ANNEXURE-I Page 1 NAME OF THE CIRCLE ANDHRA PRADESH NAME OF THE SSA VISAKHAPATNAM NAME OF THE SUB DIVISION BHEEMUNIPATNAM MONTH For the month of SEPTEMBER- 2012 1. This circle had sought help of C-DOT on the following activities which w Nil 2. The support in following areas was unsatisfactory (unavailable / refus (Unsatisfactory remark has to be substantiated by documentary evidenc a) Telephonic Assistance : NIL b) Problem attended : NIL c) Site visits made : NIL d) EPOMs , EPLD and Catridge programmed : NIL e) ED Correction done by C-DOT : NIL f) Software retrofits done bt C-DOT : NIL g) Support to BSNL Circle Repair Centre : NIL h) Training support : NIL PROFORMA FOR SUBMISSION OF MONTHLY PERFORMANCE REPORT EXTENDED BY C-DOT FOR THE MONTH OF

description

ecxvsfsdf

Transcript of Bhimili C-DOT Field Support SEPTEMBER2012

Page 1: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-I

Page 1

ANNEXURE-I

NAME OF THE CIRCLE ANDHRA PRADESHNAME OF THE SSA VISAKHAPATNAM NAME OF THE SUB DIVISION BHEEMUNIPATNAMMONTH For the month of SEPTEMBER- 2012

1. This circle had sought help of C-DOT on the following activities which was extended

Nil

2. The support in following areas was unsatisfactory (unavailable / refused ) by C-DOT -(Satisfactory)

(Unsatisfactory remark has to be substantiated by documentary evidence for which supporting documents are annexed)

a) Telephonic Assistance : NIL

b) Problem attended : NIL

c) Site visits made : NIL

d) EPOMs , EPLD and Catridge programmed : NIL

e) ED Correction done by C-DOT : NIL

f) Software retrofits done bt C-DOT : NIL

g) Support to BSNL Circle Repair Centre : NIL

h) Training support : NIL

PROFORMA FOR SUBMISSION OF MONTHLY PERFORMANCE REPORT IN RESPECT OF FIELD SUPPORT ACTIVITIES EXTENDED BY C-DOT FOR THE MONTH OF SEPTEMBER-2012

Page 2: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-I

Page 2

ANNEXURE-I

ANDHRA PRADESHVISAKHAPATNAM

1. This circle had sought help of C-DOT on the following activities which was extended

Nil

2. The support in following areas was unsatisfactory (unavailable / refused ) by C-DOT -(Satisfactory)

(Unsatisfactory remark has to be substantiated by documentary evidence for which supporting documents are annexed)

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

D.G.S.YADAV

JTO MBM BMN

PROFORMA FOR SUBMISSION OF MONTHLY PERFORMANCE REPORT IN RESPECT OF FIELD SUPPORT ACTIVITIES EXTENDED BY C-DOT FOR THE MONTH OF SEPTEMBER-2012

Page 3: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 3

Annexure-II

Peoforma for submission of report on performance of C-DOT Equipments:1 Monthly performance report in respect of field support activities extended by C-DOT:

For the month of SEPTEMBER- 2012

2 Details of C-DOT ExchangesS.No Type of Exchange MAX- L MAX-L

1 No. of Exchanges 1 NIL

2 Equipped Capacity 1128 NIL

3 Working DELs 410 NIL

01 NIL

5 NIL NIL

6 2_2_1_9 Upgradaded

7 IMPLIMENTED

8 No. of AN-RAX working on single link NIL NIL

9

10 Whether, IOPs are working in duplex mode. If not, reasons thereof

11

2.1 Status of C-DOT Exchanges for CDR purpose (Ref: MSE Cell letter No. 36-1-2007-PHM/MSE (PT.) dated 10-09-2008):-

MAX-XL MAX-L

1 5 3 2

3 List of Chronic Problems in C-DOT Exchanges , if any:-

S.No Description of Problem Pending Since Telephone No. of the concerned BSNL person

1 Nil

No. of Exchanges working in Simplex mode

No. of Exchanges lying in failed condition

Upgradation Status of MAX-L/XL Exchanges to 2_2_1_6(7.7) and Status of AN-RAX to version 12.2

No. of exchanges where IOP patch as intimated by MS cell letter no. 36-1/2006-PHM/MSE (Pt) dated 03-01-2007 has been implemented

Whether re-timing module is available for network synchronization of C-DOT Exchanges. If not, reasons thereof

Whether E-PROM Programmer available in the Circle. If no, reasons thereof. (IF yers, how many E-PROM Prrogrammer available in the Circle)

No. of the C-DOT Exchanges in the

SSA

No. of Exchanges Upgraded to version 2_2_1_9(2.11) as per MS Cell Letter No. 36-1-2007-PHM/MSE (Pt-B) Dated 27-5-2008. If not, reasons thereof.

Page 4: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 4

4 List of problems in C-DOT Exchanges reported during the month:S.No Description of Problem Pending Since Telephone No. of the concerned BSNL person

1 Nil

5 Status of Average Monthly INCOMING & OUTGOING Call Completion Ratio (CCR) in CDOT ExchangesCCR LOCAL I/C (INCOMING)

<= 10%

> 10% & <= 20%

> 20% & <= 25%

>25 % & < = 30%

>30 % & < = 35%

>35% & <=40%

>40% & <=45%

>45% & <=50% 8

>50% & <=60% 8

>60% & <=70%

>70%

Total (No. of Exchang 8 8

6 Status of implementation of CCR improvement document:

With Ref. to CGMT-A.P.Circle Lr.No.TA/XM-II/21-98/C-DOT Field Support.2009-10/04 Dated 28-03-2009

Sl.No.

LOCAL

FROM TO

1 ANK Not implimented

2 BMN Not implimented

3 CVM Not implimented

4 NRP Not implimented

5 YLC Not implimented

SSA Average

7 Status of Average Monthly Metered Call Units (MCUs) per line/circuit in C-DOT Exchanges:

Name of the C-DOT EXGE (MAX-XL &

MAX-L) Whether "CCR improvement document" has been implemented

or not

% of increase in average monthly

CCR after implementation of CCR improvement

document and daily review of the

same

Page 5: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 5

No. of Exchanges (MAX-XL,MAX-L,SBM,256P RAX)

0<=10

>10<=25

>25<=50

>50<=100

>100<=200 150 ALL XCHGES ALL EXCHNAGES COMBINED

>200<=300

>300<=400

>400<=500

>500<=600

>600

Total (No. of Exchanges)

8 Details of Circle Repair Centre:

Capacity of Card Repair

NIL

9 Details of cards reparied through contractor:

Brought Forward Received Repaired

ECIL 0 26 26

BEL NIL NIL NIL

10 Performa regarding working condition of battery/power plant

How many batteries are working OK? How many Batteries are faulty?

BMN 2 SETS 0

Note : - New 1 set installed at Bheemunipatnam exchange on 9-5-2011.

11 Short fall in help provided by C-DOT during the quarter, if any:

Average Monthly Metered Call Units

(MCUs) per line/circuit

Name of the Repair Centre

VM (9490133236)

Name of Contractor

Name of Telecom SSA

Page 6: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 6

12 NIL

13 Any other remarks

Whether the D.P.,Piller ,Cabinet,MDF earthing and cable sheath earthing were throughly checked in order to avoid huge failures in the Exchange, if not reasons thereof:

Page 7: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 7

Annexure-II

Peoforma for submission of report on performance of C-DOT Equipments:Monthly performance report in respect of field support activities extended by C-DOT: BHIMILIPATNAM

Details of C-DOT ExchangesSBM RSUs AN-RAX 256P-RAX

NIL 3 4 NIL

NIL 2104 1024 NIL

NIL 911 274 NIL

NIL 3 4 NIL

NIL NIL NIL NIL

Upgradaded Upgradaded NIL

NIL

NIL NIL 4 NIL

Whether, IOPs are working in duplex mode. If not, reasons thereof YES

Yes

Status of C-DOT Exchanges for CDR purpose (Ref: MSE Cell letter No. 36-1-2007-PHM/MSE (PT.) dated 10-09-2008):-

