Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf ·...

21
Beyond the Pilot Cliff Henke, Senior Analyst, Transit and Rail WSP USA, Los Angeles Depot Considerations for a Transition to 100% ZEB Fleet

Transcript of Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf ·...

Page 1: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Beyond the Pilot

Cliff Henke, Senior Analyst, Transit and Rail

WSP USA, Los Angeles

Depot Considerations for a Transition to 100% ZEB Fleet

Page 2: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Outline

‒ Current Projects‒ Approach Strategies‒ Challenges‒ Lessons Learned‒ Q&A

Page 3: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Recent experience with

similar challenges

King County MetroABQRIDE

IndyGoMassDOT

King County MetroABQRIDELADOTMassDOTIndyGo

King County MetroABQRIDE

LADOTMassDOT

King County MetroLADOTMassDOTIndyGo

Page 4: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

ABQRIDE Transit Electric Bus Facility Impact Study

Challenge FACILITY MODIFICATION• Integrating into existing Ops & with

existing diesel / CNG fleet

Challenge POWER• Discussions w ABQ utilities• Primary vs Secondary Service

Bldg. Elec. Service

BEB Elec. Service

CNG Elec. Service

Page 5: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

40-Foot Battery Electric Bus Feasibility Study

MBTA North Cambridge Pilot –Configuration & Fleet Size: Phased Approach

‒ Existing (28) Electric Trolley Buses replaced by New (35) Battery Electric Buses

.. - . ·-~·--- ...

'''I>

Page 6: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

40-Foot Battery Electric Bus Feasibility Study

North Cambridge Pilot – Charging Infrastructure

‒ Infrastructure to support DC Automatic Overhead Plug-In Charging

By-P

ass L

ane

DC CONDUIT RUN

MOTORIZED CORD / RETRACTOR

CONDUIT SUPPORT RACK

r SWITCHGEAR

/ SWITCH

DISPENSER

CHARGING GUN

CHARGING { TRANSFORMER CORD

en / 32 BOLLARDS 0

a. A .

/ ' ' . If

-.:I' z 0 .:: ci5 0 a.

If=

C')

z 0 .:: ci5 0 a.

~

' If= I 'N./ Vlt H z

'''I>

Page 7: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

40-Foot Battery Electric Bus Feasibility Study

North Cambridge Pilot – Electrical Service

‒35-bus configuration‒1:1 ratio = 36 chargers @ 150 kW‒5,250 kVA total capacity needed‒Electrical yard

‒ 2 @5000 kVA transformers and switches

‒ 8 low voltage switchgear cabinets

>

/

32 BOLLARDS

A .

/ ' , . >· •

2SETS OF 5,000 KVA TRANSFOR~ER AND

<)/ SWITCH ~

/ -- ~ I ~ I W I (!) i.1:r: I (.) 1,~ II ~ lo Cl)

I = ...J-:

'''I>

Page 8: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

40-Foot Battery Electric Bus Feasibility Study

North Cambridge Pilot – Charging Technology

DC Automatic Overhead Plug-In Charging System‒ 1:1 Charger per Bus‒ 150 kW Charging Cabinet‒ 3.2 Hours for full charge ‒ (assume zero SOC)‒ Could also support

overhead pantograph‒ CCSI SAE Level 2 / 3 J1772

plug / port standard‒ Multi BEB OEM & Mnuf’s

:'.:haln l.Slk Fence

Charger

Concrete Pad Pavement

UnlSlrut

Conduit Support Rack Column

DC Charging -­Conduit Rlse111

UG Eleollcll Duct Bank

Conduit Support Rack Beam DC Charging Conduit

Charging Cord and Gun

Charging Port

'''I>

Page 9: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

40-Foot Battery Electric Bus Feasibility Study

North Cambridge – Charge Cord Management

‒ Infrastructure to support DC Automatic Overhead Plug-In Charging

I-

' ~ I Cl i:i:i :c ti) :)

• Ill

~ ~ - ::. 0 t ~ I--w I ::. :) I 1/.) ti)

< I I

DC HORIZONTl>J. RIM

iD

~

... ;.,

CONDUIT SlJP PORT RAO<COUJ ....

DISPEN SER

110V

NEMA MATIER PROOF ENCI.OSURE

'''I>

Page 10: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Optimized Parking Layout

ZEB Charging Connection

Capital Costs Utility Back-Up

Sustainability Options

Facility Schedule, Strategy for Metro Divisions 8 & 9

TRACK BUS PARKING

LA Metro Bus Division 9OPS

BUSPARKING CAR

PARKING

BUSPARKING

WASH FUEL

CNG

MAIN

TENA

NCE

SANT

A AN

A AV

E

SAN BERNARDINO FWY

CANOGA AVE

LA Metro Bus Division 8NO

RDHO

FF S

TALABAMA AVE

OPS

WASH

FUEL

MAINTENANCE PRAI

RIE

ST

CNG

BUSPARKING

Page 11: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Scalability Increases Complexity Exponentially

