Bhimili C-DOT Field Support SEPTEMBER2012
-
Upload
mbhagavanprasad -
Category
Documents
-
view
221 -
download
4
description
Transcript of Bhimili C-DOT Field Support SEPTEMBER2012
ANNEXURE-I
Page 1
ANNEXURE-I
NAME OF THE CIRCLE ANDHRA PRADESHNAME OF THE SSA VISAKHAPATNAM NAME OF THE SUB DIVISION BHEEMUNIPATNAMMONTH For the month of SEPTEMBER- 2012
1. This circle had sought help of C-DOT on the following activities which was extended
Nil
2. The support in following areas was unsatisfactory (unavailable / refused ) by C-DOT -(Satisfactory)
(Unsatisfactory remark has to be substantiated by documentary evidence for which supporting documents are annexed)
a) Telephonic Assistance : NIL
b) Problem attended : NIL
c) Site visits made : NIL
d) EPOMs , EPLD and Catridge programmed : NIL
e) ED Correction done by C-DOT : NIL
f) Software retrofits done bt C-DOT : NIL
g) Support to BSNL Circle Repair Centre : NIL
h) Training support : NIL
PROFORMA FOR SUBMISSION OF MONTHLY PERFORMANCE REPORT IN RESPECT OF FIELD SUPPORT ACTIVITIES EXTENDED BY C-DOT FOR THE MONTH OF SEPTEMBER-2012
ANNEXURE-I
Page 2
ANNEXURE-I
ANDHRA PRADESHVISAKHAPATNAM
1. This circle had sought help of C-DOT on the following activities which was extended
Nil
2. The support in following areas was unsatisfactory (unavailable / refused ) by C-DOT -(Satisfactory)
(Unsatisfactory remark has to be substantiated by documentary evidence for which supporting documents are annexed)
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
D.G.S.YADAV
JTO MBM BMN
PROFORMA FOR SUBMISSION OF MONTHLY PERFORMANCE REPORT IN RESPECT OF FIELD SUPPORT ACTIVITIES EXTENDED BY C-DOT FOR THE MONTH OF SEPTEMBER-2012
ANNEXURE-II
Page 3
Annexure-II
Peoforma for submission of report on performance of C-DOT Equipments:1 Monthly performance report in respect of field support activities extended by C-DOT:
For the month of SEPTEMBER- 2012
2 Details of C-DOT ExchangesS.No Type of Exchange MAX- L MAX-L
1 No. of Exchanges 1 NIL
2 Equipped Capacity 1128 NIL
3 Working DELs 410 NIL
01 NIL
5 NIL NIL
6 2_2_1_9 Upgradaded
7 IMPLIMENTED
8 No. of AN-RAX working on single link NIL NIL
9
10 Whether, IOPs are working in duplex mode. If not, reasons thereof
11
2.1 Status of C-DOT Exchanges for CDR purpose (Ref: MSE Cell letter No. 36-1-2007-PHM/MSE (PT.) dated 10-09-2008):-
MAX-XL MAX-L
1 5 3 2
3 List of Chronic Problems in C-DOT Exchanges , if any:-
S.No Description of Problem Pending Since Telephone No. of the concerned BSNL person
1 Nil
No. of Exchanges working in Simplex mode
No. of Exchanges lying in failed condition
Upgradation Status of MAX-L/XL Exchanges to 2_2_1_6(7.7) and Status of AN-RAX to version 12.2
No. of exchanges where IOP patch as intimated by MS cell letter no. 36-1/2006-PHM/MSE (Pt) dated 03-01-2007 has been implemented
Whether re-timing module is available for network synchronization of C-DOT Exchanges. If not, reasons thereof
Whether E-PROM Programmer available in the Circle. If no, reasons thereof. (IF yers, how many E-PROM Prrogrammer available in the Circle)
No. of the C-DOT Exchanges in the
SSA
No. of Exchanges Upgraded to version 2_2_1_9(2.11) as per MS Cell Letter No. 36-1-2007-PHM/MSE (Pt-B) Dated 27-5-2008. If not, reasons thereof.
ANNEXURE-II
Page 4
4 List of problems in C-DOT Exchanges reported during the month:S.No Description of Problem Pending Since Telephone No. of the concerned BSNL person
1 Nil
5 Status of Average Monthly INCOMING & OUTGOING Call Completion Ratio (CCR) in CDOT ExchangesCCR LOCAL I/C (INCOMING)
<= 10%
> 10% & <= 20%
> 20% & <= 25%
>25 % & < = 30%
>30 % & < = 35%
>35% & <=40%
>40% & <=45%
>45% & <=50% 8
>50% & <=60% 8
>60% & <=70%
>70%
Total (No. of Exchang 8 8
6 Status of implementation of CCR improvement document:
With Ref. to CGMT-A.P.Circle Lr.No.TA/XM-II/21-98/C-DOT Field Support.2009-10/04 Dated 28-03-2009
Sl.No.
