioned in (Annex-V (reference list of
similar nature completed projects)).
Mandatory
13 CVs of key personnel (along with the certificates)
Mandatory
Documents regarding “Eligibility Criteria” should be enclosed with Technical Bids. Hazara University may
ask clarification/additional documents other than mentioned above till the opening of Financial Proposal.
The preliminary examination will be conducted on a Responsive or non-responsive basis. Only bids
which have been rated "responsive" in the preliminary examination of bids shall be considered for further
evaluation.
Page 6 of 31
5. TECHNICAL EVALUATION CRITERIA AND SELECTION PROCEEDURE
S.
NO DESCRIPTION REMARKS
1. Compliance to Specifications:
➢ 90-100% compliance with End User's specifications: (16 to 30)
➢ 80-89% compliance with End User's specifications subject to Main Function is NOT Affected.
(10 to 15)
30
2. Special Feature (s) and additional Modules NOT mentioned by the End User's, provided by the firm
which enhances the feature and function (s) of the service(s)
15
3. Past experience over the last seven years in performing similar services to large academic clients.
Please include the year, key scope objective(s), and UMS (along with the list of modules) that your
firm implemented, include the names of the project manager, team members and their roles.
The firm’s ability to complete the work and produces the required products in a timely fashion and the
ability to present any necessary reports and recommendations to University. This section should
contain the description of at least one (1) successfully completed project in the last seven (7) years,
including the name of public sector educational institution for which work was performed, general
description of the scope of work, budget, name and contact information of agency representative
responsible for the project.
{Also attach
work
completion
certificates}
10
4. Current work in hand of at least one entire UMS project in other University. Details of the project
along with Work Order & Agreements are compulsory. {Also attach copies of work order}
10
5. A statement identifying the names of key personnel that will be assigned to this project, including their
titles, length of relevant experience (name of projects executed in education institutions and task
performed), qualifications and proof of certifications for the products and services being offered (attach
resumes). Please include the PROPOSER’s ability to adequately and consistently staff the project with
the same team.
05
6. Outline methodology, planning, design and execution strategies that will result in the analysis, design,
implementation, and training of UMS that are practical to the University. Include a detailed plan for
the services to be provided, along with deliverables to be provided at each step, with a
corresponding timeline, including meetings with University officials. The work plan should be
consistent with the scope of work presented above, however; the PROPOSER may suggest
changes where appropriate.
10
7. Official Partner of the proposed program 05
8. Presence of Local Office in Islamabad and/or (Peshawar or KPK). Bidder(s) shall provide Office
Address Proof.
05
9. Ann ua l Au di t ed rep or t s o f l a s t f in an cia l y ear 05
10. Cover letter along with Annexure-B; The cover letter should a l so introduce short synopsis of
the proposal and credentials to deliver the services sought under UMS.
05
TOTAL TECHNICAL MARKS 100
Page 7 of 31
5.1. SELECTION PROCEDURE
The objective of this section is to define the steps and procedures that shall be adopted for the
award of the tender to the Selected Bidder. Following procedures will be followed for the
Selection of the successful bidder;
i. In the first stage, only Technical Proposals will be opened in the presence of the bidders’
representatives who choose to attend.
ii. Technical evaluation of the bids shall be based on the information provided in the respective
Technical Proposals.
iii. As a part of technical evaluation, bidders will be asked to conduct, on a prescheduled time, a
Presentation/Demonstration/Proof of Concept.
iv. On the basis of technical evaluation, the Financial Proposal of only technically responsive
bidders (qualified bidders) will be opened in the presence of their representatives if they choose
to attend.
v. For the overall evaluation the weightage of Technical and Financial proposals shall be 70% and
30% respectively.
vi. In order to qualify on Technical responsiveness, bidders must fulfill all the requirements as laid
down in the Technical Evaluation Criteria and secure at least 65% of the overall weightage
assigned to the Technical Proposal.
Note:
• Bidders should read these conditions carefully and comply strictly while
sending their tenders.
• If the Tenderer find any discrepancy, error, or omission in the tender Documents
he may notify it to Hazara University, Mansehra in writing before / pre-bid
meeting.
• The University reserves the right to accept or reject any or all tenders fully or partially
as per provision available under Rule-47 of the Khyber Pakhtunkhwa Public
Procurement of Goods, Works and Services Rules, 2014 and invoke Rule-48 of the
said Rules for re-bidding. The University reserve the right to cancel all the bids where
quoted price exceed estimated cost / or market value as per provision available under
Rule-47.
Page 8 of 31
6. TERMS & CONDITIONS OF TENDER
1. Single stage/two envelope bidding procedure shall be applied in response. The envelops shall be marked as
“TECHNICAL PROPOSAL” and “FINANCIAL PROPSAL”. The financial proposal of bids found
technically non-responsive shall be returned unopened to the respective bidders. Technically responsive
bidders shall be informed and their financial bids shall be opened after informing the technically responsive
bidders. The envelopes shall contain;
• Technical Proposal-(1 Original +1 Copies + 1 DVD/USB) in first envelope
• Financial Proposal - (1 Original) in second envelope
2. Rs.2,000/- in form of DD/Pay Order in Favour of Treasurer Hazara University, Mansehra. In case of Tender
Documents are downloaded from University website (www.hu.edu.pk) it should be submitted along with
Pay Order/ Demand Draft of Rs. 2,000/-. (To be attached with Technical Proposal. No bid will be accepted without
Tender Document fee.