• Technology assessments• Current & planned route evaluation• Facilities assessment• Disposal & recycling, tailpipe emissions,

utility emissions and noise

• Equity considerations• Benefit-cost analysis• Budgetary and funding analysis• Replacement scenarios and sensitivity

tests

King County Metro(largest to date)

LA County Metro

Fleet ~ 1,200 ~2,400Make New Flyer, Gillig, Proterra NABI, New Flyer, El Dorado Nat., BYDBus Engine Diesel, Hybrid, Electric, BEB CNG, rCNG, BEBBus sizes 30’, 35’, 40’ 60’ 40’, 45’, 60’Garages 7 11Utilities 2 2Energy Sources hydroelectric, coal natural gas, other renewables

Other Electric Transit

light rail, streetcar, monorail, trolleybus heavy rail, light rail

Examples of needed technical analyses:

Page 12: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Thank You

Page 13: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Potential Q&A Slides

Page 14: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Battery-Electric Bus Infrastructure

Charger

(HxWxD)

Charger

WeightDispenser (HxWxD)

Max Dist

Charger to

Dispenser

Max Dist

Dispenser to

Gun

Dispensers

per Charger

ABB 150 kW 80" x 46.1" x 30.4" 2948 lbs 31.5" x 23.7" x 8.3" 492' 22.9' 1:1 thru 1:3

ChargePoint

156 kW 43" x 40" x 75" 860 lbs 20" x 10" x 16" 330' 30' 1:1 thru 1:2

Proterra 125

kW 72" x 40" x 23.6" 2,500 lbs 26.5" x 15.75" x 8.5" 492' 25' 1:01

Denotes worst case scenario

- Flexibility in Charge Equipment

- Flexibility in Charger Use

I

--------

•••••••••• •••••••••• •••••••••• ••• • •• ::: ... ••• • •• :i:i:::=== • • •• • :::••- ... •••••••••• ••• •••••• ••• • •• ••• • •• ••• • •• ••••• ••• •••••••••• •••••••••• •••••

Charging Port on BEB Charging Gun on end of Dispenser Cord

Depot overhead pantograph ~

Bus roof mounted

charging bar -- • •

'''I>

Page 15: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Systems Integration

Training

Transition Plans

Best Industry Practices

Fleet Conversion

Back Shop Re-purpose

Maintenance Practices

Parts Inventory

Route Changes

Passenger Capacity

Travel Distance

Modeling

Contingency Plans

Performance

Training

Reliability

Availability

Maintenance Needs

Facility Upgrades

Power Upgrades

Charging Strategies

Space Constraints

Regulations

Staging

Energy Capacity

Right of Way

InfrastructureNeeds

Operations Needs

Page 16: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

How to be aggressive

in the face of

challenges?

vv

Leveraging experience

Partnering with suppliers and stakeholders

Anticipating the unknowns

Page 17: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Bus OEM: ProterraBattery Size: 550 kWh

Example 2

Modeling Capabilities

PROTERRA

PROTERRA

Winter, plug-in

Block# Routes Involved Block Length

StartTime End Time Bus OEM Battery (kWh) End SOC (KM/Miles)

C43-255 43 115/71.5 4:44AM 8:33 PM Proterra 550 ir-- ,. 9,9%

~ --··-------·---------------------------·---------·-----------~

Page 18: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Example 4

Modeling Capabilities

aoo_o

600_0

4000

2000

00 • I day hours

Halifax

Bus · BYD-1 Battery : BYD-1

7,000

6,000

5,000

4,000

3,000

Energy usage on Fleet {considering battery working ability) Season: Summer AC· YES

HEAT NO

day hours

Page 19: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

U.S TRANSIT BUSES: A UNIQUE “BUILD TO ORDER” MARKET

• Buy America and Altoona Requirements Unique in the World• Rapid Pace of Change• Each order custom

• Pilot bus• Wiring scheme different• Major components evolve lot by lot

• Time to market now 2-3 years• Big reason why OEMs are financially

fragile

“And now you want what?”

Page 20: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

VEHICLE PARTNERSHIP APPROACH

§ Tailored Design Criteria that Meet the T’s Service Needs

§ Healthy Skepticism of Advanced Propulsion Technology

§ Specification and Procurement Milestones§ Design Reviews and Testing§ Delivery Scheduling§ Manufacturing Partnerships but with

Oversight§ Inspections, Testing and Commissioning§ Do Not Forget Warranty and Field

Service Requirements

Page 21: Beyond the Pilot - ZEB Conferencezebconference.com/wp-content/uploads/2018/04/2_Henke-Final.pdf · 02-04-2018  · 40-Foot Battery Electric Bus Feasibility Study North Cambridge Pilot

Balancing KeyCHALLENGES

INSTITUTIONAL Workforce Development

Safety/TrainingFunding/Financing

Other Initiatives

CHANGE MANAGEMENT Blended O&M Needs

Future-Proofing Technology Development

Dealing with Planned Program Changes ASSETS

Supply ChainTechnology Phasing Systems Integration

Procurement