LOCAL
FROM TO
1 ANK Not implimented
2 BMN Not implimented
3 CVM Not implimented
4 NRP Not implimented
5 YLC Not implimented
SSA Average
7 Status of Average Monthly Metered Call Units (MCUs) per line/circuit in C-DOT Exchanges:
Name of the C-DOT EXGE (MAX-XL &
MAX-L) Whether "CCR improvement document" has been implemented
or not
% of increase in average monthly
CCR after implementation of CCR improvement
document and daily review of the
same
ANNEXURE-II
Page 5
No. of Exchanges (MAX-XL,MAX-L,SBM,256P RAX)
0<=10
>10<=25
>25<=50
>50<=100
>100<=200 150 ALL XCHGES ALL EXCHNAGES COMBINED
>200<=300
>300<=400
>400<=500
>500<=600
>600
Total (No. of Exchanges)
8 Details of Circle Repair Centre:
Capacity of Card Repair
NIL
9 Details of cards reparied through contractor:
Brought Forward Received Repaired
ECIL 0 26 26
BEL NIL NIL NIL
10 Performa regarding working condition of battery/power plant
How many batteries are working OK? How many Batteries are faulty?
BMN 2 SETS 0
Note : - New 1 set installed at Bheemunipatnam exchange on 9-5-2011.
11 Short fall in help provided by C-DOT during the quarter, if any:
Average Monthly Metered Call Units
(MCUs) per line/circuit
Name of the Repair Centre
VM (9490133236)
Name of Contractor
Name of Telecom SSA
ANNEXURE-II
Page 6
12 NIL
13 Any other remarks
Whether the D.P.,Piller ,Cabinet,MDF earthing and cable sheath earthing were throughly checked in order to avoid huge failures in the Exchange, if not reasons thereof:
ANNEXURE-II
Page 7
Annexure-II
Peoforma for submission of report on performance of C-DOT Equipments:Monthly performance report in respect of field support activities extended by C-DOT: BHIMILIPATNAM
Details of C-DOT ExchangesSBM RSUs AN-RAX 256P-RAX
NIL 3 4 NIL
NIL 2104 1024 NIL
NIL 911 274 NIL
NIL 3 4 NIL
NIL NIL NIL NIL
Upgradaded Upgradaded NIL
NIL
NIL NIL 4 NIL
Whether, IOPs are working in duplex mode. If not, reasons thereof YES
Yes
Status of C-DOT Exchanges for CDR purpose (Ref: MSE Cell letter No. 36-1-2007-PHM/MSE (PT.) dated 10-09-2008):-
MAX-L
2 All are Converted
Telephone No. of the concerned BSNL person
Whether re-timing module is available for network synchronization of C-DOT
Whether E-PROM Programmer available in the Circle. If no, reasons thereof. (IF yers, how many E-PROM Prrogrammer available in the Circle)
No. of Exchanges Upgraded to version 2_2_1_9(2.11) as per MS Cell Letter No. 36-1-2007-PHM/MSE (Pt-B) Dated 27-5-2008. If not, reasons thereof.
Status of conversion of all SBM RAXs and 256P C-DOT Exchanges into RSUs/AN-RAXs.
If not, reasons thereof
ANNEXURE-II
Page 8
NilTelephone No. of the concerned BSNL person
Status of Average Monthly INCOMING & OUTGOING Call Completion Ratio (CCR) in CDOT ExchangesI/C (INCOMING) O/G (Out Going)
8
8
8 8
I/C (incoming ) O/G (Outgoing )
From To From
To
Status of Average Monthly Metered Call Units (MCUs) per line/circuit in C-DOT Exchanges:
ANNEXURE-II
Page 9
No. of Exchanges (MAX-XL,MAX-L,SBM,256P RAX)
ALL EXCHNAGES COMBINED
No. of Cards declared RNP
Nil
RNP Pendency %age repair within TAT
0 0
NIL NIL
0 0
NIL
No. of Cards
receivedNo. of Cards
Repaired
How many batteries are having poor life?
How many batteries cannot take Exchange load?
ANNEXURE-II
Page 10
CHECKED AND FOUND OK
-
D.G.S. YADAVJTO MBM BMN
ANNEXURE-III
Page 11
W.R..T CGMT-A.P.Circle,Hyd Lr.No.TA/XM-II/21-98/C-DOT Field Support/Vol-II/2009-10/05 Dated 30-04-2009Annexure-III
Performa for Monthly feedback on improvement in Network Synchnonization in C-DOT Switches
For the month of SEPTEMBER- 2012
Sl.No.
