Saibu VDC, Lalitpur Phone / Fax No:- 01-5593065, Cell-9851016051 Email: [email protected] Bridge Name: Gowar Khola Bridge, Dang Date: 2072/04/21 Location: Pukar Pasal (Tarigaun VDC) to Lauhara (Manpur VDC) Bore Hole No.: 1 Client: Bridge Branch, DoR Location: Right Bank Contractor: Kalika-Rasuwa-Elite JV 15 30 DCPT 56 37 Sand and Boulder SP DCPT 84 56 DCPT 81 46 Clay with gravel CL DCPT 86 49 SPT 45 45 DCPT 64 32 Sand and Boulder SP DCPT 74 37 DCPT 76 38 DCPT 80 40 Boulder DCPT 99 50 DCPT 105 53 End of Borehole DCPT SPT Water Table at 0.65 m from existing ground level Symbol No. of Blows 27 16 Total SPT Value per penetration 45 10 20 30 Total SPT/ DCPT Value 19 21 31 23 19 20 38 27 23 29 22 31 33 31 24 27 15 29 33 37 SOIL DESCRIPTION Water Table (m) Soil Classification depth (m) 21 16 SPT (N Value) 23 21 24 19 31 35 39 31 34 SPT/ DCPT 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 0 20 40 60 80 DCPT/ SPT UD 0 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Prepared By: Checked By: Approved By:

description

bh

Transcript of BH-1

Page 1: BH-1

Saibu VDC, Lalitpur

Phone / Fax No:- 01-5593065, Cell-9851016051

Email: [email protected]

Bridge Name: Gowar Khola Bridge, Dang Date: 2072/04/21

Location: Pukar Pasal (Tarigaun VDC) to Lauhara (Manpur VDC) Bore Hole No.: 1

Client: Bridge Branch, DoR Location: Right Bank

Contractor: Kalika-Rasuwa-Elite JV

15 30

DCPT 56 37

Sand and BoulderSP

DCPT 84 56

DCPT 81 46

Clay with gravel CLDCPT 86 49

SPT 45 45

DCPT 64 32

Sand and Boulder SPDCPT 74 37

DCPT 76 38

DCPT 80 40

Boulder DCPT 99 50

DCPT 105 53

End of Borehole

DCPTSPT

Wa

ter

Ta

ble

at 0

.65

m fro

m e

xis

ting

gro

un

d leve

l

Sym

bo

l No. of Blows

27

16

To

tal S

PT

Va

lue

per penetration

4510 20 30

To

tal S

PT

/ D

CP

T

Va

lue

19 21

31

23

19

20

38 27

23

29

22 31 33

31

24 27

15

29 33 37

SOIL

DESCRIPTION

Wa

ter

Ta

ble

(m

)

So

il

Cla

ssific

ation

de

pth

(m

)

21

16

SPT (N Value)

23

21 24

19

31

35 39

31 34

SP

T/ D

CP

T

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

0 20 40 60 80

DCPT/ SPT

UD

0

1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Prepared By: Checked By: Approved By: