1st Quarter Leachate Report 2013 BFI Model Fill Landfill Permit #151-S1-R4
BFI Waste Systems of Arkansas, LLC 3817 Mabelvale Pike Little Rock, AR 72204
1st Quarter Leachate Report 2013
BFI Model Fill Landfill Permit #151-S1-R4
PREPARED FOR:
BFI Waste Systems of Arkansas, LLC 3817 Mabelvale Pike
Little Rock, AR 72204
PREPARED BY:
Pollution Management, Inc. 3512 S. Shackleford Road
Little Rock, AR 72205
April 29, 2013
TABLE OF CONTENTS
1.0 INTRODUCTION ............................................................................................................... 1
2.0 LEACHATE VOLUME ...................................................................................................... 1
2.1 Phase I Leachate Potentiometric Surface ......................................................................... 2
3.0 REMEDIATION ACTIVITIES ........................................................................................... 3
1st QUARTER LEACHATE REPORT CERTIFICATION .......................................................... 4
LIST OF TABLES Table I: Monthly Leachate Amounts for 1st Quarter 2013 Table II: Leachate Piezometer Volumes for 1st Quarter 2013 LIST OF DRAWINGS Drawing Number 1: Leachate Potentiometric Surface Map, February 13, 2013 LIST OF APPENDICES Appendix A: Monthly Leachate Discharge Report Appendix B: Weekly Leachate Piezometer and Manhole Readings
1st Quarter 2013
BFI Model Fill Landfill 1st Quarter Leachate Report 2013 Solid Waste Permit #151-S1-R4
1
1.0 INTRODUCTION
BFI Waste Systems of Arkansas, LLC (BFI) owns and operates a solid waste disposal
facility (Facility) located in Pulaski County, Arkansas in accordance with ADEQ Solid Waste
Permit #151-S1-R4.
Site Specific Condition Number 5 of Arkansas Department of Environmental Quality
(ADEQ) Solid Waste Permit #151-S1-R4 requires BFI to submit quarterly leachate reports
detailing leachate volume and monitoring activities. More specifically, the permit condition
requires BFI to submit a potentiometric surface map of the leachate hydrostatic head and the
amount of leachate removed each month from the Phase I Area. BFI is also required (by this
condition) to maintain a log of the daily-recorded leachate volumes.
The following document has been prepared to demonstrate compliance with Site Specific
Condition Number 5 and to fulfill the permit condition requirements for the 1st Quarter of 2013
(for the time period of January 1, 2013 through March 31, 2013).
2.0 LEACHATE VOLUME
TABLE I summarizes the volume of leachate collected from the Phase I, II, and III
Areas during the 1st Quarter of 2013. The flow meter readings were collected by Pollution
Management, Inc. and include the amount (of leachate) discharged to the City of Little Rock
Sewer Publicly Owned Treatment Works (POTW). All of the leachate generated during the 1st
Quarter of 2013 was discharged to the City of Little Rock POTW. Leachate collected in Phase I,
II and III of the landfill is pumped to the leachate holding tank and then discharged from the
holding tank into the POTW.
BFI Model Fill Landfill 1st Quarter Leachate Report 2013 Solid Waste Permit #151-S1-R4
2
TABLE I: MONTHLY LEACHATE 1st QUARTER 2013
Month
Total Discharged to City POTW (gal)
January 208,612 February 136,365
March 368,167 TOTAL 713,144
The total leachate discharged to the POTW during the 1st Quarter was 713,144 gallons,
see Appendix A. The total leachate discharged to the POTW during the 4th Quarter 2012 was
166,730 gallons, so the volume of leachate discharged during the 1st Quarter 2013 increased
from the previous quarter. The final cap was completed during the 4th Quarter 2012, and there is
no explanation why the leachate increased during the quarter. It is expected that the leachate
flows should start decreasing in the coming quarters.
2.1 Phase I Leachate Potentiometric Surface
Weekly piezometer readings for the Phase I Area of the facility are included in
APPENDIX B. The potentiometric surface of the leachate as measured on February 13, 2013, is
presented in DRAWING 1. DRAWING 1 was generated using the program AutoCAD Civil
3D with the program output files exported as a .dxf file.
