Transcript of Bharatiya nabhikiya vidyut nigam limited (bhavini)
Dr. Prabhat KumarDistinguished Scientist and
Chairman & Managing DirectorBharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI)
Department of Atomic EnergyA Government of India Enterprise
Kalpakkam 603 102, Tamilnadu, India
BHAVINI’s NOMINATION FOR ENGINEERING EXCELLENCE AWARD - 2013
Presentation by
STAGE 1 STAGE 2 STAGE 3
U-233
ELECTRICITY
Depleted U
Pu
300 GWe, 30 Yr
Pu FUELLEDFAST BREEDERS
Th
500 GWe, 500 Yr
ELECTRICITYU-233 FUELLED
BREEDERS
Natural Uranium
ELECTRICITYPHWR
12 GWe, 30 Yr
Th
Pu
U-233
INDIA’S THREE STAGE NUCLEAR POWER PROGRAMME
BHAVINI has commenced activities on second stage
Fuel : PuO2+ UO2
Thermal Power : 1250 MWth
Electrical output : 500 MWe
Coolant : Liquid Na
Thermal Efficiency : 40%
• Prototype Fast Breeder Reactor (PFBR) is first of its kind nuclear reactor in the country
• India’s very important and prestigious project
• Advanced construction stage
Prototype Fast Breeder Reactor Flow Chart
PFBR, the only nuclear reactor in the country has secondary loop
Fukushima incident could have been avoided if passive decay heat removal system like PFBR exist in their reactor
No power required for removal of decay heat
PFBR REACTOR ASSEMBLY COMPONENTS
1 Main Vessel
2 Core Support Structure
3 Core Catcher
4 Grid Plate
5 Core
6 Inner vessel
7 Roof slab
8 Large Rotatable Plug
9 Small Rotatable Plug
10 Control Plug
11 Absorber Rod Drive Mechanism
12 Transfer Arm
13 Intermediate Heat Exchanger
14 Primary Sodium Pump
15 Safety Vessel
Man standingHuge size reactor with complex constructional
features
Stringent administrative and quality controls at every stage
Indigenous and New TechnologyMany Challenges overcome successfully and Innovations in many activitiesAchievements and high success rate in every activitiesManufacture of thin walled gigantic components for the first time in the countryHandling & Erection of over dimensional equipment without single dentDesign, Construction, Equipment fabrication and Regulatory approval in parallel
What all makes PFBR project eligible for Engineering Excellence Award 2013
First of its kind nuclear reactor in the country - Generates more Plutonium than it consumes
Manufacturing of gigantic equipment at site due to transportation constraints meeting all the stringent specification requirements
Development of special grade materials in large scale in the country never done in the past
Development of Novel equipment erection techniques
Huge quantity of highly reactive Sodium transfer without a single drop of leak- 1750 tones !!!
Few points which make PFBR project innovative
Highly reactive Liquid Sodium transfer
Largest and deepest excavated pit in Indian nuclear plants immediately next to sea
(200 meters from the sea)
National record of largest concrete pouring in single stretch ever done by any industry in India
Initially 5000 cubic meter concreting during 2005 and then surpassed BHAVINI’s own record by pouring 5800 cubic meter concrete
Off Shore Submarine Tunnel
Under sea Tunnel 567 meters length at 50 meters below the sea
Constructed for the first time in the country
15
Tsunami bund
Outfall Channel
Shore protection
Tsunami bund/Shore Protection/Outfall Channel
15
Coastal plantationCoastal plantation
Engineered sand dune
Unique method of Tsunami protection Unique method of Tsunami protection system for the reactor site system for the reactor site
INCREASE IN ELEVATIONThe nuclear island finished floor level The nuclear island finished floor level
is raised to 15.7 meters for reactor is raised to 15.7 meters for reactor protection from future Tsunami if any protection from future Tsunami if any
Fabrication of gigantic reactor components for PFBR
Fabrication of over dimensional, thin walled reactor components at PFBR site
FABRICATION OF MAIN VESSEL
Diameter achieved within 10mm tolerance for total 12900 mm dia
Great Challenge
Made for the first
time in the country
INNER VESSELPositional accuracy,
alignment and orientation has to
be maintained during fabrication
Safety Vessel with Thermal Insulation Panels
Man standing
To be lifted during erection without swing
Primary Pipe-Grid Plate assemblyPrimary Pipe-Grid Plate assembly
The Grid Plate supports all the core subassemblies of PFBR
Welding to be done in constrained space meeting
stringent specification requirements
WELDING BETWEEN
ROOF SLAB (RS) AND MAIN VESSEL (MV)
Very important joint
Weld carries about 2500 tones of weight
Welding to be carried out insitu in confined space and access
Tube to Tubesheet welding, Post Weld Heat Treatment and Micro-Focal radiography for PFBR Steam Generators
Local Heat TreatmentWelding
Micro-Focal Radiography Nuclear Clean Hall
Fabrication of 26 meters length Steam Generators in shop
FABRICATED STEAM GENERATORS
Straightness achieved within 3mm on 26,000 mm length of SG !!!!!!
Challenges in header pullout to bend tubes welding for Sodium to Air Heat Exchangers
Extremely Difficult
Header Welding - Needs highly qualified and skilled welders
Header Welding- Extremely difficult
Challenge
Reactor equipment erection
Erection of PFBR equipment without single dent
Main Vessel
ERECTION OF MAJOR COMPONENTS
Safety Vessel Thermal Baffle
Safety Vessel is being lowered into Reactor Vault in a constrained space without swing
Erection of Thermal BaffleErection of Thermal Baffle
Inner Vessel
ERECTION OF MAJOR COMPONENTS
Grid Plate Roof Slab
Massive Argon Buffer Tank
erection
STEAM GENERATOR (SG) ERECTION
SPECIAL ARRANGEMENT FOR SHIFTING SG (25 METER LONG
COMPONENT)PLACING SG IN SPECIAL
TILTING MECHANISM
LOWERING OF SG IN STEAM GENERATOR
BUILDING
POSITIONING & ALIGNMENT
TILTING FOR ERECTION
CONNECTION OF LIFTING
SLINGS
SG LIFTED WITH HEAVY DUTY CRAWLER CRANE
FIXING OF HEATERS
ON SG
Meticulous planning and Management Technical aspects Finance Human Resources Contracts and Material Management Safety & Security Adjust as per design No damage/dent on any equipment during
erection Financial Management NIL report during the CIG audits Awards
Operational excellence of the project
“Industrial Safety Award” by Atomic Energy Regulatory Board
“Suraksha Puraskar” by National Safety Council of India
INDUSTRIAL SAFETY AWARDS
High performance in safety in the construction sector !!!!!
“Best HR Practices–2012 Award” by National Institute of Personnel Management (NIPM)
AWARDS - HUMAN RESOURCES
Development and inspiration of true potential of human capital
“ICI (TNCC) - Ultratech Award” by Indian Concrete Institute
Award for outstanding Concrete Structure
How PFBR project has added to the self reliance of India in the chosen sector
Excellences by young team with an average age of 30 years
Documentation/Technical Papers - More than 300 papers in National/International
Conferences/Journals by young company
Visit of 23,000 students at PFBR project site as a part of outreach programme
Sustainability Improvement in the quality standards Creation of new and indigenous technological
capability in terms of machining, welding, fabrication, testing, handling and erection
First Time right approach Neighborhood Development• Indirect employment• Education• Infrastructure• Health & hygiene• Water supply• Outreach programme• Sports
Key impacts which PFBR project has made
Vocational Training courses II batch commenced on 02.10.2006
Donation of Personal computers to the schools
Vocational Training Programme for Neighborhood village youth from 27.09.2005
Donated PC and books to Govt. Higher Sec. School, Pudupattinam on 28.04.2008
Water Pump & Pump room for Panchayat Union Primary School Meiyur
Construction of Compound Wall- Panchayath Union Primary School Sadhrangapattinam
Water Tank & Hand Wash Facility Panchayath Union Primary School Sadhrangapattinam
Science Lab Apparatus & Models donated to Annamalai Middle School, Desumughipet, Thirukalukundram
`
Sadras Primary Health Centre – Maternity Ward
Sprayed mosquito repellant in the surrounding villages as preventive measure for chickengunia
In co-ordination with Dr.M.S.Swaminathan Research Foundation, Chennai, action has been initiated to set up
Village Knowledge Centre Bio-shieldHatchery – Self Help Groups
One R.O. Plant has been installed at Sadras Meyyur kuppam, Kalpakkam
Epidemiological Health Survey with Assistance from BHAVINI
Robust feedback system for-Knowledge management-Sharing of experiences with industry and academia-Win Win situation for all
Training, qualification & capability development Strengthening of Industries
-Tools/fixtures- Facilities- Techniques- Manufacture - Inspection
Standardized design and manufacturing Modular concept to the possible extent
Few points which illumine more on the future readiness of the project
Over all Night View
53
PFBR the pride of nation
Thank Thank YouYou