Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the
Mekong
Prashanth ParameswaranPresentation to Hitachi Center for Technology Colloquium10/19/2011
![Page 2: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/2.jpg)
Agenda
• Overview • Method• Key Findings & Recommendations
![Page 3: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/3.jpg)
Overview
![Page 4: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/4.jpg)
The Mekong In Peril?• Rapidly growing energy demand
and regional connectivity in the Mekong region (GMS, ASEAN)
• Hydropower projects affect Mekong River, which sustains over 60 million people
• How to reconcile economic development with social and environmental imperatives?
• Is Nam Theun 2 (NT2) in Laos a “model project” in this regard as touted by WB and ADB?
![Page 5: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/5.jpg)
Nam Theun 2 in Laos• First conceived 1980s, delayed
until construction in 2005-2010• Largest private sector cross-
border power project ($, 2005)• Over US$2 bn revenues to GOL
in 25 yrs(7-9% budget)• Part of GOL plan to become
“battery of Southeast Asia” despite poor dam record (90s)
• One party, authoritarian, corrupt government
![Page 6: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/6.jpg)
Method
![Page 7: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/7.jpg)
Project Structure
• Combination of secondary research and 19 interviews covering most Mekong countries
• April – May 2011: Trip preparation• May – Mid-July 2011: Internship at Singapore’s
Energy Market Authority (EMA) • Mid July – Sept 2011: Interviews and research in
Thailand, Vietnam, Laos, Cambodia• Sept – Dec 2011: Produce articles/present findings• Dec 2011 – January 2012: Second phase of
research focusing on GMS and ASEAN Connectivity
![Page 8: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/8.jpg)
Selected Interviewees
• Energy Studies Institute, Singapore• Diplomatic Academy of Vietnam• Mekong River Commission • Cambodian Trade Ministry • Nam Theun 2 Power Company, Laos• Chulalongkorn University, Thailand• International Rivers • Mae Fah Luang University, Thailand• Former WB & ADB consultants• EarthRights International
![Page 9: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/9.jpg)
Key Findings & Recommendations
![Page 10: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/10.jpg)
Key Findings: NT2 as a Model?
Yes No
Revenue Management Resettlement Plan
Stakeholder Consultation Lack of Contingency Planning
Transparency in Process Declining Bank Leverage vs. New Actors
![Page 11: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/11.jpg)
RecommendationsActor Recommendation
Laos Strengthen WREA for project monitoring
Laos Independent review of dam assessments
WB/ADB Need to increase leverage post-construction
WB/ADB Focus more on project asymmetries
New Hydro Developers Adopt international best practice standards
![Page 12: Beyond Damnation: Nam Theun 2 and The Future of Hydropower in the Mekong](https://reader036.fdocuments.us/reader036/viewer/2022062520/56816585550346895dd83285/html5/thumbnails/12.jpg)
The End