There are sixteen (16) leachate piezometers (LPZ’s) located in the BFI Landfill in Phase
I. The sixteen (16) LPZ’s are LPZ-13, LPZ-14, LPZ-18, LPZ-20 R, LPZ-23, LPZ-23 (4”), LPZ-
24 R, LPZ-26, LPZ-27, LPZ-28, LPZ-28 (4”), LPZ-29S, LPZ-30S, LPZ-31R, LPZ-32R, and
LPZ-33. Five of the LPZ’s (LPZ-20, LPZ-24R, LPZ-23 (4”), LPZ-26 and LPZ-28 (4”) contain
air operated pumps. The pumps in LPZ-20 R and LPZ-28 worked intermittently during the 4th
Quarter but the counters did not record flow. The pump stroke counters on LPZ-24R, LPZ-26R
and LPZ-28 (4”) have stopped working; however, the pumps in the wells appear to be pumping
because when gauged, they are dry.
BFI Model Fill Landfill 1st Quarter Leachate Report 2013 Solid Waste Permit #151-S1-R4
3
3.0 REMEDIATION ACTIVITIES
During the 1st quarter of 2013, leachate piezometers LPZ-20R, LPZ-23, LPZ-24R, LPZ-
26, and LPZ-28 (4”) contained QED air-operated pumps. All pumps are located in Phase I of the
landfill. The leachate from the piezometers is pumped to the leachate manholes around the
perimeter of Phase I. The leachate flows from the manholes and is ultimately discharged to the
City of Little Rock POTW. Weekly leachate monitoring finds that leachate is maintained below
the top of the pumps in LPZ-23, LPZ-24R, LPZ-26, and LPZ-28.
Table II shows the approximate gallons of leachate that were recorded during the 1st
Quarter of 2013. The pumps in LPZ-24R, LPZ-26R and LPX-28 (4”) did not record pump
strokes, but it appears the pumps did pump. The gallons have been calculated by the number of
pump stroke counts multiplied by the approximate volume of one pump stroke.
TABLE II: APPROXIMATE LEACHATE PUMP VOLUMES 1st QUARTER 2013
Piezometer Gallons LPZ-20R 0 LPZ-23 187
LPZ-24R 0 LPZ-26R 0 LPZ-28 0 Total 187
As indicated in Table II above, pumps LPZ-20R and LPZ-26R did not work properly.
The pump counters on LPZ-24R, LPZ-26R and LPZ-28 (4”) are not working and need to be
replaced. The remaining piezometer pumps were working properly during the 1st Quarter of
2013. BFI plans to replace pumps in LPZ-20R, LPZ-26R and place new counters on pumps
20R, 24R, 26R and LPZ-28 during the 2nd Quarter of 2013.
Sewer Meter Report Form
Company: BFI Model Fill Landfill
Address: 3817 Mablevale Pike, Little Rock, AR 72202
Meter Reader’s Name: Danny Lloyd
Report Submitted By: Darrin Kempker, Republic Services
Date: 2-4-13
Sewer Meter Location: 3817 Mablevale Pike, Little Rock, AR 72202
Present Reading: 1,347,300 Date: 2-1-13
Previous Reading: (-) 1,138,688 Date: 1-2-13
Difference 208,612
Multiplier A x 1
Total Reported Flow: 208,612
Gallons
A Meter Reading Multiplier – If the meter has 1 fixed zero, the multiplier would be 10. If the meter has 2 fixed
zeros, the multiplier would be 100. If the readout is in actual gallons, report the multiplier as 1.
Send Report To: Little Rock Wastewater
Environmental Assessment Division
11 Clearwater Drive
Little Rock, Arkansas 72204
Attention: Allen Gatlin, Industrial Inspector
E-mail Report To: [email protected]
Fax Report To: (501) 688-1494 If you have any questions with this form, please contact the Environmental Assessment Division at 688-15??.
For Environmental Assessment Division Use Only:
Conversion to CCF:
Computed By:
Date:
Sewer Meter Report Form
Company: BFI Model Fill Landfill
Address: 3817 Mablevale Pike, Little Rock, AR 72202
Meter Reader’s Name: Danny Lloyd
Report Submitted By: Darrin Kempker, Republic Services
Date: 3-4-13
Sewer Meter Location: 3817 Mablevale Pike, Little Rock, AR 72202
Present Reading: 1,483,665 Date: 2-28-13
Previous Reading: (-) 1,347,300 Date: 2-1-13
Difference 136,365
Multiplier A x 1
Total Reported Flow: 136,365 Gallons
A Meter Reading Multiplier – If the meter has 1 fixed zero, the multiplier would be 10. If the meter has 2 fixed zeros, the multiplier would be 100. If the readout is in actual gallons, report the multiplier as 1.