Type of C-DOT Exchange
MBM-XL MBM-L 2 MHz
1 Anakapalli 1 Nil 2 MHz
2 Bhimunipatnam Nil 1 2 MHz
3 Chodavaram Nil 1 2 MHz
4 Narsipatnam 1 Nil 2 MHz
5 Yellamanchili 1 Nil 2 MHz
Name of the SSA: visakhapatnam
NAME OF C-DOT
EXCHANGE
Whether C-DOT Exchange is
synchonized with
2 MPBS Stream
ANNEXURE-III
Page 12
W.R..T CGMT-A.P.Circle,Hyd Lr.No.TA/XM-II/21-98/C-DOT Field Support/Vol-II/2009-10/05 Dated 30-04-2009Annexure-III
Performa for Monthly feedback on improvement in Network Synchnonization in C-DOT Switches
implimented
NOT-IMPLEMENTED
implimented
implimented
implimented
D.G.S.YADAVJTO MBM BMN
where C-DOT application note on N/W synchnonization has been implemented
Feed back on Improvement noticed in
Synchnozation after implementation of C-DOT application note
on N/W Synchnonization
1] The trunk ccts&DATA ccts are wkg effiently
2] The SWITCH wkg stable .NO fault found sofar
Pro-1
Page 13
Proforma-1
Statement showing C-DOT Exchanges working in Simplex mode in the BMN SDCA IN VM SSA
Sl.No. Type of Exchange
1 BHIMILIPATNAM BHIMILIPATNAM
2 ANANDAPURAM BHIMILIPATNAM
3 TAGARAPUVALASA BHIMILIPATNAM
4 REDDIPALLI BHIMILIPATNAM
Name of C-DOT Exge working in Simplex Mode
Pro-1
Page 14
Proforma-1
Statement showing C-DOT Exchanges working in Simplex mode in the BMN SDCA IN VM SSA
Reasons thereof
D.G.S.YADAV
JTO MBM BMN
Proposed corrective action taken/to be taken
A. Cards repair TIC-9, TUI-9, SPC-9 and TUC-1. B. Mother boards to be checked for duplex mode of working.
A. Cards repair TSC-1,TSI-1,TSM-1,TIC-9, TUI-9, SPC-9. B. Mother boards to be checked for duplex mode of working. C.RBM Stream wiring to be checked.
A. Cards repair TIC-15, TUI-15, SPC-15. B. Mother boards to be checked for duplex mode of working.
A. Cards repair TIC-4, TUI-4, SPC-4. B. Mother boards to be checked for duplex mode of working.
Pro-2
Page 15
Proforma-2
Statement showing C-DOT AN-RAX Exchanges working in Simplex mode
Reasons thereof1 INS KALINGA cards sent for repair 1 -ARC, 1-ARI , 2-SPC2 KAPULAUPPADA cards sent for repair 1 -ARC, 1-ARI , 2-SPC3 REVIDI cards sent for repair 1 -ARC, 1-ARI , 2-SPC4 SONTYAM cards sent for repair 1 -ARC, 1-ARI , 2-SPC
D.G.S.YADAV
JTO MBM BMN
Sl.No.
Name of C-DOT AN-RAX Exge
Proposed corrective action taken/to be taken
Pro-3
Page 16
Proforma-3
Statement showing C-DOT Exchanges having Monthly Avg. I/C CCR less than 40
Sl.No. Reasons thereof
1 NIL NIL NIL NIL
D.G.S.YADAV
JTO MBM BMN
Name of C-DOT Exge
Type of Exchange(MBM-XL or MBM-L
Proposed corrective action taken/to be taken
Pro-4
Page 17
Proforma-4
Statement showing C-DOT Exchanges having Monthly Avg. O/G CCR less than 40
Sl.No. Reasons thereof
1 NIL NIL NIL NIL
D.G.S.YADAV
JTO MBM BMN
Name of C-DOT Exge
Type of Exchange(MBM-XL or MBM-L
Proposed corrective action taken/to be taken
Pro-5
Page 18
Proforma-5
Statement showing C-DOT Exchanges having Monthly Avg. Local CCR less than 40
Sl.No. Reasons thereof
1 NIL NIL NIL NIL
D.G.S.YADAV
JTO MBM BMN
Name of C-DOT Exge
Type of Exchange(MBM-XL or MBM-L
Proposed corrective action taken/to be taken
Pro-6
Page 19
Proforma-6
Statement showing C-DOT Exchanges having Monthly Avg. MCUs less than 100
Sl.No. Reasons thereof
1 NIL NIL NIL NIL
2
3
4
D.G.S.YADAV
JTO MBM BMN
Name of C-DOT Exge
Type of Exchange(MBM-XL or MBM-L
Proposed corrective action taken/to be taken
Pro-7
Page 20
Proforma-7
Statement showing Exchange wise % of increase in Avg. Monthly CCR (Local ,I/C & O/G) after implementation of CCR Improvement Document.
Sl.No. Name of C-DOT Exge
Local CCR INCOMING CCR OUTGOING CCR
FROM TO FROM TO FROM
1 BMN SDCA
Type of Exchange (MBM-XL or
MBM-L
Pro-7
Page 21
Proforma-7
Statement showing Exchange wise % of increase in Avg. Monthly CCR (Local ,I/C & O/G) after implementation of CCR Improvement Document.
OUTGOING CCR
TO
TO BE IMPLEMENTED
D.G.S.YADAV
JTO MBM BMN
Proposed corrective action taken/to be taken to improve the CCR