3. 2% amount of total bid price (be attached with Tender form) in the form of DD/Pay Order in Favour of Treasurer
Hazara University Mansehra
4. (Technical & Financial Bids) shall be submitted on or before Tuesday, June ,9 2020 at 1300 hrs to the
Procurement Office, Hazara University, Mansehra. The bids will be opened on the same date at 1400 hrs. in the
presence of the bidders or their representative who wish to be present in the Conference Room of Administrative
Block of University.
5. The Employer may, on his own motion or at the request of any prospective Bidder/Supplier(s), hold a pre-bid meeting
to clarify issues and to answer any questions on matters related to the Bidding Documents. All prospective
Bidder/Suppliers or their authorized representatives shall be invited to attend such a pre-bid meeting. The
Bidder/Suppliers are requested to submit questions, if any, in writing so as to reach the Employer on or before pre-
bid meeting i.e Tuesday, June 02 2020 at 1400 hrs in the Conference Room of the University.
Any modification of the Bidding Documents hereof which may become necessary as a result of the pre-bid meeting
shall be made by the Employer/ exclusively through the issue of an Addendum on Hazara University’s website
and not through the minutes of the pre-bid meeting. Absence at the pre-bid meeting will not be a cause for
disqualification of a Bidder/Supplier.
6. Bids received after the due date and the specified time (including the extended period if any) for any reason
whatsoever, shall not be entertained and shall be returned unopened. No correspondence will be entertained on
this matter. The University shall not be responsible for any postal delay or non-receipt/non- delivery of the
documents. No further correspondence on the subject will be entertained. The University reserves the right to
modify and amend any of the above-stipulated condition/criterion depending upon project priorities vis-à-vis
urgent commitments.
7. The Proposal should be filled by the bidders in English language only. If any supporting documents submitted are in
any language other than English, translation of the same in English language is to be duly attested by the Bidders.
For purposes of interpretation of the documents, the English translation shall govern.
8. Any dispute arising during course of completion of assignment will be referred to the Vice Chancellor of Hazara
University, Mansehra and his decision will be final and binding upon the bidder
Page 9 of 31
9. Bid security shall be kept sealed in the financial proposal. The bidder(s) are also required to keep an affidavit in
the technical proposal stating that a bid security amounting to 2 percent of total amount, without indicating the
figure in the letter, has been placed in the financial proposal. Otherwise the technical proposal will be considered
non-responsive and will be returned to the bidder(s) after being examined by the University Purchase Committee.
10. The winner of bid shall submit a performance guarantee @10% of the total won bid amount in form of demand
draft/pay order/Bank Guarantee in favor of Treasurer Hazara University Mansehra. Performance guarantee will be
released after successful completion of 100% work. However, retention money @10% of the total amount will be
deducted from the bill which will be released after successfully lapse of warranty / defect liability period from the
effective date of taking over certificate.
11. Warranty:
Limited Media Warranty. The Developer warrants that, for a period o f 3 years following delivery of the
Software, the media upon which the Software is delivered will be free from defects in materials and workmanship
under normal use.
The Developer's sole obligation in this regard will be to provide the purchaser with a performing copy of the
Software without costs to the purchaser within a reasonable time (within one month) following the purchaser
written notice to the Developer of the defect.
Limited Support Warranty. For a period of three (03) years following the deployment of the Software,
the Developer shall perform its maintenance and support services consistent with generally accepted industry
standards, but only if the Software is installed and operated in accordance with the Developer's documentation
and other instructions.
Limited Performance Warranty. The Developer warrants that, for a period of three (03) years starting on the
date of deployment of the Software, the Software will perform substantially in accordance with the functional
specifications set forth in the documentation, but only if the Software is installed and operated in accordance with
the Developer's documentation and other instructions.
If the Supplier, having been notified, fails to remedy the defect(s) within the specified period, the Purchaser
may proceed to take such remedial action as may be necessary, at the Supplier’s risk and expense and without
prejudice to any other rights which the Purchaser may have against the Supplier under the Contract.
12. The bidder shall indicate in his offer, list of items / modules with prescribed specifications / features etc, the unit
price and total bid prices of each items / modules (Total price must Include transportation, insurance, fixing, placing,
demonstration, testing, training, deputation of staff for atleast three years and all Government taxes etc). Taxes levied
by the Government, if any, shall be recoverable from the bidder as per rules. The Price should be quoted in Pakistani
Rupees.
13. No advance payment will be made as per Government rules. The payment will be made to the supplier after
completion of entire work. The retention money / performance guarantee will be released after successfully laps of
warranty / defective period. As per mutual agreement, payment may be released as per following breakup;
• 20% Submission of System Analysis Document & System Requirement Specification
• 30% upon Deployment of Project.
• 40% after complete deployment/training of Complete System at Hazara University, Mansehra per contract.
Page 10 of 31
• 10% after successful completion of warranty / defect period.