Send Report To: Little Rock Wastewater Environmental Assessment Division 11 Clearwater Drive Little Rock, Arkansas 72204 Attention: Allen Gatlin, Industrial Inspector E-mail Report To: [email protected] Fax Report To: (501) 688-1494 If you have any questions with this form, please contact the Environmental Assessment Division at 688-15??. For Environmental Assessment Division Use Only:
Conversion to CCF: Computed By: Date:
Sewer Meter Report Form
Company: BFI Model Fill Landfill
Address: 3817 Mablevale Pike, Little Rock, AR 72202
Meter Reader’s Name: Danny Lloyd
Report Submitted By: Darrin Kempker, Republic Services
Date: 4-3-13
Sewer Meter Location: 3817 Mablevale Pike, Little Rock, AR 72202
Present Reading: 1,851,832 Date: 4-1-13
Previous Reading: (-) 1,483,665 Date: 2-28-13
Difference 368,167
Multiplier A x 1
Total Reported Flow: 368,167 Gallons
A Meter Reading Multiplier – If the meter has 1 fixed zero, the multiplier would be 10. If the meter has 2 fixed zeros, the multiplier would be 100. If the readout is in actual gallons, report the multiplier as 1.
Send Report To: Little Rock Wastewater Environmental Assessment Division 11 Clearwater Drive Little Rock, Arkansas 72204 Attention: Allen Gatlin, Industrial Inspector E-mail Report To: [email protected] Fax Report To: (501) 688-1494 If you have any questions with this form, please contact the Environmental Assessment Division at 688-15??. For Environmental Assessment Division Use Only:
Conversion to CCF: Computed By: Date:
1 of 6
1/4/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 242.71 25.63 2.6714 271.66 239.60 34.60 241.95 29.71 4.8918 266.34 240.79 25.55 243.08 23.26 2.29
20R 286.69 243.19 43.50 254.90 31.79 11.71 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2230824R 286.02 241.12 44.90 NA DRY NA 58324026R 290.06 242.44 47.62 NA DRY NA 99965627 266.22 242.99 22.68 246.42 19.8 2.8828 295.02 242.82 52.20 246.99 48.03 4.17
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 259.37 35.77 14.2330S 300.78 263.78 37.00 270.17 30.61 6.3930D 300.27 243.27 57.00 255.31 44.96 12.0431 299.68 246.58 53.10 249.05 50.63 2.4732 298.52 245.00 53.52 DRY NA DRY NA
1/11/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 243.08 25.26 3.0414 271.66 239.60 34.60 242.28 29.38 5.2218 266.34 240.79 25.55 243.30 23.04 2.51
20R 286.69 243.19 43.50 255.21 31.48 12.02 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2241924R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 246.69 19.53 3.1528 295.02 242.82 52.20 247.23 47.79 4.41
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 260.00 35.14 14.8630S 300.78 263.78 37.00 270.65 30.13 6.8730D 300.27 243.27 57.00 255.89 44.38 12.6231 299.68 246.58 53.10 249.36 50.32 2.7832 298.52 245.00 53.52 DRY NA DRY NA
BFI PIZ Readings1st Quarter 2013
PIZ Stroke Count
PIZ Stroke Count
2 of 6
1/24/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 245.24 23.10 5.2014 271.66 239.60 34.60 242.77 28.89 5.7118 266.34 240.79 25.55 245.21 21.13 4.42
20R 286.69 243.19 43.50 254.69 32.00 11.50 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2253224R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 19200027 266.22 242.99 22.68 246.68 19.54 3.1428 295.02 242.82 52.20 246.92 48.10 4.10
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 259.33 35.81 14.1930S 300.78 263.78 37.00 270.46 30.32 6.6830D 300.27 243.27 57.00 254.36 45.91 11.0931 299.68 246.58 53.10 249.07 50.61 2.4932 298.52 245.00 53.52 DRY NA DRY NA
