BIDDERS’ CONFERENCE IT-3981Dismantling, Refurbishment, Replacement and Supply of Electrical
Overhead Travelling Cranes Over 10 Tons Capacity
January 14th-15th 2014 Handling Engineering Group
Technical Annexes 1 and 4
Handling Engineering Group 3
Technical Annexes 1 and 4
• Annex 1: General Requirements for Electrical Overhead and Gantry Cranes
• Annex 4: PLC Programming and Documentation Requirements
January 14th-15th 2014
Handling Engineering Group 4
Annex 1• General requirements applicable both to
new cranes and to new components for refurbishment works on existing cranes
• Some of the requirements are mandatory while others are applicable only when stated in the technical questionnaire
• Machine Directive 2006/42/EC and technical questionnaire have priority with respect to this document
January 14th-15th 2014
Handling Engineering Group 5
Annex 1
January 14th-15th 2014
Handling Engineering Group 6
Annex 1
January 14th-15th 2014
Handling Engineering Group 7
Annex 1
January 14th-15th 2014
Handling Engineering Group 8
Annex 1
January 14th-15th 2014
Handling Engineering Group 9
Annex 1
January 14th-15th 2014
Handling Engineering Group 10
Annex 1
January 14th-15th 2014
Handling Engineering Group 11
Annex 1
January 14th-15th 2014
Handling Engineering Group 12
Annex 1
January 14th-15th 2014
Handling Engineering Group 13
Annex 1
January 14th-15th 2014
Handling Engineering Group 14
Annex 1
January 14th-15th 2014
Handling Engineering Group 15
Annex 1
January 14th-15th 2014
Handling Engineering Group 16
Annex 1
January 14th-15th 2014
Handling Engineering Group 17
Annex 1
January 14th-15th 2014
Handling Engineering Group 18
Annex 4
Covers the following aspects of PLC programming:• Design requirements• Interface with users• Software protection• Documentation
January 14th-15th 2014
Handling Engineering Group 19
Annex 4
January 14th-15th 2014
Handling Engineering Group 20
Annex 4
January 14th-15th 2014
Handling Engineering Group 21
Annex 4
January 14th-15th 2014
Handling Engineering Group 22
Annex 4
January 14th-15th 2014
Handling Engineering Group 23
Annex 4
January 14th-15th 2014