14. Liquidated Damages: If the Supplier fails to deliver any or all of the Goods or to perform the Services
(modules/software/training/documentation etc.) within the period(s) specified in the Contract, the Purchaser shall,
without prejudice to its other remedies under the Contract, deduct from the Contract Price, as liquidated damages,
0.5% of the total amount of the Contract per week, up to a maximum of 10% of the total amount of contract. Once
the maximum is reached, the Purchaser may consider termination of the Contract.
15. Force Majeure: The Supplier shall not be liable for forfeiture of its performance security, liquidated damages, or
termination for default if and to the extent that it’s delay in performance or other failure to perform its obligations
under the Contract is the result of an event of Force Majeure.
For purposes of this clause, “Force Majeure” means an event beyond the control of the Supplier and not involving
the Supplier’s fault or negligence and not foreseeable. Such events may include, but are not restricted to, wars or
revolutions, fires, floods, epidemics, quarantine restrictions, and freight embargoes.
If a Force Majeure situation arises, the Supplier shall promptly notify the Purchaser in writing of such condition
and the cause thereof. Unless otherwise directed by the Purchaser in writing, the Supplier shall continue to
perform its obligations under the Contract as far as is reasonably practical, and shall seek all reasonable alternative
means for performance not prevented by the Force Majeure event.
16. Offer should be valid for 60 days from the date of opening of tender.
17. The Purchaser may at any time terminate the Contract by giving written notice to the Supplier if the Supplier
becomes bankrupt or otherwise insolvent. In this event, termination will be without compensation to the Supplier,
provided that such termination will not prejudice or affect any right of action or remedy which has accrued or will
accrue thereafter to the Purchaser.
18. The bidder(s) shall quote their best delivery period and following deliverables are expected from this project:
i. Detailed plan for the project execution
ii. Requirements Specification Document(s) and their Design Document(s) based on Requirements Specification,
Installation, configuration, customization, and integration covering the scope of the project System’s documentation
in the form of installation and configuration guides, user and administration manuals etc.
19. If the acceptance of tender issued during the validity period of the tender is not accepted by the bidder. The
Earnest Money shall be forfeited.
20. Any overwriting/crossing, etc. appearing in the offer may be properly signed by the person signing the tender. All
pages of the tender must be properly signed & stamped. Offer with any overwriting/use of Blanco shall not be
accepted in any circumstances.
Page 11 of 31
21. Deliverables: Two copies of final version, hard copy along with soft copies on CDROM shall be given to Hazara University,
Mansehra. The document must have the following: - A Complete Analysis details
• Database design
• Data dictionary with complete meta data
• Complete System Design and Complete final version of Source Code along with details and liacencse of the language /
tool used for developing software system.
• Input forms / screens
• Output report formats
• Screens for queries
• Codification-naming convention.
• Design methodology
• Inter system linkages/ interfaces
• Security and backup considerations
• System Manuals (Hard Copy + Soft Copy)
• User Manuals (Hard Copy + Soft Copy)
• Detailed Training Material for all modules covered in the project and trainings for all leels of users.
• Hardware and Software platforms available at the University Scanner and necessary software (to be suggested by the
tenderer)
22. In case, the bidder fails to execute the contract strictly in accordance with the terms and conditions laid down
in the contract, the security deposited by him shall be forfeited.
23. Any conditional, ambiguous, incomplete, supplementary or revised offer after the opening of tender, shall not be
entertained.
24. Bidders shall have office in Islamabad or Khyber Pakhtunkhwa.
25. The contractor shall not assign or sub-let his contract or any substantial part thereof to any other agency.
26. The evaluation will be based on the comparison specification/ modules/ features, technical team, past experience and
software etc. The University reserves the right to add any other modules / features at its own discretion / requirement
without any additional cost on University.
27. Any overwriting / crossing etc. appearing in the offer, may be properly signed by the person signing the
tender. All pages of the tender must be properly signed.
28. After Sale service and proper training must be guaranteed for a period of atleast three years. Successful bidder
will also depute technical team to the Hazara University during the entire warranty period without any additional
liability on Hazara University. (Attached with Technical proposal)
29. From amongst the “Technically Responsive” bids the one found highest scorer for the cumulative value of both
Technical and Financial scores (Score on Technical Evaluation + Score on Financial Evaluation), will qualify for the
award of tender.
Page 12 of 31
30. The university reserves the right at the time of award of contract to increase or decrease the number of modules
and their features.
31. Within a week of receipt of contract, the successful bidder shall sign the contract and return it to the University.
32. Bidder shall be bound for complete installation/commissioning, proper training and indoor availability of technical
staff for atleast three years Free of Cost on site (At Hazara University, Mansehra).
33. Work order/ contract will be issued subject to the availability of funds.
34. The bidders are required to submit the company profile including Technical, Engineering, managerial
capabilities after-sale service and past experience / performance along-with their Technical bid and also list of
reference installation in Pakistan for similar equipment. (Attached with proposal)
35. Modules &features mentioned at section No-8 under the heading “Hazara University Management System
(HUMS)” are minimum. Maximum Modules & features in each module may increase / decrease as per actual
requirement of the University without any additional cost on the University.