2/1/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 245.12 23.22 5.0814 271.66 239.60 34.60 243.26 28.40 6.2018 266.34 240.79 25.55 245.09 21.25 4.30
20R 286.69 243.19 43.50 254.60 32.09 11.41 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2265424R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 245.69 20.53 2.1528 295.02 242.82 52.20 246.86 48.16 4.04
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 259.85 35.29 14.7130S 300.78 263.78 37.00 268.35 32.43 4.5730D 300.27 243.27 57.00 254.31 45.96 11.0431 299.68 246.58 53.10 248.98 50.7 2.4032 298.52 245.00 53.52 DRY NA DRY NA
PIZ Stroke Count
PIZ Stroke Count
3 of 6
2/7/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 244.53 23.81 4.4914 271.66 239.60 34.60 243.68 27.98 6.6218 266.34 240.79 25.55 244.36 21.98 3.57
20R 286.69 243.19 43.50 255.13 31.56 11.94 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2273524R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 246.91 19.31 3.3728 295.02 242.82 52.20 246.79 48.23 3.97
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 263.16 31.98 18.0230S 300.78 263.78 37.00 270.47 30.31 6.6930D 300.27 243.27 57.00 255.37 44.9 12.1031 299.68 246.58 53.10 249.11 50.57 2.5332 298.52 245.00 53.52 DRY NA DRY NA
2/13/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 243.73 24.61 3.6914 271.66 239.60 34.60 243.84 27.82 6.7818 266.34 240.79 25.55 245.29 21.05 4.50
20R 286.69 243.19 43.50 256.21 30.48 13.02 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2281424R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 246.26 19.96 2.7228 295.02 242.82 52.20 246.84 48.18 4.02
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 260.04 35.10 14.9030S 300.78 263.78 37.00 270.48 30.3 6.7030D 300.27 243.27 57.00 255.46 44.81 12.1931 299.68 246.58 53.10 249.62 50.06 3.0432 298.52 245.00 53.52 DRY NA DRY NA
PIZ Stroke Count
PIZ Stroke Count
4 of 6
2/22/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 244.82 23.52 4.7814 271.66 239.60 34.60 243.79 27.87 6.7318 266.34 240.79 25.55 245.32 21.02 4.53
20R 286.69 243.19 43.50 256.37 30.32 13.18 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2281424R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 247.01 19.21 3.4728 295.02 242.82 52.20 247.10 47.92 4.28
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 260.36 34.78 15.2230S 300.78 263.78 37.00 270.54 30.24 6.7630D 300.27 243.27 57.00 255.65 44.62 12.3831 299.68 246.58 53.10 249.87 49.81 3.2932 298.52 245.00 53.52 DRY NA DRY NA
3/1/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 245.42 22.92 5.3814 271.66 239.60 34.60 243.68 27.98 6.6218 266.34 240.79 25.55 245.40 20.94 4.61
20R 286.69 243.19 43.50 256.39 30.30 13.20 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2305924R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 247.03 19.19 3.4928 295.02 242.82 52.20 247.12 47.90 4.30
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 260.61 34.53 15.4730S 300.78 263.78 37.00 270.58 30.2 6.8030D 300.27 243.27 57.00 255.78 44.49 12.5131 299.68 246.58 53.10 249.95 49.73 3.3732 298.52 245.00 53.52 DRY NA DRY NA
PIZ Stroke Count
PIZ Stroke Count
5 of 6
3/7/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 244.54 23.80 4.5014 271.66 239.60 34.60 243.19 28.47 6.1318 266.34 240.79 25.55 244.76 21.58 3.97
20R 286.69 243.19 43.50 254.98 31.71 11.79 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2305924R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 245.86 20.36 2.3228 295.02 242.82 52.20 246.25 48.77 3.43
