BID CLARIFICATION #1 · reference specification section 12-2400 window shades. 2. reference...

3
BID CLARIFICATION #3 June 19, 2019 DUE DATE: June 25, 2019 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 90661 LOCATION: University of Connecticut Capital Projects & Facilities Procurement 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661: 1) Attached is the Christopher Williams Architects Addendum #3 including Drawing G-004 End of Bid Clarification #3

Transcript of BID CLARIFICATION #1 · reference specification section 12-2400 window shades. 2. reference...

Page 1: BID CLARIFICATION #1 · reference specification section 12-2400 window shades. 2. reference architectural rcp's & interior elevations & details for more specific information and extent

BID CLARIFICATION #3 June 19, 2019 DUE DATE: June 25, 2019 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 90661 LOCATION: University of Connecticut Capital Projects & Facilities Procurement 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661:

1) Attached is the Christopher Williams Architects Addendum #3 including Drawing G-004

End of Bid Clarification #3

Page 2: BID CLARIFICATION #1 · reference specification section 12-2400 window shades. 2. reference architectural rcp's & interior elevations & details for more specific information and extent

06/19/2019 IPB 901 661 ADDENDUM 3 Page 1 of 1

ADDENDUM #3

VIA EMAIL ................................................ Date: Jun 19, 2019 Project: 1905 – Tech Quad Phase III Innovation Partnership Building UCONN Project No: 901 661 Re: Constructions Documents - Additional 3rd Floor Window Treatments Issued by: Christopher Williams Architects LLC

85 Willow Street, Building 54 New Haven, CT 06511 (203) 776-0184

To: Antoaneta Fedeles AIA,

LEED AP Project Manager / Facilities and Space Planner - UCONN University Planning, Design and Construction

[email protected]

Walt Dalia Purchasing Agent II Capital Projects & Facilities Procurement

[email protected] (860) 486-8047

No. of pages: 1 Notice to all Bidders: This Addendum forms a part of and modifies the original documents issued for bidding, dated May 10, 2019 to the extent noted herein. This Addendum supersedes all previous Drawings, General Documents, Specifications, Instructions and Addenda pertaining to these items. Acknowledge receipt of this Addendum on the submitted Bid. Item #1: Revised Architectural Drawings G-004 Level 3 - Overall Plan –Addition of Window shades to rooms 301, 302, 304 and 305 and notes clarifying extent of window treatments throughout this project.

END OF ADDENDUM #3

Page 3: BID CLARIFICATION #1 · reference specification section 12-2400 window shades. 2. reference architectural rcp's & interior elevations & details for more specific information and extent

T

CDEFGH

10

11

12

13

B A

11.7

A2A-104

A5A-104

A5A-101

A5A-103

OFFICES&

SERVERRM313

CORRIDORC3C

CONFERENCERM

313A

MEETINGRM317

OFFICE324A

OFFICE324B

OFFICE324C

OFFICE319C

OFFICE319B

OFFICE319A

OFFICE316A

OFFICE316B

SHELLSPACE

318

FREIGHT ELEVATOR FOR ACCESS

ELEVATOR318

1G-003

LIMITS OF WORK AREA

OFFICE316

LIMITS OF WORK AREA

127'

- 6"

A6A-111

A6A-112

A5A-112

No color scheme assigned toview

ELECTRICAL325 ELEC.

325A

WS-1WS-1WS-1WS-1 WS-1WS-1WS-1WS-1WS-1WS-1

OFFICE

301

OFFICE

302OFFICE

304

CONF

305

E2.08

E2.05E2.06

5' - 4"

E2.16. .E2.16

.E2.16 .E2.16

..

E2.1

7E2

.17

E2.0

7

.E2.1

7.

E2.1

7

E2.08E2.06E2.05

A3A-504 TYP.