36. The formal Agreement between the Employer and the successful Bidders shall be executed as per instructions of
tender documents within 14 days of the receipt of the Contract Agreement by the successful Bidder(s) from the
Employer. The Contract form is provided at Annexure-D, which may be modifiable as per mutual consent of both
the parties.
37. The successful bidder shall be responsible for complete installation / commissioning / training and shall also depute
of team to Hazara University, Mansehra to upgrade the modules and features as per actual requirement of the
University for a warranty period of three years without any additional cost and shall provide undertaking as per
Annexure-F.
38. All the bidder(s) are required to regularly visit Hazara University website www.hu.edu.pk for time to time
notifications / information and updates about the tender process.
7. SPECIAL / MANDATORY CONDITIONS
• Refurbished or Grey smuggled products / software will not be accepted in any case.
• Manufacturer’s Authorization Letter (Where applicable) will be provided by the bidder(s). The same shall
be verified with the Manufacturer / issuing authority.
• Any product inferior to the given specification / University requirement shall be disqualified straight away.
• Compliance sheet must be provided by the bidder along with the quotation
• Specification shall be equivalent or higher.
• The modules alongwith its features once approved may be changed with another one (Not available in
tender documents) as per actual requirement of University without any change in price once approved.
Page 13 of 31
8. HAZARA UNIVERSITY – CAMPUS MANAGEMENT SYSTEM (HCMS)
8.1 CAMPUS MANAGEMENT SYSTEM Hazara University, Mansehra intends to develop a comprehensive information system to computerize all functions
performed at the university including the entire student lifecycle starting from the admissions to graduation, HR,
Finance, Examination and others. The whole system shall be divided into two major parts: CMS (student information
system) and University Management Information (UMS) (to manage and automate all functions at the university for
smooth running of the business). As this is a long-term solution, therefore, the database engine and other technical
aspects of the HCMS should also be identified and acquired so that university has no problem in future.
8.2 TITLES OF THE MODULES AND SUB MODULES
Titles of the modules and sub modules are given in below table;
Unit# Title of the Module Type CMS/UMS
1 Core Module CMS/UMS
2 Access to data and Security
Management of the System
UMS
3 Admission Module CMS
4 Academic Module CMS
5 Online Learning Module CMS
6 Student Portal Module CMS
7 Student Financial and Scholarship CMS
8 Student Services Center (SSC) Portal UMS
9 Examination Module UMS
10 Hostel Management Module CMS/UMS
11 Library Management System Module UMS
12 Human Resource Management UMS
13 Financial, Payroll, Store & Inventory Management UMS
14 Planning and Budget Management UMS
15 Project Management UMS
16 Repair and Maintenance and Record of
Buildings
UMS
17 Campus Accommodation and House Management System
UMS
Page 14 of 31
18 Transport Module UMS
19 Job Portal – Module UMS
20 Data Migration UMS
21 Collaboration Details UMS
22 Document Manager UMS
23 Historical Events and its records UMS
24 Quality Enhancement Cell (QEC) UMS
25 Office of Research, Innovation and Commercialization (ORIC)
UMS
26 Sports Management System CMS
27 Affiliated Colleges UMS
28 Alumni Association UMS
29 Question Bank and Paper Generator for Entry test and other tests and examinations.
CMS/UMS
30 Staff Welfare Module UMS
8.3 TECHNOLOGICAL ASPECT:
All those who want to take part in tender process must also propose the technical platform which will be used to
developed the whole system. The rapid changes in the technology should also be brought into consideration for
future sustainability of the system.
Page 15 of 31
8.4 CMS – STUDENT INFORMATION SYSTEM:
The functionalities of the CMS can divided into the following modules/sub-systems:
Unit # MAIN MODULES & MAJOR FEATURES
(CMS/UMS)
UNIT
COST
Total amount (Inclusive of all
charges, taxes, support cost
during warranty period, demo,
testing, training etc)
Unit
No. 1
Core Module: (CMS/UMS)
Setting up basic academic and administrative rules related to the
Student information system. For example:
• System of Education setting up - policies, rules and regulation
• Campuses
• Affiliated Colleges
• Private and external students
• Faculties, academic departments, centers, degree programmes,
diploma and certificates courses
• Outcome based Education (OBE) • Data Security and access control • Back-up
Unit
No. 2
Access to data and Security Management of the
System: (UMS)
• Access should be provide to all users as per their
need and role to various data and information with
full privacy and confidentiality.
• A complete list of users with their requirements will be
provided to the developer by the university.
• Maintaining record of each transaction and operation on
the data
• Maintaining of log files
• A mobile Apps shall also be developed for this purpose.
Unit
No. 3
Admission Module: (CMS)
The following functions shall include under the Admission
Module:
• Online Registration of the candidates for the admission to
various academic programmes.
• Online Submission of admission form/application in one or
more than one programs or a single application with
multiple options available to the candidates. Uploading
required information to the system will be part of this
module.
• Application processing
o Evaluating applications using rules and regulations for
admission to various academic programmes
o Generation of merit-list and waiting lists as per the
university requirements.
• Linking the admission system with other systems available
or to be developed by the university in the future as per the
requirements of the university.
Page 16 of 31
• Generation of fee slip, deposit details and linking the
system with the Banks in asynchronous and synchronous
modes.
• Linking the admission system with the third party testing
system.
• Admission Analysis, i.e, trends of application in each
programme, etc.
• Generation of various reports as per the requirements of the
University including .
Unit
No. 4
Academic Module: (CMS)
• Catalogs and Curriculum of each degree programme as per
the university approved policy.
• Keep record of various activities such as versions of
approved curriculum, equivalence of courses, transfer
students’ option, cross-coded courses, and maintaining list
of non-credit courses.
• Enrollment as per the university requirements
(requirements will be given by the User that how students
can be enrolled in the system).
• Grading schemes and linking it with OBE.
• Student portal to be linked with this module.
• Graduation Processing (registration for convocation,
medals, other certificates, academic costume, fee, etc)
• Planning for semesters as per the academic calendar
• Pre-registration by students
• Teacher and course information offered in various semester
• Faculty and Facility to assign teachers with courses offered
in the semester of the specific batch.
• Facilities and support for various functions required during
a semester such as add & drop of courses, withdrawal of
courses, System should support the replacement of an
abolish course with an equivalent course (if any).
• Student Attendance System sub module as per the
university rules and regulations.
• Student’s Academic Advisory System
• Students’ Counselling session by the Academic Advisors
• OBE concept shall be incorporated to the academic
(curriculum of each degree programme) – ELOs, PLOs,
CLOs and other principles of the OBE based shall be
incorporated
• All required function of the OBE based system such as
Mapping of various LOs, remedial process, grading, and
others shall be incorporated.
Page 17 of 31
Unit
No. 5
Online Learning Module: (CMS)
The university has already developed LMS based on Open
Source Software which should be integrated with the CMS
by including more sophisticated features such as video/audio
lectures, zoom connectivity and course management. This
module should also be linked with the student portal and
academic modules to share data for the users.
Unit
No. 6
Student Portal Module: (CMS)
The main purpose of this module to provide services to
student and their parents to view data concerning to them. A
flexible module should be developed so where new features
(reports) can be added. Some of the following common data
which shall be made visible to students through the system:
• Personal information
• Course enrollment status
• Updated Class schedules and timetable
• GPA and other marks
• Attendance Status in each course
• Dues Status - paid and outstanding
• Printing vouchers etc,
• Review all financial transactions made by the student
Unit
No. 7
Student Financial and Scholarship: (CMS)
In order to facilities students and candidates (external
candidates for examination) who would like to pay dues or
other amount, a comprehensive module would be required to
handle this important matter through automatic means. The
following should have the following features and performing
tasks, which are listed below:
Prominent features
• Making payment through online system
• Linking modern payment methods such as auto payment
from ATM, Credit Cards and through mobile companies
payment systems (JAZZ, Easy paisa, etc).
• Payment Alert for students and finance dept of the
university.
Functions:
• Generating tuition & other Fees vouchers and bills for
students and candidates for various types of activities such
as test fee, admission fee, examination fee, etc.
• Hostel payments management
• Creating students payment plans along with installment
and/or discount as per the rules.
• Miscellanies (fine, freezing , wavier etc.) as per the
university requirements.
• Managing Student Account and generating messages as
per the university requirements.
• Financial Aid and Scholarship (an independent sub-
module to be created for this purpose). The scholarship sub
module should include all functions required from the
Page 18 of 31
announcement till the award of scholarship.
• Various reports as per the university requirements.
Unit
No. 8
Student Services Center (SSC): (UMS)
• Online Application System for student where student
should be able to submit any application for academic and
non-academic matters.
• Processing of student application by the SSC staff.
• Making decision on the application by relevant officer or
section.
• Communication of decision to student
• Student’s Appeal System: student may launch appeal
against any decision as per the rules and regulations of the
university.
Unit
No. 9
Examination Module: (UMS)
• In addition to the Academic Module stated above, an
independent module for the examination section will be
created with the following functions:
• Planning and announcement of Examination schedule
• Fee/Payment of examination to be integrated with the
Students’ finance as shown above.
• Allocation of invigilation staff along with the TA/DA (if
any).
• Conduct of exam including all function starting from
issuing of admit card/roll number slip and till
announcement of results.
• Generation of Degree, transcript, and other certificate as per
the requirements.
o Issuing of degree after completing all formalities
through the integration of this module with the
students’ finance and academic.
o Auto issue degree and transcript system (Vice
Chancellor and others).
o Watermarking on the printed degree and transcript
o Various report as per the examination
department requirements.
Unit
No.
10
Hostel Management Module: (CMS/UMS)
The university provides hostel facilities for both male and
female students. The following functions shall be required
for the Hostel Management Module:
• Application for hostel during the admission time (while
candidates applying for admission should opt for the
hostel).
• Allotment of hostel based on the merit as per the
university rules and regulations
• All routine matters/functions shall be included from
hostel fee, food, change of room, availability of rooms,
Page 19 of 31
discipline matters, in-out record, permission to leave
hostel especially for female student, mess management,
etc.
Unit
No.
11
Library Management System Module: (UMS)
• Configuration of Koha with all functions (issue, return,
circulations, etc.) at the university
• Integration of Koha with other system/module
• Digital Library
• Thesis and research Repository
Unit
No.