MAX-L

2 All are Converted

Telephone No. of the concerned BSNL person

Whether re-timing module is available for network synchronization of C-DOT

Whether E-PROM Programmer available in the Circle. If no, reasons thereof. (IF yers, how many E-PROM Prrogrammer available in the Circle)

No. of Exchanges Upgraded to version 2_2_1_9(2.11) as per MS Cell Letter No. 36-1-2007-PHM/MSE (Pt-B) Dated 27-5-2008. If not, reasons thereof.

Status of conversion of all SBM RAXs and 256P C-DOT Exchanges into RSUs/AN-RAXs.

If not, reasons thereof

Page 8: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 8

NilTelephone No. of the concerned BSNL person

Status of Average Monthly INCOMING & OUTGOING Call Completion Ratio (CCR) in CDOT ExchangesI/C (INCOMING) O/G (Out Going)

8

8

8 8

I/C (incoming ) O/G (Outgoing )

From To From

To

Status of Average Monthly Metered Call Units (MCUs) per line/circuit in C-DOT Exchanges:

Page 9: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 9

No. of Exchanges (MAX-XL,MAX-L,SBM,256P RAX)

ALL EXCHNAGES COMBINED

No. of Cards declared RNP

Nil

RNP Pendency %age repair within TAT

0 0

NIL NIL

0 0

NIL

No. of Cards

receivedNo. of Cards

Repaired

How many batteries are having poor life?

How many batteries cannot take Exchange load?

Page 10: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-II

Page 10

CHECKED AND FOUND OK

-

D.G.S. YADAVJTO MBM BMN

Page 11: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-III

Page 11

W.R..T CGMT-A.P.Circle,Hyd Lr.No.TA/XM-II/21-98/C-DOT Field Support/Vol-II/2009-10/05 Dated 30-04-2009Annexure-III

Performa for Monthly feedback on improvement in Network Synchnonization in C-DOT Switches

For the month of SEPTEMBER- 2012

Sl.No.

Type of C-DOT Exchange

MBM-XL MBM-L 2 MHz

1 Anakapalli 1 Nil 2 MHz

2 Bhimunipatnam Nil 1 2 MHz

3 Chodavaram Nil 1 2 MHz

4 Narsipatnam 1 Nil 2 MHz

5 Yellamanchili 1 Nil 2 MHz

Name of the SSA: visakhapatnam

NAME OF C-DOT

EXCHANGE

Whether C-DOT Exchange is

synchonized with

2 MPBS Stream

Page 12: Bhimili C-DOT Field Support SEPTEMBER2012

ANNEXURE-III

Page 12

W.R..T CGMT-A.P.Circle,Hyd Lr.No.TA/XM-II/21-98/C-DOT Field Support/Vol-II/2009-10/05 Dated 30-04-2009Annexure-III

Performa for Monthly feedback on improvement in Network Synchnonization in C-DOT Switches

implimented

NOT-IMPLEMENTED

implimented

implimented

implimented

D.G.S.YADAVJTO MBM BMN

where C-DOT application note on N/W synchnonization has been implemented

Feed back on Improvement noticed in

Synchnozation after implementation of C-DOT application note

on N/W Synchnonization

1] The trunk ccts&DATA ccts are wkg effiently

2] The SWITCH wkg stable .NO fault found sofar

Page 13: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-1

Page 13

Proforma-1

Statement showing C-DOT Exchanges working in Simplex mode in the BMN SDCA IN VM SSA

Sl.No. Type of Exchange

1 BHIMILIPATNAM BHIMILIPATNAM

2 ANANDAPURAM BHIMILIPATNAM

3 TAGARAPUVALASA BHIMILIPATNAM

4 REDDIPALLI BHIMILIPATNAM

Name of C-DOT Exge working in Simplex Mode

Page 14: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-1

Page 14

Proforma-1

Statement showing C-DOT Exchanges working in Simplex mode in the BMN SDCA IN VM SSA