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 259.01 36.13 13.8730S 300.78 263.78 37.00 269.31 31.47 5.5330D 300.27 243.27 57.00 253.46 46.81 10.1931 299.68 246.58 53.10 249.57 50.11 2.9932 298.52 245.00 53.52 DRY NA DRY NA
3/21/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 245.10 23.24 5.0614 271.66 239.60 34.60 243.02 28.64 5.9618 266.34 240.79 25.55 245.50 20.84 4.71
20R 286.69 243.19 43.50 255.45 31.24 12.26 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2305924R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 247.08 19.14 3.5428 295.02 242.82 52.20 246.89 48.13 4.07
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 266.22 28.92 21.0830S 300.78 263.78 37.00 270.58 30.2 6.8030D 300.27 243.27 57.00 255.63 44.64 12.3631 299.68 246.58 53.10 248.94 50.74 2.3632 298.52 245.00 53.52 DRY NA DRY NA
PIZ Stroke Count
PIZ Stroke Count
6 of 6
3/28/2013Elev of Top Elev of Bottom Top of Pipe to Elev of H2O Level Distance to H2O Depth of H2O in
of Pipe of Well Bottom of Well from Top of Pipe Well13* 268.34 240.04 28.30 245.76 22.58 5.7214 271.66 239.60 34.60 243.77 27.89 6.7118 266.34 240.79 25.55 245.54 20.80 4.75
20R 286.69 243.19 43.50 255.51 31.18 12.32 4423 290.44 243.44 47.00 NA DRY NA
23 (4") 287.34 235.24 52.10 NA DRY NA 2305924R 286.02 241.12 44.90 NA DRY NA 58327026R 290.06 242.44 47.62 NA DRY NA 76727 266.22 242.99 22.68 246.31 19.91 2.7728 295.02 242.82 52.20 246.95 48.07 4.13
28 (4") 294.28 237.48 56.80 NA DRY NA 8226229S 295.11 266.11 29.00 NA DRY NA29D 295.14 245.14 50.00 258.22 36.92 13.0830S 300.78 263.78 37.00 270.58 30.2 6.8030D 300.27 243.27 57.00 255.70 44.57 12.4331 299.68 246.58 53.10 249.00 50.68 2.4232 298.52 245.00 53.52 DRY NA DRY NA
PIZ Stroke Count
1 of 4
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 23.77 3.732 269.10 241.60 27.50 244.93 23.92 3.583 269.22 241.22 28.00 244.94 24.38 3.624 275.47 237.77 37.70 242.55 30.89 6.815 275.32 235.62 39.70 239.09 31.82 7.886 275.27 235.57 39.70 239.11 30.63 9.077 269.54 238.54 31.00 242.20 26.49 4.518 269.96 238.36 31.60 242.16 26.24 5.369 269.25 243.25 26.00 245.86 23.79 2.21
10 269.43 240.43 29.29 244.72 25.69 3.6011 269.42 240.42 29.29 241.68 25.28 4.01
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 23.29 4.212 269.10 241.60 27.50 244.93 23.38 4.123 269.22 241.22 28.00 244.94 23.94 4.064 275.47 237.77 37.70 242.55 30.53 7.175 275.32 235.62 39.70 239.09 31.59 8.116 275.27 235.57 39.70 239.11 30.21 9.497 269.54 238.54 31.00 242.20 26.03 4.978 269.96 238.36 31.60 242.16 25.91 5.699 269.25 243.25 26.00 245.86 23.24 2.76
10 269.43 240.43 29.29 244.72 25.31 3.9811 269.42 240.42 29.29 241.68 24.93 4.36
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 21.12 6.382 269.10 241.60 27.50 244.93 21.31 6.193 269.22 241.22 28.00 244.94 22.92 5.084 275.47 237.77 37.70 242.55 29.64 8.065 275.32 235.62 39.70 239.09 29.21 10.496 275.27 235.57 39.70 239.11 28.11 11.597 269.54 238.54 31.00 242.20 23.29 7.718 269.96 238.36 31.60 242.16 23.81 7.799 269.25 243.25 26.00 245.86 23.22 2.78
10 269.43 240.43 29.29 244.72 23.28 6.0111 269.42 240.42 29.29 241.68 23.31 5.98
BFI Leachate MonitoringManholes
1st Quarter 2013
1/4/2013
1/11/2013
1/24/2013
2 of 4
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 20.97 6.532 269.10 241.60 27.50 244.93 21.13 6.373 269.22 241.22 28.00 244.94 21.04 6.964 275.47 237.77 37.70 242.55 28.57 9.135 275.32 235.62 39.70 239.09 27.52 12.186 275.27 235.57 39.70 239.11 28.32 11.387 269.54 238.54 31.00 242.20 24.13 6.878 269.96 238.36 31.60 242.16 24.42 7.189 269.25 243.25 26.00 245.86 23.70 2.30