12
Human Resource Management: (UMS)
A comprehensive module shall be developed to provide
useful information and support the university
management to make decision regarding the HR System.
A well taught Decision Support System (DSS) shall be
developed.
Major Functions:
• Development of HR Database and migration of the
current data into the system.
• Hiring and need based assessment as per rules and in the
light of the existing HR available.
• Job Portal shall be developed as per the HU Statutes and
rules.
• Implanting new hired personnel
• HR Module shall include all functions required from
hiring till Retirement
• Auto Leave application based on DSS
• Auto NOCs issuing system for different situation based
on DSS
• Request forms for GP fund and other matters through
online system.
• Auto Housing Allotment based on DSS
• Auto billing system for services at the University
(including canteen, transport, etc).
• Various HR Reports as per the requirement of the
university.
Unit
No.
13
Financial, Payroll and Store Management: (UMS)
Financial unit plays a vital role in the success of the
universities in modern ages. A well taught financial module
would be required to provide support to the management
to make appropriate and timely decisions. Preparation of
budget, planning for new activities, purchases, and financial
analysis of the various units of the university shall be
included in this module. The Finance module shall include
the following sub-module also:
Page 20 of 31
1. Payroll
2. Store
3. Procurement
Note: Open source software or licensed based (with a
reasonable annual subscription or one time cost) can also be
used for this module which can be then integrated with all
other modules every it is applicable and required.
Major Functions:
• Integration of all fee collections to the finance of the
university.
• Development of budget as per the required format.
• Live Dashboard to show the update status of each major
budget head to Vice Chancellor and other designated
managers.
• Record of all transactions.
• Integration all transactions to the online Cash management
system and banks.
• Investment details and updated information for timely
decision.
• Cost and benefits analysis of each unit within the
university in term of the vision and mission of the
university.
• All routine functions such as Bank & Cash Voucher,
Journal Voucher, Trial Balance, Balance, Profit & Loss,
Income Statement, Financial Reports, Pay Generation,
Tax Calculation and Certificates, Pay Slip Generation
and Advance Salary
• Monthly issuance of payslips via email to all employees
with updated balances of GPF balances etc.
• Maintinance of pension record
• Printing of cheques, vouchers and reports
• Maintinance of Department Developmental Fund
Accounts as per requirement.
• Maintinance of internal audit record as per requirement
• Complete record of all payment to individual in form of
TA/DA, allowances, honorarium, and other payments.
• Auto Ident system for purchasing through store and
procurement.
• Record of all stocks in the main store
• Record of all stocks in each section / department and its
integration with main store
• Integration of all assets with KPITB website
• Generation, printing and scanning of Bar Codes as per
KPITB requirement for all assets
• Record of all consumables
Page 21 of 31
• Maintinance of Comparative Statements
• Integration of Procurement record with KPPRA and
Hazara University’s websites as per KPPRA Rule.
• E-tendering as per KPPRA Rule
• Purchase Order/Supply Order
• Integration of BPV, Cheque Nos, amount, invoice &
vender references etc with assets record.
• Good Receive Notes
• Complete Inventory Management
• Issuance and Return
• Various Reports as per the requirement of the university.
Unit
No.
14
Planning and Budget Module: (UMS)
• Planning for the Annual budget
• Integrating the departmental requirements –
requirements may be obtained from each department
using approved format.
• Integrating requirements of all department
• Budget preparation as per the approved format
• Execuation of annual budget
• Integration of Budget Record with Books of Accounts
• Integration of headwise budget in vouchers with
comparative analysis of allocated, consumed and actual
available budget etc.
• Dashboard shall be created for Vice Chancellor and
others to view latest position of each budget head.
• Alarms generation if spending is exceeded for any head.
Unit
No.
15
Project Management: (UMS)
• All projects must be recorded in the system with details.
• Any project given to the university by Government must
be recorded and managed through the automatic system
using the following data
o Title of the project
o Amount
o Sponsor agency
o Dates – launch and completion
o Current progress and status
o Audit report (if required)
o Completion of project
o Review after completion
o Maintenance period
o Integration of project record with main book of
accounts.
Page 22 of 31
Unit
No.
16
Repair and Maintenance and Record of Buildings:
(UMS)
• Request and maintenance form
• Request for maintenance shall be traced through the auto
system
• Complete Annual Maintenances record of each building
• Budget allocation based on the historical data
Unit
No.
17
Campus Accommodation and House Management
System: (UMS)
Currently a number of houses, hostels and guesthouses
are available at the university. The following function
shall be included in this module:
• Allotment procedure – from application to the
occupation
• Complete financial record of each staff hostel,
residence and guesthouse
• Complete Annual Maintenances record of each house,
staff hostel and guesthouse
• Record of complaint received and settled.
Unit
No.
18
Transport Module: (UMS)
• All university vehicles to be recorded with appropriate
details
• Current usages
• Maintenance record on annual basis
• Allotment of Vehicle for official use
• Budget of the transport section
• Fuel consumption (pkm) & ceiling comparison reports
• Auction of vehicle
Unit
No.