Reasons thereof

D.G.S.YADAV

JTO MBM BMN

Proposed corrective action taken/to be taken

A. Cards repair TIC-9, TUI-9, SPC-9 and TUC-1. B. Mother boards to be checked for duplex mode of working.

A. Cards repair TSC-1,TSI-1,TSM-1,TIC-9, TUI-9, SPC-9. B. Mother boards to be checked for duplex mode of working. C.RBM Stream wiring to be checked.

A. Cards repair TIC-15, TUI-15, SPC-15. B. Mother boards to be checked for duplex mode of working.

A. Cards repair TIC-4, TUI-4, SPC-4. B. Mother boards to be checked for duplex mode of working.

Page 15: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-2

Page 15

Proforma-2

Statement showing C-DOT AN-RAX Exchanges working in Simplex mode

Reasons thereof1 INS KALINGA cards sent for repair 1 -ARC, 1-ARI , 2-SPC2 KAPULAUPPADA cards sent for repair 1 -ARC, 1-ARI , 2-SPC3 REVIDI cards sent for repair 1 -ARC, 1-ARI , 2-SPC4 SONTYAM cards sent for repair 1 -ARC, 1-ARI , 2-SPC

D.G.S.YADAV

JTO MBM BMN

Sl.No.

Name of C-DOT AN-RAX Exge

Proposed corrective action taken/to be taken

Page 16: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-3

Page 16

Proforma-3

Statement showing C-DOT Exchanges having Monthly Avg. I/C CCR less than 40

Sl.No. Reasons thereof

1 NIL NIL NIL NIL

D.G.S.YADAV

JTO MBM BMN

Name of C-DOT Exge

Type of Exchange(MBM-XL or MBM-L

Proposed corrective action taken/to be taken

Page 17: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-4

Page 17

Proforma-4

Statement showing C-DOT Exchanges having Monthly Avg. O/G CCR less than 40

Sl.No. Reasons thereof

1 NIL NIL NIL NIL

D.G.S.YADAV

JTO MBM BMN

Name of C-DOT Exge

Type of Exchange(MBM-XL or MBM-L

Proposed corrective action taken/to be taken

Page 18: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-5

Page 18

Proforma-5

Statement showing C-DOT Exchanges having Monthly Avg. Local CCR less than 40

Sl.No. Reasons thereof

1 NIL NIL NIL NIL

D.G.S.YADAV

JTO MBM BMN

Name of C-DOT Exge

Type of Exchange(MBM-XL or MBM-L

Proposed corrective action taken/to be taken

Page 19: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-6

Page 19

Proforma-6

Statement showing C-DOT Exchanges having Monthly Avg. MCUs less than 100

Sl.No. Reasons thereof

1 NIL NIL NIL NIL

2

3

4

D.G.S.YADAV

JTO MBM BMN

Name of C-DOT Exge

Type of Exchange(MBM-XL or MBM-L

Proposed corrective action taken/to be taken

Page 20: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-7

Page 20

Proforma-7

Statement showing Exchange wise % of increase in Avg. Monthly CCR (Local ,I/C & O/G) after implementation of CCR Improvement Document.

Sl.No. Name of C-DOT Exge

Local CCR INCOMING CCR OUTGOING CCR

FROM TO FROM TO FROM

1 BMN SDCA

Type of Exchange (MBM-XL or

MBM-L

Page 21: Bhimili C-DOT Field Support SEPTEMBER2012

Pro-7

Page 21

Proforma-7

Statement showing Exchange wise % of increase in Avg. Monthly CCR (Local ,I/C & O/G) after implementation of CCR Improvement Document.

OUTGOING CCR

TO

TO BE IMPLEMENTED

D.G.S.YADAV

JTO MBM BMN

Proposed corrective action taken/to be taken to improve the CCR