WINDOW TREATMENT NOTES:1. REFERENCE SPECIFICATION SECTION 12-2400 WINDOW

SHADES.2. REFERENCE ARCHITECTURAL RCP'S & INTERIOR ELEVATIONS &

DETAILS FOR MORE SPECIFIC INFORMATION AND EXTENT IN SPACES OTHER THAN IN ROOMS 301, 302, 304 AND 305

3

3

3

3 3

CDEFGH

3

4

5

6

7

8

10

11

12

13

B

11.7

FREIGHT ELEVATOR FOR ACCESS

OCCUPIED OFFICES - NIC

OCCUPIED OFFICES - NIC

OCCUPIED OFFICES - NIC

OCCUPIED OFFICES - NIC

OCCUPIED OFFICES - NIC

OCCUPIED OFFICES - NIC

SHELL SPACE313

SHELL SPACE316

ELEC.325A

ELECTRICAL325

EXISTING

315A

EXISTING

315BEXISTING315

PROJECT:

UN

IVE

RSIT

Y O

F CO

NN

ECT

ICU

T A

RCH

ITE

CTU

RAL

& E

NG

INE

ERI

NG

BU

ILD

ING

SE

RVIC

ES

31 L

ED

OY

T RO

AD

UN

IT 3

038

STO

RRS,

CO

NN

ECT

ICU

T 06

269-

3038

TE

LEPH

ON

E:

(860

) 486

-312

7 F

ACS

IMIL

E:

(860

) 486

-317

7

SCALE:DATE:

DRAFTER:

SHEET TITLE:

WORK ORDER NO:FILE NAME:

SHEET:

SHEET: of

CERTIFICATION:

STATUS:

AUTHOR:

CONSULTANT:

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

PROJECT NO:

A

B

C

D

E

A

B

C

D

E

6 5 4 3 2 1

6 5 4 3 2 1

1. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of all Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. Where a conflict within the Contract Documents exists, the Contractor shall provide the better quality or greater quantity of work in accordance with the Architect's resolution without any increase in the Contract sum. Organization of the Specifications into divisions, sections and articles, and arrangement of sheets shall not control the Contractor in dividing the work among subcontractors, or in establishing the extent of Work to be performed by any trade.

2. REFERENCE KEY NOTES and SHEET KEY NOTES are intended to indicate and clarify the extent and requirements of the Work; they do not indicate every location or occurence of required Work. The lack of a key note to an individual item of Work will not relieve the Contractor of responsibility to execute that Work as part of the Contract when the requirement for that Work can be logically inferred by other parts of the Contract Documents

3. Do not scale drawings, except for estimation and approximation purposes.

4. This is an existing building; all conditions and critical dimensions must be field verified.

GENERAL NOTES

1/16" = 1'-0"

6/19/2019 12:31:15 PMC:\U

sers\AW

illiams\D

ocuments\1905 - 3RD

FLR FITOU

T UCO

NN

-IBP_Central_awilliam

s@cw

architectsllc.com.rvt

OVERALL THIRD FLOORPLAN

G-004

04/03/19

901-661

Tech Quad Phase III-InnovationPartnership Building

159 Discovery DriveStorrs, CT 06269

ISSUED FORBID

05/10/19

TRUE NORTH

PROJECT NORTH

0' 8' 16' 32' 48'4'NOT TO SCALEA6 OVERALL THIRD FLOOR PLAN-NEW WORKNOT TO SCALEA3 PARTIAL THIRD FLOOR EXISTING CONDITIONS

0' 8' 16' 32' 48'4'

TRUE NORTH

PROJECT NORTH

EXISTING & OCCUPIED

315A

315B 315

2

KEYNOTESE2.05 COORDINATE PULL CHAINS LOCATIONS PER ROOM CONDITION- CONFIRM

IN THE SUBMITTALE2.06 COORDINATE FULL SHADE LENGTH PER LOCATION.E2.07 NEW AUTOMATIC WINDOW SHADES (TYP)E2.08 EXTEND SHADES BEHIND COLUMNS, (TYP)E2.16 PROVIDE WINDOW SHADES-FULL HEIGHT OF GLASS, MATCH MULLION

SPACING, APP WINDOW HEIGHT=9'8" .E2.17 PROVIDE WINDOW SHADES-FULL HEIGHT OF GLASS, MATCH MULLION

SPACING, APP WINDOW HEIGHT=7'-0"

REVISIONS:MARK DATE DESCRIPTION

2 6/13/2019 ADDENDUM 23 06/19/2019 ADDENDUM 3