19
Job Portal – Module: (UMS)
• Integration of existing online application and its
conversion to a full-fledged job portal.
• Announcement of jobs
• Online Applications
• Processing of application as per the rules and regulations
• Communicating outcome to candidates.
• Appeal against scrutiny if any
• Shortlisting and calls for interview
• Complete record and back-up of the system
Page 23 of 31
Unit
No.
20
Data Migration: (UMS)
• Migration of Existing Data
• Import Data from Existing Software, Excel Sheet or Word
• Data Verification
Unit
No.
21
Collaboration Details: (UMS)
• Record of all collaboration with national and international
organizations
• Major outcome of the collaboration
• Auto Update about each collaboration to the Vice
Chancellor and other senior management
Unit
No.
22
Document Manager: (UMS)
• Record of all official documents
• Minutes of major bodies – Academic Council, F&PC,
Syndicate and Senate with all searching facilities.
• Searching of any document or specific decision in minutes.
• Providing document to a person or organization with
approval.
• Maintinance of personal record of all employees
• Maintinance of pension record
• Other Useful function
Unit
No.
23
Historical Events and its records: (UMS)
• Record of convocation with details such as Chief
guest, vice chancellor, students graduated, date and
other useful information.
• Conferences and other events
• Sport events
• Various ceremonies
Unit
No.
24
Quality Enhancement Cell: (UMS)
• Various forms and reports to be submitted and generated
by the QEC.
• Course evaluation through electronic questionnaire,
which requires a written or selected response answer to
a series of questions in order to evaluate the instruction of
a given course.
• Teacher evaluation for improvement focuses on the
provision of feedback useful for the improvement of
teaching practices, namely through professional
development. It involves helping teachers learn about,
reflect on, and improve their practice.
• Course and teacher evaluation is a mandatory process for
students in the end of a semester.
• Various reports as per the requirement of the Department.
Page 24 of 31
Unit
No.
25
Office of Research, Innovation and
Commercialization (ORIC): (UMS)
• Various forms and reports to be submitted and generated
by the ORIC.
• Recording all R&D matter at the University.
• Record of research paper published in each year.
• Record of Patents by the university staff and students
• Record of products development
• Record of funded projects
• Impact of projects and major outcome
• Various reports as per the requirement of the Department.
Unit
No.
26
Sports Management System: (CMS)
• Existing sport facilities
• Events organized by the Sport Directorate.
• List of teams
• Selection of players for each team
• Budget
• Indoor and outdoor gymnasium
Unit
No.
27
Affiliated Colleges: (UMS)
• List of affiliated college with allowed academic
programmes
• Portal for the colleges to interact with the university.
• Integration of Assessments & visit reports of Committees
• Required record of the students from affiliated colleges
• Payment details
Unit
No.
28
Alumni Association: (UMS)
• Online Auto registration system of the graduated students
to Alumni
• Recording of Success stories by Alumni
• Donation by the Alumni
• Issuance of Alumni Card
• Notable Alumnus
• Major achievement by the Alumni
• Reunion
• Contribution by Alumni to the university
• Details about elections
• Alumni portal for the Alumni association to
communicating Alumnus and university.
Unit
No.
29
Question Bank and Paper Generator for Entry test
and testing??? (CMS / UMS)
• Question Bank Definition both Subjective and Objective
• Random Paper Generation
• Paper Format Definition
• Paper Printing
Page 25 of 31
Unit
No.
30
Staff Welfare & Insurance Fund Module: (UMS)
• Record of Subscription, donations, gifts and endowments
etc to the Fund
• Investment record
• Integration of unclaimed amount of interest on Provident
Fund of an employees
• Integration of unclaimed amount of Provident Fund for last
six years
• Maintinance of Bank record, ledger & vochers etc
• Generation of Reports for Management Committee, Board
of Trustees, Annual Audit, and other Statutory Bodies etc
as per requirement.
• Generation of payment default report
• Association of record with subscription and benefits
• Head wise Ledgers and maintenance of record of
employees availed the benefits from fund
• Incorporation of approved subscription and benefit rates
etc.
Support cost of two years after expiry of warranty period of three years
with number of personal __________________
Total amount
Note: Bidder(s) are required to provide unit cost, total amount and support cost in financial proposal and
provide the modules / features in technical proposal.
Page 26 of 31
ANNEXURE – BIDDING FORMS
Annexure - A
LETTER OF BID (LETTER OF INTENTION
(To be furnished with technical proposal)
Procurement Ref. No: Dated:___/June/2020
To
The Treasurer,
Hazara University, Mansehra
Dear Sir,
Having examined the bidding documents, the receipt of which is hereby duly acknowledged, we, the
undersigned, offer to supply, install, train and commission the Software in conformity with the said bidding
documents and technical offer.
We undertake, if our Bid is accepted, to deliver the services/goods within days from
date of award of contract.
We agree to abide by this Bid for the Bid Validity Period specified in the bidding documents and it shall
remain binding upon us and may be accepted at any time before the expiration of that period.
Until a formal Contract is prepared and executed, this Bid, together with your written acceptance thereof
and your notification of award, shall constitute a binding Contract between us.
We understand that you are not bound to accept the lowest or any bid you may receive. We certify/confirm
that we comply with the eligibility requirements as per bidding documents.