10 269.43 240.43 29.29 244.72 23.71 5.5811 269.42 240.42 29.29 241.68 23.74 5.55
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 21.19 6.312 269.10 241.60 27.50 244.93 21.37 6.133 269.22 241.22 28.00 244.94 21.38 6.624 275.47 237.77 37.70 242.55 28.51 9.195 275.32 235.62 39.70 239.09 28.14 11.566 275.27 235.57 39.70 239.11 28.26 11.447 269.54 238.54 31.00 242.20 25.18 5.828 269.96 238.36 31.60 242.16 25.42 6.189 269.25 243.25 26.00 245.86 24.01 1.99
10 269.43 240.43 29.29 244.72 23.97 5.3211 269.42 240.42 29.29 241.68 23.98 5.31
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 21.86 5.642 269.10 241.60 27.50 244.93 21.04 6.463 269.22 241.22 28.00 244.94 20.16 7.844 275.47 237.77 37.70 242.55 27.81 9.895 275.32 235.62 39.70 239.09 26.66 13.046 275.27 235.57 39.70 239.11 27.57 12.137 269.54 238.54 31.00 242.20 25.19 5.818 269.96 238.36 31.60 242.16 25.50 6.109 269.25 243.25 26.00 245.86 23.52 2.48
10 269.43 240.43 29.29 244.72 23.49 5.8011 269.42 240.42 29.29 241.68 23.48 5.81
2/1/2013
2/7/2013
2/13/2013
3 of 4
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 20.58 6.922 269.10 241.60 27.50 244.93 20.63 6.873 269.22 241.22 28.00 244.94 20.76 7.244 275.47 237.77 37.70 242.55 28.56 9.145 275.32 235.62 39.70 239.09 28.00 11.706 275.27 235.57 39.70 239.11 27.39 12.317 269.54 238.54 31.00 242.20 23.47 7.538 269.96 238.36 31.60 242.16 23.75 7.859 269.25 243.25 26.00 245.86 23.17 2.83
10 269.43 240.43 29.29 244.72 23.22 6.0711 269.42 240.42 29.29 241.68 23.24 6.05
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 20.49 7.012 269.10 241.60 27.50 244.93 20.49 7.013 269.22 241.22 28.00 244.94 20.70 7.304 275.47 237.77 37.70 242.55 28.31 9.395 275.32 235.62 39.70 239.09 27.88 11.826 275.27 235.57 39.70 239.11 27.03 12.677 269.54 238.54 31.00 242.20 23.24 7.768 269.96 238.36 31.60 242.16 23.61 7.999 269.25 243.25 26.00 245.86 23.06 2.94
10 269.43 240.43 29.29 244.72 23.13 6.1611 269.42 240.42 29.29 241.68 23.20 6.09
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 22.03 5.472 269.10 241.60 27.50 244.93 21.84 5.663 269.22 241.22 28.00 244.94 22.16 5.844 275.47 237.77 37.70 242.55 28.92 8.785 275.32 235.62 39.70 239.09 28.61 11.096 275.27 235.57 39.70 239.11 29.70 10.007 269.54 238.54 31.00 242.20 25.11 5.898 269.96 238.36 31.60 242.16 25.42 6.189 269.25 243.25 26.00 245.86 24.20 1.80
10 269.43 240.43 29.29 244.72 24.13 5.1611 269.42 240.42 29.29 241.68 24.14 5.15
2/22/2013
3/1/2013
3/7/2013
4 of 4
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 20.94 6.562 269.10 241.60 27.50 244.93 21.13 6.373 269.22 241.22 28.00 244.94 21.80 6.204 275.47 237.77 37.70 242.55 30.62 7.085 275.32 235.62 39.70 239.09 29.44 10.266 275.27 235.57 39.70 239.11 29.14 10.567 269.54 238.54 31.00 242.20 22.97 8.038 269.96 238.36 31.60 242.16 23.74 7.869 269.25 243.25 26.00 245.86 23.19 2.81
10 269.43 240.43 29.29 244.72 23.26 6.0311 269.42 240.42 29.29 241.68 23.28 6.01
MH # Elev of Top of Elev of Bottom Top of MH to Elev of H2O Distance to H2O Depth of H2O inManhole of Manhole Bottom of MH in MH from Top of MH MH
1 268.84 241.34 27.50 244.85 20.68 6.822 269.10 241.60 27.50 244.93 20.88 6.623 269.22 241.22 28.00 244.94 21.45 6.554 275.47 237.77 37.70 242.55 29.61 8.095 275.32 235.62 39.70 239.09 28.69 11.016 275.27 235.57 39.70 239.11 28.01 11.697 269.54 238.54 31.00 242.20 21.94 9.068 269.96 238.36 31.60 242.16 22.98 8.629 269.25 243.25 26.00 245.86 22.40 3.60
10 269.43 240.43 29.29 244.72 22.44 6.8511 269.42 240.42 29.29 241.68 22.49 6.80
3/21/2013
3/28/2013