Dated this day of 2020
Duly authorized to sign Bid for and on behalf of
______________________________________
(Name & Designation)
___________________________________
(CNIC No)
_________________________________
(Mobile No)
________________________________
(Stamp)
Page 27 of 31
Annexure – B
LETTERHEAD OF SUPPLIER/MANUFACTURER)
BIDDER QUALIFICATION STATEMENT
(To be furnished with technical proposal)
Name and Address of Tenderer/Bidder
A. Name of Supplier/Tenderer
B. Address of Head Office
C. No. of Employees/Engineers
D. Date Established and/or Registered
E. Project In-charge
F. Section/Department/Division
G. Email Address: ____________________________________________
H. Telephone Number ____________________________________________
I. Mobile Number ____________________________________________
J. National Income Tax No. ____________________________________________
K. Khyber Pakhtunkhwa Revenue Authority (KPRA) Registration: ___________________
We hereby certify to the best of our knowledge that the foregoing statement are true and correct and all
available information and data have been supplied and that we agree to show documentary proof thereon upon
your request.
Name & Address of the Tenderer
(Signature)
(In the Capacity of)
Page 28 of 31
Annexure – C
DECLARATION
I have read all the terms and conditions and agree to fully comply and abide by them. Any non-conformity
on my part would result in the rejection of the bid.
__________________ __________________
Name of the Tenderer UMS & IT, Manager
Authorized Signatures Authorized Signatures
& Official Stamp & Official Stamp
Page 29 of 31
Annexure – D
THIS AGREEMENT made the day of 2020 between Hazara University, Mansehra (hereinafter
called “the Purchaser”) of the one part and [name of Supplier] (hereinafter called “the Supplier”) of the
other part:
WHEREAS the Purchaser invited bids for certain goods and ancillary services, viz., procurement of
Software’s and has accepted a bid by the Supplier for the supply, installation, commissioning and
training of those goods and services in the sum of [contract price in words and figures] (hereinafter
called “the Contract Price”).
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
1. In this Agreement words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this
Agreement, viz.:
(a) the Price Schedule submitted by the Bidder;
(b) the Technical Specifications;
(c) the General Conditions of Contract;
(d) the Purchaser’s Notification of Award.
(e) Bidding Documents.
3. In consideration of the payments to be made by the Purchaser to the Supplier as hereinafter
mentioned, the Supplier hereby covenants with the Purchaser to provide the goods and services and to
remedy defects therein in conformity in all respects with the provisions of the Contract
4. The Purchaser hereby covenants to pay the Supplier in consideration of the provision of the
goods and services and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the
contract.
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in accordance with
their respective laws the day and year first above written.
Signed, sealed, delivered by the (for the
Purchaser)
Signed, sealed, delivered by the (for the
Supplier)
CONTR A CT FORM
Page 30 of 31
Annexure-E
To
The Treasurer,
Hazara University, Mansehra .
WHERES (Name of Supplier) (hereinafter called “The Supplier”) has undertaken, in pursuance of
Agreement dated to supply, install, train and Commission Software.
AND WHEREAS, it has been stipulated by you in the said Agreement that the Supplier shall furnish you
with a Bank Guarantee by a recognized bank for the sum specified therein as security for compliance with the
Supplier’s performance obligations in accordance with the Agreement.
AND WHEREAS we have agreed to give the Supplier a Guarantee:
THEREFORE WE hereby affirm that we are Guarantors and responsible to you, on behalf of the
Supplier, up to a total of (Amount of the Guarantee in Words and Figures) and we undertake to pay you, upon your
first written demand declaring the Supplier to be in default under agreement without cavil or argument, any sum
or sums within the limits of (Amount of Guarantee) as aforesaid, without your needing to prove or to show grounds
or reasons for your demand or the sum specified therein.
This guarantee is valid until the (Day) day of (Month), (Year).
Signature and Seal of the Guarantor
Date Address
PERFOR M A N CE BOND ( FORM)
Page 31 of 31
Annexure - F
INSTALLATION/COMMISSIONING/TRAINING/DEPUTATION OF TEAM
UNDERTAKING BY ORIGINAL EQUIPMENT/SOFTWARE MANUFACTURER
We (Name of Original Software Manufacturer or Authorized Dealer), a manufacturer/ authorized
dealer duly organized under the law of (Name of Country) and having its principal place of business
at (Address of Original Software Manufacturer or Authorized Dealer) hereby undertake that we are
exclusively responsible for the successful Installation, Commissioning, and Training for the
equipment/software offered by us/ our local agent for your Invitation for Bids Reference
Number____________________________ dated____/_____/2020. .
It is hereby further undertake that our technical team comprising of _____persons will be available in
Hazara University, Mansehra on working days to upgrade all modules and features as per actual
requirement of the University for a warranty period of three years.
Any and all costs associated with successful installation, commissioning, training and deputation of
team for a warranty period of three years has been included in our aforementioned quotation.
Date
Name & Address of the Original Software Manufacturer or Authorized Dealer
(Signature)
Note: This letter should be on the letterhead of the Original Software Manufacturer or Authorized Dealer and
should be signed by a duly person.